High-strength crank arm for steel dam
By designing a locking bushing and a reinforcing ring and block structure on the steel dam arm, the problems of low strength and poor stability of the existing arm are solved, the strength and stability of the structure are significantly improved, and the requirements for high-strength applications are met.
Patent Information
- Application Number
- CN202420153740.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-22
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-01-22
AI Technical Summary
The existing steel dam gate arm structure has low strength and poor stability, especially at the joints, making it difficult to meet high-strength requirements.
A high-strength crank arm for steel dams is designed. By penetrating the locking sleeve on the crank body, and fixing reinforcing rings and peripheral spacer reinforcing blocks at both ends of the locking sleeve, the traditional locking shaft hole structure is improved and added Structural strength and stability.
The overall strength and stability of the arm body are improved, and the load-bearing capacity of the connection with other components is enhanced.
Smart Images

Figure CN221798360U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy projects, in particular to a high-strength crank arm for a steel dam. Background Art
[0002] With the needs of urban water use, landscape construction, environmental improvement, irrigation and flood control and drainage projects, various water conservancy gates have been widely used in these projects. Among them, steel dam gates have many advantages, such as adaptability to wide rivers, simple structure, saving civil engineering investment, can be closed to store water, can be opened to drain water, usually use the top of the gate to pass water, can also form artificial waterfall landscape, and can freely adjust the water blocking height to control the water level, etc., and are widely used in various water conservancy projects.
[0003] The steel dam gate requires a crank arm locking device, which includes a locking seat embedded part, a locking seat, a locking shaft, a driving member support, a locking shaft driving member and a crank arm, wherein the crank arm is a key component connecting the bottom shaft and the driving device, and plays a role in force transmission. Therefore, high emphasis is placed on the crank arm, and the existing crank arm structure is single, with low structural strength and poor stability, especially at the connection with other components, the strength needs to be strengthened. Therefore, the utility model proposes a high-strength crank arm for steel dams. Utility Model Content
[0004] The utility model aims to provide a high-strength crank arm for a steel dam to solve the problems raised in the above-mentioned background technology.
[0005] In order to solve the above technical problems, the utility model provides the following technical solutions: a high-strength crank arm for a steel dam, comprising a crank arm body, a locking sleeve penetrating the crank arm body, and reinforcement rings are respectively fixed at both ends of the locking sleeve.
[0006] A plurality of reinforcing blocks are fixed at intervals along the circumference of the outer sides of both ends of the locking sleeve.
[0007] The reinforcement block is a triangular structure.
[0008] The locking sleeve is located on a section inside the crank arm body and is fixed with a plurality of reinforcing plates at intervals along its circumference.
[0009] The reinforcing plate is triangular at both ends and has a straight plate structure in the middle.
[0010] Compared with the prior art, the beneficial effects achieved by the utility model are as follows: the utility model redesigns the crank arm body structure, and a locking sleeve is provided through the crank arm body, and the traditional locking shaft hole is changed to a locking shaft sleeve. Reinforcement rings are respectively fixed at both ends of the locking shaft sleeve, so that the locking shaft can pass through the locking shaft sleeve instead of the traditional locking shaft hole, thereby improving the strength and stability of the crank arm body structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. In the accompanying drawings:
[0012] Figure 1 It is a side view structural schematic diagram of a high-strength crank arm for a steel dam of the utility model;
[0013] Figure 2 This is a schematic diagram of the main structure of a high-strength crank arm for a steel dam of the utility model;
[0014] In the figure: 1 crank arm body; 2 locking sleeve; 3 reinforcement ring; 4 reinforcement block; 5 reinforcement plate. DETAILED DESCRIPTION
[0015] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0016] Example 1
[0017] See also Figure 1-2 The utility model provides a technical solution: a high-strength crank arm for a steel dam, comprising a crank arm body 1, a locking sleeve 2 is fixedly provided through the crank arm body 1, and reinforcement rings 3 are respectively fixedly provided at both ends of the locking sleeve 2.
[0018] Multiple reinforcement blocks 4 are fixed at intervals along the circumference of the outer sides of both ends of the locking sleeve 2, further improving the strength and stability of the crank arm body 1 structure.
[0019] The reinforcing block 4 is a triangular structure, has strong structural stability, and improves the strength and stability of the overall structure of the crank body 1.
[0020] Example 2
[0021] See also Figure 1 The locking sleeve 2 is located in a section of the crank arm body 1 and has a plurality of reinforcing plates 5 fixed at intervals along its circumference, further improving the strength and stability of the crank arm body 1 structure.
[0022] The reinforcing plate 5 is triangular at both ends and has a straight plate structure in the middle, which has strong structural stability and improves the strength and stability of the overall structure of the crank body 1.
[0023] It should be noted that relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises", or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article, or device that includes a series of elements includes not only those elements, but also other elements that are not explicitly listed, or also includes elements that are inherent to such process, method, article, or device.
[0024] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A high-strength crank arm for a steel dam, comprising a crank arm body (1), characterized in that: The crank arm body (1) is provided with a locking sleeve (2) extending through it, and reinforcement rings (3) are fixedly provided at both ends of the locking sleeve (2), and a plurality of reinforcement plates (5) are fixedly provided at intervals along the circumference of a section of the locking sleeve (2) located inside the crank arm body (1), and the reinforcement plates (5) are triangular at both ends and a straight plate structure in the middle.
2. The high-strength crank arm for a steel dam according to claim 1, characterized in that: Multiple reinforcement blocks (4) are fixed at intervals along the circumference of the outer sides of both ends of the locking sleeve (2).
3. The high-strength crank arm for a steel dam according to claim 2, characterized in that: The reinforcement block (4) is a triangular structure.