Pretreatment pond for rainwater regulation and storage
By designing a concave pond body and a pretreatment pond with a combined gabion structure in the rainwater regulation and storage system, the problem of excessive water storage overflow and retention caused by excessive rainfall in the rainy season has been solved, and efficient purification and stable treatment of rainwater have been achieved. Improved the system's flood resistance and ecological environment protection.
Patent Information
- Application Number
- CN202420195737.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-26
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-01-26
AI Technical Summary
The front pond of the existing rainwater regulation and storage system is prone to excessive water storage overflow and surface runoff water retention when there is heavy rainfall in the rainy season, resulting in functional failure.
A pretreatment pond for rainwater regulation and storage is designed. It adopts a concave pond structure. There is a water outlet connected to the downstream water body and a water distribution gabion wall on the side slope. The top height of the water distribution gabion wall is the same as the highest When the water level is the same, a gabion layer is laid on the side slope, and an overflow overflow port and a slow-flow gabion are set up in the pond body. The combined structure of the water passing distance and the slow-flow gabion is used to control the water flow speed and purify rainwater.
Effectively remove large particle pollutants, reduce the risk of urban flooding, improve flood resistance, avoid water pollution, achieve self-drainage, self-purification and self-consumption, ensure system stability and safety, and reduce erosion through vegetation buffer zones to maintain ecology environment.
Smart Images

Figure CN221788511U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a pretreatment pond for rainwater regulation and storage, belonging to the technical field of environmental protection. Background Art
[0002] The pre-pond (or pre-treatment pond) in the rainwater storage system is a pre-treatment facility of the rainwater storage system, which is mainly used to precipitate large particle pollutants in rainwater runoff. For example, the utility model patent CN207660075U discloses a sponge city pre-pond, including a stepping road, a water tank arranged downstream of the stepping road, and a terrestrial vegetation area arranged between the stepping road and the pond; the middle part of the stepping road includes a water collection section, a plurality of zigzag water flow holes are opened on the top of the water collection section, and an energy dissipation and sedimentation area is provided downstream of the water collection section. The energy dissipation and sedimentation area includes a plurality of energy dissipation landscape stones arranged in a surrounding shape based on the water collection section, and a pebble layer laid in the area surrounded by the energy dissipation landscape stones and the water collection section; the pond is a pit-shaped structure with high sides and low middle, and the bottom surface of the pond is an aquatic plant layer, and the bark covering layer, improved soil layer, coarse sand cushion layer, permeable non-woven fabric layer and thick gravel layer are arranged from top to bottom below the aquatic plant layer, and the original soil layer is below the thick gravel layer. The pre-pond divides the water inlet area into several small water bodies, each of which has an ecological purification function, which is purified step by step, and finally reduces the rainwater pollution entering the main water body. It is ecologically sustainable, low-cost and easy to construct. For another example, the utility model patent with the publication number CN212387809U discloses a multi-level rainwater overflow wetland system based on a pre-pond, including a rainwater pre-pond, several levels of rainwater retaining walls and slope protection; the rainwater pre-pond is a concave pond structure, the slope protection is set in the outlet area of the river channel, and several levels of rainwater retaining walls are built from the rainwater pre-pond to the slope protection along the slope direction; each level of rainwater retaining wall includes a retaining wall body, a pedestrian stepping stone and a surface flow wetland, and the retaining wall body, the pedestrian stepping stone and the surface flow wetland are built in sequence along the water flow direction, the upper end of the retaining wall body of the first level of rainwater retaining wall is set flush with the edge of the rainwater pre-pond, and the lower end of the surface flow wetland of the last level of rainwater retaining wall is set flush with the high end of the slope protection. The system divides the slope terrain by building multi-level rainwater retaining walls to form a stepped terrain, and through a series of biological and physical effects, it achieves the purpose of purifying and storing surrounding rainwater, absorbing rainwater runoff, and beautifying the landscape environment.
