Foundation pit enclosure structure and enclosure system for vertical shaft construction
By using a combined structure of anchored diaphragm walls, cast-in-place piles, concrete floors and gravel bodies in the construction of foundation pits and shafts, the problems of foundation pit slope stability and construction complexity are solved, and the structural strength is improved and the construction speed is improved. It speeds up the process, simplifies the process, and reduces environmental impact and construction costs.
Patent Information
- Application Number
- CN202420270321.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-04
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2034-02-04
Smart Images

Figure CN221798463U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a foundation pit enclosure structure and enclosure system for shaft construction, which is mainly applicable to the technical field of urban deep tunnel drainage water inlet fore pool and water inlet shaft construction. Background Art
[0002] During the construction of the comprehensive flood control and drainage system project in the urban environment, the stability and safety of the excavation and support of the foundation pit slope is the focus of the slope engineering. At present, the traditional construction method is to surround the foundation pit by installing a continuous wall around the foundation pit. During the period of abundant groundwater or rainy season, with the rise of groundwater level and the instantaneous increase of rainfall, the short-term flow rate is large and the flow rate is fast, which has a huge impact on the stability and safety of the foundation pit slope during the construction period. If the support structure is not stable enough, problems such as slope instability will occur, affecting the safety of the project. In view of the narrow and long urban river channel, the limited space for the layout of regional site structures, and the complex enclosure structure of the conventional flood control and drainage water inlet forebay and shaft, the limited layout of the narrow space in the site, the process conversion and connection during the construction process have a great constraint on the overall construction period and cost, which is a severe test for the selection of the foundation pit support structure. In order to ensure the safety of the foundation pit slope project and quickly complete the construction of the main structure of the foundation pit, it is necessary to optimize the support structure of the flood control and drainage system. Utility Model Content
[0003] The technical problem to be solved by the utility model is: in order to solve the above technical problem, the utility model provides a foundation pit retaining structure and a retaining system for shaft construction.
[0004] The technical solution adopted by the utility model is: a foundation pit enclosure structure for shaft construction, characterized in that: it has a foundation pit continuous wall anchored into the ground, the foundation pit continuous wall is connected end to end, the area surrounded by the foundation pit continuous wall is the construction area, the foundation pit is excavated in the construction area, cast-in-place piles are driven in the position near the foundation pit continuous wall in the foundation pit along the arrangement direction of the foundation pit continuous wall, a concrete bottom plate is cast on the foundation pit ground near the foundation pit continuous wall, a concrete retaining wall is cast on the concrete bottom plate and arranged along the arrangement direction of the foundation pit continuous wall, and a slag body is filled between the concrete retaining wall and the foundation pit continuous wall. In this way, after the foundation pit continuous wall is anchored into the ground around the foundation pit, by setting the cast-in-place piles, concrete bottom plate, concrete retaining wall and the slag body filled between the concrete retaining wall and the foundation pit continuous wall fixed together, the foundation pit continuous wall plays a good supporting role, and the structural strength of the foundation pit enclosure is greatly enhanced.
[0005] An auxiliary wall connected end to end along the arrangement direction of the continuous wall is anchored in the foundation pit near the continuous wall of the foundation pit, a steel bar connector is fixedly installed at the contact position of the continuous wall of the foundation pit with the concrete bottom plate, and oil felt is laid at the contact position of the auxiliary wall with the concrete bottom plate. In this way, after the auxiliary wall is anchored, cast-in-place piles are driven into the foundation pit between the auxiliary wall and the continuous wall of the foundation pit, which is convenient for positioning the cast-in-place pile construction; when pouring the concrete bottom plate, the auxiliary wall and the continuous wall of the foundation pit cooperate to play the role of a mold, and when pouring the concrete bottom plate, the concrete bottom plate is fixedly connected to the continuous wall of the foundation pit under the action of the steel bar connector, and the oil felt arranged at the contact position of the auxiliary wall with the concrete bottom plate facilitates the separation of the auxiliary wall from the concrete bottom plate when the auxiliary wall is removed.
[0006] Steel supports are installed between the continuous wall of the foundation pit and the auxiliary wall above the foundation pit. In this way, the steel supports play a good supporting role for the auxiliary wall, and the steel supports need to be removed when pouring the concrete retaining wall.
[0007] The auxiliary wall is composed of PC construction piles and Larsen steel sheet piles spliced in sequence.
[0008] Crown beams are arranged on the tops of the foundation pit continuous wall and the auxiliary wall.
