Hydraulic engineering emergency dam
By designing the embankment structure, footing structure and support structure that can be stowed and spliced, the existing emergency embankment deployment time-consuming and difficult disassembly problems are solved, rapid deployment and efficient disassembly are achieved, meeting emergency needs and reducing waste of raw materials.
Patent Information
- Application Number
- CN202420254652.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-02
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-02-02
AI Technical Summary
Existing emergency dams for water conservancy projects need to be poured in advance and constructed on-site. The construction period is long and cannot effectively play an emergency role. It is also difficult to dismantle and reuse after the water level returns to normal, resulting in a waste of construction materials.
An emergency dam including a dam structure, a footing structure and a support structure is designed. The splicing and disassembly of the dam wall is realized by rotating rods to store support plates, connecting rods and connecting holes. The ground plugs and tips enhance the stability and support. The board and fixed board are configured as detachable structures to facilitate disassembly and secondary use.
It realizes the rapid deployment and disassembly of emergency dams, reduces the waste of construction materials, meets temporary emergency needs, and improves the stability and reusability of the device.
Smart Images

Figure CN221798302U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of emergency dams, in particular to an emergency dam for a water conservancy project. Background Art
[0002] Water conservancy projects are projects built to control and allocate natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits. Water is an indispensable and precious resource for human production and life, but its natural state does not fully meet human needs. Only by building water conservancy projects can we control water flow, prevent floods and waterlogging disasters, and regulate and distribute water to meet people's needs for water resources in life and production. Water conservancy projects require the construction of different types of hydraulic structures such as dams, dikes, spillways, sluices, water inlets, channels, ferries, rafts, fishways, etc. to achieve their goals. In the construction of water conservancy projects, the water level of the river sometimes rises, and temporary emergency dams need to be built.
[0003] However, the current emergency dams of water conservancy projects need to be poured in advance and built on site, which takes a long time to build, cannot truly play an efficient emergency role, and are inconvenient to use. Moreover, since they are fixed on site, it is not convenient for users to break them up after the water level returns to normal after the water conservancy project is completed, and they cannot be used again after being broken down, resulting in a waste of construction materials and failing to meet the requirements of emergency temporary use. Utility Model Content
[0004] In order to solve the above technical problems, the utility model provides an emergency dam for a water conservancy project.
[0005] The utility model is implemented by the following technical scheme: an emergency dam for a water conservancy project, comprising a dam structure, a footing structure and a supporting structure, wherein the footing structure is located at the bottom of the dam structure, and the supporting structure is located on the surface of the dam structure;
[0006] The dam structure includes a dam wall, a connecting hole is opened on one side of the dam wall, a connecting rod is fixedly connected to the other side of the dam wall, a first fixing plate is fixedly connected to the surface of the dam wall, a groove is opened on the surface of the first fixing plate, a rotating rod is rotatably connected inside the groove, a first supporting plate is fixedly connected to the surface of the rotating rod, and a first anti-slip protrusion is fixedly connected to the bottom of the first supporting plate.
[0007] Through the above technical solution, the first support plate is rotatably stored by the rotating rod, which is convenient for secondary use after storage, and the first anti-slip protrusion effectively prevents the first support plate from slipping.
[0008] As a further improvement of the above solution, the connecting hole matches the size of the connecting rod, and the groove is configured as a semicircular structure.
[0009] Through the above technical solution, the connecting rods are plugged into the connecting holes to realize the merging and splicing of multiple dam walls, which is convenient for users to use them again after breaking and dismantling.
[0010] As a further improvement of the above solution, the anchor structure includes a first ground plug, the bottom of which is fixedly connected to a first prong, the surface of which is fixedly connected to a second ground plug, the bottom of which is fixedly connected to a second prong.
[0011] As a further improvement of the above solution, the number of the first ground plugs is three, and the number of the second ground plugs is twelve.
[0012] Through the above technical solution, the first ground plug is inserted into the ground so that the second ground plug can be inserted, making the overall device more secure.
