Rainwater regulation and storage wetland purification system

By designing a rainwater storage wetland purification system and utilizing the structures of front ponds, dry streams, wetland purification ponds and river channels, we have solved the problems of waterlogging and water pollution in urban rainwater treatment, and achieved the retention, purification and reasonable discharge of rainwater. , protecting the ecological environment and reducing treatment costs.

CN221797243UActive Publication Date: 2024-10-01BEIJING ZEHO WATERFRONT ECOLOGICAL ENV TREATMENT CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420195740.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2024-10-01
Estimated Expiration
2034-01-26

AI Technical Summary

Technical Problem

When existing technologies treat urban rainwater, the limited local consumption scale of landscape water bodies can easily lead to urban waterlogging. The direct discharge method will increase the burden on sewage treatment plants, cause water pollution, and damage the ecological environment.

Method used

A rainwater storage wetland purification system is designed, including front ponds, dry streams, wetland purification ponds and rivers. Through structures such as water distribution gabion walls, purification pond overflow weirs and vegetation buffer zones, rainwater retention and purification are achieved and reasonable drainage to avoid urban waterlogging and improve water purification effects.

Benefits of technology

Effectively regulate, store and purify urban rainwater, reduce the risk of waterlogging, improve flood resistance, protect the ecological environment, reduce rainwater treatment costs, and achieve rational utilization and discharge of rainwater resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221797243U_ABST
    Figure CN221797243U_ABST
Patent Text Reader

Abstract

The utility model relates to a rainwater regulation and storage wetland purification system which comprises a front pond, a dry stream, a wetland purification pond and a river channel which are sequentially communicated in the water flow direction, the front pond is provided with a water inlet pipe connected with an urban rainwater drainage system, and a first water distribution gabion wall is arranged between the front pond and the dry stream in the transverse direction. A first water distribution gabion wall is transversely arranged between the front pond and the dry stream, a second water distribution gabion wall is transversely arranged between the dry stream and the wetland purification pond, the wetland purification pond is provided with a purification pond overflow weir, the highest water level heights of the front pond, the dry stream and the wetland purification pond are sequentially reduced between the wetland purification pond and the riverway, and the top surface height of the first water distribution gabion wall is the same as the highest water level height of the front pond; the top face height of the second water distribution gabion wall is the same as the highest water level height of the dry stream. Urban rainwater is regulated and stored through reasonable planning and design, reasonable utilization and discharge of rainwater resources are achieved, the risk of urban waterlogging can be relieved, the flood fighting capacity of cities can be improved, rainwater can be purified, water pollution is avoided, and the environment is protected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a rainwater storage wetland purification system and belongs to the technical field of environmental protection. Background Art

[0002] In the process of urbanization, a large amount of the surface is covered by hard materials such as cement and asphalt, which makes it impossible for rainwater to penetrate into the ground, resulting in a large amount of surface runoff. These surface runoffs cannot be effectively discharged, which easily leads to problems such as waterlogging and water pollution, posing a huge challenge to the sustainable development of cities. Therefore, formulating scientific and reasonable strategies for rainwater discharge, runoff control, and storage and purification has become an important task in urban rainwater management.

[0003] In order to better meet the needs of urban rainwater discharge, a variety of solutions have been proposed, among which the more typical solution is to absorb urban precipitation by building a landscape rainwater absorption system and introduce urban precipitation into the urban sewage treatment system for discharge. For example, the invention patent with publication number CN115367951A discloses a landscape rainwater purification system and method based on natural solutions, which realizes the use of the purification function of the natural ecosystem to remove pollutants through the sequentially connected ecological gravel bed, surface flow wetland and rainwater wet pond: the ecological gravel bed is used as a pretreatment facility of the surface flow wetland to filter and intercept suspended matter and degradable particulate matter in the water body, purify the pollution and realize the landscape effect of gurgling water through the upper and lower diversion; the surface flow wetland can carry out ecological strengthening treatment of pollutants to form an ecological wetland natural landscape; the rainwater wet pond can further enhance the water body's reoxygenation capacity and biochemical degradation, degrade nitrogen and oxygen in the water, and at the same time can realize water storage and preserve a certain ecological base flow during the dry season to maintain the ecological environment function. The landscape rainwater purification system and method are based on the concept of natural solutions, implement low-impact surface source pollution control strategies, construct diversified habitats according to local conditions, and create a natural waterfront experience area through the combination of gravel and plants. For another example, the invention patent with publication number CN116220166A discloses a rainwater discharge system based on sponge city construction, which is used to solve the problem that roads are often flooded during the rainy season, including several rainwater collection pipes, several rainwater collection pipes are connected to rainwater drainage pipes; several sewage collection pipes, the sewage collection pipes transport domestic sewage to the sewage treatment plant, and the sewage treatment plant is connected to the sewage drainage pipe; the first connecting branch pipe is used to connect the rainwater collection pipe and the sewage collection pipe to each other, and the second connecting branch pipe is used to connect each rainwater collection pipe, and the rainwater collection pipe, rainwater drainage pipe, sewage collection pipe, and sewage drainage pipe are all equipped with flow meters. The rainwater discharge system divides the rainwater collection pipe and the sewage collection pipe into modules, and organically integrates the two into one, so that each network pipe can work saturatedly as much as possible, thereby increasing the speed of rainwater removal and reducing the flooding of urban waterlogging roads.