[0009] The concrete retaining wall is provided with drainage holes, and reinforcing ribs are provided between the concrete retaining wall and the concrete bottom plate.
[0010] A retaining system for shaft construction, using the above foundation pit retaining structure, characterized in that: a shaft continuous wall is anchored in the foundation pit at the location of the shaft construction, cement mixing piles are evenly driven in the foundation pit at the locations around the shaft continuous wall, and a foundation pit bottom plate is paved on the ground of the foundation pit. In this way, the shaft continuous wall protects the shaft area during the shaft construction, and the cement mixing piles driven into the ground around the shaft increase the structural strength of the ground around the shaft, preventing the soil around the shaft from falling into the shaft during the shaft construction.
[0011] The beneficial effects of the utility model are as follows: the utility model is provided with bored piles, concrete bottom plate and concrete retaining wall in the continuous wall of the foundation pit around the foundation pit, and slag is filled between the concrete retaining wall and the continuous wall of the foundation pit, so the structure is simple, the deformation of the enclosure structure can be effectively controlled, and the surrounding environment protection is more beneficial to the surrounding environment protection, and the use of multiple large-span internal support systems can be avoided during the excavation of the foundation pit, and the construction waste generated by the removal of a large number of internal supports in the later stage can be avoided, thus practicing green environmental protection; the utility model is provided with a foundation pit enclosure structure around the foundation pit and a vertical shaft enclosure structure around the vertical shaft, so the foundation pit excavation can be supported as it is excavated, the construction speed is fast, and the steel support is convenient to erect and dismantle. At the same time, the foundation pit size is small, the excavation and backbuilding time is short, and the time-space effect is good, so that the vertical shaft foundation pit excavation and the foundation pit retaining wall multi-process cross-operation can be implemented simultaneously, and the construction of the vertical shaft upper bottle mouth structure can be realized simultaneously with the construction of the water inlet front pool bottom plate, which is flexible and can effectively shorten the construction period. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 : A schematic plan view of the utility model.
[0013] Figure 2 : A schematic cross-sectional view of the utility model.
[0014] Figure 3 : The structural schematic diagram of the foundation pit retaining structure in the utility model.
[0015] Figure 4 : A schematic cross-sectional view of the auxiliary wall in the utility model.
[0016] In the figure: 1. Continuous wall of foundation pit; 2. Auxiliary wall; 2-1. PC method pile; 2-2. Larsen steel sheet pile; 3. Crown beam; 4. Steel support; 5. Concrete retaining wall; 6. Slag body; 7. Concrete bottom plate; 8. Steel bar connector; 9. Asphalt felt; 10. Cast-in-place pile; 11. Foundation pit bottom plate; 12. Vertical shaft; 13. Continuous wall of vertical shaft; 14. Cement mixing pile; 15. Foundation pit. DETAILED DESCRIPTION
[0017] The present invention will be further described in detail below with reference to the accompanying drawings and through examples. The following examples are provided to explain the present invention, but the present invention is not limited to the following examples.
[0018] This embodiment is a containment system for the construction of a shaft 12. A shaft continuous wall 13 is anchored on the ground around the shaft 12, the shaft continuous wall 13 surrounds the shaft 12, a foundation pit continuous wall 1 is anchored around the construction area of the shaft 12, and the soil between the foundation pit continuous wall 1 and the shaft continuous wall 13 is excavated to form a foundation pit 15.
[0019] In this embodiment, cement mixing piles 14 are evenly driven into the soil around the shaft continuous wall 13. This greatly enhances the structural strength of the soil around the shaft 12 and prevents the soil around the shaft 12 from entering the shaft 12 when the shaft 12 is being constructed.
[0020] In this embodiment, an auxiliary wall 2 connected end to end along the arrangement direction of the continuous wall 1 is anchored in the foundation pit 15 at a position close to the continuous wall 1, and a steel support 4 is installed between the auxiliary wall 2 and the continuous wall 1 above the foundation pit 15. In this way, the connection strength between the continuous wall 1 and the auxiliary wall 2 is enhanced during the construction of the retaining structure of the foundation pit 15.
[0021] In this embodiment, crown beams 3 are fixedly installed on the tops of the shaft continuous wall 13 , the foundation pit continuous wall 1 and the auxiliary wall 2 , and steel supports 4 are installed between the crown beams 3 of the foundation pit continuous wall 1 and the crown beams 3 of the auxiliary wall 2 .
