Highway subgrade anti-settlement structure
By using a multi-layer structure in the highway subgrade, including support columns, steel mesh, geogrids and asphalt layers, the problem of subgrade settlement is solved, the load-bearing capacity and safety of the subgrade are improved, the service life is extended and the risk of traffic accidents is reduced risk.
Patent Information
- Application Number
- CN202420272192.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-04
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2034-02-04
AI Technical Summary
Existing highway subgrade structures are prone to settlement after being subjected to high loads for a long time, resulting in uneven road surfaces, increasing the risk of traffic accidents and endangering driving safety.
The materials used include plain soil layer, support columns, sand and gravel, concrete, steel mesh, geogrid, gravel layer, asphalt layer, leakage channel, filter screen board, road shoulder protection slope, diversion channel, storage tank, installation screen board, bamboo The structure of fiber material, plain soil and green mesh covering network prevents settlement by improving the compressive strength and deformation resistance of the roadbed, and improves the durability and waterproofing of the roadbed through the asphalt layer.
It effectively prevents roadbed settlement, extends the service life of the pavement layer, improves the load-bearing capacity and safety of the highway, and reduces the occurrence of traffic accidents.
Smart Images

Figure CN221810486U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of roadbeds, and specifically to a highway roadbed anti-settling structure. Background Art
[0002] The roadbed is the foundation of the track or road surface, and is a geotechnical structure formed by excavation or filling. The main function of the roadbed is to provide the necessary conditions for track or road surface laying and train or vehicle operation, and to bear the static and dynamic loads of the track and locomotive vehicles or road surface and traffic loads, while transmitting and diffusing the loads deep into the foundation. In the longitudinal section, the roadbed must ensure the required elevation of the line: in the plane, the roadbed is connected with bridges and tunnels to form a complete through line. In civil engineering, the roadbed occupies an important position in terms of construction quantity, land area and investment.
[0003] The Chinese authorized patent with application number CN201820917798.X discloses a highway roadbed structure, including a support plate and a fixing ring, wherein the support plates are arranged to be opposite to each other in transverse front, a measuring ruler is arranged on the front of the support plates, a level ruler is inlaid on the upper end of the support plates, a groove is embedded in one side of the support plates, and the groove is arranged to be opposite to each other in transverse front, and a connecting plate is slidably connected to the inner side of the groove. Through the telescopic rod, workers can directly construct the longitudinal width of the shoulder or U-shaped ditch, without the need to use a tape measure to measure multiple times during construction, and the shoulder or U-shaped ditch can be made to meet the specified dimensions for construction. The measuring ruler is set so that workers can observe the height of the roadbed at any time during construction, and will not exceed the specified height, resulting in the need for workers to rework, so that workers can carry out effective construction while working. It is suitable for the roadbed field and has good development prospects.
[0004] However, in the implementation of relevant technologies, it was found that the above-mentioned highway roadbed structure has the following problems: during the use of the prior art, roadbed settlement is a phenomenon that endangers driving safety. Since the highway is subjected to a high load for a long time, the roadbed sinks as a whole, forming an uneven surface. If you are not careful, serious traffic accidents may occur, endangering people's lives. Therefore, a highway roadbed anti-sedimentation structure is proposed. Utility Model Content
[0005] The utility model provides a highway roadbed anti-settling structure, which solves the problem in the related art that roadbed settlement is a phenomenon that endangers driving safety. Since the highway bears a high load for a long time, the roadbed sinks as a whole, forming unevenness. If you are not careful, serious traffic accidents may occur, endangering people's lives.
[0006] The technical solution of the utility model is as follows: a highway subsidence prevention structure, comprising: a plain soil layer, a plurality of support columns are arranged on the top of the plain soil layer, sand and gravel are filled between the plurality of support columns, a first steel mesh is arranged on the top of the plurality of support columns, concrete is filled between the first steel meshes, and a geogrid is arranged above the concrete;
[0007] A gravel layer is laid on the geogrid, a second steel mesh is arranged on the gravel layer, and an asphalt layer is laid on the second steel mesh.
[0008] Preferably, drainage grooves are provided on both sides above the asphalt layer, and filter screen plates are fixedly installed on both sides of the inner wall of the drainage groove.
