Fabricated precast concrete bridge

By installing the concrete main body and bridge deck frame on the bridge, combined with the bridge deck steel plate and mounting columns, the problem of deformation and collision of traditional bridges under the backlog of vehicles is solved, the stability and comfort of the bridge deck are improved, and the noise and safety are reduced risk.

CN221810519UActive Publication Date: 2024-10-08ZHEJIANG JIAOGONG EQUIP ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323369521.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-12
Publication Date
2024-10-08
Estimated Expiration
2033-12-12

AI Technical Summary

Technical Problem

Traditional Baotong bridges are prone to deformation under the backlog of vehicles, affecting the smoothness of the bridge deck and driving comfort, and may collide with the bridge structure to generate noise, and the safety risks increase in high traffic flow and high speed environments.

Method used

A prefabricated concrete bridge is used, which is connected to the bridge through the concrete main body, combined with the bridge deck frame and bridge deck steel plate, and uses structures such as mounting columns, fixing nuts, and tunnel pipes to ensure the stable fixation of the bridge deck and prevent collision and deformation.

Benefits of technology

It improves the stability and comfort of the bridge deck, reduces noise generation, and enhances the safety and service life of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221810519U_ABST
    Figure CN221810519U_ABST
Patent Text Reader

Abstract

An assembly type precast concrete bridge comprises a precast bridge deck and a bridge, the precast bridge deck is arranged above the bridge, the precast bridge deck comprises a concrete body and a bridge deck frame arranged on the edge of the concrete body, the precast bridge deck is connected with the bridge through the concrete body, and the precast bridge deck is fixed to the bridge through the concrete body. On one hand, the concrete body has high strength, the flatness of the prefabricated bridge deck in long-term use is guaranteed, on the other hand, the concrete body is connected with the bridge, collision between the prefabricated bridge deck slab and the bridge can be prevented, and therefore noise generated in the using process of the assembly type bridge structure is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of assembled bridges, and in particular relates to an assembled prefabricated concrete bridge. Background Art

[0002] With the increasing number of highway reconstruction and expansion and urban road improvement projects, more and more temporary bridges are appearing in engineering projects. Most traditional temporary bridges are built by building a bridge structure, and then laying a steel bridge deck on the bridge structure. The steel bridge deck is fixed to the bridge structure with bolts and other fasteners. During use, the bridge deck is easily deformed by the backlog of vehicles, affecting the flatness of the bridge deck and the driving comfort of the bridge deck. The deformed bridge deck is easy to collide with the bridge structure, causing the bridge to generate a lot of noise during use. Under the driving requirements of large traffic volume and high speed requirements, traditional temporary bridges are somewhat insufficient before this requirement, and also increase safety risks. Summary of the invention

[0003] In view of the above shortcomings, the technical problem to be solved by the utility model is to provide an assembled prefabricated concrete bridge, which can greatly improve the stability of the bridge deck and improve the comfort of use of the bridge deck.

[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is:

[0005] An assembled precast concrete bridge comprises a precast bridge deck and a bridge. The precast bridge deck is arranged above the bridge. The precast bridge deck comprises a concrete body and a bridge deck frame arranged on the edge of the concrete body, and is connected to the bridge via the concrete body.

[0006] As a preferred solution of the utility model, the bridge is provided with mounting columns, and the concrete body is fixed to the bridge via the mounting columns.

[0007] As a preferred solution of the utility model, installation holes are evenly distributed below the concrete body, and the installation holes are adapted to the installation columns.

[0008] As a preferred solution of the utility model, the installation column includes a stud and two fixing nuts arranged on the stud, and the stud is fixed to the bridge through the fixing nuts.

[0009] As a preferred solution of the utility model, a bridge deck steel plate is fixed on the prefabricated bridge deck.

[0010] As a preferred solution of the utility model, a channel tube is arranged on the bridge deck steel plate, and the channel tube is arranged toward the concrete body to form an installation channel in the concrete body.

[0011] As a preferred solution of the utility model, the bridge deck steel plate is provided with a through hole, the concrete body is provided with a hoisting channel, and the hoisting channel is coaxially arranged with the through hole.

[0012] As a preferred solution of the utility model, a support plate is provided on the concrete body, a support plate through hole is provided in the support plate, and the support plate through hole is coaxially arranged with the lifting channel and the through hole.

[0013] As a preferred solution of the utility model, a hoisting pipe is provided on the support plate, and the support plate is connected to the bridge deck steel plate through the hoisting pipe.

