Novel anchoring structure for anchoring rubber dam
By combining bolt anchors and wedge anchors, the problems of insufficient fixing strength and weak erosion resistance of the rubber dam are solved, achieving higher connection strength and service life, ensuring the stability and sealing effect of the rubber dam, and simplifying installation process.
Patent Information
- Application Number
- CN202323489618.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2033-12-21
AI Technical Summary
The existing rubber dam fixation method uses soft connections and hinged links, which have problems of insufficient strength and weak erosion resistance, resulting in a failure to guarantee the service life.
The combination of bolt anchors and wedge anchors is used to ensure the firm connection between the rubber dam and the foundation through components such as anchor bolts, nuts and lower pads, enhancing the tensile strength and resistance to water flow impact, and anchoring through wedges Provides friction to prevent slipping.
It improves the connection strength, service life and sealing effect of the rubber dam, ensures the stability and reliability of anchoring, extends the service life, simplifies the installation process, and saves time and human resources.
Smart Images

Figure CN221798337U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of rubber dams, in particular to a novel anchoring structure for anchoring rubber dams. Background Art
[0002] A rubber dam is a device used for irrigation, drainage and flood control in water conservancy projects. It is made of rubber material and has the characteristics of softness, corrosion resistance and aging resistance. It can adapt to various water level changes and has good sealing performance and anti-seepage effect. During use, the rubber dam needs to be firmly fixed on the water body or soil to ensure its stability and working effect. The existing fixing method uses soft connection and hinge connection. The strength of this connection method has problems, the service life cannot be guaranteed, and the anti-scouring ability in the river channel is weak. Utility Model Content
[0003] The utility model provides a novel anchoring structure for anchoring a rubber dam, which solves the problems of strength problems, inability to guarantee the service life and weak anti-scouring ability in the river channel.
[0004] In order to solve the above technical problems, the technical solution of the utility model is as follows:
[0005] The embodiment of the utility model provides a new anchoring structure for anchoring a rubber dam, comprising:
[0006] Base;
[0007] A rubber dam connected to the foundation via bolt anchors;
[0008] A wedge anchor is connected to the rubber dam.
[0009] Furthermore, the bolt anchor comprises an anchor bolt and a first nut, the first nut is sleeved outside the anchor bolt, and one end of the anchor bolt and the first nut are embedded in the foundation.
[0010] Furthermore, the bolt anchor also includes a second nut, and the second nut is connected to the other end of the anchor bolt.
[0011] Furthermore, the wedge anchor includes a lower pad, which is sleeved outside the anchor bolt, located between the first nut and the second nut, and connected to the foundation.
[0012] Further, the wedge anchor also includes an upper pressure plate matched with the lower pad;
[0013] The upper pressing plate is sleeved outside the anchor bolts.
[0014] Furthermore, the rubber dam is sandwiched between the lower pad and the upper pressure plate, and is sleeved outside the anchor bolt.
[0015] The above solution of the utility model includes at least the following beneficial effects:
[0016] The novel anchoring structure of the rubber dam anchoring described in the utility model, the combination of the rubber dam wedge anchoring and the bolt anchoring can provide guarantees for connection strength, service life, force rationality and ease of installation; by combining hard links and soft links, the rubber dam anchoring system can remain stable while bearing pressure, and can also extend the service life, and can also achieve greater sealing strength, ensuring that the anchoring effect of the rubber dam is more reliable; the rubber dam anchoring is easy to install and can save a lot of time and human resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a structural schematic diagram of a novel anchoring structure of a rubber dam anchoring of the utility model;
[0018] Figure 2 It is an enlarged view of the A part of the novel anchoring structure of the rubber dam anchoring of the utility model;
[0019] Figure 3 It is an enlarged view of position B of the novel anchoring structure of the rubber dam anchoring of the utility model.
[0020] Description of reference numerals:
[0021] 1. Foundation; 2. Rubber dam; 3. Bolt anchor; 4. Wedge anchor; 31. Anchor bolt; 32. First nut; 33. Second nut; 41. Lower pad; 42. Upper pressure plate. DETAILED DESCRIPTION
[0022] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0023] like Figure 1 As shown, an embodiment of the utility model provides a new anchoring structure for anchoring a rubber dam, comprising:
[0024] Foundation 1;
[0025] The rubber dam 2 is connected to the foundation 1 via bolt anchors 3;
[0026] The wedge anchor 4 is connected to the rubber dam 2 .
[0027] In the embodiment of the utility model, the rubber dam is an important equipment commonly used in water conservancy projects, which is used to regulate water flow, prevent floods and protect river banks; the rubber dam 2 is connected to the foundation 1 by bolt anchors 3, which can ensure that the rubber dam 2 is firmly fixed on the foundation 1; the wedge anchors 4 provide greater friction, enhance the stability of the anchoring, and make the rubber dam 2 not easy to move or slide. The special design of the wedge anchors 4 can form a close contact between it and the rubber dam 2, ensuring that the gap between the rubber dam 2 and the foundation 1 is effectively filled, thereby preventing water leakage; the new anchoring structure of the rubber dam anchoring combines the rubber dam wedge anchoring and bolt anchoring, and fully utilizes the advantages of the two anchoring methods. By installing bolt anchors 3 and wedge anchors 4 at different positions of the foundation 1, the firmness of the rubber dam can be enhanced and the sealing effect can be improved. This anchoring method is suitable for various types of rubber dam products and can improve the safety and reliability of the rubber dam.