[0009] Preferably, shoulder protection slopes are provided on both sides of the bare soil layer, a diversion groove is provided inside the shoulder protection slope, and the diversion groove is connected to the drainage groove.
[0010] Preferably, a water storage tank is provided at the top of the shoulder protection slope, the water storage tank is communicated with the guide groove, and mounting mesh plates are fixedly installed on both sides of the inner wall of the water storage tank.
[0011] Preferably, the bottom of the installation mesh is provided with bamboo fiber material, the top of the installation mesh is provided with plain soil, and a green mesh covering mesh is provided above the plain soil.
[0012] Preferably, a plurality of holes are penetrated through the green net covering net, and the plurality of holes are opened sequentially from front to back, and a plurality of bundles of green plants are planted inside the plain soil, and the plurality of bundles of green plants are located on the inner walls of the plurality of holes.
[0013] The working principle and beneficial effects of the utility model are:
[0014] The construction workers dig the foundation to the bare soil layer, and then place the support columns formed by pouring concrete into the bottom of the bare soil layer. The support columns, gravel, concrete and the first steel mesh can increase the compressive strength of each layer in the roadbed, thereby increasing the bearing capacity and deformation resistance of the roadbed, preventing the roadbed from softening and settling, thereby extending the service life of the pavement layer. The geogrid is used to resist deformation, and the gravel layer is a combination of crushed stone and sand, with a high bearing capacity. The gravel bears gravity and load, stably disperses pressure, and protects the foundation from damage. The asphalt layer is laid to improve the durability, waterproofness and skid resistance of the highway roadbed, thereby preventing the roadbed from settling, causing the entire roadbed to sink, and forming uneven surfaces that cause traffic accidents. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0016] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the utility model;
[0017] Figure 2 It is a schematic diagram of the cross-sectional three-dimensional structure of the bare soil layer of the utility model;
[0018] Figure 3 It is a schematic diagram of the enlarged structure of point A of the utility model.
[0019] In the figure: 1. Bare soil layer; 2. Support column; 3. Sand and gravel; 4. Concrete; 5. First steel mesh; 6. Geogrid; 7. Gravel layer; 8. Asphalt layer; 9. Second steel mesh; 10. Drainage trough; 11. Filter screen; 12. Shoulder protection slope; 13. Diversion channel; 14. Water storage tank; 15. Installation screen; 16. Bamboo fiber material; 17. Bare soil; 18. Green net covering net; 19. Holes; 20. Green plants. DETAILED DESCRIPTION
[0020] The following will be combined with the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] See also Figure 1 - Figure 3 A highway subsidence prevention structure comprises: a plain soil layer 1, a plurality of support columns 2 are arranged on the top of the plain soil layer 1, sand and gravel 3 are filled between the plurality of support columns 2, a first steel mesh 5 is arranged on the top of the plurality of support columns 2, concrete 4 is filled between the first steel mesh 5, and a geogrid 6 is arranged above the concrete 4;
[0022] A gravel layer 7 is laid on the geogrid 6, a second steel mesh 9 is arranged on the gravel layer 7, and an asphalt layer 8 is laid on the second steel mesh 9;
[0023] The construction workers dig the foundation to the bare soil layer 1, and then put the support column 2 formed by pouring concrete into the bottom of the bare soil layer 1. The arrangement of the support column 2, gravel 3, concrete 4 and the first steel mesh 5 can improve the compressive strength of each layer in the roadbed, thereby improving the bearing capacity and deformation resistance of the roadbed, preventing the roadbed from softening and settling, thereby extending the service life of the road surface layer. The geogrid 6 is used to resist deformation, and the gravel layer 7 is a combination of crushed stone and sand with a high bearing capacity. The gravel bears gravity and load, stably disperses pressure, and protects the foundation from damage. The asphalt layer 8 is laid to improve the durability, waterproofness and skid resistance of the highway roadbed, thereby preventing the roadbed from settling, causing the roadbed to sink as a whole, forming uneven terrain and causing traffic accidents.