[0003] The above-mentioned pre-ponds used in the rainwater storage system can effectively absorb and purify rainwater runoff, but they still have a common limitation: they can only process rainwater within the system's absorption capacity. When there is heavy rainfall in the rainy season and the amount of water entering the pre-pond is too large, it is easy to cause the water storage in the pre-pond to exceed the limit and overflow, and the surface runoff is retained and accumulated, causing the pre-pond function to fail. Utility Model Content
[0004] In order to overcome the above-mentioned defects of the prior art, the utility model provides a pretreatment pond for rainwater storage, which can not only precipitate and purify the rainwater entering the pond, but also quickly guide the incoming water into the downstream water body or surrounding rivers when the incoming water volume is too large, so as to avoid stagnation and overflow.
[0005] The utility model realizes the above-mentioned purpose through the following technical scheme: a pretreatment pond for rainwater regulation and storage, a water outlet (or water outlet channel) connected with a downstream water body is arranged on its side slope, a water distribution gabion wall is arranged in the water outlet in a horizontal direction (referring to a direction perpendicular or approximately perpendicular to the water outlet direction), the top surface height of the water distribution gabion wall is the same as the highest water level height of the pretreatment pond, and a gabion layer is laid on the side slope.
[0006] The pretreatment pond is a concave pond structure (or pit-shaped structure), and its highest water level is higher than the highest water level of the downstream water body (such as a stream or pond).
[0007] Preferably, the slope of the side slope is 1:2-1:1.
[0008] Furthermore, the slope of the slope is 1:1.5.
[0009] Preferably, the bottom of the pretreatment pond slopes downward from the direction opposite to the water outlet toward the direction where the water outlet is located.
[0010] Preferably, the slope of the pond body is 0.5%.
[0011] Preferably, the pond bottom is paved with a silt layer.
[0012] Preferably, the pretreatment pond is provided with a water inlet pipe connected to the urban rainwater drainage system.
[0013] Preferably, the height of the drain outlet of the water inlet pipe is not lower than the top surface height of the water distribution gabion wall, and is usually the same as the top surface height of the water distribution gabion wall.
[0014] Preferably, the drain outlet is arranged on the opposite side slope of the water outlet.
[0015] Preferably, an over-limit overflow port (or over-limit overflow channel) connected to the surrounding river channel is provided on the slope, and an over-limit overflow weir is provided in the over-limit overflow port, and the top surface height of the over-limit overflow weir is the same as the top surface height of the water distribution gabion wall.
[0016] Preferably, the cross-section of the over-limit overflow weir is trapezoidal, and the slope of the water-facing surface is smaller than the slope of the water-receiving surface.
[0017] Furthermore, the slope of the upstream surface of the over-limit overflow weir is 1:0.3-1:0.2, and the slope of the downstream surface is 1:0.2-1:0.1.
[0018] Preferably, an over-limit overflow dry creek and / or a vegetation buffer zone is provided between the over-limit overflow outlet and the surrounding river channel.
[0019] Preferably, the water distribution gabion wall is composed of water distribution gabions arranged in rows, and the water distribution gabions are divided into multiple groups along the arrangement direction (lateral direction or extension direction of the water distribution gabion wall), and water-passing spaces (or water-passing openings) are left between adjacent water distribution gabion groups.
[0020] The widths of the water-passing spacings (the widths in the transverse direction or in the extending direction of the water distribution gabion wall) may be the same or different. Preferably, the widths of the water-passing spacings are the same.
[0021] Preferably, the number of water distribution gabions in the water distribution gabion group is one or more.
[0022] Preferably, the lengths of the water distribution gabion groups in the arrangement direction are the same, that is, the number of water distribution gabions in the water distribution gabion groups is the same.
[0023] Preferably, a slow-flow gabion is provided in the water-passing spacing, and the side walls of the slow-flow gabion (the side walls along the extension direction of the water distribution gabion wall) are respectively tightly attached to the side walls of the water distribution gabion on the corresponding sides, the top surface height of the slow-flow gabion is lower than the top surface height of the water distribution gabion, and the particle size of the built-in stone of the slow-flow gabion is larger than the particle size of the built-in stone of the water distribution gabion.