[0004] The above-mentioned existing technologies each have their own characteristics, and respectively use local absorption of landscape water bodies and direct discharge to treat rainy season precipitation in cities. However, they still have their own limitations: the solution of local absorption of landscape water bodies is limited in scale. When the instantaneous rainwater is too heavy, it is easy to fail to absorb the precipitation in a short time, causing the rainwater to spread and urban waterlogging; the solution of discharging precipitation to a sewage treatment plant or into a river by direct discharge, because the rainwater is not treated, discharge into the sewage treatment plant will increase the workload and treatment cost of the sewage treatment plant, and discharge into the river will easily cause water pollution and damage the ecological environment. Utility Model Content

[0005] In order to overcome the above-mentioned defects of the prior art, the utility model provides a rainwater storage wetland purification system, which can store and purify urban rainfall, protect the ecological environment, and reasonably discharge excess rainwater to avoid urban waterlogging.

[0006] The utility model realizes the above-mentioned technical scheme as follows: a rainwater regulation wetland purification system comprises a pre-pond, a dry creek, a wetland purification pond and a river channel which are connected in sequence, the pre-pond is provided with a water inlet pipe connected to a city rainwater drainage system, a first water distribution gabion wall is provided between the pre-pond and the dry creek in a horizontal direction (a direction perpendicular or approximately perpendicular to the water flow direction, the same below), a second water distribution gabion wall is provided between the dry creek and the wetland purification pond in a horizontal direction, the wetland purification pond is provided with a purification pond overflow weir, the purification pond overflow weir is located between the wetland purification pond and the river channel, the pre-pond, the dry creek and the The highest water level height of the wetland purification pond decreases in sequence, the height of the bottom of the wetland purification pond is not higher than the normal water level height of the river channel, the bottom of the dry creek is lower than the bottom of the wetland purification pond, the bottom of the front pond is lower than the bottom of the dry creek, the top surface height of the first water distribution gabion wall is the same as the highest water level height of the front pond, the top surface height of the second water distribution gabion wall is the same as the highest water level height of the dry creek and lower than the top surface height of the first water distribution gabion wall, and the top surface height of the overflow weir of the purification pond is higher than the normal water level height of the river channel and lower than the top surface height of the second water distribution gabion wall.

[0007] Preferably, the height of the water outlet of the water inlet pipe is not lower than the top surface height of the first water distribution gabion wall, and is usually the same as the top surface height of the first water distribution gabion wall.

[0008] Preferably, the slope of the front pond is 1:2-1:1.

[0009] Furthermore, the slope of the side slope of the front pond is 1:1.5.

[0010] Preferably, a gabion layer is laid on the slope of the front pond.

[0011] Preferably, the bottom of the front pond is inclined downward along the direction of water flow, with a slope of 0.5%.

[0012] Preferably, the bottom of the front pond is paved with a silt layer.

[0013] Preferably, the dry creek has an inverted trapezoidal trough structure.

[0014] The slope of the dry creek is usually not greater than 1:3, such as 1:4, 1:3.5 or 1:3, preferably 1:3.

[0015] Preferably, the bottom of the dry creek slopes downward along the direction of water flow, with a slope of ≥0.3%.

[0016] Preferably, the bottom and slope of the dry creek adopt a plain soil base layer, a pebble layer is laid on the base layer, and a geotextile is laid between the base layer and the pebble layer.

[0017] The slope of the side slope of the wetland purification pond is usually not greater than 1:3, such as 1:4, 1:3.5 or 1:3, preferably 1:3.

[0018] Preferably, the bottom and slope of the wetland purification pond include a plain soil layer, a graded gravel layer, a coarse sand layer, a planting soil layer and a pebble layer from bottom to top, a geotextile is laid between the coarse sand layer and the graded gravel layer, and aquatic plants are planted in the planting soil layer.

[0019] Preferably, the first water distribution gabion wall and the second water distribution gabion wall have the same structure, both consisting of water distribution gabions arranged in rows along the transverse direction, and the water distribution gabions are divided into multiple groups along the transverse direction, with water-passing spaces left between adjacent groups.

[0020] The water distribution gabions constituting the water distribution gabion wall (the first water distribution gabion wall and / or the second water distribution gabion wall) can be arranged in a single row or in multiple rows. When arranged in multiple rows, the water distribution gabions in adjacent rows are arranged closely along the water flow direction.

[0021] Preferably, the water distribution gabions constituting the water distribution gabion wall are arranged in a single row, and the number of water distribution gabions in each group is one or more.

[0022] Preferably, the water distribution gabion wall is provided with a water distribution gabion wall foundation, and the water distribution gabion wall foundation comprises a plain soil layer, a graded crushed stone layer and a concrete layer from bottom to top.

[0023] Preferably, the overflow weir of the purification pond is paved with pebbles.

[0024] Preferably, the purification pond overflow weir is provided with a purification pond overflow weir foundation, and the purification pond overflow weir foundation comprises a plain soil layer, a graded crushed stone layer and a concrete layer from bottom to top.

[0025] Preferably, a vegetation buffer zone is provided between the overflow weir of the purification pond and the river channel, and the vegetation buffer zone slopes downward from the overflow weir of the purification pond to the river channel.

[0026] Preferably, the slope of the river channel is used as the vegetation buffer zone, or the vegetation buffer zone is constructed based on the slope of the river channel.

