Network cabling scaffold

By adding climbing ladders, base plates, limit bolts, adjusting screws and tool storage systems to the network cabling construction frame, the problems of shelf height adjustment and easy access to tools are solved, and the stability and ease of operation of the construction frame are improved. sex.

CN221806313UActive Publication Date: 2024-10-01CHINA LIFE INSURANCE CO LTD WUXI BRANCH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323560742.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-10-01
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

The existing network cabling construction rack cannot adjust the height, which can easily lead to tipping. It also lacks tool storage function, making it difficult for operators to pick up and find tools when wiring at high altitudes.

Method used

A construction frame including a climbing ladder, a base plate, limit bolts, adjusting screws, wiring tool boxes, track grooves, screw rods, tool storage boxes, gears and knobs is designed. The frame is adjusted by adjusting screws and limit bolts. height, and utilize gears and knobs for easy access to tools.

Benefits of technology

The stability and safety of the construction frame are improved. Operators can easily take and use tools when wiring at high altitudes, which improves the convenience of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221806313U_ABST
    Figure CN221806313U_ABST
Patent Text Reader

Abstract

The utility model relates to a network cabling construction frame, and aims to solve the technical problems that the current network cabling construction frame is easy to topple over in the use process and an operator is easy to take and find tools inconveniently during high-altitude cabling, the network cabling construction frame comprises a mounting frame, two ends of the mounting frame are movably connected with two climbing ladders, and the climbing ladders are arranged on the mounting frame. A wiring tool box is further fixedly mounted at the top end of the mounting frame, the bottom ends of the two climbing ladders are movably connected with a base plate, two limiting bolts are arranged on one side of the base plate, four adjusting screw rods are in threaded connection with the four corners of the base plate, a rail groove is formed in one side of the interior of the wiring tool box, and a wiring groove is formed in the other side of the interior of the wiring tool box. According to the construction frame, the levelness of the construction frame can be adjusted, the phenomenon that the construction frame topples over due to the fact that pits appear in the construction bottom face is avoided, and the stability of the construction frame in the using process and the safety of workers in the construction process are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of construction frames, in particular to a network wiring construction frame. Background Art

[0002] When network cabling needs to be expanded, high-density patch panels can make more efficient use of space by reducing the number of passive patch panels required in each installation. Network cabling work requires the use of a wiring construction frame to assist the network cabling work, but the height of the wiring construction frame platform in the prior art is not easy to adjust, so it is not easy to adapt to the height of the wiring position required by the construction personnel. In addition, during network cabling construction, it is usually necessary to limit some cables to avoid entanglement between cables.

[0003] According to the public patent 202120221084.7, a network wiring construction frame includes a construction frame body, the construction frame body includes a base and a platform, the two sides of the top of the base are respectively connected with a first screw and a second screw, the top of the base is threadedly connected to the platform through the first screw and the second screw, one side of the top of the platform is fixed with a fixed splint, the top of the fixed splint is movably connected with a movable splint, the movable splint is elastically connected to the fixed splint through a plurality of springs, and a limited position seat is placed between the fixed splint and the movable splint. In the process of realizing the utility model, the inventor found that at least the following problems in the prior art have not been solved. By rotating the first screw and the second screw, the problem that the construction personnel cannot adjust the height of the wiring position according to the needs is solved. During use, the traditional network wiring construction frame cannot adjust the horizontality when it is placed, which easily leads to the phenomenon of tipping during use, and the network wiring construction frame does not have the function of storing wiring tools, and the operator is prone to inconvenience in taking tools and finding tools when wiring at high altitude. For this reason, it is necessary to design a new technical solution to solve it. Utility Model Content

[0004] The purpose of the utility model is to overcome the deficiencies of the prior art, meet actual needs, and provide a network wiring construction frame to solve the technical problems that the current network wiring construction frame is prone to tipping over during use and that operators are prone to inconvenience in taking tools and finding tools when wiring at high altitudes.

