Sludge raw material preparation device for sludge brick production

By designing a sludge mixing device with drums and shafts with opposite rotation directions and different speeds, combined with augers and conveying chambers, the problems of corrosion and service life shortening caused by sludge residues are solved, and uniform mixing and mixing of sludge are achieved. The smoothness of transportation improves the maintenance convenience and service life of the equipment.

CN221819079UActive Publication Date: 2024-10-11HUBEI GATLIN BIO-ENVIRONMENTAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420400985.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-01
Publication Date
2024-10-11
Estimated Expiration
2034-03-01

AI Technical Summary

Technical Problem

The existing sludge raw material preparation device for sludge brick production has problems such as residual sludge on the mixing rod, which causes corrosion and shortens the service life.

Method used

A device including a preparation tank, a mixing tank, a rotating drum, a support rod, a scraper, a stirring paddle and a transmission system was designed to achieve uniform mixing of the sludge through the drum and shaft rotating in opposite directions and with different speeds, and through the winch The Longhe feeding chamber prevents sludge clogging, and is equipped with a disassembly and assembly mechanism for easy cleaning and maintenance.

Benefits of technology

Effectively prevent sludge residue, extend the service life of the equipment, and ensure the uniformity of sludge mixing and smooth transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221819079U_ABST
    Figure CN221819079U_ABST
Patent Text Reader

Abstract

The utility model discloses a sludge raw material preparation device for sludge brick production, which comprises a preparation tank, the outer wall of the preparation tank is fixedly sleeved with a plurality of annular electric heating pipes, the outer wall of the preparation tank is fixedly sleeved with a heat preservation sleeve, the annular electric heating pipes are all located in the heat preservation sleeve, the top of the heat preservation sleeve is fixedly connected with an outer lantern ring, and the outer lantern ring is fixedly connected with a water storage tank. A packaging cover is arranged above the preparation tank, and the bottom of the packaging cover is fixedly connected with an inner slip ring. According to the sludge raw material preparation device for sludge brick production, the packaging cover and the preparation tank can be conveniently and tightly connected together through an outer sleeve ring and an inner sliding ring, meanwhile, the packaging cover and the preparation tank can be firmly connected and prevented from falling off through an arranged disassembling and assembling mechanism, meanwhile, the disassembling and assembling steps are simple, and operation is convenient. Related devices on the packaging cover can be conveniently taken out of the preparation tank to be cleaned, sludge is prevented from being adsorbed and agglomerated, and therefore the service life is prolonged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sludge brick production, in particular to a sludge raw material preparation device for sludge brick production. Background Art

[0002] Sludge generally refers to the silt material settled on the riverbed, or the fixed sediment produced during the water treatment process. There are many pathogens or insect eggs in the natural sludge. If the sludge is not handled properly, it will harm the surrounding environment. In order to effectively treat the sludge, current technology has been used to make bricks from sludge and apply it to the construction industry, which effectively reduces the pollution caused by sludge and can achieve the reuse of sludge.

[0003] The publication number CN212554377U discloses a sludge raw material preparation device for the production of high-density sludge bricks, including a mixing extrusion box and a molding box, wherein sludge ports and feeding ports are respectively arranged on both sides of the upper end of the mixing box, a discharge port is arranged at the bottom of the mixing box, a stirring motor is fixedly installed in the middle of the upper end of the mixing box, a rotating shaft is arranged in the mixing box, the stirring motor and the rotating shaft are drivingly connected, a plurality of stirring rods are arranged on the rotating shaft, conical teeth are fixed on the stirring rods, a cross bar is arranged at the bottom of the rotating shaft, a vertical rod is connected to the end of the cross bar away from the rotating shaft, a scraper is arranged on the vertical rod in contact with the inner wall of the mixing box, and its practical new type enables the sludge to be fully mixed and stirred with the additive in the mixing box, extruded into a high-density sludge mixture in the extrusion box, and discharged after being fully filled in the molding box, so as to utilize the sludge as a resource and avoid direct discharge to cause environmental pollution.