[0027] Preferably, the front pond is connected with the surrounding river channel through an over-limit overflow dry creek, a first over-limit overflow weir is provided between the front pond and the over-limit overflow dry creek, the top surface height of the first over-limit overflow weir is the same as the top surface height of the first water distribution gabion wall, the water inlet of the wetland purification pond (the connecting point between the wetland purification pond and the dry creek) is connected with the surrounding river channel, the connecting point is located on the water inlet direction side of the second water distribution gabion wall, and a second over-limit overflow weir is provided, the top surface height of the second over-limit overflow weir is the same as the top surface height of the second water distribution gabion wall.

[0028] Preferably, the first over-limit overflow weir and the second over-limit overflow weir have the same structure, both have trapezoidal longitudinal sections, and the slope of the water-facing surface is smaller than the slope of the water-receiving surface.

[0029] Preferably, the slope of the water-facing surface of the over-limit overflow weir (the first over-limit overflow weir and / or the second over-limit overflow weir) is 1:0.3-1:0.2, and the slope of the water-receiving surface is 1:0.2-1:0.1.

[0030] Furthermore, the slope of the upstream surface of the over-limit overflow weir is 1:0.25, and the slope of the downstream surface is 1:0.1.

[0031] Preferably, the over-limit overflow weir is provided with an over-limit overflow weir foundation, and the over-limit overflow weir foundation comprises, from bottom to top, a plain soil layer, a graded crushed stone layer and a concrete layer.

[0032] Preferably, the over-limit overflow weir is a concrete-filled stone retaining wall.

[0033] The beneficial effects of the utility model are as follows: the utility model regulates and stores (seasonal) urban rainwater through reasonable planning and design, and guides rainwater to the surrounding rivers, thereby realizing the rational utilization and discharge of rainwater resources, improving the ecological environment of the city, and enhancing the city's landscape value and living comfort; by controlling the generation, collection, regulation and discharge of surface runoff into rivers, the risk of urban waterlogging is effectively reduced, and the city's flood resistance is improved; the setting of treatment facilities such as ponds and streams can effectively filter and dilute pollutants in the water during the regulation and storage of rainwater, absorb and degrade harmful substances in the water, avoid polluting the water body after entering the river, and the retention of rainwater can also improve the purification effect and infiltration volume, and replenish groundwater; because a low wall-like energy dissipation slope foot composed of gabions is set at the slope foot of the outlet side of the front pond, it can not only bear the strong impact formed by the water flow here, but also improve High / guarantee the stability of the slope, and the water-facing surface of the low wall is basically perpendicular to the bottom of the front pond, that is, perpendicular to the fast water flow that quickly flows into the pond bottom along the water inlet side slope when the rain is heavy, and the water can enter the gaps in the gabions, which plays a good energy dissipation role; under normal conditions, in the process of flowing from the front pond and the dry creek to the river channel, the oxygen content of the raw water entering the front pond is relatively high, and it flows into the front pond along the water inlet side slope and enters the pond bottom, which can increase the oxygen content of the water at the bottom of the front pond, avoiding turbidity and odor due to lack of oxygen at the bottom, and the front pond effluent and wetland purification pond effluent with low oxygen content can be efficiently reoxygenated when flowing through the first water distribution gabion wall and the dry creek or flowing through the purification pond overflow weir and the vegetation buffer zone and the water inlet side slope of the river channel, thereby increasing the oxygen content in the wetland purification pond and the river channel, helping to maintain an aerobic biochemical environment, improve the purification effect, and eliminate odor. The utility model can self-drain, self-purify and self-absorb rainfall within the design range of the absorption capacity. For rainfall exceeding the absorption capacity (sudden situations such as heavy rainstorms), it is discharged through over-limit overflow to ensure its own stability and safety. The over-limit overflow discharge path is provided with dry streams and / or vegetation buffer zones to reduce the scouring of water flow, and the over-limit overflow rainwater is precipitated and purified to ensure the purification effect of rainwater and protect the ecological environment. The utility model can not only absorb local rainwater, but also play a role in regulating and purifying external guest water. The rainwater stored in the system (mainly referring to the rainwater in the wetland purification pond) can be emptied through infiltration within 24 hours after the end of the rainfall. While giving full play to the function of the sponge system, it can operate continuously and efficiently with strong stability, effectively reducing the cost of urban rainwater treatment. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a schematic cross-sectional structure diagram of an implementation mode of the utility model;

[0035] Figure 2 yes Figure 1 A schematic diagram of a partially enlarged cross-sectional structure of the front pond;

[0036] Figure 3 yes Figure 1 A schematic diagram of a partially enlarged cross-sectional structure of the dry creek;

[0037] Figure 4 yes Figure 1 A partially enlarged cross-sectional structural schematic diagram of the wetland purification pond;

[0038] Figure 5 It is a structural schematic diagram of an implementation mode of the water distribution gabion wall of the utility model;

[0039] Figure 6 yes Figure 1 A schematic diagram of a partially enlarged cross-sectional structure of the vegetation buffer zone;

[0040] Figure 7 It is a top view of an implementation method of the utility model with an over-limit overflow function;

[0041] Figure 8 It is a top view of another implementation mode of the utility model in which the over-limit overflow function is provided;

[0042] Fig. 9 It is a schematic diagram of the cross-sectional structure of the over-limit overflow weir of the utility model;

[0043] Fig.10 It is a schematic diagram of the cross-sectional structure of a pre-pond with a low wall-shaped energy dissipation slope foot. DETAILED DESCRIPTION

