Top beam steel support hanging plate structure for pipe gallery excavation
By setting up a Z-shaped hanging plate structure on the crown beam, the problem of steel supports falling off due to vibration is solved, construction safety and efficiency are improved, and the stable installation of steel supports is achieved.
Patent Information
- Application Number
- CN202420745892.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-11
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the construction of urban underground comprehensive pipe corridors, traditional steel supports are easy to fall off due to the vibration of the excavator, resulting in low construction safety and reduced efficiency.
A crown beam steel support hanging plate structure is adopted. The hanging plate is composed of a Z-shaped main plate, a fixed ring and a triangular reinforcement rib plate. It is fixed on the crown beam through a steel cable tensioning reinforcement rod to ensure that the steel support is stably installed.
It effectively prevents the steel support from falling due to vibration during construction, improves construction safety and efficiency, and has a simple structure and low production cost.
Smart Images

Figure CN221798460U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of urban underground comprehensive pipe gallery construction, in particular to a crown beam steel supporting hanging plate structure for pipe gallery excavation. Background Art
[0002] At present, the construction of urban underground comprehensive pipe corridors has effectively utilized underground space in order to avoid the common "road zipper" and "air spider web" phenomena in cities, save urban land resources, and improve investment efficiency. Since the comprehensive pipe corridor is built about 10m underground, the foundation pit is deep and the cross-section is large. During excavation and construction, due to unstable geology and vibration of the excavator, it is easy for the two sides of the foundation pit to overturn to the middle. Therefore, several steel supports are set in the foundation pit, and the two ends of the steel support are tightly fixed with the crown beams on both sides to prevent the two sides of the foundation pit from overturning to the middle. In the traditional pipe corridor excavation construction, the steel support is directly connected to the crown beam. After the excavator excavates, the vibration caused by the excavator can easily cause the steel support to fall off, affecting the safety of on-site construction and reducing construction efficiency. Utility Model Content
[0003] In view of the defects of the above-mentioned prior art, the technical problem to be solved by the utility model is to provide a crown beam steel support hanging plate structure for tunnel excavation which has a simple structure and can reinforce the steel support and effectively solve the problem of the steel support falling due to vibration during the tunnel excavation process.
[0004] In order to solve the above technical problems, the utility model adopts the following technical solutions: a crown beam steel support hanging plate structure for tunnel excavation, crown beams are arranged on the left and right sides of the tunnel foundation pit, and each crown beam is equipped with a hanging plate; the hanging plate is composed of a Z-shaped main board, a fixing ring and a pair of triangular reinforcing ribs, the vertical plate of the Z-shaped main board is close to the side wall of the crown beam close to the tunnel foundation pit, the upper horizontal plate of the Z-shaped main board is fitted on the top of the crown beam, the lower horizontal plate of the Z-shaped main board holds up the corresponding end of the steel support, and a reinforcing rib connected to the vertical plate is respectively arranged at the front and rear ends of the lower horizontal plate, the fixing ring is arranged on the top surface of the upper horizontal plate, and a reinforcing rod is also arranged on the crown beam outside the hanging plate, and the steel cable passes through the fixing ring and is sleeved on the reinforcing rod to tighten the hanging plate.
[0005] Preferably, the upper horizontal plate is fixedly mounted to the top of the crown beam by bolts arranged at the front and rear ends.
[0006] Preferably, the Z-shaped main board is formed in one piece by bending a rectangular plate.
[0007] Preferably, the width of the Z-shaped main board is 900 mm.
[0008] Preferably, the fixing ring is a semicircular plate with a through hole in the middle, and is fixed to the upper horizontal plate by welding.