[0024] The water distribution gabion and the slow-flow gabion are both composed of cage nets and pebbles filled therein. The pebbles built into the water distribution gabion are usually pebbles with a particle size of 60-80 mm, and the pebbles built into the slow-flow gabion are usually pebbles with a particle size of 80 mm-150 mm.
[0025] The beneficial effects of the utility model are:
[0026] (1) The utility model has the function of retaining and slowing down the flow rate of incoming water (mainly rainwater discharged from cities), which can not only absorb urban rainwater, reduce the risk of urban waterlogging, and improve the city's flood resistance, but also effectively remove large particle pollutants in the incoming water by sedimentation, purify the water quality, and avoid polluting the water body after entering the river. When the incoming water enters the pond body, it first contacts the gabion layer, and then slowly flows into the pond bottom after dissipating energy through the gabion layer, which can effectively reduce the scouring of the slope and bottom of the pond body by the incoming water;
[0027] (2) Due to the setting of the water-passing spacing on the wall of the water distribution gabion wall, the water can be filtered and purified through the water-permeable function of the water distribution gabion, and when the amount of water is too large, the water can pass through the water-passing spacing quickly to avoid being retained in the pond. By flexibly setting the number and width of the water-passing spacing, the amount of water passing and the direction of the water in a unit time can be effectively controlled to achieve reasonable water distribution to the downstream;
[0028] (3) Due to the setting of slow-flow gabions within the water-passing interval, the water distribution gabion wall can treat the incoming water in different ways according to the different water volumes, while filtering and purifying the incoming water to the maximum extent and preventing the incoming water from being retained in the pond. When the water level in the pond is lower than the top height of the slow-flow gabions, the incoming water flows through the water distribution gabions and slow-flow gabions by infiltration, slowing down the incoming water and dissipating its energy, and filtering and purifying it. Since the stone particle size in the slow-flow gabions is larger than that in the water distribution gabions, the incoming water flows through the slow-flow gabions. The water flow velocity in the cage will be greater than the water flow velocity flowing through the water distribution gabion, so that it can filter and purify all the incoming water while reducing the incoming water to the greatest extent, and control the water level in the pond. When the water level in the pond is higher than the top surface height of the slow-flow gabion, the water above the top surface height of the slow-flow gabion will quickly flow to the downstream water body through the water-passing gap (referring to the water-passing gap above the slow-flow gabion), so that the water level in the pond is restored to below the top surface height of the slow-flow gabion as quickly as possible, thereby achieving filtration and purification of the incoming water;
[0029] (4) Since a low wall-like energy dissipation slope foot composed of gabions is set at the foot of the slope on the water outlet side of the pond body, it can not only bear the strong impact of the water flow here and improve / ensure the stability of the slope, but also the water-facing surface of the low wall is basically perpendicular to the bottom surface of the pond body (pond bottom), that is, perpendicular to the fast water flow that flows rapidly into the pond bottom along the slope on the water inlet side when the rain is heavy, and water can enter the gaps in the gabions, which can effectively dissipate the energy of the fast water flow;
[0030] (5) The utility model can self-drain, self-purify and self-absorb rainfall within the designed absorption capacity range. For rainfall exceeding the absorption capacity range (sudden situations such as heavy rainstorms), it can be discharged by overflow to ensure its own stability and safety. Dry streams and / or vegetation buffer zones are set up on the discharge path of the overflow to reduce the scouring of water flow, and the overflow rainwater is precipitated and purified to ensure the purification effect of rainwater and protect the ecological environment.