[0028] like Figures 1 to 3 As shown, the bolt anchor 3 includes a foundation bolt 31 and a first nut 32 , the first nut 32 is sleeved outside the foundation bolt 31 , and one end of the foundation bolt 31 and the first nut 32 are embedded in the foundation 1 .
[0029] In the embodiment of the utility model, the bottom end of the anchor bolt 31 is hook-shaped, and the upper end is provided with a thread. The first nut 32 is connected to the anchor bolt 31 through the thread. The bottom ends of the first nut 32 and the anchor bolt 31 are pre-buried in the foundation 1, and the upper end of the anchor bolt 31 extends to the outside of the foundation 1; the hook-shaped anchor bolt 31 can form a firm anchor point inside the foundation 1, so that the rubber dam is fixed on the foundation with higher tensile strength and water flow impact resistance, reducing the safety risks caused by the rubber dam 2 detaching from the foundation 1.
[0030] like Figures 1 to 3 As shown, the bolt anchor 3 further includes a second nut 33 , and the second nut 33 is connected to the other end of the anchor bolt 31 .
[0031] In the embodiment of the utility model, the first nut 32 cooperates with the second nut 33, and the second nut 33 is connected to the upper end of the anchor bolt 31 to enhance the overall connection force of the anchor. The first nut 32 and the second nut 33 can clamp the rubber dam 2, thereby ensuring a stable connection between the rubber dam 2 and the foundation 1, and improving the overall stability and resistance to water flow impact; by adjusting the tightness of the second nut 33, the tightness of the connection point can be adjusted, and the tightness of the anchor can be adjusted according to actual needs to meet the requirements under different stress and environmental conditions; the presence of the second nut 33 makes the installation, disassembly and maintenance of the rubber dam 2 more convenient, and it can be adjusted or replaced as needed, thereby improving the overall maintainability.
[0032] like Figures 1 to 3 As shown, the wedge anchor 4 includes a lower pad 41 , which is sleeved outside the anchor bolt 31 , located between the first nut 32 and the second nut 33 , and connected to the foundation 1 .
[0033] In the embodiment of the utility model, the lower pad 41 is pre-buried in the concrete foundation 1, and the lower surface of the lower pad 41 forms a firm connection with the foundation 1; the lower pad 41 increases the contact area between the anchor and the foundation, provides a larger support area, disperses the pressure between the anchor and the foundation 1, enhances the stability of the anchoring, and reduces the possibility of movement or sliding of the rubber dam; the lower pad 41 can evenly disperse the anchoring force to the foundation 1, reduce the stress concentration at the anchoring point, reduce the bearing pressure of the foundation, and improve the safety and stability of the foundation; the upper surface of the lower pad 41 is wavy, which provides friction with the rubber dam 2.
[0034] like Figures 1 to 3 As shown, the wedge anchor 4 further includes an upper pressing plate 42 matched with the lower pad 41 ; the upper pressing plate 42 is sleeved outside the anchor bolt 31 .
[0035] In the embodiment of the utility model, the lower surface of the upper pressure plate 42 is a wave shape matched with the lower pad 41. By clamping the rubber dam 2 by the upper pressure plate 42 and the lower pad 41, the contact area between the wedge anchor 4 and the rubber dam 2 can be increased, the friction force can be increased, the anchoring force can be dispersed, and the stability and firmness of the anchoring can be improved; and the upper pressure plate 42 and the lower pad 41 avoid direct contact between the rubber dam 2 and the concrete foundation 1 and the bolts, provide protection for the rubber dam 2, reduce wear, and increase the service life of the rubber dam 2; the upper pressure plate 42 and the lower pad 41 also enhance the sealing effect, ensuring that the gap between the rubber dam 2 and the foundation 1 is effectively filled, thereby preventing water leakage.
[0036] like Figures 1 to 3 As shown, the rubber dam 2 is sandwiched between the lower pad 41 and the upper pressure plate 42 , and sleeved outside the anchor bolt 31 .
[0037] In the embodiment of the present invention, during installation, at the upstream anchor point (reference Figure 2 ), the rubber dam 2 is folded back, and the clamping and folding installation of the rubber dam form a tight connection between the rubber dam and the lower pad, the upper pressure plate and the anchor bolts, preventing the rubber dam 2 from being separated from the anchor during use, ensuring the stable and firm connection between the rubber dam 2 and the foundation 1; the elastic characteristics of the rubber dam can absorb and reduce the impact of water flow impact or structural vibration on the anchor, reduce the structural stress, and improve the seismic performance of the structure.
