Detection and alarm device applied to pile foundation concrete pouring elevation

By using probes and telescopic rod detection devices during the pile foundation concrete pouring process, it ensures that the concrete is poured to a predetermined height, solving the problems of excessive overfilling and difficulty in ensuring the quality of the completed piles, and achieving precise pouring and cost savings.

CN221798535UActive Publication Date: 2024-10-014TH ENG CO LTD OF CHINA RAILWAY 22 BUREAU GRP +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420282755.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-06
Publication Date
2024-10-01
Estimated Expiration
2034-02-06

AI Technical Summary

Technical Problem

During the pile foundation concrete pouring process, the concrete surface cannot be accurately judged, resulting in excessive overfilling, waste of concrete and increased pile breaking costs, and it is difficult to ensure the quality of the pile.

Method used

Design a detection and alarm device including a probe, a telescopic rod, a conductive sheet and a control box. By setting the probe in the pile foundation hole, when the concrete contacts the probe, the telescopic rod lifts up the conductive sheet and contacts the conductive bolt, triggering the alarm light and buzzer. buzzer to ensure filling reaches the set height.

Benefits of technology

It achieves accurate detection of the concrete pouring elevation of the pile foundation, avoids overfilling, saves concrete and labor costs, and improves the quality of the piles.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221798535U_ABST
    Figure CN221798535U_ABST
Patent Text Reader

Abstract

The utility model discloses a pile foundation concrete pouring elevation detection alarm device, which belongs to the technical field of pile foundations, and comprises a control box, the control box is connected with a clamping assembly through a first bolt, a clamping pipe is arranged in the clamping assembly, the clamping pipe is connected with a telescopic assembly through an anti-bending spring, and the telescopic assembly is connected with the control box through a second bolt. The telescopic assembly is connected with the second folding rod lifting lug through the self-locking folding rod. According to the utility model, the telescopic rod is adjusted to a required length, and then the telescopic rod with the probe extends into a pile foundation hole, so that silt and stones are contained in the concrete pouring process, and only when the concrete is poured to an expected position, the solid surface of the concrete is in contact with the probe and the telescopic rod is jacked up; a conductive sheet is in contact with a conductive bolt to switch on a power supply to trigger an alarm lamp strip buzzer in a control box, so that the device can accurately detect the elevation of concrete pouring in a pile foundation hole, and the pile foundation can be accurately poured to a set height.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of pile foundations, and in particular relates to an alarm device for detecting the elevation of concrete pouring in pile foundations. Background Art

[0002] Pile foundation has become an important foundation form in high-rise buildings, bridges and other projects. In particular, bored piles are a common structure in engineering construction. In order to ensure the quality of the pile foundation, a certain amount of over-pouring is required. The over-pouring height should be 0.5-1m, and the pile top elevation should be at least 0.5m higher than the design elevation. In actual construction, due to the presence of mud slag slurry at the bottom of the hole, the mixture with concrete cannot meet the design strength requirements after the pile top is formed. Therefore, a certain amount of concrete over-pouring is required, and it exceeds the design height by 0.5-1m, and then the pile is broken to the design pile top elevation;

[0003] However, at present, since the concrete surface cannot be accurately judged, in order to ensure the quality of the pile, it is better to over-pour 2-3m or even more. This not only wastes concrete, but also increases the labor cost of breaking the piles, and the processing of the remaining piles also increases the cost expenditure and environmental risks. Therefore, a device for detecting and alarming the elevation of pile foundation concrete pouring is needed to solve the above problems. Utility Model Content

[0004] The purpose of the utility model is to provide a detection and alarm device for pile foundation concrete pouring elevation to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a device for detecting and alarming the elevation of concrete pouring in a pile foundation, comprising a control box, wherein the control box is connected to a clamping assembly through a first bolt, a clamping tube is arranged inside the clamping assembly, the clamping tube is connected to a telescopic assembly through a bending-resistant spring, the telescopic assembly is connected to a second folding rod lifting ear through a self-locking folding rod, the second folding rod lifting ear is connected to the outside of a sleeve, a telescopic rod is connected inside the sleeve, a stabilizing rod lifting ear is connected outside the sleeve, the stabilizing rod lifting ear is connected to the same protective tube through two stabilizing rods, the protective tube is hinged to the load-bearing lifting ear through a pin, the load-bearing lifting ear is connected to the telescopic assembly through a screw, and the telescopic rod The top of the telescopic rod is connected to a second cover, the protective tube is arranged outside the second cover, the protective tube is connected to a load-bearing box, the load-bearing box is connected to the first cover, the bottom end of the telescopic rod is connected to a probe, the second cover is connected to a connecting rod, the top of the connecting rod is connected to the conductive sheet, the insulating sheet and the metal sheet through a threaded rod, the conductive sheet, the insulating sheet and the metal sheet are all arranged in the protective tube, the connecting rod outer sleeve is connected to a control spring, the two ends of the control spring are respectively connected to the metal sheet and the second cover, the conductive sheet is slidably connected to the same insulating bracket, the insulating bracket has two conductive bolts threadedly connected, the conductive bolt outer sleeve is connected to a buffer spring, and the top of the conductive bolt overlaps the first cover.