[0004] However, the device has the following shortcomings: when in use, the device can stir the sludge raw material through the conical teeth on the stirring rod to fully mix it with the additive, but sludge often remains on the stirring rod after the stirring is completed. If it is not cleaned, long-term use will easily cause the residual pollutants in the sludge to corrode the stirring rod and the inside of the mixing box, thereby shortening the service life.

[0005] Therefore, the utility model provides a sludge raw material preparation device for producing sludge bricks to solve the above problems. Utility Model Content

[0006] In view of the deficiencies in the prior art, the utility model provides a sludge raw material preparation device for producing sludge bricks, which solves the above problems.

[0007] To achieve the above purpose, the utility model is implemented through the following technical solutions: a sludge raw material preparation device for sludge brick production, comprising a preparation tank, the outer wall fixed sleeve of the preparation tank is provided with a plurality of annular electric heating pipes, the outer wall fixed sleeve of the preparation tank is provided with a heat preservation sleeve, the plurality of annular electric heating pipes are all located in the heat preservation sleeve, the top of the heat preservation sleeve is fixedly connected with an outer sleeve ring, a packaging cover is provided above the preparation tank, the bottom of the packaging cover is fixedly connected with an inner sliding ring, the bottom of the inner sliding ring slides and extends into the outer sleeve ring, and the outer sleeve ring is provided with a plurality of disassembly mechanisms;

[0008] The disassembly and assembly mechanism includes a fastening hole opened on the inner sliding ring, a mounting tube is connected through the outer sliding ring, one end of the mounting tube is rotatably connected through a threaded rod, a telescopic sleeve is threadedly sleeved on the threaded rod, one end of the telescopic sleeve slides through the fastening hole, and the end of the threaded rod away from the telescopic sleeve is fixedly connected to a hand wheel.

[0009] Preferably, a stirring tank is provided on the top of the preparation tank, a rotating drum is rotatably connected and penetrated on the packaging cover, the bottom end of the rotating drum extends into the stirring tank, two symmetrically distributed support rods are fixedly connected to the rotating drum, a scraper is fixedly connected to one side of the support rod, a plurality of first stirring paddles are fixedly connected to one side of the support rod, a rotating shaft is rotatably connected to the rotating drum, a plurality of second stirring paddles are fixedly sleeved on the rotating shaft, and the stirring tank, rotating drum, support rod, scraper, first stirring paddle, rotating shaft and second stirring paddle are used in combination to facilitate stirring of the prepared raw materials, so that they are fully mixed with auxiliary reagents, thereby facilitating the later preparation of sludge bricks.

[0010] Preferably, a protective cover is fixedly connected to the top of the packaging cover, the top of the rotating drum extends into the protective cover, the top of the protective cover is fixedly connected to a motor, the output shaft of the motor is fixedly connected to a transmission rod, the bottom end of the transmission rod rotates and extends into the protective cover, a driving gear is fixedly provided on the transmission rod, a linkage gear is fixedly provided on the rotating drum, the linkage gear is meshed with the driving gear, a driven wheel is fixedly provided on the rotating shaft, a driving wheel is fixedly provided on the transmission rod, a same belt is wound around the driving wheel and the driven wheel, and the protective cover, motor, transmission rod, driving gear, linkage gear, driving wheel, driven wheel and belt are used in combination to drive the rotating shaft and the rotating drum to rotate synchronously, so as to facilitate sufficient stirring of the inside of the mixing tank.

[0011] Preferably, a feed cavity is provided on the preparation tank, a plurality of feed discharge pipes are fixedly connected to the bottom inner wall of the stirring tank, the bottom ends of the feed discharge pipes extend into the feed cavity, and an electric valve is fixedly connected to the feed discharge pipes. By using the provided feed cavity, feed discharge pipes and electric valves in combination, the evenly mixed preparation materials can be conveniently transported to the feed cavity for storage.