[0005] In order to achieve the purpose of the utility model, the technical solution adopted by the utility model is: designing a network wiring construction frame, including a mounting frame, two climbing ladders are movably connected at both ends of the mounting frame, and a wiring tool box is also fixedly installed on the top of the mounting frame, the bottom ends of the two climbing ladders are movably connected to a base plate, two limit bolts are provided on one side of the base plate, and four adjusting screws are threadedly connected at the four corners of the base plate, a track groove is provided on one side of the interior of the wiring tool box, and a lead screw is movably connected on the other side of the interior of the wiring tool box, and a tool storage box is stored inside the wiring tool box, the bottom end of the lead screw is connected to the second gear through a first gear, and the other end of the second gear is fixedly connected to a knob.

[0006] Preferably, connecting plates are welded to the inner side surfaces of the two climbing ladders, and sleeve plates and extension plates are respectively installed at the other ends of the two connecting plates, and a limiting pin is provided on one side of the upper surface of the sleeve plates.

[0007] Preferably, one end of the sleeve plate is movably connected to the other end of one of the connecting plates, the other end of the sleeve plate is movably outside one end of the extension plate, the other end of the extension plate is movably connected to the other end of another of the connecting plates, and the limit pin is connected to the inside of the sleeve plate through a thread and extends into the socket of the extension plate.

[0008] Preferably, one end of the two limiting bolts is connected to the inside of the base plate through threads and abuts against the outer surface of the climbing ladder.

[0009] Preferably, one end of the tool storage box is movably connected to the inner wall of the track groove, and the other end of the tool storage box is connected to the outside of the screw rod through a thread.

[0010] Preferably, the center of the first gear is fixedly connected to the outside of the screw rod, and the toothed end of the first gear is meshed with the toothed end of the second gear.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] 1. The utility model combines the base plate, the limit bolts and the adjusting screw rods. When the construction frame is in use, the operator first moves the construction frame to an appropriate position, and then rotates the two climbing ladders at both ends of the installation frame. During this process, the sleeve plate will move outside the extension plate, and one end of the sleeve plate and the extension plate will rotate on the two connecting plates, so as to adjust the angle of the sleeve plate and the extension plate, and then tighten the limit pin inside the sleeve plate and extend it to the inside of the jack, so as to limit the position of the two climbing ladders, and then rotate the base plate at the bottom end of the climbing frame, so that the base plate is kept level with the ground, and then tighten the limit bolts inside the base plate, so that it is against the surface of the climbing ladder and limits its position, and then rotate the four adjusting screws in the base plate according to the level of the bottom surface, so as to adjust the height of the bottom ends of the four adjusting screws from the base plate, so as to adjust the level of the construction frame, avoid the phenomenon that the construction frame topples due to the appearance of potholes on the construction bottom surface, and improve the stability of the construction frame during use and the safety of personnel during construction.

[0013] 2. The utility model combines a wiring tool box, a track groove, a screw rod, a tool storage box, a first gear, a second gear and a knob. When an operator is performing wiring construction on a construction frame, he can directly turn the knob so that the knob drives the first gear to rotate through the second gear, thereby allowing the first gear to drive the screw rod to rotate at one end of the tool storage box. During this process, the other end of the tool storage box will rotate inside the track groove, so that the tool storage box can be moved out of the wiring tool box, and then the drawer on the tool storage box can be pulled out, so that the tools can be taken out from the inside for use, thereby avoiding the phenomenon that it is inconvenient for operators to take tools and find tools when wiring at high altitudes, and improving the convenience of operators when using tools for wiring on the construction frame. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the structure of the utility model;

[0015] Figure 2 It is a partial enlarged view of the utility model;

[0016] Figure 3 It is a partial enlarged view of the base plate of the utility model;

[0017] Figure 4 It is a cross-sectional view of the wiring tool box of the utility model;

[0018] Figure 5 It is a partial enlarged view of the wiring tool box of the utility model;