[0044] See also Figure 1-Figure 6The utility model discloses a rainwater storage and wetland purification system, which is used for the storage and discharge of urban rainwater. It includes a pre-pond 1, a dry creek 2, a wetland purification pond 3 and a river 4 which are connected in sequence along the water flow direction. The pre-pond is used for sedimentation pretreatment of urban discharged rainwater. The dry creek is used for transferring the rainwater stored in the pre-pond to the wetland purification pond. The transfer process has a good effect of retaining rainwater, thereby preliminarily purifying the rainwater. The retained rainwater has enough time to penetrate downward to conserve groundwater. The wetland purification pond is used for purifying the water quality of rainwater. A first water distribution gabion wall 501 is provided between the front pond and the dry creek along the horizontal direction (in the direction perpendicular or approximately perpendicular to the water flow direction, the same below), which is used for distributing rainwater flowing from the front pond to the dry creek. The first water distribution gabion wall can be set on the slope of the front pond or the slope of the dry creek at the connection between the front pond and the dry creek. A second water distribution gabion wall 502 is provided between the dry creek and the wetland purification pond along the horizontal direction, which is used for distributing rainwater flowing from the dry creek to the wetland purification pond. The second water distribution gabion wall can be set on the slope of the wetland purification pond at the connection between the dry creek and the wetland purification pond. The wetland purification pond is provided with a purification pond overflow weir 6, which is located between the wetland purification pond and the river channel, and is usually located on the slope of the wetland purification pond. It is used to discharge the rainwater stored in the wetland purification pond into the river channel by overflow when the rainwater exceeds its capacity. It also has the function of flushing the soil with a small water flow and controlling the runoff. The highest water levels of the front pond, the dry creek and the wetland purification pond are successively reduced so that the rainwater entering the system can flow along the preset flow path. The height of the bottom of the wetland purification pond is not higher than the normal water level of the river channel to avoid rainwater from being retained in the wetland purification pond for a long time. The bottom of the dry creek is lower than the bottom of the wetland purification pond, and the bottom of the front pond is lower than the bottom of the dry creek to improve the rainwater absorption capacity in the system. The top surface height of the first water distribution gabion wall is the same as the highest water level of the front pond, so that the rainwater stored in the front pond can flow into the dry creek before reaching the highest water level, avoiding the rainwater stored in the front pond exceeding the highest water level and overflowing. The top surface height of the second water distribution gabion wall is the same as the highest water level of the dry creek and is lower than the top surface height of the first water distribution gabion wall, which can not only allow the rainwater stored in the dry creek to flow into the wetland purification pond before reaching the highest water level, avoiding the rainwater stored in the dry creek exceeding the highest water level and overflowing, but also avoid the rainwater in the dry creek from flowing back to the front pond. The top surface height of the overflow weir of the purification pond is higher than the normal water level of the river channel and lower than the top surface height of the second water distribution gabion wall, which can not only ensure the water capacity of the wetland purification pond, but also avoid the rainwater in the wetland purification pond from flowing back to the dry creek.

[0045] The front pond is provided with an inlet pipe connected to the city's municipal rainwater drainage system. The drainage pipe (external drainage pipe) of the city's municipal rainwater drainage system can also be connected to the front pond as the inlet pipe of the front pond, which is used to discharge urban rainwater into the front pond. The height of the outlet 101 of the inlet pipe is usually not lower than the top surface height of the first water distribution gabion wall (that is, not lower than the highest water level of the front pond) to avoid backflow of rainwater in the front pond. The outlet height of the inlet pipe is preferably the same as the top surface height of the first water distribution gabion wall to minimize the scouring of the slope of the front pond by the incoming water.

[0046] The water outlet of the water inlet pipe preferably adopts a gradually expanding inner diameter drain outlet or an eight-shaped drain outlet, which is used to dissipate energy of incoming water to reduce scouring of the slope of the front pond.

[0047] The slope of the front pond is usually 1:2-1:1, preferably 1:1.5, to ensure its water storage capacity. Its total volume usually accounts for 10%-15% of the storage volume of the rainwater storage wetland purification system.

[0048] The slope and bottom of the front pond are compacted with local soil. After the slope of the front pond is compacted, a gabion layer (constituting a gabion revetment) 102 is preferably laid. The gabion layer covers the slope of the front pond. The gabions of the gabion layer preferably have blocks of stone inside, and the particle size of the blocks of stone is preferably 30-50 cm. The water from the urban municipal rainwater drainage system first contacts the gabion layer, and then slowly flows into the bottom of the pond after dissipating energy through the gabion layer, further reducing the scouring of the slope and bottom of the front pond by the water.

[0049] The bottom of the front pond is preferably tilted downward along the direction of water flow, and the tilt slope is preferably 0.5%, which helps the rainwater in the front pond to flow toward the dry creek. The bottom of the front pond is paved with a silt layer 103, which can not only slow down the water flow speed, but also help rainwater filtering. The silt layer is usually laid at a height of 0.4-0.6m, preferably 0.5m. Under the gradual scouring of the water flow in the front pond, the top surface of the silt layer forms a slope that is the same or similar to that of the bottom of the front pond.

[0050] According to actual needs, a low wall-like energy dissipation slope foot 108 composed of gabions can be set at the foot of the outlet side slope of the front pond (especially the front pond with rapid water flow on rainy days) (see Fig.10 ), and it plays the role of force dissipation / energy dissipation and slope protection at the foot of the slope. The water-facing surface (the side facing the pond) of the low wall-shaped force dissipation slope foot is a vertical surface, perpendicular to the horizontal plane projection direction of the outflow water flow. The height of the low wall-shaped force dissipation slope foot can be set according to the force dissipation needs and take into account the landscape effect. It can usually be slightly lower than half of the height of the front pond overflow outlet (relative to the bottom of the front pond), for example, one third or one quarter of the height of the front pond overflow outlet.