[0031] (6) Under normal conditions, the oxygen content of the raw water entering the pond is relatively high. It flows into the pond along the inlet side slope and enters the pond bottom, which can increase the oxygen content of the water at the bottom of the pond and avoid turbidity and odor due to lack of oxygen at the bottom. The pond effluent with low oxygen content can be efficiently reoxygenated when flowing through the water distribution gabion wall, over-limit overflow weir, vegetation buffer zone and the inlet side slope of the river channel, thereby increasing the oxygen content in the river channel, helping to maintain an aerobic biochemical environment, improving the purification effect and eliminating odor. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic cross-sectional structure diagram of an implementation mode of the utility model;
[0033] Figure 2 It is a schematic cross-sectional structure diagram of another implementation mode of the utility model (with a low wall-shaped energy dissipation slope foot);
[0034] Figure 3 It is a top view of an implementation method of the utility model with an over-limit overflow function;
[0035] Figure 4 It is a schematic diagram of the cross-sectional structure of the over-limit overflow weir of the utility model;
[0036] Figure 5 It is a structural schematic diagram of an implementation method of the water distribution gabion wall of the utility model;
[0037] Figure 6 yes Figure 5 A schematic diagram of a top view structure;
[0038] Figure 7 It is a structural schematic diagram of a second embodiment of the water distribution gabion wall of the utility model;
[0039] Figure 8 yes Figure 7 A schematic diagram of a top view structure;
[0040] Fig. 9 It is a top view structural schematic diagram of a third embodiment of the water distribution gabion wall of the utility model;
[0041] Fig.10 It is a top structural schematic diagram of a fourth implementation mode of the water distribution gabion wall of the utility model. DETAILED DESCRIPTION
[0042] See also Figure 1 and Figure 2 The utility model discloses a pre-treatment pond for rainwater regulation and storage, which is an urban rainwater collection facility (or pre-pond) of a rainwater regulation and purification system. The pre-treatment pond is a concave pond structure (or a pit-shaped structure), and its highest water level is higher than the highest water level of a downstream water body (such as a stream or a pond, etc.). A water outlet (or a water outlet channel) connected to the downstream water body is arranged on its slope. The water outlet is usually formed by excavating downward from the top of the slope or reserved when the slope is constructed. A water distribution gabion wall 1 is arranged in the horizontal direction (referring to a direction perpendicular or approximately perpendicular to the water outlet direction) inside the water outlet for distributing rainwater flowing from the pre-treatment pond to the downstream water body. The top surface height of the water distribution gabion wall is the same as the highest water level height of the pre-treatment pond, so that the rainwater stored in the pre-treatment pond can flow into the downstream water body before reaching the highest water level, thereby preventing the rainwater stored in the pre-treatment pond from exceeding the highest water level and overflowing.
[0043] The pretreatment pond is provided with an inlet pipe connected to the city's municipal rainwater drainage system. The drainage pipe (external drainage pipe) of the city's municipal rainwater drainage system can also be connected to the pretreatment pond as the inlet pipe of the pretreatment pond, which is used to discharge urban rainwater into the pretreatment pond. The height of the drainage port 2 of the inlet pipe is usually not lower than the top surface height of the water distribution gabion wall (that is, not lower than the highest water level of the pretreatment pond) to avoid backflow of rainwater in the pretreatment pond. The height of the drainage port of the inlet pipe is preferably the same as the top surface height of the water distribution gabion wall to minimize the scouring of the slope of the pretreatment pond by the incoming water.
[0044] The drainage outlet of the water inlet pipe preferably adopts a drainage outlet with gradually expanding inner diameter or an eight-shaped drainage outlet, which is used for dissipating energy of incoming water to reduce scouring of the slope of the pretreatment pond.
[0045] The slope of the side slope is usually 1:2-1:1, preferably 1:1.5, to ensure its water storage capacity, and its total volume usually accounts for 10%-15% of the storage volume of the rainwater storage and purification system.