[0012] Preferably, the top inner wall of the feed chamber is rotatably connected to an auger, the top end of the auger is rotatably extended into the mixing tank, the top end of the auger is fixedly connected to a square cylinder, the bottom end of the rotating shaft is fixedly connected to a square rod, the bottom end of the square rod is slidably extended into the square cylinder, and the auger, square cylinder and square rod are used in combination to facilitate the driving of the auger by the rotating shaft, and at the same time, the phenomenon of blockage of raw materials during movement can be avoided.

[0013] Preferably, an extrusion box is fixedly connected to the bottom of the preparation tank, a connecting pipe is fixedly connected to the bottom of the preparation tank, the connecting pipe is communicated with the inside of the feeding cavity, the bottom end of the connecting pipe extends into the extrusion box, a switch valve is fixedly connected to the connecting pipe, and the combination of the extrusion box, the connecting pipe and the switch valve can facilitate the raw materials in the preparation tank to enter the extrusion box for extrusion processing.

[0014] Preferably, an electric push rod is connected through one side of the extrusion box, and the output shaft of the electric push rod is fixedly connected to a pressure plate, and the outer wall of the pressure plate is in contact with the inner wall of the extrusion box. The electric push rod and the pressure plate are used in combination to extrude the prepared raw materials in the extrusion box into blocks, which is convenient for subsequent processing.

[0015] Preferably, a limiting groove is provided on the outer wall of the telescopic sleeve, and a clamping rod is fixedly connected to the inner wall of the mounting tube, and one end of the clamping rod slides and extends into the limiting groove. The limiting groove and the clamping rod are used in combination to limit the telescopic sleeve to prevent it from rotating and prevent it from moving too far.

[0016] Beneficial Effects

[0017] The utility model provides a sludge raw material preparation device for sludge brick production. Compared with the prior art, it has the following beneficial effects:

[0018] (1) The sludge raw material preparation device for sludge brick production can conveniently connect the packaging cover and the preparation tank tightly together through the outer ring and the inner sliding ring. At the same time, the disassembly and assembly mechanism can connect them firmly to prevent them from falling off. At the same time, the disassembly and assembly steps are simple, and the relevant components on the packaging cover can be conveniently taken out from the preparation tank for cleaning, thereby preventing sludge from being adsorbed and agglomerated, thereby increasing the service life.

[0019] (2) The sludge raw material preparation device for sludge brick production can conveniently stir the sludge raw material in the stirring tank to make it more evenly mixed by setting a rotating drum and a rotating shaft with opposite rotation directions and different rotation speeds. At the same time, the auger set in the feeding chamber can prevent the sludge from being blocked during the transportation process. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1It is a three-dimensional diagram of the external structure of the utility model;

[0021] Figure 2 It is a front view cross-sectional structural schematic diagram of the utility model;

[0022] Figure 3 yes Figure 2 A schematic diagram of the enlarged structure of part A;

[0023] Figure 4 It is the relevant assembly drawing of the rotating shaft in the utility model;

[0024] Figure 5 It is a partial assembly diagram of the disassembly and assembly mechanism in the utility model.

[0025] In the figure: 1. preparation tank; 2. annular electric heating tube; 3. insulation sleeve; 4. outer ring; 5. packaging cover; 6. inner sliding ring; 7. fastening hole; 8. mounting tube; 9. threaded rod; 10. telescopic sleeve; 11. hand wheel; 12. stirring tank; 13. rotating drum; 14. supporting rod; 15. scraper; 16. first stirring paddle; 17. rotating shaft; 18. second stirring paddle; 19. protective cover; 20. motor; 21. transmission rod; 22. driving gear; 23. linkage gear; 24. driven wheel; 25. driving wheel; 26. belt; 27. feeding cavity; 28. feeding pipe; 29. ​​electric valve; 30. auger; 31. square tube; 32. square rod; 33. extrusion box; 34. connecting pipe; 35. switch valve; 36. electric push rod; 37. pressure plate; 38. limit groove; 39. clamping rod. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] Embodiment 1:

