Directional drilling construction pipeline outer wall grouting plugging device

By designing a grouting sealing device including an inner steel belt, an outer steel belt, a rubber pad, a positioning hole, a screw rod and an adjusting nut, the problem of loose sealing of the outer wall of the pipe in non-grooved pipe construction is solved and the realization It ensures the quality of grouting and the effect of non-settlement of the ground surface.

CN221798445UActive Publication Date: 2024-10-01BEIJING SHOUGANG CONSTR GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323670295.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-30
Publication Date
2024-10-01
Estimated Expiration
2033-12-30

AI Technical Summary

Technical Problem

In the construction of existing non-grooved pipelines, the outer wall of the pipeline is not tightly sealed, making it difficult to ensure the quality of grouting, resulting in possible settlement of the ground surface.

Method used

A grouting sealing device including an inner steel belt, an outer steel belt, a rubber pad, a positioning hole, a screw rod and an adjusting nut is designed. Through the overlap and adjustment of these components, the rubber pad is connected to the pipeline and soil. Fits tightly to seal the gap between the pipe and the soil.

Benefits of technology

It realizes the tooling of grouting sealing, ensures the quality of grouting construction, prevents surface settlement, has a simple structure, is easy to install, is safe and efficient.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221798445U_ABST
    Figure CN221798445U_ABST
Patent Text Reader

Abstract

The utility model discloses a directional drilling construction pipeline outer wall grouting plugging device, and belongs to the technical field of underground pipeline jacking construction. Comprising a pipeline, a pipeline, an outer steel belt, a rubber cushion plate, a positioning hole, a screw rod, an adjusting nut and a hole channel soil body, eight adjusting nuts are welded on a pipeline at equal intervals and lead screws are installed on the pipeline, eight positioning holes are welded on an outer steel belt at equal intervals, the outer steel belt is in a lap joint mode, a rubber cushion plate is installed on the pipeline, the pipeline is installed on the outer side of the rubber cushion plate, the outer steel belt is installed on the inner side of the rubber cushion plate, and the lead screws are inserted into the positioning holes in the outer steel belt. The rubber cushion plate is tightly attached to the pipeline and the duct soil body. The device has the advantages of being simple in structure, safe, efficient and convenient to install, the grouting plugging quality of the gap between the directional drilling construction hole channel and the pipeline is guaranteed, and it is guaranteed that the earth surface does not settle after directional drilling pipeline construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of underground pipeline jacking construction, and in particular provides a directional drilling construction pipeline outer wall grouting and plugging device, which is suitable for non-grooving pipeline construction horizontal directional drilling construction. Background Art

[0002] Horizontal directional drilling construction for non-grooved pipeline construction is a commonly used construction method for municipal engineering. It has the advantages of fast construction speed and the ability to penetrate long-distance underground pipelines at a greater depth. With the help of directional drilling rigs, guide holes are drilled, holes are expanded and cleaned, and pipelines are pulled back. To facilitate the dragging of pipelines into the boreholes, the borehole diameter is designed to be 1.2-1.5 times the outer diameter of the pipeline. After the pipeline is dragged into the borehole, a cavity will be formed. When crossing roads, rivers and other areas where ground settlement is restricted, grouting of the outer wall of the pipeline is required to prevent the collapse of the borehole from causing surface settlement.

[0003] Before grouting, the outer wall of the pipe end and the hole need to be sealed. The current method of sealing is bricklaying or backfilling soil, which has problems such as being not tight and difficult to ensure the quality of grouting. Summary of the invention

[0004] The utility model aims to provide a grouting and plugging device for the outer wall of a pipeline in a directional drilling construction, which solves the problems that the existing method is not strict and it is difficult to ensure the quality of grouting, and realizes the tooling of grouting and plugging.

[0005] The grouting plugging device is easy to manufacture and install, and can plug the gap between the pipeline and the soil, ensuring the quality of the grouting construction and ensuring that there is no settlement problem on the surface after the directional drilling pipeline construction.