[0051] The dry creek is preferably an inverted trapezoidal trough structure, and the slope of its side slope is usually not greater than 1:3, such as 1:4, 1:3.5 or 1:3, preferably 1:3, to ensure its water-receiving capacity.

[0052] The bottom of the dry creek is preferably tilted downward along the direction of water flow, with a slope of ≥0.3%, and the water flow speed is ensured not to exceed 2.0m / s, which not only helps the rainwater in the dry creek to flow toward the wetland purification pond, but also prevents the water flow speed from being too fast to affect the effects of retention, purification and infiltration.

[0053] The bottom and slope of the dry creek preferably use a base soil layer 201, which is formed by compacting local base soil. A pebble layer 202 is laid on the base soil for filtering and purifying rainwater. A geotextile is laid between the base soil and the pebble layer to filter rainwater and prevent the base soil from floating. The height of the pebble layer is preferably 300 mm, and the particle size of the pebble is preferably 60-80 mm, so as to ensure the filtering and purification effect of rainwater and the structural strength of the creek bottom.

[0054] The slope of the wetland purification pond is usually not greater than 1:3, such as 1:4, 1:3.5 or 1:3, preferably 1:3, to ensure its water storage capacity. Its volume is usually the sum of the wetland volume required for purification of local rainwater and municipal rainwater.

[0055] The pond bottom and slope of the wetland purification pond preferably include a plain soil layer 301, a graded gravel layer 302, a coarse sand layer 303, a planting soil layer 304 and a pebble layer 305 from bottom to top. The plain soil layer is formed by compacting local plain soil. The height of the graded gravel layer is preferably 200 mm. A geotextile is laid between the coarse sand layer and the graded gravel layer, which mainly plays the role of isolation and filtration. The height of the coarse sand layer is preferably 100 mm, which is mainly used to filter the infiltrating rainwater. The height of the planting soil layer is preferably 300 mm. Aquatic plants 306, such as calamus, reeds and / or cannas, are planted in the planting soil layer, which can not only beautify the environment, but also absorb harmful substances in the water to purify the water quality. The pebble layer serves as the bottom of the wetland purification pond to increase the water filtering effect. Pebbles with a particle size of 50-150 mm are preferably used.

[0056] The regulating depth of the wetland purification pond can be set to 0.3m. Usually, when the terrain around the wetland purification pond and the highest water level of the wetland purification pond meet the height difference of 0.2m, the superelevation of the wetland purification pond is calculated as 0.2m. When the terrain around the wetland purification pond is relatively flat and the height difference with the highest water level of the wetland purification pond is less than 0.2m, the boundary elevation of the wetland purification pond is controlled by the highest water level of the wetland purification pond plus 0.05m to meet the superelevation requirement.

[0057] The structures of the first water distribution gabion wall and the second water distribution gabion wall are usually the same, both of which are composed of water distribution gabions 503 arranged in rows along the horizontal direction, and their main functions are to control the rainwater retention, improve the purification effect and dissipate energy (slow down the water flow when the rainwater volume is large). The water distribution gabions are divided into multiple groups along the horizontal direction, and there is a water flow spacing between adjacent groups, that is, there is a water flow outlet 504. The water distribution gabion wall can not only play the role of water distribution, but also facilitate pedestrians to pass. The length of each group of water distribution gabions along the horizontal direction and the number and width of the water flow outlets can be flexibly set according to the actual terrain and construction needs.

[0058] The water distribution gabions constituting the water distribution gabion wall (the first water distribution gabion wall and / or the second water distribution gabion wall) can be arranged in a single row or in multiple rows. When arranged in multiple rows, the water distribution gabions in adjacent rows are arranged closely along the water flow direction. Usually, the water distribution gabions constituting the water distribution gabion wall are arranged in a single row, and the number of water distribution gabions in each group is one or more.

[0059] The water distribution gabion wall is provided with a water distribution gabion wall foundation, which preferably includes a plain soil layer 505, a graded crushed stone layer 506 and a concrete layer 507 from bottom to top, wherein the plain soil layer is formed by compacting local plain soil, and the compaction coefficient is not less than 0.93, so as to improve the bearing capacity, the thickness of the graded crushed stone layer is preferably 200 mm, and the concrete layer is C20 plain concrete, and the thickness is preferably 200 mm, so as to enhance the bearing capacity of the foundation.

[0060] The water distribution gabion is composed of a cage net and pebbles filled therein. The pebbles are usually pebbles with a particle size of 60-80 mm. The part of the water distribution gabion in contact with the surrounding soil is paved with non-woven fabric 508 for isolation to prevent soil from entering the water distribution gabion and causing blockage.

[0061] The purification pond overflow weir is preferably paved with pebbles, and the purification pond overflow weir is provided with a purification pond overflow weir foundation, and the purification pond overflow weir foundation includes a plain soil layer 601, a graded crushed stone layer 602 and a concrete layer 603 from bottom to top, wherein the plain soil layer is formed by compacting local plain soil, the thickness of the graded crushed stone layer is preferably 300 mm, the concrete layer is C25 fine stone concrete, and the thickness is preferably 80 mm. Before the concrete layer is poured and dried, pebbles with a particle size of 150-300 mm are laid on its surface to form the purification pond overflow weir.