[0006] As a preferred embodiment, the clamping assembly includes a clamping plate, and three first threaded holes, two second threaded holes and one through hole are formed in the clamping plate.

[0007] As a preferred implementation, the clamping tube is clamped in the through hole, the first bolt is threadedly connected in the second threaded hole, and the three first threaded holes are all threadedly connected with the second bolt.

[0008] As a preferred embodiment, the telescopic assembly includes an externally threaded tube, one end of which is connected to a bending-resistant spring, the other end of which is threadedly connected to an internally threaded tube, the internally threaded tube is clamped in the first folding rod lifting ear, and one end of the internally threaded tube is connected to the load-bearing lifting ear via a screw.

[0009] As a preferred implementation, the telescopic rod is arranged between two stabilizing rods, and the first cover is arranged on the second cover.

[0010] As a preferred implementation, the clamping tube is arranged between the first bolt and the second bolt, and the control box is arranged on the clamping tube.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] The utility model is provided with a probe, a telescopic rod, a conductive sheet, a conductive bolt and a control box. The telescopic rod is adjusted to a required length, and then the telescopic rod with the probe is extended into the pile foundation hole. During the concrete pouring process, mud, sand and gravel are contained. Only when the concrete is poured to the expected position, the concrete solid surface contacts the probe and lifts the telescopic rod, so that the conductive sheet contacts the conductive bolt and the power is turned on to trigger the alarm light with buzzer in the control box, so that the device can accurately detect the elevation of the concrete poured in the pile foundation hole, so that the pile foundation can be accurately poured to the set height. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;

[0014] Figure 2 It is a schematic diagram of the structure of the externally threaded pipe of the utility model when viewed from above;

[0015] Figure 3 It is a schematic diagram of the structure of the utility model in a partial front view;

[0016] Figure 4 This is a schematic diagram of the front view structure of the insulating bracket of the utility model;

[0017] Figure 5 It is a schematic diagram of the side view structure of the insulating bracket of the utility model;

[0018] Figure 6 It is a schematic diagram of the side view structure of the clamping plate of the utility model;

[0019] Figure 7 It is a schematic diagram of the front view structure of the clamping plate of the utility model.

[0020] In the figure: 1, control box; 2, clamping assembly; 201, clamping plate; 202, first threaded hole; 203, second threaded hole; 204, through hole; 3, telescopic assembly; 301, external threaded tube; 302, internal threaded tube; 303, first folding rod lifting ear; 4, anti-bending spring; 5, self-locking folding rod; 6, load-bearing box; 7, first cover; 8, protective tube; 9, stabilizing rod; 10, second cover; 11, sleeve; 12, stabilizing rod lifting ear; 13, second folding rod lifting ear; 14, telescopic rod; 15, probe; 16, load-bearing lifting ear; 17, connecting rod; 18, control spring; 19, threaded rod; 20, conductive sheet; 21, insulating sheet; 22, metal sheet; 23, insulating bracket; 24, conductive bolt; 25, buffer spring; 26, first bolt; 27, clamping tube; 28, second bolt. DETAILED DESCRIPTION

[0021] The present invention will be further described below in conjunction with the embodiments.

[0022] The following examples are used to illustrate the present invention, but cannot be used to limit the scope of protection of the present invention. The conditions in the examples can be further adjusted according to specific conditions, and simple improvements to the method of the present invention under the premise of the concept of the present invention are within the scope of protection claimed by the present invention.

[0023] See also Figure 1-7 The utility model provides an alarm device for detecting the elevation of concrete pouring in pile foundation, including a control box 1, a control box 1, and a control box 1 connected to a clamping assembly 2 through a first bolt 26. By setting the control box 1, the control box 1 is transparent, and an alarm light with a buzzer is arranged in the control box 1, and a rechargeable power supply is provided to ensure long-term power supply at the construction site. A small hole is provided at the side end of the load-bearing box 6, and the purpose is to lead the wire from the side end hole of the box after the wire is connected to the bolt, and pass through the telescopic device tube. A small hole is also provided at the bottom end of the control box 1, and the wire passes through the hole to connect the power supply and the alarm light;

[0024] A clamping tube 27 is provided in the clamping assembly 2, and the clamping assembly 2 includes a clamping plate 201. Three first threaded holes 202, two second threaded holes 203 and one through hole 204 are provided in the clamping plate 201. The clamping tube 27 is clamped in the through hole 204. The first bolt 26 is threadedly connected in the second threaded hole 203. The three first threaded holes 202 are all threadedly connected with the second bolt 28. By providing the first bolt 26 and the second threaded hole 203, the first bolt 26 screwed into the second threaded hole 203 can install the control box 1 on the clamping plate 201.