[0024] Specifically, drainage grooves 10 are provided on both sides above the asphalt layer 8, and filter screens 11 are fixedly installed on both sides of the inner wall of the drainage groove 10. Road shoulder protection slopes 12 are provided on both sides of the bare soil layer 1. A guide groove 13 is provided inside the shoulder protection slope 12, and the guide groove 13 is connected to the drainage groove 10. A water storage tank 14 is provided on the top of the shoulder protection slope 12, and the water storage tank 14 is connected to the guide groove 13. A mounting screen 15 is fixedly installed on both sides of the inner wall of the water storage tank 14, and a bamboo fiber material 16 is provided at the bottom of the mounting screen 15. Bare soil 17 is laid on the top of the mounting screen 15, and a green net covering net 18 is provided above the bare soil 17. A plurality of holes 19 are provided through the upper part of the green net covering net 18, and the plurality of holes 19 are provided in sequence from front to back. A plurality of bundles of green plants 20 are planted inside the bare soil 17, and the plurality of bundles of green plants 20 are located on the inner walls of the plurality of holes 19.
[0025] The filter screen 11 prevents impurities from entering the interior of the drain trough 10, and when it rains, rainwater flows into the diversion trough 13 through the drain trough 10 and into the water storage tank 14. The bamboo fiber material 16 has good water absorption, which ensures that the bare soil 17 remains moist, thereby achieving the purpose of replenishing the water required for the growth of the green plants 20 and achieving the effect of reusing rainwater. The green net covering net 18 covers the bare soil 17 to reduce the loss of the bare soil 17.
[0026] The working process of the present application is as follows: the construction workers dig the foundation to the bare soil layer 1, and then place the support column 2 formed by pouring concrete into the bottom of the bare soil layer 1, and through the arrangement of the support column 2, gravel 3, concrete 4 and the first steel mesh 5, the compressive strength of each layer in the roadbed layer can be improved, thereby improving the bearing capacity and deformation resistance of the roadbed, preventing the roadbed from softening and settling, thereby extending the service life of the pavement layer, and using the geogrid 6 to resist deformation, and through the gravel layer 7 which is a combination of crushed stone and sand and has a higher bearing capacity, the gravel bears gravity and load, stably disperses pressure, and protects the foundation from damage, and through the laid asphalt layer 8, the durability, waterproofness and skid resistance of the highway roadbed are improved, thereby preventing the roadbed from settling, causing the roadbed to sink as a whole, forming unevenness and causing traffic accidents.
[0027] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A highway roadbed anti-settlement structure, It is characterized in that include: A plain soil layer (1), wherein a plurality of support columns (2) are arranged on the top of the plain soil layer (1), sand and gravel (3) are filled between the plurality of support columns (2), a first steel mesh (5) is arranged on the top of the plurality of support columns (2), concrete (4) is filled between the first steel mesh (5), and a geogrid (6) is arranged above the concrete (4); A gravel layer (7) is laid above the geogrid (6), a second steel mesh (9) is arranged above the gravel layer (7), and an asphalt layer (8) is laid above the second steel mesh (9).
2. A highway subsidence prevention structure according to claim 1, Features: Drain grooves (10) are provided on both sides above the asphalt layer (8), and filter screen plates (11) are fixedly mounted on both sides of the inner wall of the drain groove (10).
3. A highway subsidence prevention structure according to claim 2, Features: Road shoulder protection slopes (12) are provided on both sides of the bare soil layer (1), a diversion groove (13) is provided inside the road shoulder protection slope (12), and the diversion groove (13) is connected to the water leakage groove (10).
4. A highway roadbed anti-settlement structure according to claim 3, Features: A water storage tank (14) is provided on the top of the shoulder protection slope (12), the water storage tank (14) is connected to the guide groove (13), and mounting mesh plates (15) are fixedly mounted on both sides of the inner wall of the water storage tank (14).
5. A highway subsidence prevention structure according to claim 4, Features: The bottom of the installation mesh plate (15) is provided with a bamboo fiber material (16), the top of the installation mesh plate (15) is provided with a plain soil (17), and a green mesh covering net (18) is provided above the plain soil (17).
6. A highway subsidence prevention structure according to claim 5, Features: The green net covering net (18) is provided with a plurality of holes (19) extending through it, and the plurality of holes (19) are provided in sequence from front to back. A plurality of bundles of green plants (20) are planted inside the plain soil (17), and the plurality of bundles of green plants (20) are located on the inner walls of the plurality of holes (19).