[0013] As a further improvement of the above scheme, the supporting structure includes a second fixing plate, a threaded hole is opened on the surface of the second fixing plate, a screw is arranged inside the threaded hole, one end of the second fixing plate is fixedly connected to the second supporting plate, and the bottom of the second supporting plate is fixedly connected to the second anti-slip protrusion.
[0014] As a further improvement of the above solution, the number of the second fixing plates is three, and the second fixing plates are configured as a detachable structure.
[0015] Through the above technical solution, the second support plate and the second fixed plate are arranged as a disassembly structure, which is convenient for users to dismantle after the water level returns to normal after the construction of the water conservancy project is completed.
[0016] Compared with the prior art, the beneficial effects of the present invention are:
[0017] The utility model provides a first support plate that can be rotated and stored by a rotating rod, which is convenient for secondary use after storage, and the first anti-slip protrusion effectively prevents the first support plate from slipping. By providing a connecting rod and a connecting hole for plugging, multiple dam walls can be combined and spliced, which is convenient for users to use them again after breaking and dismantling.
[0018] The utility model is configured such that the first ground plug is inserted into the ground so that the second ground plug can be inserted, which makes the overall device more secure. The second support plate and the second fixing plate are configured as a disassembly structure, which is convenient for users to dismantle after the water conservancy project construction is completed and the water level returns to normal. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the utility model;
[0020] Figure 2 This is a schematic diagram of the overall right side structure of the utility model;
[0021] Figure 3 For this utility model Figure 2 A schematic diagram of the enlarged structure of the middle part A;
[0022] Figure 4 It is a schematic diagram of the overall structure of the utility model when viewed from above.
[0023] Description of main symbols:
[0024] Dam structure; 101, dam wall; 102, connecting hole; 103, connecting rod; 104, first fixing plate; 105, groove; 106, rotating rod; 107, first supporting plate; 108, first anti-slip protrusion; 2, anchor structure; 201, first ground plug; 202, first pointed head; 203, second ground plug; 204, second pointed head; 3, supporting structure; 301, second fixing plate; 302, threaded hole; 303, screw; 304, second supporting plate; 305, second anti-slip protrusion. DETAILED DESCRIPTION
[0025] The present invention is further described below in conjunction with the accompanying drawings and specific implementation methods. It should be noted that, under the premise of no conflict, the various embodiments or technical features described below can be arbitrarily combined to form a new embodiment.
[0026] Example:
[0027] Please combine Figure 1-4 , a water conservancy project emergency dam of this embodiment includes a dam structure 1, a footing structure 2 and a support structure 3, the footing structure 2 is located at the bottom of the dam structure 1, and the support structure 3 is located on the surface of the dam structure 1;
[0028] The dam structure 1 includes a dam wall 101, a connection hole 102 is provided on one side of the dam wall 101, a connection rod 103 is fixedly connected to the other side of the dam wall 101, a first fixing plate 104 is fixedly connected to the surface of the dam wall 101, a groove 105 is provided on the surface of the first fixing plate 104, a rotating rod 106 is rotatably connected inside the groove 105, a first supporting plate 107 is fixedly connected to the surface of the rotating rod 106, and a first anti-skid protrusion 108 is fixedly connected to the bottom of the first supporting plate 107. The first supporting plate 107 is rotatably stored by the rotating rod 106, which is convenient for secondary use after storage, and the first anti-skid protrusion 108 effectively prevents the first supporting plate 107 from slipping.
[0029] The connecting hole 102 is consistent with the size of the connecting rod 103, the groove 105 is set as a semicircular structure, and the connecting rod 103 is plugged into the connecting hole 102 to realize the merging and splicing of multiple dam walls 101, which is convenient for users to use them again after breaking and dismantling.
[0030] The anchor structure 2 includes a first ground plug 201 , a first prong 202 is fixedly connected to the bottom of the first ground plug 201 , a second ground plug 203 is fixedly connected to the surface of the first ground plug 201 , and a second prong 204 is fixedly connected to the bottom of the second ground plug 203 .