[0025] The clamping tube 27 is connected to the telescopic assembly 3 through the anti-bending spring 4. By setting the anti-bending spring 4, when the probe 15 is subjected to the upward force of the concrete, the anti-bending spring 4 can be deformed, so that the probe 15 is not easily damaged due to excessive force;

[0026] The telescopic assembly 3 is connected to the second folding rod lifting lug 13 via the self-locking folding rod 5. By providing the self-locking folding rod 5, the self-locking folding rod 5 can support the sleeve 11 when the self-locking device is opened, and the sleeve 11 can prevent the five-meter-long telescopic rod 14 from shaking;

[0027] The telescopic assembly 3 includes an external threaded tube 301, one end of which is connected to the anti-bending spring 4, and the other end of the external threaded tube 301 is threadedly connected to the internal threaded tube 302. By arranging the external threaded tube 301 and the internal threaded tube 302, since the external threaded tube 301 can rotate in the internal threaded tube 302, the external threaded tube 301 and the internal threaded tube 302 cooperate with each other to form telescopic structures of different lengths;

[0028] The internal threaded tube 302 is clamped in the first folding rod lifting ear 303, one end of the internal threaded tube 302 is connected to the load-bearing lifting ear 16 by a screw, the telescopic rod 14 is arranged between the two stabilizing rods 9, the first cover 7 is arranged on the second cover 10, the clamping tube 27 is arranged between the first bolt 26 and the second bolt 28, the control box 1 is arranged on the clamping tube 27, the second folding rod lifting ear 13 is connected to the outside of the sleeve 11, the telescopic rod 14 is connected inside the sleeve 11, the stabilizing rod lifting ear 12 is connected outside the sleeve 11, the stabilizing rod lifting ear 12 is connected to the same protective tube 8 through two stabilizing rods 9, the protective tube 8 is hinged to the load-bearing lifting ear 16 through a pin, the load-bearing lifting ear 16 is connected to the telescopic assembly 3 by a screw, and by setting the load-bearing lifting ear 16, on the one hand, the spring is protected from being affected by impurities, and on the other hand, the sleeve 11 is connected;

[0029] The top of the telescopic rod 14 is connected with the second cover 10, the protective tube 8 is arranged outside the second cover 10, the protective tube 8 is connected with the load-bearing box 6, the load-bearing box 6 is connected with the first cover 7, and the bottom end of the telescopic rod 14 is connected with the probe 15. By setting the telescopic rod 14, the top end of the top rod of the telescopic rod 14 has a 20 mm long internal thread, and the lower end also has a 20 mm internal thread. The upper end of the second rod has a 20 mm external thread. When the second rod is put in and extended from the upper end, it is locked with the lower end thread of the first rod. When contracted, the second upper end thread and the first upper end thread are locked. The two ends of the second rod also have 20 mm internal threads. The second rod and the third rod are connected according to the connection method of the first rod and the second rod, and so on to form a 5-meter telescopic rod 14. The fine-tuning part is that the lower end of the top rod has several openings, and there are threads on the openings. The second rod is adjusted to the position and tightened and squeezed with a locking ring;

[0030] The second cover 10 is connected to a connecting rod 17. By setting the second cover 10, the top of the telescopic rod 14 is covered to prevent impurities from entering.

[0031] The top of the connecting rod 17 is connected to the conductive sheet 20, the insulating sheet 21 and the metal sheet 22 through the threaded rod 19. The conductive sheet 20, the insulating sheet 21 and the metal sheet 22 are all arranged in the protective tube 8. The outer cover of the connecting rod 17 is connected with a control spring 18. The two ends of the control spring 18 are respectively connected to the metal sheet 22 and the second cover 10. By setting the control spring 18, since the protective tube 8 is arranged outside the control spring 18, the control spring 18 is not easily lifted by the external mud and stones to mistakenly trigger the alarm device in the control box 1;

[0032] The conductive sheet 20 is slidably connected with the same insulating bracket 23, the insulating bracket 23 is internally threaded with two conductive bolts 24, the conductive bolts 24 are outer-circuited with a buffer spring 25, and the control box 1, the conductive bolts 24, the conductive sheet 20 and the probe 15 are arranged, the control box 1 is connected to the conductive bolts 24 through a wire, and the conductive bolts 24 are connected to the probe 15 through the conductive sheet 20 and the wire;

[0033] The top end of the conductive bolt 24 overlaps with the first cover 7, and a buffer spring 25 is provided. Since the buffer spring 25 is placed in the conductive bolt 24 and passes through the conductive bolt 24, the conductive sheet 20 and the two conductive bolts 24 can be in full contact, and a buffering effect is also played to alleviate the upward impact of the conductive sheet 20.