[0014] As a preferred solution of the utility model, the bridge deck frame includes a plurality of frame beams, and the bridge deck steel plates are fixed on the frame beams.

[0015] The beneficial effect of the utility model is that the prefabricated bridge deck is fixed to the bridge through the concrete body. On the one hand, the concrete body has high strength to ensure the flatness of the prefabricated bridge deck for long-term use. On the other hand, the connection between the concrete body and the bridge can prevent collision between the prefabricated bridge deck and the bridge, thereby reducing the noise generated by the assembled bridge structure during use. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the assembly process of the assembled prefabricated concrete bridge.

[0017] Figure 2 This is a schematic diagram of the bridge structure.

[0018] Figure 3 It is a structural diagram of the precast bridge deck.

[0019] Figure 4 This is a structural diagram of the precast bridge deck with the concrete main body hidden.

[0020] Figure markings: prefabricated bridge deck 1, concrete body 1-1, bridge deck frame 1-2, frame beam 1-3, bridge 2, mounting column 3, stud 3-1, fixing nut 3-2, mounting channel 4, bridge deck steel plate 5, channel pipe 5-1, through hole 5-2, lifting channel 6, support plate 7, support plate through hole 7-1, lifting pipe 7-2. DETAILED DESCRIPTION

[0021] The utility model is further described below in conjunction with the accompanying drawings.

[0022] An assembled precast concrete bridge comprises a precast bridge deck 1 and a bridge 2. The precast bridge deck 1 is arranged above the bridge 2. The precast bridge deck 1 comprises a concrete body 1-1 and a bridge deck frame 1-2 arranged on the edge of the concrete body 1-1. The precast bridge deck 1 is connected to the bridge 2 through the concrete body 1-1. The precast bridge deck 1 is fixed to the bridge 2 through the concrete body 1-1. On the one hand, the concrete body 1-1 has high strength to ensure the flatness of the precast bridge deck 1 for long-term use. On the other hand, the connection between the concrete body 1-1 and the bridge 2 can prevent collision between the precast bridge deck 1 and the bridge 2, thereby reducing the noise generated by the assembled bridge structure during use.

[0023] The bridge 2 is provided with mounting columns 3, and the concrete body 1-1 is fixed to the bridge 2 through the mounting columns 3. The mounting columns 3 prevent the prefabricated bridge deck 1 from moving relative to the bridge 2, thereby ensuring the stability of the assembled bridge structure.

[0024] The mounting column 3 includes a stud 3-1 and two fixing nuts 3-2 arranged on the stud 3-1. The stud 3-1 is fixed to the I-beam of the bridge 2 through the fixing nuts 3-2. The height of the stud 3-1 above the upper end surface of the bridge 2 is adjusted by adjusting the position of the fixing nuts 3-2 on the stud 3-1 to ensure that the stud 3-1 can stably limit the placement of the prefabricated bridge deck 1 on the bridge 2.

[0025] A bridge deck steel plate 5 is fixed on the prefabricated bridge deck 1 , and the bridge deck steel plate 5 is used to protect the upper end surface of the concrete body 1 - 1 , thereby increasing the service life of the prefabricated bridge deck 1 .

[0026] The upper end surface of the bridge deck steel plate 5 is provided with an intaglio pattern for increasing the roughness of the upper end surface of the bridge deck steel plate 5 , thereby preventing vehicles from slipping on the bridge deck steel plate 5 .

[0027] A channel pipe 5-1 is arranged on the lower end surface of the bridge deck steel plate 5, and the channel pipe 5-1 is arranged toward the concrete main body 1-1. An installation channel 4 is formed in the concrete main body 1-1 through the channel pipe 5-1. The installation channel 4 is adapted to the installation column 3, that is, the installation column 3 is inserted into the installation channel 4. The prefabricated bridge panel 1 is limitedly placed by the cooperation of the installation column 3 and the installation channel 4, thereby ensuring the stability of the assembled bridge structure.

[0028] The hole diameter of the installation channel 4 is slightly larger than the axial diameter of the stud 3 - 1 , so as to facilitate the disassembly and assembly of the prefabricated bridge deck 1 and the bridge 2 .

[0029] A through hole 5-2 is provided on the bridge deck steel plate 5, and a lifting channel 6 is provided on the concrete body 1-1. The lifting channel 6 is coaxially arranged with the through hole 5-2. The setting of the lifting channel 6 and the through hole 5-2 facilitates the lifting of the prefabricated bridge panel 1, and at the same time, it can prevent water accumulation on the bridge deck steel plate 5.