[0062] A vegetation buffer zone 7 is preferably provided between the overflow weir of the purification pond and the river channel. The vegetation buffer zone is inclined downward from the overflow weir of the purification pond to the direction of the river channel, and the slope ratio is preferably 1:10, which is convenient for water flow. The plants planted in the vegetation buffer zone can be lawns, reeds, calamus and / or loosestrife, etc., which can not only filter and purify rainwater through plant roots, stems and leaves, but also play a role in soil consolidation and beautify the environment. In actual construction, the slope of the river channel can be used as the vegetation buffer zone, or the slope of the river channel can be used as the basis for constructing the vegetation buffer zone.

[0063] See also Figure 7 and Figure 8 The front pond is preferably connected to the surrounding river channel through an over-limit overflow dry creek 8. A first over-limit overflow weir 901 is provided between the front pond and the over-limit overflow dry creek for overflowing when the water level in the front pond exceeds the limit. The top surface height of the first over-limit overflow weir is the same as the top surface height of the first water distribution gabion wall, which can prevent the over-limit water in the front pond from flowing into the dry creek due to the top surface height of the first over-limit overflow weir being higher than the top surface height of the first water distribution gabion wall, and can also prevent the water in the front pond from being discharged from the system through the first over-limit overflow weir due to the top surface height of the first over-limit overflow weir being lower than the top surface height of the first water distribution gabion wall. The connecting point with the dry creek) is connected with the surrounding river channel, the connecting point is located on the water inflow direction side of the second water distribution gabion wall, and is provided with a second over-limit overflow weir 902, which is used for overflow when the water level in the wetland purification pond exceeds the limit, and can also prevent excessive rainwater from impacting the wetland purification pond. The top surface height of the second over-limit overflow weir is the same as the top surface height of the second water distribution gabion wall, which can prevent the excess water in the wetland purification pond from being unable to overflow or flow back to the dry creek due to the top surface height of the second over-limit overflow weir being higher than the top surface height of the second water distribution gabion wall, and can also prevent the inflow water of the dry creek from being all or most of the discharge system through the first over-limit overflow weir due to the top surface height of the second over-limit overflow weir being lower than the top surface height of the second water distribution gabion wall.

[0064] A vegetation buffer zone 10 can be set between the excessive overflow dry creek and the surrounding river channels and between the second excessive overflow weir and the surrounding river channels to filter and purify the excessive overflow rainwater.

[0065] See also Fig. 9 The first over-limit overflow weir and the second over-limit overflow weir have the same structure, both have trapezoidal longitudinal sections, and the slope of the water-facing surface is smaller than the slope of the water-receiving surface.

[0066] The water-facing surface slope of the over-limit overflow weir (the first over-limit overflow weir and / or the second over-limit overflow weir) is usually 1:0.3-1:0.2, preferably 1:0.25, and the water-retaining surface slope is usually 1:0.2-1:0.1, preferably 1:0.1, which can not only effectively block the water in the corresponding pond, but also enable the excess water to quickly climb the slope and overflow when the water amount in the corresponding pond exceeds the limit.

[0067] The over-limit overflow weir is provided with an over-limit overflow weir foundation, which preferably includes a plain soil layer 903, a graded crushed stone layer 904 and a concrete layer 905 from bottom to top, wherein the plain soil layer is formed by compacting local plain soil, and the compaction coefficient is not less than 0.93, so as to improve the bearing capacity, the thickness of the graded crushed stone layer is preferably 200 mm, and the concrete layer is C20 plain concrete, and the thickness is preferably 200 mm, so as to enhance the bearing capacity of the foundation.

[0068] The over-limit overflow weir may be a concrete-filled stone retaining wall to ensure structural strength.

[0069] The rainwater storage wetland purification system can not only absorb local rainwater, but also store external water:

[0070] Local rainwater absorption: After rainfall reaches hard roofs, permeable pavements, and natural green spaces, the excess rainwater flows through the surface and is discharged to the front pond through the city's municipal rainwater drainage system, and then flows into the dry creek, where the rainwater is purified and transferred to the wetland purification pond for further purification and natural infiltration, thereby achieving on-site rainwater absorption. Most of the excess rainwater is urgently discharged into the river from the over-limit discharge channels of the front pond and the wetland purification pond, and the other part is discharged into the river from the end of the wetland purification pond through the purification pond overflow weir. The rainwater stored in the system (mainly referring to the rainwater in the wetland purification pond) can be discharged through infiltration within 24 hours after the rainfall ends.

[0071] External water of the park: rainwater from construction land and roads transported by municipal rainwater pipelines. Rainwater in the construction land is reduced at the source through low-impact development facilities inside the plot, and excess rainwater enters the municipal pipeline network. Rainwater on the road surface can be divided into three parts:

[0072] In the first part, the first 4 mm of rainfall is directly transported to the sewage treatment plant through the municipal sewer pipe;

[0073] In the second part, 4-31.2mm rainfall (31.2mm rainfall corresponds to the indicator requirement of 85% of the annual runoff control rate of municipal roads) is discharged from the municipal outlet into the rainwater storage wetland purification system for purification and absorption;

[0074] The third part, rainfall exceeding 31.2 mm, will be discharged into the river through the over-limit discharge channel of the pre-pond and wetland purification pond of the rainwater storage and wetland purification system.