[0031] There are three first ground plugs 201 and twelve second ground plugs 203. The first ground plugs 201 are inserted into the ground so that the second ground plugs 203 can be inserted, making the overall device more secure.
[0032] The supporting structure 3 includes a second fixing plate 301 , a threaded hole 302 is provided on the surface of the second fixing plate 301 , a screw 303 is provided inside the threaded hole 302 , one end of the second fixing plate 301 is fixedly connected to a second supporting plate 304 , and a second anti-slip protrusion 305 is fixedly connected to the bottom of the second supporting plate 304 .
[0033] There are three second fixing plates 301 , and the second fixing plates 301 are configured as a detachable structure. The second support plate 304 and the second fixing plate 301 are configured as a detachable structure, which is convenient for users to dismantle after the water level returns to normal after the water conservancy project construction is completed.
[0034] The implementation principle of an emergency dam for a water conservancy project in the embodiment of the present application is as follows: when in use, after placing the dam wall 101 on the ground, the first support plate 107 is rotated and spread on the ground through the rotating rod 106, and the first anti-skid protrusion 108 effectively prevents the first support plate 107 from slipping. The first support plate 107 can also be rotated and stored through the rotating rod 106, which is convenient for secondary use after storage. The connecting rod 103 is plugged into the connecting hole 102 to realize the merging and splicing of multiple dam walls 101. The first ground plug 201 is inserted into the ground so that the second ground plug 203 is inserted, which makes the overall device more secure. The second support plate 304 and the second fixing plate 301 are set as a disassembly structure, which is convenient for users to dismantle after the water level returns to normal after the construction of the water conservancy project is completed.
[0035] The above-mentioned implementation modes are only preferred implementation modes of the present invention, and cannot be used to limit the protection scope of the present invention. Any non-substantial changes and substitutions made by technicians in this field on the basis of the present invention shall fall within the scope of protection required by the present invention.
Claims
1. An emergency dam for a water conservancy project, It is characterized in that It comprises a dam structure (1), a foundation structure (2) and a support structure (3), wherein the foundation structure (2) is located at the bottom of the dam structure (1), and the support structure (3) is located on the surface of the dam structure (1); The dam structure (1) comprises a dam wall (101), a connection hole (102) is provided on one side of the dam wall (101), a connection rod (103) is fixedly connected to the other side of the dam wall (101), a first fixing plate (104) is fixedly connected to the surface of the dam wall (101), a groove (105) is provided on the surface of the first fixing plate (104), a rotating rod (106) is rotatably connected inside the groove (105), a first supporting plate (107) is fixedly connected to the surface of the rotating rod (106), and a first anti-slip protrusion (108) is fixedly connected to the bottom of the first supporting plate (107).
2. A water conservancy project emergency dam as claimed in claim 1, Features: The connection hole (102) matches the size of the connection rod (103), and the groove (105) is configured as a semicircular structure.
3. The emergency dam for water conservancy projects according to claim 1, Features: The anchor structure (2) comprises a first ground plug (201), the bottom of the first ground plug (201) being fixedly connected to a first pointed head (202), the surface of the first ground plug (201) being fixedly connected to a second ground plug (203), and the bottom of the second ground plug (203) being fixedly connected to a second pointed head (204).
4. A water conservancy project emergency dam as claimed in claim 3, Features: The number of the first ground plugs (201) is three, and the number of the second ground plugs (203) is twelve.
5. The emergency dam for water conservancy projects according to claim 1, Features: The support structure (3) comprises a second fixing plate (301), a threaded hole (302) is provided on the surface of the second fixing plate (301), a screw rod (303) is arranged inside the threaded hole (302), one end of the second fixing plate (301) is fixedly connected to a second supporting plate (304), and the bottom of the second supporting plate (304) is fixedly connected to a second anti-slip protrusion (305).
6. A water conservancy project emergency dam as claimed in claim 5, Features: The number of the second fixing plates (301) is three, and the second fixing plates (301) are configured as a detachable structure.