[0022] In this embodiment, cast-in-place piles 10 are driven into the ground of the foundation pit 15 between the auxiliary wall 2 and the foundation pit continuous wall 1 along the arrangement direction of the foundation pit continuous wall 1, and a concrete base plate 7 is poured on the ground of the foundation pit 15 between the auxiliary wall 2 and the foundation pit continuous wall 1. The top of the cast-in-place pile 10 extends above the ground of the foundation pit 15. When the concrete base plate 7 is poured, the top of the cast-in-place pile 10 extends into the concrete base plate 7. When the concrete base plate 7 solidifies, the concrete base plate 7 is connected to the cast-in-place pile 10, thereby enhancing the overall structural strength. A steel bar connector 8 is fixedly installed at a corresponding position of the concrete base plate 7 on the foundation pit continuous wall 1. When the concrete base plate 7 is poured, the steel bar connector 8 extends into the concrete base plate 7. When the concrete base plate 7 solidifies, the concrete base plate 7 is connected to the foundation pit continuous wall 1 through the steel bar connector 8, thereby enhancing the overall structural strength. The auxiliary wall 2 is paved with asphalt felt 9 at a position corresponding to the concrete bottom plate 7, so that after the concrete bottom plate 7 solidifies and when the auxiliary wall 2 is removed, it is convenient to separate the concrete bottom plate 7 from the auxiliary wall 2.
[0023] In this embodiment, a concrete wall is cast on the concrete bottom plate 7, and the concrete wall is arranged along the arrangement direction of the foundation pit continuous wall 1. When casting the concrete wall, the steel support 4 between the foundation pit continuous wall 1 and the auxiliary wall 2 needs to be removed.
[0024] In this embodiment, drainage holes are provided on the concrete retaining wall 5, and the drainage holes are arranged in a plum blossom shape. Reinforcement ribs are provided between the concrete retaining wall 5 and the concrete bottom plate 7, and a slag body 6 is filled between the concrete retaining plate and the foundation pit continuous wall 1. In this way, under the cooperation of the foundation pit continuous wall 1, the cast-in-place piles 10, the concrete bottom plate 7, the concrete retaining wall 5 and the slag body 6, the support strength of the foundation pit 15 enclosure structure is greatly enhanced.
[0025] In this embodiment, a foundation pit 15 bottom plate 11 is paved on the ground of the foundation pit 15 , so that it is convenient for personnel and equipment to move in the foundation pit 15 .
[0026] The construction method of this embodiment is:
[0027] Carry out the construction of the shaft continuous wall 13 and the foundation pit continuous wall 1;
[0028] Carry out the construction of cement mixing pile 14;
[0029] Excavate the soil between the vertical shaft continuous wall 13 and the foundation pit continuous wall 1 to form a foundation pit 15. Before excavating the vertical shaft 12 foundation pit 15, drainage should be carried out first, and then the excavation cycle and support of the vertical shaft 12 foundation pit 15 should be completed, and a drainage ditch should be dug around the foundation pit 15;
[0030] An auxiliary wall 2 is driven into the foundation pit 15 at a position close to the foundation pit continuous wall 1, and a steel support 4 is installed between the auxiliary wall 2 and the foundation pit continuous wall 1 above the foundation pit 15;
[0031] Construction of cast-in-place piles 10 is performed on the ground of the foundation pit 15 between the auxiliary wall 2 and the foundation pit continuous wall 1;
[0032] Casting of a concrete bottom plate 7 is performed on the ground of the foundation pit 15 between the auxiliary wall 2 and the foundation pit continuous wall 1;
[0033] After the concrete bottom plate 7 solidifies, the concrete retaining wall 5 is poured on the concrete bottom plate 7. During the pouring process of the concrete retaining wall 5, the steel support 4 between the auxiliary wall 2 and the foundation pit continuous wall 1 needs to be removed;
[0034] Filling the space between the auxiliary wall 2 and the foundation pit continuous wall 1 with a slag body 6, and arranging a grass planting layer on the slag body 6;
[0035] Remove auxiliary wall 2.
[0036] The diameter of the cement mixing pile 14 is Φ850mm, the distance between two adjacent cement mixing piles 14 is 600mm, and the cement soil mixing pile is constructed in a marked continuous manner, according to the skip-type double-hole full-set remixing connection sequence, the water-cement ratio of the cement slurry is controlled at 1.5, and the cement content is 20%. The site is debugged according to different soil layers, and the most ideal mix ratio according to the site conditions is used as the construction mix ratio to ensure that the 28d unconfined compressive strength of the pile body is ≥1.0MPa.