[0046] The slope and bottom of the pretreatment pond are compacted with local soil. After the slope is compacted, a gabion layer (constituting a gabion revetment) 3 is preferably laid. The gabion layer covers the slope of the pretreatment pond. The gabions of the gabion layer preferably have blocks of stone inside, and the particle size of the blocks of stone is preferably 30-50 cm. The water from the urban municipal rainwater drainage system first contacts the gabion layer, and then slowly flows into the bottom of the pond after dissipating energy through the gabion layer, further reducing the scouring of the slope and bottom of the pre-pond by the water.
[0047] The bottom of the pretreatment pond is preferably inclined downward from the opposite side of the water outlet toward the direction where the water outlet is located, and the inclination slope is preferably 0.5%, which helps the rainwater in the pre-pretreatment pond to flow toward the downstream water body. The pond bottom is preferably paved with a silt layer 4, which can not only slow down the water flow speed, but also help rainwater filtration. The laying height of the silt layer is usually 0.4-0.6m, preferably 0.5m. Under the gradual scouring of the water flow in the pretreatment pond, the top surface of the silt layer forms a slope that is the same or similar to that of the bottom of the pretreatment pond. The bottom surface height of the water distribution gabion wall (referring to the bottom surface height of the part located above the slope or the ground) is higher than the top surface height of the silt layer.
[0048] The drainage outlet of the water inlet pipe is preferably arranged on the opposite side slope of the water outlet. According to actual needs, a low wall-like energy dissipation slope foot 5 (such as a stone cage) formed by the pretreatment pond (especially the pretreatment pond with a rapid water flow in rainy days) can be set at the foot of the water outlet side slope. Figure 2As shown in the figure), it plays the role of force dissipation / energy dissipation and slope protection at the foot of the slope. The water-facing surface (the side facing the pond) of the low wall-shaped force dissipation slope foot is a vertical surface, which is perpendicular to the horizontal plane projection direction of the outflow water flow. The height of the low wall-shaped force dissipation slope foot can be set according to the force dissipation demand and take into account the landscape effect. It can usually be slightly lower than half of the outlet height of the pretreatment pond (relative to the bottom of the pretreatment pond), for example, one third or one quarter of the outlet height of the pretreatment pond.
[0049] See also Figure 3 and Figure 4 The slope is provided with an over-limit overflow port (or over-limit overflow channel) connected to the surrounding river channel. The over-limit overflow port is provided with an over-limit overflow weir 6 for overflow when the water level in the pre-treatment pond exceeds the limit. The top surface height of the over-limit overflow weir is the same as the top surface height of the water distribution gabion wall, which can not only prevent the over-limit water in the pre-treatment pond from flowing to the downstream water body 7 due to the top surface height of the over-limit overflow weir being higher than the top surface height of the water distribution gabion wall, but also prevent the water in the pre-treatment pond from being discharged through the over-limit overflow weir due to the top surface height of the over-limit overflow weir being lower than the top surface height of the water distribution gabion wall. An over-limit overflow dry stream 8 and / or a vegetation buffer zone 9 are preferably provided between the over-limit overflow port and the surrounding river channel to filter and purify the over-limit overflow rainwater.
[0050] The cross section of the over-limit overflow weir is preferably trapezoidal, and the slope of the water-facing surface is smaller than the slope of the water-receiving surface. The water-facing surface slope of the over-limit overflow weir is usually 1:0.3-1:0.2, preferably 1:0.25, and the water-receiving surface slope is usually 1:0.2-1:0.1, preferably 1:0.1, which can effectively block the water in the pond and quickly overflow when the water in the pond exceeds the limit.
[0051] The over-limit overflow weir is provided with a foundation, which preferably includes a plain soil layer 10, a graded crushed stone layer 11 and a concrete layer 12 from bottom to top, wherein the plain soil layer is formed by compacting local plain soil, and the compaction coefficient is not less than 0.93, so as to improve the bearing capacity, the thickness of the graded crushed stone layer is preferably 200 mm, and the concrete layer is C20 plain concrete, and the thickness is preferably 200 mm, so as to enhance the bearing capacity of the foundation.
[0052] The over-limit overflow weir may be a concrete-filled stone retaining wall to ensure structural strength.