[0006] The utility model includes: a pipeline 1, an inner steel belt 2, an outer steel belt 3, a rubber pad 4, a positioning hole 5, a screw rod 6, an adjustment nut 7, and a channel soil 8. Eight adjustment nuts 7 are welded along the same spacing on the inner steel belt 2 and screw rods 6 are installed, eight positioning holes 5 are welded along the same spacing on the outer steel belt 3, the outer steel belt 3 is overlapped, and an adjustment amount of 100-200 mm is reserved, the rubber pad 4 is installed on the pipeline 1, the inner steel belt 2 is installed on the outside of the rubber pad 4, the outer steel belt 3 is installed on the inside of the rubber pad 4, the screw rod 6 is inserted into the positioning hole 5 on the outer steel belt 3, the screw rod 6 is adjusted in length, the rubber pad 4 is closely fitted with the pipeline 1 and the channel soil 8, and the grouting construction of the gap between the pipeline and the channel is subsequently carried out.

[0007] The utility model has the advantages of simple structure, safety, high efficiency, easy installation, ensuring the quality of grouting and plugging of gaps between directional drilling construction channels and pipelines, and ensuring that no ground settlement occurs after directional drilling pipeline construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0008] Figure 1It is a front cross-sectional view of the utility model of the pipeline outer wall grouting plugging device.

[0009] Figure 2 It is a side sectional view of the utility model of the pipeline outer wall grouting plugging device.

[0010] Figure 3 It is a partial enlarged view of injection A of the pipeline outer wall grouting plugging device of the utility model.

[0011] Figure 4 It is a partial enlarged view of injection B of the pipeline outer wall grouting and plugging device of the utility model.

[0012] Figure 5 It is a partial enlarged view of injection C of the pipeline outer wall grouting plugging device of the utility model.

[0013] In the figure, there are pipeline 1, inner steel belt 2, outer steel belt 3, rubber pad 4, positioning hole 5, screw rod 6, adjusting nut 7, and channel soil 8. DETAILED DESCRIPTION

[0014] Figure 1 — Figure 2 The utility model is a schematic diagram of a structural section.

[0015] The utility model comprises a receiving pipe 1, an inner steel belt 2, an outer steel belt 3, a rubber pad 4, a positioning hole 5, a screw rod 6, an adjusting nut 7 and a hole soil body 8.

[0016] Process the inner steel belt 2, outer steel belt 3, rubber pad 4, positioning holes 5, screw 6, and adjustment nuts 7. Weld eight adjustment nuts 7 along the same spacing on the inner steel belt 2 and install screw 6. Weld eight positioning holes 5 along the same spacing on the outer steel belt 3. The outer steel belt 3 is overlapped to leave an adjustment amount. Install the rubber pad 4 on the pipeline 1, install the inner steel belt 2 to the outside of the rubber pad 4, and install the outer steel belt 3 to the inside of the rubber pad 4. Insert the screw 6 into the positioning hole 5 on the outer steel belt 3, and adjust the length of the screw 6 to make the rubber pad 4 fit tightly with the pipeline 1 and the channel soil 8. Then carry out grouting construction of the gap between the pipeline and the channel.

Claims

1. A directional drilling construction pipeline outer wall grouting plugging device, characterized in that: include: A pipeline (1), an inner steel belt (2), an outer steel belt (3), a rubber pad (4), a positioning hole (5), a screw rod (6), an adjusting nut (7), and a duct soil body (8); eight adjusting nuts (7) are welded at the same intervals on the inner steel belt (2) and a screw rod (6) is installed; eight positioning holes (5) are welded at the same intervals on the outer steel belt (3); the outer steel belt (3) is overlapped and an adjustment amount of 100-200 mm is reserved; the rubber pad (4) is installed on the pipeline (1), the inner steel belt (2) is installed on the outer side of the rubber pad (4), the outer steel belt (3) is installed on the inner side of the rubber pad (4), the screw rod (6) is inserted into the positioning hole (5) on the outer steel belt (3), and the rubber pad (4) is tightly fitted with the pipeline (1) and the duct soil body (8).