[0037] Among them, the guide wall of the foundation pit continuous wall 1 adopts reinforced concrete structure, with a net distance of 1250mm, a rib thickness of 350mm, and a height of 2000mm. The net distance between the two guide walls is 5cm greater than the thickness of the foundation pit continuous wall 1. The earthwork of the guide wall trench is excavated by excavators and manually matched with the mold. The guide wall reinforced concrete is constructed in sections, each section is about 30m long, and the construction joints of the sections and the section joints of the continuous wall are staggered by more than 0.5m. After the guide wall is demolded, the wall support should be added in time, using 100×100mm square wood, with a horizontal spacing of 1500mm, and two upper and lower layers.
[0038] Among them, the foundation pit continuous wall 1 adopts a 1200mm thick reinforced concrete structure. According to different strata conditions, hydraulic slotting machines, double-wheel milling machines and hammers are selected for slotting construction. Hydraulic slotting machines are used for soft soil and fully weathered strata, double-wheel milling machines are used for strong weathered and medium weathered rocks (strength less than 40MPa), and hammers are used for slotting construction for rocks with higher strength.
[0039] Among them, the wall body of the foundation pit continuous wall 1 adopts a section system, which is divided into the leading section and the embedded section, and is constructed symmetrically.
[0040] Among them, the bottom cleaning and slurry replacement in the first trench of the foundation pit continuous wall adopts the reverse circulation replacement method and the lifting and grabbing method to clean the foundation after the trench is completed. When the sediment at the bottom of the trench has been cleared, the slurry is replaced in time to ensure that the sediment at the bottom of the trench is ≤100mm and the specific gravity of the mud at the bottom of the trench is ≤1.15g / cm3.
[0041] Among them, the wall body of the foundation pit continuous wall 1 should be continuous, uniform, without voids, roughness, defects, mud inclusions, missing reinforcement, etc. The allowable deviation of the center line of the wall top is less than 30mm, the wall inclination is less than 1‰, the thickness of the sediment at the bottom of the wall is less than 100mm, and the filling coefficient should not be less than 1.0.
[0042] Among them, the joints between the wall sections of the foundation pit continuous wall 1 adopt H-shaped steel joints.
[0043] Among them, the foundation pit continuous wall 1 is poured with concrete, and the underwater concrete strength grade is increased by one grade. Two guide tubes are set in the standard trough section (one guide tube on each side of the special-shaped trough section), the distance between the guide tubes is less than 3m, and the guide tube should not be more than 1.5m away from the end of the trough section. The concrete surface in the trough should rise evenly, and the height difference of the concrete surface at the two guide tubes should not be more than 0.3m, and the top should be 0.3~0.5m higher. The one-time capacity is not less than 3m 3 .
[0044] Among them, the over-pouring height of the foundation pit continuous wall 1 is 1000mm. Before the construction of the crown beam 3, the floating slurry on the top of the foundation pit continuous wall 1 should be chiseled off, and the residue, loose soil and accumulated water should be cleaned up. After the floating slurry is chiseled off, it must be ensured that the exposed wall top concrete reaches the design strength value, and the pile chiseling must not damage the quality of the wall.
[0045] Among them, RJP double high-pressure rotary jet piles with a diameter of 2000mm are used at the joints of the foundation pit continuous wall 1 to reinforce the waterproof performance; the specific parameters are: cement addition amount 35%, water-cement ratio 1:1.0, cement slurry pressure 30Mpa, air pressure 0.7~1Mpa, slurry flow rate 135~165L / min, high-pressure water pressure 20Mpa, and air flow rate of 1~2 cubic meters / Min.
[0046] Among them, a drainage ditch with a length of 400mm and a width of 400mm is set on the ground around foundation pit 15, and a sedimentation tank with a length of 1000mm, a width of 1000mm and a depth of 1000mm is set at intervals of 30m in the drainage ditch. The pit is drained by open ditches or blind ditches and collection wells; the bedrock fissure water in the pit is drained by a combination of open ditches or blind ditches and collection wells with a length of 500mm, a width of 500mm and a height of 1000mm.
[0047] Before excavation of the shaft 12, a pumping test is conducted to ensure that the rate of water level drop in the shaft is in a stable proportional relationship with the water output, so as to determine the effects of each section of the foundation pit 15 continuous wall 1 on the pressurized water.
[0048] The lower part of the shaft 12 masonry structure is constructed in reverse order, and the excavation surface of each lining construction is controlled to be 1.0m below the bottom of the lining structure;
[0049] Among them, after the vertical shaft 12 pit is excavated to the bottom, the reserved lining anchor connector is chiseled out, the concrete in the lining range is roughened, the slag is cleared and then poured, and the bottom plate and anchor piles are constructed immediately.