[0075] A preferred implementation of the rainwater storage wetland purification system is as follows (taking the normal water level of the river as zero as the starting point of the elevation):

[0076] Front pond:

[0077] (1) The slope gradient is 1:1.5, the pond bottom elevation is -1.0m, the highest water level elevation is 0.7m, and the slope and pond bottom are made of plain soil, which is compacted mechanically.

[0078] (2) After the slope is compacted, a layer of gabion mesh (50cm thick) is laid with stone blocks (30cm-50cm) inside. The bottom of the front pond is plain soil, without gabions, and the bottom of the pond slopes downward toward the dry creek with a slope of 0.5%.

[0079] (3) The total volume accounts for 10%-15% of the storage capacity of the rainwater storage wetland purification system, and the total depth is 1.7m, of which the silt area (silt layer) is 0.5m and the sedimentation area (water accumulation layer or aquifer) is 1.2m.

[0080] Dry Creek:

[0081] (1) The cross section is inverted trapezoidal, with the stream bottom elevation being -0.1m and the highest water level being 0.3m.

[0082] (2) The slope of the side slope is 1:3, and the stream bottom slopes downward toward the wetland purification pond with a slope of ≥0.3%, but the maximum flow rate shall not exceed 2.0 m / s.

[0083] (3) After the bottom soil is compacted, lay a layer of permeable geotextile.

[0084] (4) Lay 300mm thick pebbles with a particle size of 60-80mm on the geotextile.

[0085] (5) The depth of the aquifer is 300 mm.

[0086] Wetland purification pond:

[0087] (1) The elevation of the pond bottom is the same as the normal water level of the river, and the highest water level is 0.1m.

[0088] (2) The slope of the slope is 1:3 and the storage depth is 0.3m.

[0089] (3) After the soil on the slope and pond bottom is compacted, 200 mm thick graded gravel is laid.

[0090] (4) Lay a layer of geotextile on the graded gravel.

[0091] (5) 100 mm thick coarse sand and 300 mm thick planting soil are laid on the geotextile, and the top elevation of the planting soil is -0.2 m.

[0092] (6) After the planting soil is laid, aquatic plants (calamus, reeds, cannas, etc.) are planted sporadically on the slopes and bottom of the pond.

[0093] (7) After the aquatic plants are planted, pebbles with a particle size of 50-150 mm are laid on the surface of the planting soil.

[0094] Overflow weir of purification pond:

[0095] (1) The top elevation is 0.1m and the width is 1m.

[0096] (2) After the base soil is compacted, lay 300 mm thick graded gravel.

[0097] (3) 80 mm thick C25 fine stone concrete is laid on the graded gravel, and pebbles with a particle size of 150-300 mm are laid on the surface before the concrete dries to form an overflow weir of the purification pond.

[0098] Water distribution gabion wall:

[0099] (1) The top elevation of the first water distribution gabion wall is 0.7m, and the top elevation of the second water distribution gabion wall is 0.3m.

[0100] (2) The foundation structure of the water distribution gabion wall is plain soil (compaction system not less than 0.93), 200 mm thick graded crushed stone, and 200 mm thick C20 plain concrete.

[0101] (3) The water distribution gabion wall uses pebble gabions with a thickness of 400 mm. A 200 mm wide water inlet is set at intervals for wetland water distribution.

[0102] (4) The water distribution gabion is made of galvanized steel wire mesh gabion with a diameter of 3mm and internal pebbles with a particle size of 60-80mm. A layer of non-woven fabric is laid on the contact part of each gabion with the surrounding soil.

[0103] Over-limit overflow weir:

[0104] (1) The top elevation of the first over-limit overflow weir is 0.7m, and the top elevation of the second over-limit overflow weir is 0.3m.

[0105] (2) The slope ratio of the upstream side is 1:0.25, the slope ratio of the downstream side is 1:0.1, the top width is 200 mm, and the bottom width is 515 mm.

[0106] (3) The base soil of the foundation should be compacted, with a compaction coefficient of not less than 0.93.

[0107] (4) 200mm thick graded crushed stone with a width of 1215mm is laid on it.

[0108] (5) 200m thick C20 plain concrete is laid on the graded gravel. The width of the plain concrete is 1015mm, and a gap of 100mm is left at both ends of the graded gravel layer.

[0109] (5) After the curing period of the plain concrete is over, a retaining wall is built on it as an overflow weir.

[0110] Vegetation buffer strips:

[0111] (1) The overflow weir of the purification pond is inclined downward toward the river channel with a slope ratio of 1:10.

[0112] (2) The top surface elevation is 0.2m.

[0113] (3) The plants planted are lawn, reed, calamus and / or loosestrife, etc.

[0114] The method for regulating and purifying urban rainwater and external guest water by the rainwater regulating and storing wetland purification system comprises the following steps:

[0115] S1: Urban rainwater and / or guest water enters the front pond for sedimentation pretreatment;

[0116] S2: The pre-treated rainwater flows into the dry creek for preliminary purification;

[0117] S3: The initially purified rainwater flows into the wetland purification pond for water purification;

[0118] S4: Rainwater after water purification seeps into or flows into rivers.

[0119] Among them, in S1, urban municipal rainwater drainage is discharged into the front pond through a drainage pipe, the rainwater is stored in the front pond and the flow rate is slowed down, and large particle pollutants are removed from the rainwater through sedimentation.