[0028] See also Figure 2 , Figure 3 and Figure 5A sludge raw material preparation device for sludge brick production includes a preparation tank 1, a plurality of annular electric heating tubes 2 are provided on the outer wall fixed sleeve of the preparation tank 1, a heat preservation sleeve 3 is provided on the outer wall fixed sleeve of the preparation tank 1, the plurality of annular electric heating tubes 2 are all located in the heat preservation sleeve 3, an outer sleeve ring 4 is fixedly connected to the top of the heat preservation sleeve 3, a packaging cover 5 is provided above the preparation tank 1, a material discharge hopper and a liquid injection pipe are provided on the packaging cover 5, which are used to transport materials and reaction reagents into a stirring tank 12, an inner sliding ring 6 is fixedly connected to the bottom of the packaging cover 5, the bottom of the inner sliding ring 6 slides and extends into the outer sleeve ring 4, and a plurality of disassembly and assembly mechanisms are provided on the outer sleeve ring 4;

[0029] The disassembly and assembly mechanism includes a fastening hole 7 opened on the inner sliding ring 6, a mounting tube 8 is connected through the outer ring 4, one end of the mounting tube 8 is rotatably connected through a threaded rod 9, a telescopic sleeve 10 is threadedly sleeved on the threaded rod 9, one end of the telescopic sleeve 10 slides through the fastening hole 7, and the end of the threaded rod 9 away from the telescopic sleeve 10 is fixedly connected to a hand wheel 11.

[0030] Embodiment 2:

[0031] See also Figures 1 to 5This embodiment provides a technical solution based on the first embodiment: a stirring tank 12 is provided on the top of the preparation tank 1, a rotating drum 13 is rotatably connected to the packaging cover 5, and the bottom end of the rotating drum 13 extends into the stirring tank 12. Two symmetrically distributed support rods 14 are fixedly connected to the rotating drum 13. The support rod 14 is L-shaped, and a push plate for pushing the material to move is provided at the bottom. A scraper 15 is fixedly connected to one side of the support rod 14. One side of the scraper 15 is made of elastic material and fits the inner wall of the stirring tank 12. A plurality of first stirring paddles 16 are fixedly connected to one side of the support rod 14. The rotating shaft 17 has a plurality of second stirring paddles 18 fixedly sleeved thereon, and the second stirring paddles 18 and the first stirring paddles 16 are alternately distributed; a protective cover 19 is fixedly connected to the top of the packaging cover 5, and the top of the rotating drum 13 extends into the protective cover 19, and a motor 20 is fixedly connected to the top of the protective cover 19, and a transmission rod 21 is fixedly connected to the output shaft of the motor 20, and the bottom end of the transmission rod 21 rotates and extends into the protective cover 19, and a driving gear 22 is fixedly sleeved on the transmission rod 21, and a linkage gear 23 is fixedly sleeved on the rotating drum 13, and the linkage gear 23 is meshed with the driving gear 22, and a driven wheel 24 is fixedly sleeved on the rotating shaft 17, and the transmission rod 2 1 is fixedly sleeved with a driving wheel 25, and a belt 26 is wound between the driving wheel 25 and the driven wheel 24; a feeding cavity 27 is opened on the preparation tank 1, and a plurality of feeding pipes 28 are fixedly connected to the bottom inner wall of the stirring tank 12, and the bottom ends of the feeding pipes 28 extend into the feeding cavity 27, and an electric valve 29 is fixedly connected to the feeding pipes 28; an auger 30 is rotatably connected to the top inner wall of the feeding cavity 27, and the top end of the auger 30 is rotatably extended into the stirring tank 12, and a square cylinder 31 is fixedly connected to the top of the auger 30, and a square rod 32 is fixedly connected to the bottom end of the rotating shaft 17, and the bottom end of the square rod 32 slides and extends into the square cylinder 31; the bottom of the preparation tank 1 An extrusion box 33 is fixedly connected, and a box door is provided on one side of the extrusion box 33. A connecting pipe 34 is fixedly connected to the bottom of the preparation tank 1, and the connecting pipe 34 is connected to the inside of the feeding cavity 27. The bottom end of the connecting pipe 34 extends into the extrusion box 33, and a switch valve 35 is fixedly connected to the connecting pipe 34; an electric push rod 36 is connected through one side of the extrusion box 33, and the output shaft of the electric push rod 36 is fixedly connected to a pressure plate 37, and the outer wall of the pressure plate 37 is in contact with the inner wall of the extrusion box 33; a limiting groove 38 is provided on the outer wall of the telescopic sleeve 10, and a clamping rod 39 is fixedly connected to the inner wall of the mounting cylinder 8, and one end of the clamping rod 39 slides and extends into the limiting groove 38.