[0019] In the figure: 1, mounting frame; 11, climbing ladder; 12, connecting plate; 13, sleeve plate; 14, extension plate; 15, limit pin; 16, socket;

[0020] 2. Wiring tool box; 21. Track groove; 22. Screw rod; 23. Tool storage box; 24. First gear; 25. Second gear; 26. Turning knob;

[0021] 3. Base plate; 31. Limit bolt; 32. Adjusting screw. DETAILED DESCRIPTION

[0022] The utility model is further described below in conjunction with the accompanying drawings and embodiments:

[0023] Example 1: A network cabling construction frame, see Figures 1 to 5 The top of the mounting frame 1 is also fixedly mounted with a wiring tool box 2, and the bottom ends of the two climbing ladders 11 are movably connected with a base plate 3. Two limiting bolts 31 are arranged on one side of the base plate 3. Four adjusting screws 32 are threadedly connected at the four corners of the base plate 3. When the construction frame is in use, the base plate 3 is rotated at the bottom end of the climbing frame so that the base plate 3 is kept level with the ground. The limiting bolts 31 are then tightened inside the base plate 3 so that they are against the surface of the climbing ladder 11 and their position is limited. The four adjusting screws 32 are rotated inside the base plate 3 according to the level of the bottom surface so as to adjust the height of the bottom ends of the four adjusting screws 32 from the base plate 3, thereby achieving the adjustment of the level of the construction frame, avoiding the phenomenon that the construction frame falls over due to the occurrence of potholes on the construction bottom surface, and improving the stability of the construction frame during use and the safety of personnel during construction.

[0024] A track groove 21 is provided on one side of the interior of the wiring tool box 2, and a screw rod 22 is movably connected to the other side of the interior of the wiring tool box 2. A tool storage box 23 is stored in the interior of the wiring tool box 2, and the bottom end of the screw rod 22 is connected to the second gear 25 through the first gear 24, and the other end of the second gear 25 is fixedly connected to a knob 26. When the operator is performing wiring construction on the construction frame, the knob 26 can be directly turned so that the knob 26 drives the first gear 24 to rotate through the second gear 25, so that the first gear 24 drives the screw rod 22 to rotate at one end of the tool storage box 23. During this process, the other end of the tool storage box 23 will rotate inside the track groove 21, so that the tool storage box 23 is moved out of the wiring tool box 2, and then the drawer on the tool storage box 23 is pulled out, so that the tools are taken out from the inside for use, which avoids the inconvenience of the operator taking tools and finding tools when wiring at high altitude, and improves the convenience of the operator when using tools for wiring on the construction frame.

[0025] For details, see Figure 1 and Figure 2The inner sides of the two climbing ladders 11 are welded with connecting plates 12, and the other ends of the two connecting plates 12 are respectively installed with sleeve plates 13 and extension plates 14. A limiting pin 15 is arranged on one side of the upper surface of the sleeve plate 13. One end of the sleeve plate 13 is movably connected to the other end of one connecting plate 12, and the other end of the sleeve plate 13 is movable outside one end of the extension plate 14. The other end of the extension plate 14 is movably connected to the other end of the other connecting plate 12. The limiting pin 15 is connected to the inside of the sleeve plate 13 through a thread and extends to the insertion hole 16 of the extension plate 14. When the construction frame is in use, the operator first moves the construction frame to an appropriate position, and then rotates the two climbing ladders 11 at both ends of the mounting frame 1. During this process, the sleeve plate 13 moves outside the extension plate 14, and at the same time, one end of the sleeve plate 13 and the extension plate 14 rotates on the two connecting plates 12 to adjust the angles of the sleeve plate 13 and the extension plate 14, and then tightens the limit pin 15 inside the sleeve plate 13 and extends it to the inside of the socket 16, thereby limiting the position of the two climbing ladders 11.