[0053] See also Figure 5-Figure 10The water distribution gabion wall is composed of water distribution gabions 101 arranged in rows. The water distribution gabions are divided into multiple groups along the arrangement direction (horizontally or in the extension direction of the water distribution gabion wall). There are water-passing spacings (or water-passing openings) 102 between adjacent water distribution gabion groups. In this way, the water distribution gabion wall can not only filter and purify the incoming water through the water-permeable function of the water distribution gabion, but also quickly pass the incoming water through the water-passing spacing when the incoming water volume is too large to avoid being retained in the pond body. By flexibly setting the number and width of the water-passing spacings, the amount of water passing and the direction of the incoming water in a unit time can also be effectively controlled to achieve reasonable water distribution downstream.
[0054] The water outlet can also be arranged in other suitable ways, for example, the water distribution gabion wall is built by displacing the water distribution gabions up and down. After the water distribution gabion wall is built and stabilized, part of the water distribution gabions in the middle of the wall are removed to form the water outlet.
[0055] The widths of the water-passing spaces (the widths in the horizontal direction or in the extending direction of the water distribution gabion wall) can be the same or different. The widths of the water-passing spaces are preferably the same so that the water flow of the water-passing spaces is the same, which is convenient for water distribution management and control.
[0056] The number of water distribution gabions in the water distribution gabion group can be one or more. The specific number can be determined according to the number of water-passing spacings set according to the local rainwater storage demand. When the water distribution gabion wall includes multiple layers of water distribution gabions, the water distribution gabions of the water distribution gabion group can be one vertical row or several vertical rows.
[0057] The water distribution gabion groups preferably have the same length in the arrangement direction, that is, the number of water distribution gabions in each water distribution gabion group is the same, so that the spacing between adjacent water-passing spacings is the same, which is both beautiful and can ensure uniform water distribution downstream, facilitating management and control.
[0058] The water distribution gabions constituting the water distribution gabion wall may be arranged in a single row or in multiple rows (arranged in multiple rows along the front-to-back direction or the water flow direction). When arranged in multiple rows, adjacent rows of water distribution gabions may be arranged in any of the following ways:
[0059] (1) The adjacent rows of water distribution gabions are closely attached to each other (along the water flow direction), and the water-passing distances of the adjacent rows of water distribution gabions are aligned front to back. This arrangement is equivalent to increasing the width of the water distribution gabion wall in the front-to-back direction, improving the structural strength, and enhancing the impact resistance and stability;
[0060] (2) If Fig. 9As shown, there is a gap between adjacent rows of water distribution gabions, and the water-passing gaps of adjacent rows of water distribution gabions are aligned front and back. In this way, when the incoming water passes through the water-passing gap of the front row of water distribution gabions in the adjacent rows of water distribution gabions, it will stay and accumulate briefly in the space between the front and rear rows of water distribution gabions to dissipate energy and reduce speed.
[0061] (3) If Fig.10 As shown, there is a spacing between adjacent rows of water distribution gabions, and the water-passing spacings of adjacent rows of water distribution gabions are staggered (staggered along the extension direction of the water distribution gabion wall). With this arrangement, the stored water in the pretreatment pond will form a deflection when passing through the water-passing spacings of each row of water distribution gabions and will stay and accumulate briefly in the space between adjacent rows of water distribution gabions, thereby effectively dissipating energy and slowing down the incoming water flowing through the water-passing spacing to the downstream water body, thereby reducing the scouring of the slope and bottom of the downstream water body.