[0034] The working principle and use process of the utility model are as follows: the device is installed on the external casing through the clamping component 2, the telescopic rod 14 is adjusted to the required length, and then the telescopic rod 14 with the probe 15 is extended into the pile foundation hole. During the concrete pouring process, there are mud, sand and gravel. Only when the concrete is poured to the expected position, the concrete solid surface contacts the probe 15 and lifts the telescopic rod 14, so that the conductive sheet 20 contacts the conductive bolt 24 and the power is turned on to trigger the alarm light with buzzer in the control box 1. When the device is used, the whole device is at the end of work, the five-meter-long telescopic rod 14 can be retracted to 1 meter in length, and then the self-locking foldable rod 5 can be folded up for easy carrying.

[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A device for detecting and alarming the elevation of concrete pouring in a pile foundation, comprising a control box (1), characterized in that: The control box (1) is connected to the clamping assembly (2) via a first bolt (26); a clamping tube (27) is provided inside the clamping assembly (2); the clamping tube (27) is connected to the telescopic assembly (3) via a bending-resistant spring (4); the telescopic assembly (3) is connected to a second folding rod lifting ear (13) via a self-locking folding rod (5); the second folding rod lifting ear (13) is connected to the outside of the sleeve (11); the sleeve (11) is connected to the telescopic rod (14), the sleeve (11) is externally connected to a stabilizing rod lifting ear (12), the stabilizing rod lifting ear (12) is connected to the same protective tube (8) through two stabilizing rods (9), the protective tube (8) is hinged to the load-bearing lifting ear (16) through a pin, the load-bearing lifting ear (16) is connected to the telescopic component (3) through a screw, the top end of the telescopic rod (14) is connected to a second cover (10), the protective tube (8) is arranged outside the second cover (10), and the protective tube ( 8) is connected to a load-bearing box (6), the load-bearing box (6) is connected to a first cover (7), the bottom end of the telescopic rod (14) is connected to a probe (15), the second cover (10) is connected to a connecting rod (17), the top end of the connecting rod (17) is connected to a conductive sheet (20), an insulating sheet (21) and a metal sheet (22) through a threaded rod (19), and the conductive sheet (20), the insulating sheet (21) and the metal sheet (22) are all arranged in the protective tube (8) The connecting rod (17) is provided with a control spring (18) connected to the outer sleeve, and the two ends of the control spring (18) are respectively connected to the metal sheet (22) and the second cover (10). The conductive sheet (20) is slidably connected to the same insulating bracket (23). The insulating bracket (23) is internally threadedly connected to two conductive bolts (24). The conductive bolts (24) are provided with a buffer spring (25) connected to the outer sleeve, and the top of the conductive bolts (24) overlaps the first cover (7).

2. The device for detecting and alarming the elevation of concrete pouring in pile foundation according to claim 1 is characterized in that: The clamping assembly (2) comprises a clamping plate (201), and the clamping plate (201) is provided with three first threaded holes (202), two second threaded holes (203) and a through hole (204).

3. The device for detecting and alarming the elevation of concrete pouring in pile foundation according to claim 2 is characterized in that: The clamping tube (27) is clamped in the through hole (204), the first bolt (26) is threadedly connected in the second threaded hole (203), and the three first threaded holes (202) are all threadedly connected with second bolts (28).

4. The device for detecting and alarming the elevation of concrete pouring in pile foundation according to claim 1 is characterized in that: The telescopic assembly (3) comprises an externally threaded tube (301), one end of the externally threaded tube (301) is connected to the anti-bending spring (4), the other end of the externally threaded tube (301) is threadedly connected to an internally threaded tube (302), the internally threaded tube (302) is clamped in a first folding rod hanging ear (303), and one end of the internally threaded tube (302) is connected to a load-bearing hanging ear (16) via a screw.

5. The device for detecting and alarming the elevation of concrete pouring in pile foundation according to claim 1 is characterized in that: The telescopic rod (14) is arranged between the two stabilizing rods (9), and the first cover (7) is arranged on the second cover (10).

6. The device for detecting and alarming the elevation of concrete pouring in pile foundation according to claim 1 is characterized in that: The clamping tube (27) is arranged between the first bolt (26) and the second bolt (28), and the control box (1) is arranged on the clamping tube (27).