Asphalt storage tank for highway construction
By using the design of components such as reference plates, cylinders, support wheels, reinforcing rings, and drive motors in asphalt storage tanks, the problems of weak structure and uneven heating of asphalt storage tanks in the existing technology are solved, and more efficient asphalt is achieved. Store and heat.
Patent Information
- Application Number
- CN202420409372.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-04
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-03-04
AI Technical Summary
The structure of the existing asphalt storage tank is not strong, resulting in asphalt residue and uneven heating, affecting construction efficiency.
An asphalt storage tank structure including a reference plate, cylinder, support wheel, reinforcing ring, drive motor and cross rod is designed. Through the cooperation of these components, the stability and heating uniformity of the tank are enhanced, and the asphalt residue and Heating time.
It improves the stability and heating efficiency of asphalt storage tanks, reduces the problems of asphalt residue and uneven heating, and improves construction efficiency.
Smart Images

Figure CN221820822U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of highway construction, in particular to an asphalt storage tank for highway construction. Background Art
[0002] Asphalt tank is a series of "internal heating type local rapid asphalt storage heater device", which is the most advanced asphalt equipment in China that integrates fast heating, energy saving and environmental protection. The direct heating portable equipment in the product not only has fast heating speed and fuel saving, but also does not pollute the environment. It is easy to operate. The automatic preheating system completely eliminates the trouble of baking or cleaning asphalt and pipelines. The automatic circulation program allows the asphalt to automatically enter the heater, dust collector, induced draft fan, asphalt pump, asphalt temperature display, water level display, steam generator, pipeline and asphalt pump preheating system, pressure relief system steam combustion system, tank cleaning system, oil unloading and tank entry device, etc. All of them are installed on the tank body to form a compact integrated structure.
[0003] Existing asphalt tanks are basically formed by bending and welding plates.
[0004] The current transportation and storage situation of asphalt is that the finished asphalt is processed outside the construction site and then transported to the construction site. The asphalt retained at the construction site needs to be heated to the required temperature when used, and the heating speed affects the construction progress.
[0005] The prior art CN214737135U discloses an asphalt storage tank for highway construction, including an asphalt storage tank body, a chassis shell fixedly installed on the left side of the asphalt storage tank body, a rotating shaft fixedly installed on the output shaft of the motor, and a sealing ring fixedly installed on the outside of the rotating shaft. Although the utility model is provided with a cylindrical tightly connected insulation layer and insulation cotton and a high-temperature resistant insulation board, so that the external insulation effect of the asphalt storage tank body is good, the tank structure design of the utility model has defects, the tank structure is not strong, and residual asphalt is likely to appear in the tank body. In addition, the utility model has uneven heating resulting in low working efficiency, and the asphalt in contact with the bottom of the tank body is always in a heated state. Utility Model Content
[0006] 1. Technical issues to be solved
[0007] In view of the deficiencies in the prior art, the utility model provides an asphalt storage tank for highway construction, which solves the problems raised in the above-mentioned background technology.
[0008] (II) Technical solution
[0009] To achieve the above purpose, the utility model is implemented through the following technical solutions: a highway construction asphalt storage tank, including a reference plate and a tank body, a plurality of cylinders are hinged at the bottom of the reference plate, a support ring is fixedly installed on one side of the upper surface of the reference plate, a limiting ring and two support wheels are fixedly connected on the other side of the upper surface of the reference plate, a funnel section is provided on one side of the tank body, an end cover is threadedly connected on one side of the tank body, and a plurality of reinforcing rings are clamped inside the tank body; a driving motor is fixedly installed on the middle part of the upper surface of the reference plate, a gear ring is fixedly installed in the middle part of the tank body, and a plurality of cross sticks are installed inside the reinforcing ring.
[0010] Optionally, a through hole is opened in the middle of the reference plate, the tank body passes through the through hole, the tank body is rotatably connected to the limiting ring, the funnel section is rotatably connected to the support ring, and the funnel section is adapted to the support ring.
[0011] Optionally, a disassembly handle is fixedly installed on one side of the end cover, a circular threaded section is fixedly connected to the other side of the end cover, a smooth section is fixedly connected to the side of the threaded section away from the end cover, the thread of the threaded section is an external thread, and the size of the smooth section is adapted to the size of the tank body.