[0120] In S2, when the rainwater stored in the front pond reaches a certain amount, the rainwater flows into the dry creek through the first water distribution gabion wall. When the rainwater flows through the first water distribution gabion wall, the first water distribution gabion wall purifies and dissipates energy for the rainwater (slows down the water flow when the water volume is large). The rainwater continues to flow forward in the dry creek, and the pebble layer at the bottom of the creek can retain the rainwater, which is not only helpful for the initial purification of the rainwater, but also the retained rainwater can infiltrate and conserve groundwater.

[0121] In S3, when a certain amount of rainwater is retained in the dry stream, the water flows into the wetland purification pond through the second water distribution gabion wall and is retained in the wetland purification pond. The aquatic plants in the wetland purification pond absorb harmful substances in the water.

[0122] In S4, the rainwater stored in the wetland purification pond is filtered through various structural layers of the pond bottom and slope during the infiltration process to purify the water quality; when the amount of rainwater flowing into the wetland purification pond is too large, the rainwater in the wetland purification pond overflows through the overflow weir of the purification pond and flows into the river channel.

[0123] The rainwater regulation wetland purification system can self-drain, self-purify and self-absorb rainfall within the design range of the absorption capacity. For rainfall exceeding the absorption capacity (sudden situations such as heavy rainstorms), most of the excess rainwater is discharged through excessive overflow (discharge system from the excessive overflow weir), and the other part is discharged from the overflow weir of the purification pond at the end of the wetland purification pond, thereby ensuring its own stability and safety. The discharge path of the excessive overflow and the overflow discharge path at the end of the wetland purification pond are equipped with dry streams and / or vegetation buffer zones to reduce the scouring of water flow, and the excessive overflow rainwater is precipitated and purified to ensure the purification effect of rainwater and protect the ecological environment.

Claims

1. Rainwater storage wetland purification system, characterized by The invention comprises a pre-pond, a dry creek, a wetland purification pond and a river channel which are connected in sequence, wherein the pre-pond is provided with a water inlet pipe connected to a city rainwater drainage system, a first water distribution gabion wall is arranged transversely between the pre-pond and the dry creek, a second water distribution gabion wall is arranged transversely between the dry creek and the wetland purification pond, the wetland purification pond is provided with a purification pond overflow weir, and the purification pond overflow weir is located between the wetland purification pond and the river channel, the maximum water levels of the pre-pond, the dry creek and the wetland purification pond decrease in sequence, and the wetland purification pond is provided with a purification pond overflow weir. The height of the pond bottom is not higher than the normal water level of the river channel, the bottom of the dry creek is lower than the bottom of the wetland purification pond, the bottom of the front pond is lower than the bottom of the dry creek, the top surface height of the first water distribution gabion wall is the same as the highest water level of the front pond, the top surface height of the second water distribution gabion wall is the same as the highest water level of the dry creek and lower than the top surface height of the first water distribution gabion wall, and the top surface height of the overflow weir of the purification pond is higher than the normal water level of the river channel and lower than the top surface height of the second water distribution gabion wall.

2. The rainwater storage wetland purification system according to claim 1, characterized in that The slope of the side slope of the front pond is 1:2-1:

1.

3. The rainwater storage wetland purification system according to claim 2, characterized in that A gabion layer is laid on the side slope of the front pond.

4. The rainwater storage wetland purification system according to claim 1, characterized in that The slope of the side slope of the dry creek is not greater than 1:

3.

5. The rainwater storage wetland purification system according to claim 4, characterized in that The bottom and slope of the dry creek adopt a plain soil base layer, a pebble layer is laid on the base layer, and a geotextile is laid between the base layer and the pebble layer.

6. The rainwater storage wetland purification system according to claim 1, characterized in that The slope of the side slope of the wetland purification pond is not greater than 1:

3.

7. The rainwater storage wetland purification system according to claim 6, characterized in that The bottom and slope of the wetland purification pond include a plain soil layer, a graded gravel layer, a coarse sand layer, a planting soil layer and a pebble layer from bottom to top, a geotextile is laid between the coarse sand layer and the graded gravel layer, and aquatic plants are planted in the planting soil layer.

8. The rainwater storage wetland purification system according to claim 1, characterized in that The first water distribution gabion wall and the second water distribution gabion wall have the same structure, and are both composed of water distribution gabions arranged in rows along the transverse direction. The water distribution gabions are divided into multiple groups along the transverse direction, and water-passing spaces are left between adjacent groups.

9. The rainwater storage wetland purification system according to any one of claims 1 to 8, characterized in that The front pond is connected with the surrounding river channel through the over-limit overflow dry creek, and a first over-limit overflow weir is arranged between the front pond and the over-limit overflow dry creek, and the top surface height of the first over-limit overflow weir is the same as the top surface height of the first water distribution gabion wall. The water inlet of the wetland purification pond is connected with the surrounding river channel, and the connection point is located on the water inlet direction side of the second water distribution gabion wall, and a second over-limit overflow weir is arranged, and the top surface height of the second over-limit overflow weir is the same as the top surface height of the second water distribution gabion wall.

10. The rainwater storage wetland purification system according to claim 9, characterized in that The first over-limit overflow weir and the second over-limit overflow weir have the same structure, and both have trapezoidal longitudinal sections, and the slope of the water-facing surface is greater than the slope of the water-receiving surface.

Citation Information

Cited By

  • Rainwater regulation and storage wetland purification system and purification method

    CN117700050A

  • Discharge opening biological filter system