[0062] A slow-flow gabion 103 is preferably provided in the water-passing spacing, which is used to slow down the flow velocity of water flowing through the water-passing spacing and filter and purify the flowing water. The side walls of the slow-flow gabion (the side walls along the extension direction of the water distribution gabion wall) are respectively closely attached to the side walls of the water distribution gabion on the corresponding sides, the top surface height of the slow-flow gabion is lower than the top surface height of the water distribution gabion, and the particle size of the built-in stone of the slow-flow gabion is larger than the particle size of the built-in stone of the water distribution gabion. With such arrangement, the water distribution gabion wall can treat the incoming water in different ways according to the different water volumes, and avoid the incoming water from being retained in the pretreatment pond while filtering and purifying the incoming water to the maximum extent. When the water level in the pretreatment pond is lower than the top surface height of the slow-flow gabion, the incoming water flows through the water distribution gabion and the slow-flow gabion by infiltration, slowing down the incoming water and dissipating energy, and filtering and purifying the incoming water. Since the stone particle size in the slow-flow gabion is larger than that in the water distribution gabion, the water flow velocity flowing through the slow-flow gabion will be greater than that of the flow The water flow speed through the water distribution gabion can filter and purify all the incoming water while reducing the incoming water to the greatest extent, thereby controlling the water level in the pretreatment pond; when the water level in the pretreatment pond is higher than the top surface height of the slow-flow gabion, the water in the pretreatment pond that is higher than the top surface height of the slow-flow gabion will quickly flow to the downstream water body through the water pass gap (referring to the water pass gap above the slow-flow gabion), so that the water level in the pretreatment pond is restored to below the top surface height of the slow-flow gabion as quickly as possible, thereby achieving filtration and purification of the incoming water.
[0063] The height of the slow-flow gabion (referring to the height above the ground) can be 1 / 2 or 2 / 3 of the height of the water distribution gabion (referring to the height above the ground).
[0064] The water distribution gabion and the slow-flow gabion are both composed of cage nets and pebbles filled therein. The pebbles built into the water distribution gabion are usually pebbles with a particle size of 60-80 mm, and the pebbles built into the slow-flow gabion are usually pebbles with a particle size of 80 mm-150 mm.
[0065] The two edges of the top of the water distribution gabion and the slow-flow gabion in the front-to-back direction can be reinforced by conformable square steel or angle steel.
[0066] The water distribution gabion wall is provided with a foundation, which preferably includes a plain soil layer 104, a graded crushed stone layer 105 and a concrete layer 106 from bottom to top, wherein the plain soil layer is formed by compacting local plain soil, and the compaction coefficient is not less than 0.93, so as to improve the bearing capacity, the thickness of the graded crushed stone layer is preferably 200 mm, and the concrete layer is cast by C20 plain concrete, and the thickness is preferably 200 mm, so as to enhance the bearing capacity of the foundation.
[0067] The parts of the water distribution gabion and the slow-flow gabion that are in contact with the surrounding bare soil are paved with non-woven fabric 107 for isolation to prevent bare soil from entering the gabion and causing blockage.
[0068] A preferred implementation of the pretreatment pond is as follows (with the normal water level of the river channel as zero, as the starting point of the elevation):
[0069] Pond body:
[0070] (1) The slope gradient is 1:1.5, the pond bottom elevation is -1.0m, the highest water level elevation is 0.7m, and the slope and pond bottom are made of plain soil, which is compacted mechanically.
[0071] (2) After the slope is compacted, a layer of gabion mesh (50cm thick) is laid with stone blocks (30cm-50cm) inside. The bottom of the front pond is plain soil, without gabions, and the bottom of the pond slopes downward toward the dry creek with a slope of 0.5%.
[0072] (3) The total volume accounts for 10%-15% of the storage capacity of the rainwater storage and purification system, and the total depth is 1.7m, of which the silt area (silt layer) is 0.5m and the sedimentation area (water accumulation layer or aquifer) is 1.2m.
[0073] Water distribution gabion wall:
[0074] (1) The foundation structure is plain soil (compaction system not less than 0.93), 200 mm thick graded crushed stone, and 200 mm thick C20 plain concrete.
[0075] (2) The water distribution gabion wall adopts pebble gabions with a thickness of 400 mm. The top surface height is the same as the highest water level of the pretreatment pond. A 200 mm wide water inlet is set at intervals in the water distribution gabion wall.