[0026] For further information, see Figure 3 One end of the two limit bolts 31 is connected to the inside of the base plate 3 through threads and is against the outer surface of the climbing ladder 11. The limit bolts 31 are tightened inside the base plate 3 so that they are against the surface of the climbing ladder 11 and limit its position.

[0027] It is worth noting that see Figure 5 One end of the tool storage box 23 is movably connected to the inner wall of the track groove 21, and the other end of the tool storage box 23 is connected to the outside of the screw rod 22 through a thread. The first gear 24 drives the screw rod 22 to rotate at one end of the tool storage box 23. During this process, the other end of the tool storage box 23 will rotate inside the track groove 21, so that the tool storage box 23 can be moved out of the wiring tool box 2.

[0028] It is worth noting that see Figure 5 The center of the first gear 24 is fixedly connected to the outside of the screw rod 22, and the toothed end of the first gear 24 is meshed with the toothed end of the second gear 25. The knob 26 is turned to allow the knob 26 to drive the first gear 24 to rotate through the second gear 25, so that the first gear 24 drives the screw rod 22 to rotate at one end of the tool storage box 23, thereby achieving the lifting and lowering of the tool storage box 23.

[0029] In addition, the components designed in the present invention are all universal standard parts or components known to technical personnel in the field. Their structures and principles can be known to technical personnel through technical manuals or through conventional experimental methods. They can be fully implemented by technical personnel in the field, and there is no need to elaborate. The content protected by the present invention does not involve improvements to internal structures and methods.

[0030] The embodiments of the present invention disclose preferred embodiments, but are not limited thereto. A person skilled in the art can easily understand the spirit of the present invention based on the above embodiments and make different extensions and changes. However, as long as they do not deviate from the spirit of the present invention, they are all within the protection scope of the present invention.

Claims

1. A network cabling construction frame, comprising a mounting frame (1), It is characterized in that Two climbing ladders (11) are movably connected at both ends of the mounting frame (1), a wiring tool box (2) is also fixedly installed at the top of the mounting frame (1), the bottom ends of the two climbing ladders (11) are movably connected to a base plate (3), one side of the base plate (3) is provided with two limit bolts (31), four corners of the base plate (3) are threadedly connected with four adjusting screws (32), one side of the interior of the wiring tool box (2) is provided with a track groove (21), the other side of the interior of the wiring tool box (2) is movably connected with a screw rod (22), the interior of the wiring tool box (2) contains a tool storage box (23), the bottom end of the screw rod (22) is connected to a second gear (25) through a first gear (24), and the other end of the second gear (25) is fixedly connected with a knob (26).

2. A network cabling construction frame as claimed in claim 1, It is characterized in that The inner side surfaces of the two climbing ladders (11) are both welded with connecting plates (12), the other ends of the two connecting plates (12) are respectively installed with sleeve plates (13) and extension plates (14), and a limiting pin (15) is provided on one side of the upper surface of the sleeve plates (13).

3. A network cabling construction frame as claimed in claim 2, It is characterized in that One end of the sleeve plate (13) is movably connected to the other end of one of the connecting plates (12), the other end of the sleeve plate (13) is movably outside one end of the extension plate (14), the other end of the extension plate (14) is movably connected to the other end of the other connecting plate (12), and the limit pin (15) is connected to the inside of the sleeve plate (13) through a thread and extends into the insertion hole (16) of the extension plate (14).

4. A network cabling construction frame as claimed in claim 1, It is characterized in that One end of the two limiting bolts (31) is connected to the inside of the base plate (3) through threads, and is abutted against the outer surface of the climbing ladder (11).

5. A network cabling construction frame as claimed in claim 1, It is characterized in that One end of the tool storage box (23) is movably connected to the inner wall of the track groove (21), and the other end of the tool storage box (23) is connected to the outside of the screw rod (22) through a thread.

6. A network cabling construction frame as claimed in claim 1, It is characterized in that The center of the first gear (24) is fixedly connected to the outside of the screw rod (22), and the toothed end of the first gear (24) is meshed with the toothed end of the second gear (25).