[0009] The beneficial effects of the utility model are as follows: by setting up a hanging plate, it is stably installed on the foundation pit concrete and at the same time drags the end of the steel support to avoid the steel support falling due to vibration during the excavation of the corridor, causing damage to equipment or personnel, thereby improving the safety during construction, and the hanging plate has a simple structure and low production cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 It is a schematic diagram of the structure of the utility model;
[0011] Figure 2 This is an assembly diagram of the utility model (only showing the state where the steel support on one side of the tunnel foundation pit is installed on the crown beam through the hanging plate);
[0012] In the figure: 1-vertical plate, 2-upper horizontal plate, 3-lower horizontal plate, 4-fixing ring, 5-reinforcement rib plate, 6-crown beam, 7-pipe gallery foundation pit, 8-steel support, 9-reinforcement rod, 10-steel cable. DETAILED DESCRIPTION
[0013] In order to better understand the improvements made by the present invention relative to the prior art, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0014] like Figure 1 As shown in FIG. 2 , a crown beam steel support hanging plate structure is used for tunnel excavation. Crown beams 6 are provided on the left and right sides of the tunnel foundation pit. Each crown beam 6 is equipped with a hanging plate for holding up the steel support 8.
[0015] The hanging plate is composed of a Z-shaped main plate, a fixing ring 4 and a pair of triangular reinforcing ribs 5. The Z-shaped main plate is formed by bending a rectangular plate in one piece and has a width of 900 mm.
[0016] The vertical plate 1 of the Z-shaped main plate is close to the side wall of the crown beam 6 and close to the side of the tunnel foundation pit 7. The upper horizontal plate 2 of the Z-shaped main plate is installed on the top of the crown beam 6, and the upper horizontal plate 2 is fixed and installed on the top of the crown beam 6 by bolts set at the front and rear ends. The lower horizontal plate 3 of the Z-shaped main plate holds up the corresponding end of the steel support 8, and a reinforcing rib 5 connected to the vertical plate 1 is set at each of the front and rear ends of the lower horizontal plate 3.
[0017] The fixing ring 4 is arranged on the top surface of the upper horizontal plate. The fixing ring 4 is a semicircular plate with a through hole in the middle and is fixed to the upper horizontal plate 2 by welding. A reinforcing rod 9 is also arranged on the crown beam 6 outside the hanging plate. The steel cable 10 passes through the fixing ring 4 and is sleeved on the reinforcing rod 9 to tighten the hanging plate to prevent the upper end of the Z-shaped main plate from tilting under the action of the steel support 8.
[0018] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A crown beam steel support plate structure for pipe gallery excavation, wherein crown beams (6) are provided on the left and right sides of the pipe gallery foundation pit, and the characteristics are: Each side crown beam (6) is equipped with a hanging plate; the hanging plate is composed of a Z-shaped main plate, a fixing ring (4) and a pair of triangular reinforcing ribs (5); the vertical plate (1) of the Z-shaped main plate is closely attached to the side wall of the crown beam (6) close to the side of the tunnel foundation pit (7); the upper horizontal plate (2) of the Z-shaped main plate is fitted and installed on the top of the crown beam (6); the lower horizontal plate (3) of the Z-shaped main plate holds up the corresponding end of the steel support (8); the front and rear ends of the lower horizontal plate (3) are each provided with a reinforcing rib (5) connected to the vertical plate (1); the fixing ring (4) is arranged on the top surface of the upper horizontal plate; a reinforcing rod (9) is also arranged on the crown beam (6) outside the hanging plate; the steel cable (10) passes through the fixing ring (4) and is sleeved on the reinforcing rod (9) to tighten the hanging plate.
2. The crown beam steel support plate structure for pipe gallery excavation according to claim 1 is characterized in that: The upper horizontal plate (2) is fixedly mounted on the top of the crown beam (6) by bolts arranged at the front and rear ends.
3. The crown beam steel support plate structure for pipe gallery excavation according to claim 1 is characterized in that: The Z-shaped main board is formed in one piece by bending a rectangular plate.
4. The crown beam steel support plate structure for pipe gallery excavation according to claim 2 is characterized in that: The width of the Z-shaped main board is 900 mm.
5. The crown beam steel support plate structure for pipe gallery excavation according to claim 1 is characterized in that: The fixing ring (4) is a semicircular plate with a through hole in the middle, and is fixed to the upper horizontal plate (2) by welding.