[0030] Support plate 7 is provided at the lower end surface of the concrete main body 1-1. A support plate through hole 7-1 is provided in the support plate 7. The support plate through hole 7-1 is coaxially arranged with the hoisting hole passage 6 and the through hole 5-2. By providing the support plate 7, it is possible to prevent the surface of the concrete main body 1-1 from being damaged during hoisting, and it is convenient to recycle the precast bridge deck 1.

[0031] A hoisting pipe 7-2 is provided on the support plate 7. The support plate 7 is connected to the bridge deck steel plate 5 through the hoisting pipe 7-2, which is convenient for fixing the support plate 7. The hoisting pipe 7-2 is used to form the hoisting hole passage 6.

[0032] The bridge deck frame 1-2 includes a plurality of frame beams 1-3. The bridge deck steel plate 5 is fixed on the frame beams 1-3, so that the bridge deck frame 1-2 and the bridge deck steel plate 5 enclose a casting cavity with one end open. The concrete main body 1-1 is cast in the casting cavity. To ensure the strength of the concrete main body 1-1, a steel reinforcement cage is placed in the casting cavity.

[0033] The cross section of the frame beam 1-3 is in a U shape, so as to ensure the connection strength between the bridge deck frame 1-2 and the concrete main body 1-1.

[0034] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be obvious to those skilled in the art. The general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to these embodiments shown herein, but rather will conform to the widest scope consistent with the principles and novel features disclosed herein.

[0035] Although more terms corresponding to the reference numerals in the drawings are used herein, the possibility of using other terms is not excluded; these terms are only used to more conveniently describe and explain the essence of the present invention; interpreting them as any additional limitation is contrary to the spirit of the present invention.

Claims

1. An assembled prefabricated concrete bridge, characterized in that: The prefabricated bridge deck (1) comprises a prefabricated bridge deck (1) and a bridge (2). The prefabricated bridge deck (1) is arranged above the bridge (2). The prefabricated bridge deck (1) comprises a concrete body (1-1) and a bridge deck frame (1-2) arranged on the edge of the concrete body (1-1), and is connected to the bridge (2) via the concrete body (1-1).

2. The prefabricated concrete bridge according to claim 1, characterized in that: The bridge (2) is provided with mounting columns (3), and the concrete body (1-1) is fixed to the bridge (2) via the mounting columns (3).

3. The prefabricated concrete bridge according to claim 2, characterized in that: Mounting holes (4) are evenly distributed below the concrete body (1-1), and the mounting holes (4) are adapted to the mounting columns (3).

4. The prefabricated concrete bridge according to claim 2, characterized in that: The mounting column (3) comprises a stud (3-1) and two fixing nuts (3-2) arranged on the stud (3-1); the stud (3-1) is fixed to the bridge (2) via the fixing nuts (3-2).

5. The prefabricated concrete bridge according to claim 1, characterized in that: A bridge deck steel plate (5) is fixed on the prefabricated bridge deck (1).

6. The assembled precast concrete bridge according to claim 5, characterized in that: A hole pipe (5-1) is arranged on the bridge deck steel plate (5), and the hole pipe (5-1) is arranged toward the concrete body (1-1) to form an installation hole (4) in the concrete body (1-1).

7. The assembled prefabricated concrete bridge according to claim 5, characterized in that: The bridge deck steel plate (5) is provided with a through hole (5-2), the concrete body (1-1) is provided with a hoisting hole (6), and the hoisting hole (6) and the through hole (5-2) are coaxially arranged.

8. The assembled precast concrete bridge according to claim 6, characterized in that: A support plate (7) is provided on the concrete body (1-1), a support plate through hole (7-1) is provided in the support plate (7), and the support plate through hole (7-1) is coaxially arranged with the lifting channel (6) and the through hole (5-2).

9. The assembled precast concrete bridge according to claim 8, characterized in that: The support plate (7) is provided with a hanging pipe (7-2), and the support plate (7) is connected to the bridge deck steel plate (5) via the hanging pipe (7-2).

10. The assembled precast concrete bridge according to claim 5, characterized in that: The bridge deck frame (1-2) comprises a plurality of frame beams (1-3), and the bridge deck steel plate (5) is fixed on the frame beams (1-3).