[0038] When installing the embodiment of the utility model, first, the positions of the upstream anchor point and the downstream anchor point are determined on the concrete foundation, then the anchor bolts 31 and the first nuts 32 are pre-buried in the concrete foundation, and the lower pad 41 is sleeved on the anchor bolts 31 and placed on the concrete foundation; in order to ensure the installation space of the upper pressure plate 42, the required installation space is reserved using a template, and then the foundation concrete is poured; after the concrete solidifies and the strength reaches the requirement, the rubber dam is installed, and the rubber dam is passed through the anchor bolts 31, and at the same time When the rubber dam bag is folded back, it can prevent it from falling off; then install the wedge-shaped upper pressure plate 42, pass through the anchor bolt 31, make the lower surface of the upper pressure plate 42 match the upper surface of the lower pressure plate 41, and ensure the sealing of the rubber dam; finally, screw the second nut 33 onto the anchor bolt 31, and by adjusting the tightness of the second nut 33, the tightness of the connection point can be adjusted, and the fastening force of the anchor can be adjusted according to actual needs; ensure the firm connection between the rubber dam and the foundation, and improve the overall stability and water flow impact resistance.
[0039] During the manufacturing process of the rubber dam, the molding methods of the ground-contacting section and the lifting section of the dam bag are slightly different; first, the splicing method is adopted in the manufacturing process of the ground-contacting section of the dam bag. During splicing, the rubber material is cut according to a certain size and shape, and bonded at the seams. Multiple rubber sheets can be spliced into a complete ground-contacting section of the dam bag. The splicing process needs to pay attention to the selection and use of adhesives to ensure the firmness and sealing of the seams; and for the lifting section of the dam bag, the overall molding and vulcanization method is adopted. Overall molding refers to placing the rubber material in a mold, and undergoing high temperature and high pressure vulcanization treatment to form it into an integral lifting section of the dam bag. Overall molding and vulcanization can ensure the uniformity and consistency of the lifting section of the dam bag, and improve its firmness and durability; by seamlessly splicing the ground-contacting section and the lifting section, the two parts are bonded together to form a continuous and seamless rubber dam, which can ensure the integrity and sealing of the rubber dam.
[0040] The anchoring of the rubber dam uses a combination of wedge anchoring and bolt anchoring to ensure the strength of the connection. The wedge anchoring of the rubber dam can provide greater friction, enhance the stability of the connection, and effectively prevent the movement or sliding of the rubber dam, while the bolt anchoring can provide additional fixing force to ensure the firmness of the connection. By combining the two anchoring methods, their advantages can be fully utilized to ensure the strength of the connection; secondly, the combination of the wedge anchoring of the rubber dam and the bolt anchoring can also ensure the service life of the connection. The wedge anchoring material of the rubber dam has good weather resistance and corrosion resistance, and can withstand long-term water erosion and environmental influences. The bolt anchoring material has also been specially treated and has a longer service life. By combining the two anchoring methods, the service life of the connection can be extended and the frequency of replacement and maintenance can be reduced; in addition, the wedge anchoring of the rubber dam The combination of wedge anchoring and bolt anchoring ensures the rationality of the connection force. The wedge anchoring can provide greater friction and disperse the force at the connection. The bolt anchoring can provide additional fixing force at the connection to make the connection force evenly distributed. By reasonably designing and selecting the position and method of wedge anchoring and bolt anchoring, the connection force can be reasonable, local stress concentration can be reduced, and the safety and stability of the connection can be improved. Finally, the installation of wedge anchoring and bolt anchoring of rubber dams is relatively simple. Both wedge anchoring and bolt anchoring adopt standardized design and manufacturing. The installation process is simple and clear. The wedge anchoring can achieve quick fixing by embedding the wedge between the rubber dam and the foundation. The bolt anchoring can achieve connection fixation by tightening the bolts and nuts. By combining the two anchoring methods, it can flexibly adapt to different installation requirements and save installation time and cost.
[0041] The above is a preferred embodiment of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A new anchoring structure for rubber dam anchoring, characterized in that: include: Basics (1); The rubber dam (2) is connected to the foundation (1) via bolt anchors (3); A wedge anchor (4) is connected to the rubber dam (2); the bolt anchor (3) comprises a foundation bolt (31) and a first nut (32), the first nut (32) being sleeved outside the foundation bolt (31), and one end of the foundation bolt (31) and the first nut (32) being embedded in the foundation (1); the bolt anchor (3) further comprises a second nut (33), the second nut (33) being connected to the other end of the foundation bolt (31).
2. The new anchoring structure for rubber dam anchoring according to claim 1 is characterized in that: The wedge anchor (4) comprises a lower pad (41), which is sleeved outside the anchor bolt (31), located between the first nut (32) and the second nut (33), and connected to the foundation (1).
3. The new anchoring structure for rubber dam anchoring according to claim 2 is characterized in that: The wedge anchor (4) further comprises an upper pressure plate (42) matched with the lower pad (41); The upper pressing plate (42) is sleeved outside the anchor bolt (31).
4. The novel anchoring structure for rubber dam anchoring according to claim 3 is characterized in that: The rubber dam (2) is sandwiched between the lower pad (41) and the upper pressure plate (42), and is sleeved outside the anchor bolt (31).