[0032] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0033] Working principle: first, pour the sludge preparation raw materials and related auxiliary reagents into the stirring tank 12 through the discharge hopper and injection pipe on the packaging cover 5, and then start the motor 20. The motor 20 drives the driving gear 22 and the driving wheel 25 to rotate through the transmission rod 21. The driving gear 22 drives the linkage gear 23 meshing with it to rotate. The driving wheel 25 drives the driven wheel 24 to rotate through the belt 26. At this time, the drum 13 and the rotating shaft 17 both start to rotate. The scraper 15 can scrape off the sludge attached to the inner wall of the stirring tank 12. The first stirring paddle 16 and the second stirring paddle 18 can fully stir the sludge preparation raw materials to make them evenly mixed. After stirring for a period of time, the electric valve 29 is opened. At this time, the push plate at the bottom of the support rod 14 can squeeze the mixed material into the feeding cavity 27 through multiple feeding pipes 28. At the same time, as the auger 30 rotates, the mixture is stirred. The sludge is then conveyed to the squeezing box 33 through the connecting pipe 34. After enough sludge has fallen, the switch valve 35 can be closed to start the electric push rod 36. The electric push rod 36 drives the pressing plate 37 to move to squeeze the sludge into blocks. Then, the box door on the squeezing box 33 can be opened to take it out, and then the switch valve 35 is opened to repeat the preparation. After completing the preparation work, the operator can turn the hand wheel 11 in turn. The hand wheel 11 drives the telescopic sleeve 10 threadedly connected to it to move through the threaded rod 9, so that the telescopic sleeve 10 and the fastening hole 7 fall off. Then, the packaging cover 5 can be pulled up to completely detach the related components connected to it from the outside of the stirring tank 12. Then, it can be cleaned and the sludge can be rinsed clean. Finally, the reverse operation can be performed to install it. During the installation process, the square rod 32 is inserted into the square tube 31, and the fastening hole 7 is aligned with the telescopic sleeve 10.

[0034] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A sludge raw material preparation device for sludge brick production, comprising a preparation tank (1), characterized in that: The outer wall fixed sleeve of the preparation tank (1) is provided with a plurality of annular electric heating tubes (2), and the outer wall fixed sleeve of the preparation tank (1) is provided with a heat preservation sleeve (3). The plurality of annular electric heating tubes (2) are all located in the heat preservation sleeve (3). The top of the heat preservation sleeve (3) is fixedly connected with an outer sleeve ring (4). A packaging cover (5) is provided above the preparation tank (1). The bottom of the packaging cover (5) is fixedly connected with an inner sliding ring (6). The bottom of the inner sliding ring (6) slides and extends into the outer sleeve ring (4). The outer sleeve ring (4) is provided with a plurality of disassembly and assembly mechanisms. The disassembly and assembly mechanism comprises a fastening hole (7) provided on the inner sliding ring (6); a mounting tube (8) is connected through the outer sliding ring (4); one end of the mounting tube (8) is rotatably connected through a threaded rod (9); a telescopic sleeve (10) is threadedly sleeved on the threaded rod (9); one end of the telescopic sleeve (10) slides through the fastening hole (7); and one end of the threaded rod (9) away from the telescopic sleeve (10) is fixedly connected to a hand wheel (11).