[0076] (3) The water distribution gabion is made of galvanized steel wire mesh gabion with a diameter of 3 mm and internal pebbles with a particle size of 60-80 mm.
[0077] (4) A slow-flow gabion is set inside the water inlet. Its height is 1 / 2 of the height of the water distribution gabion. The slow-flow gabion is made of pebbles with the same thickness as the water distribution gabion.
[0078] (5) The slow-flow gabion is made of galvanized steel wire mesh gabion with a diameter of 3 mm and internal pebbles with a particle size of 80-150 mm.
[0079] (6) A layer of non-woven fabric is laid on the contact area between each gabion and the surrounding soil.
[0080] Over-limit overflow weir:
[0081] (1) The top elevation of the over-limit overflow weir is 0.7m.
[0082] (2) The slope ratio of the upstream side is 1:0.25, the slope ratio of the downstream side is 1:0.1, the top width is 200 mm, and the bottom width is 515 mm.
[0083] (3) The base soil of the foundation should be compacted, with a compaction coefficient of not less than 0.93.
[0084] (4) 200mm thick graded crushed stone with a width of 1215mm is laid on it.
[0085] (5) 200m thick C20 plain concrete is laid on the graded gravel. The width of the plain concrete is 1015mm, and a gap of 100mm is left at both ends of the graded gravel layer.
[0086] (6) After the curing period of the plain concrete is over, a retaining wall is built on it as an overflow weir.
[0087] Unless otherwise specified or one preferred or optional technical means is a further limitation of another technical means, all preferred and optional technical means disclosed in the present utility model can be arbitrarily combined to form several different technical solutions.
Claims
1. A pretreatment pond for rainwater storage, characterized in that The slope is provided with a water outlet connected to the downstream water body, and an over-limit overflow outlet connected to the surrounding river channel. A water distribution gabion wall is arranged horizontally inside the water outlet, and the top surface height of the water distribution gabion wall is the same as the highest water level height of the pretreatment pond. A gabion layer is paved on the slope, and an over-limit overflow weir is arranged in the over-limit overflow outlet, and the top surface height of the over-limit overflow weir is the same as the top surface height of the water distribution gabion wall.
2. The pretreatment pond for rainwater storage as claimed in claim 1, characterized in that The slope of the side slope is 1:2-1:
1.
3. The pretreatment pond for rainwater storage as claimed in claim 1, characterized in that The pond bottom is inclined downward from the opposite side of the water outlet toward the direction where the water outlet is located.
4. The pretreatment pond for rainwater storage as claimed in claim 3, characterized in that The pond bottom is paved with a silt layer.
5. The pretreatment pond for rainwater storage as claimed in claim 1, characterized in that It is equipped with an inlet pipe connected to the city's rainwater drainage system.
6. The pretreatment pond for rainwater storage as claimed in claim 5, characterized in that The cross section of the over-limit overflow weir is trapezoidal, and the slope of the water-facing surface is smaller than the slope of the water-receiving surface.
7. A pre-treatment pond for rainwater storage as claimed in any one of claims 1 to 6, characterized in that The water distribution gabion wall is composed of water distribution gabions arranged in rows. The water distribution gabions are divided into multiple groups along the arrangement direction, and water-passing spacing is left between adjacent water distribution gabion groups.
8. The pretreatment pond for rainwater storage as claimed in claim 7, characterized in that The widths of the water-passing intervals are the same.
9. The pretreatment pond for rainwater storage as claimed in claim 7, characterized in that A slow-flow gabion is provided in the water-passing spacing, and the side walls of the slow-flow gabion are respectively in close contact with the side walls of the water distribution gabion on the corresponding sides, the top surface height of the slow-flow gabion is lower than the top surface height of the water distribution gabion, and the particle size of the built-in stone of the slow-flow gabion is larger than the particle size of the built-in stone of the water distribution gabion.
Citation Information
Cited By
Farmland ecological pond purifying, filtering and renovating method
CN119122085A