[0050] The diameter of the bored pile 10 is 850mm, the distance between two adjacent bored piles 10 is 600mm, and the bored pile 10 is constructed by skipping method; the bored pile 10 adopts original soil slurry (it is determined whether to use artificial slurry according to the test hole formation situation), and the mud index in the injection hole is: mud specific gravity 1.10-1.15g / cm3 (reverse circulation 1.05-1.10g / cm3); viscosity 18-22s (reverse circulation 16-18s); mud index discharged from the orifice, mud specific gravity is less than 1.30g / cm3 (reverse circulation is less than 1.15g / cm3); viscosity 22-26s (reverse circulation 18-22s). During the mud circulation process, the mud index can be magnified, and the sand remover is used to remove sand according to the actual construction situation on site to ensure the performance of the circulating mud.
[0051] Among them, the PC method pile adopts a spiral steel pipe with a diameter of 915mm and a wall thickness of 14mm. The gap of the PC method pile adopts a small-stop Larsen steel sheet pile 2-2 connection. The sinking speed of the PC method pile is controlled at 1m / Min. The PC method pile is backfilled with plain soil and compacted, and the surface is plastered with C30 plain concrete with a thickness of >50mm. The construction of PC method piles adopts resonance-free driving and static pulling technology.
[0052] Among them, after the slag body 6 between the foundation pit 15, the auxiliary wall 2, is filled, the PC construction piles can be pulled out, and the pulled out auxiliary wall 2 must be filled with cement slurry with a water-cement ratio of 0.5.
[0053] Among them, the 3rd degree of the crown beam is not less than 800mm, the diameter of the steel support 4 steel pipe is not less than 609mm, the wall thickness is not less than 16mm, the height of the H-shaped steel joint is 500mm, the width is 300mm, the web thickness is 13mm, and the wing plate thickness is 21mm.
[0054] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A foundation pit retaining structure for shaft construction, characterized in that: The invention comprises a foundation pit continuous wall (1) anchored into the ground, the foundation pit continuous wall (1) is connected end to end, the area surrounded by the foundation pit continuous wall (1) is a construction area, a foundation pit (15) is excavated in the construction area, cast-in-place piles (10) are driven into the foundation pit (15) at a position close to the foundation pit continuous wall (1) along the arrangement direction of the foundation pit continuous wall (1), a concrete bottom plate (7) is cast on the ground of the foundation pit (15) close to the foundation pit continuous wall (1), a concrete retaining wall (5) is cast on the concrete bottom plate (7) and arranged along the arrangement direction of the foundation pit continuous wall (1), and a slag body (6) is filled between the concrete retaining wall (5) and the foundation pit continuous wall (1).
2. The foundation pit retaining structure for shaft construction according to claim 1, characterized in that: An auxiliary wall (2) connected end to end along the arrangement direction of the continuous wall (1) is anchored in the foundation pit (15) at a position close to the continuous wall (1) of the foundation pit, a steel bar connector (8) is fixedly installed at a position where the continuous wall (1) of the foundation pit contacts a concrete bottom plate (7), and an oil felt (9) is laid at a position where the auxiliary wall (2) contacts the concrete bottom plate (7).
3. The foundation pit retaining structure for shaft construction according to claim 2, characterized in that: A steel support (4) is installed between the foundation pit continuous wall (1) and the auxiliary wall (2) above the foundation pit (15).
4. The foundation pit retaining structure for shaft construction according to claim 2, characterized in that: The auxiliary wall (2) is composed of PC method piles and Larsen steel sheet piles (2-2) spliced in sequence.
5. The foundation pit retaining structure for shaft construction according to claim 2, characterized in that: A cap beam (3) is provided on the top of the foundation pit continuous wall (1) and the auxiliary wall (2).
6. The foundation pit retaining structure for shaft construction according to claim 1, characterized in that: The concrete retaining wall (5) is provided with drainage holes, and reinforcing ribs are provided between the concrete retaining wall (5) and the concrete bottom plate (7).
7. A retaining system for shaft construction, using the retaining structure for foundation pit for shaft construction according to any one of claims 1 to 6, characterized in that: A vertical shaft continuous wall (13) is anchored in the foundation pit (15) at the location where the vertical shaft (12) is constructed, cement mixing piles (14) are evenly driven in the foundation pit (15) at the locations around the vertical shaft continuous wall (13), and a foundation pit bottom plate (11) is paved on the ground of the foundation pit (15).