2. The sludge raw material preparation device for sludge brick production according to claim 1, characterized in that: The top of the preparation tank (1) is provided with a stirring tank (12), the packaging cover (5) is rotatably connected to a rotating drum (13), the bottom end of the rotating drum (13) extends into the stirring tank (12), the rotating drum (13) is fixedly connected to two symmetrically distributed support rods (14), one side of the support rod (14) is fixedly connected to a scraper (15), one side of the support rod (14) is fixedly connected to a plurality of first stirring paddles (16), the rotating drum (13) is rotatably connected to a rotating shaft (17), and the rotating shaft (17) is fixedly sleeved with a plurality of second stirring paddles (18).

3. The sludge raw material preparation device for sludge brick production according to claim 2, characterized in that: The top of the packaging cover (5) is fixedly connected to a protective cover (19), the top of the rotating drum (13) extends into the protective cover (19), the top of the protective cover (19) is fixedly connected to a motor (20), the output shaft of the motor (20) is fixedly connected to a transmission rod (21), the bottom end of the transmission rod (21) rotates and extends into the protective cover (19), a driving gear (22) is fixedly sleeved on the transmission rod (21), a linkage gear (23) is fixedly sleeved on the rotating drum (13), the linkage gear (23) is meshed with the driving gear (22), a driven wheel (24) is fixedly sleeved on the rotating shaft (17), a driving wheel (25) is fixedly sleeved on the transmission rod (21), and a belt (26) is wound between the driving wheel (25) and the driven wheel (24).

4. The sludge raw material preparation device for sludge brick production according to claim 2, characterized in that: The preparation tank (1) is provided with a feeding cavity (27), and a plurality of feeding pipes (28) are fixedly connected to the inner wall of the bottom of the stirring tank (12), the bottom ends of the feeding pipes (28) extend into the feeding cavity (27), and an electric valve (29) is fixedly connected to the feeding pipes (28).

5. The sludge raw material preparation device for sludge brick production according to claim 4, characterized in that: The top inner wall of the feeding cavity (27) is rotatably connected to an auger (30), the top end of the auger (30) is rotatably extended into the stirring tank (12), the top end of the auger (30) is fixedly connected to a square cylinder (31), the bottom end of the rotating shaft (17) is fixedly connected to a square rod (32), the bottom end of the square rod (32) is slidably extended into the square cylinder (31).

6. The sludge raw material preparation device for sludge brick production according to claim 1, characterized in that: The bottom of the preparation tank (1) is fixedly connected to an extrusion box (33), the bottom of the preparation tank (1) is fixedly connected to a connecting pipe (34), the connecting pipe (34) is connected to the inside of the material delivery cavity (27), the bottom end of the connecting pipe (34) extends into the extrusion box (33), and the connecting pipe (34) is fixedly connected to a switch valve (35).

7. The sludge raw material preparation device for sludge brick production according to claim 6, characterized in that: An electric push rod (36) is connected through one side of the extrusion box (33), and an output shaft of the electric push rod (36) is fixedly connected to a pressure plate (37), and an outer wall of the pressure plate (37) is in contact with an inner wall of the extrusion box (33).

8. The sludge raw material preparation device for sludge brick production according to claim 1, characterized in that: The outer wall of the telescopic sleeve (10) is provided with a limiting groove (38), and the inner wall of the mounting cylinder (8) is fixedly connected with a clamping rod (39), and one end of the clamping rod (39) slides and extends into the limiting groove (38).