[0012] Optionally, a matching thread is provided inside the tank body near one end of the end cover, and the matching thread is an internal thread, which is adapted to the thread of the threaded section and has the same length as that of the threaded section.
[0013] Optionally, the reinforcement ring is an integrated structure, the outer diameter of the reinforcement ring is adapted to the inner diameter of the tank body, and the number of the reinforcement rings is at least three, which are respectively distributed at both ends and the middle of the tank body.
[0014] Optionally, a transmission gear is provided on the output shaft of the drive motor, and the transmission gear is meshed with the ring gear.
[0015] Optionally, in order to ensure the meshing of the transmission gear and the gear ring, a plurality of the support wheels are distributed in parallel on both sides of the tank body, the support wheels are in contact with the tank body, and the support wheels and the support rings need to ensure that the tank body remains level.
[0016] Optionally, the plurality of cross-sticks are distributed in a circular array about the axis of the reinforcing ring, a cavity is provided inside the cross-stick, and a heating wire is installed in the cavity.
[0017] (III) Beneficial effects
[0018] The utility model provides an asphalt storage tank for highway construction, which has the following beneficial effects:
[0019] 1. The highway construction asphalt storage tank, through the coordinated arrangement of the end cover, reinforcement ring, tank body, funnel section, reference plate, two support wheels and several cylinders, strengthens the stability of the tank body and reduces the possibility of asphalt residue during discharge. The reinforcement ring increases the strength of the tank body, and the setting of the funnel section reduces the possibility of residue in dead corners.
[0020] 2. The highway construction asphalt storage tank ensures comprehensive heating and reduces local overheating through the coordinated setting of the drive motor, transmission gear, gear ring and tank body; through the setting of several cross sticks, the heating points are increased, the time for heating to the required temperature is reduced, and the work efficiency is increased. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0022] Figure 2 This is a front view structural schematic diagram of the utility model;
[0023] Figure 3 This is a schematic diagram of the cross-sectional structure of the utility model when viewed from above;
[0024] Figure 4 For this utility model Figure 3 Schematic diagram of the enlarged structure at A;
[0025] Figure 5 It is a front view cross-sectional structural schematic diagram of the utility model.
[0026] In the figure: 1, reference plate; 2, cylinder; 3, support wheel; 4, tank body; 5, support ring; 6, end cover; 7, drive motor; 8, transmission gear; 9, gear ring; 10, reinforcement ring; 11, cross stick; 12, heating wire; 101, through hole; 102, limit ring; 401, funnel section; 402, matching thread; 601, disassembly and assembly handle; 602, threaded section; 603, smooth section; 1101, cavity. DETAILED DESCRIPTION
[0027] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0028] Example 1
[0029] See also Figures 1 to 4The utility model provides a technical solution: an asphalt storage tank for highway construction, comprising a reference plate 1 and a tank body 4, a plurality of cylinders 2 are hingedly connected below the reference plate 1, a support ring 5 is fixedly installed on one side of the upper surface of the reference plate 1, a limiting ring 102 and two support wheels 3 are fixedly connected to the other side of the upper surface of the reference plate 1, a funnel section 401 is arranged on one side of the tank body 4, a through hole 101 is opened in the middle of the reference plate 1, the tank body 4 passes through the through hole 101, the tank body 4 is rotatably connected to the limiting ring 102, the funnel section 401 is rotatably connected to the support ring 5, the funnel section 401 is adapted to the support ring 5, an end cover 6 is threadedly connected to one side of the tank body 4, and a disassembly handle is fixedly installed on one side of the end cover 6 601, a circular threaded section 602 is fixedly connected to the other side of the end cover 6, a smooth section 603 is fixedly connected to the side of the threaded section 602 away from the end cover 6, the thread of the threaded section 602 is an external thread, the size of the smooth section 603 is adapted to the size of the tank body, a matching thread 402 is provided inside the end of the tank body 4 close to the end cover 6, the matching thread 402 is an internal thread, the matching thread 402 is adapted to the thread of the threaded section 602 and the length is equal, a plurality of reinforcing rings 10 are clamped inside the tank body 4, the reinforcing ring 10 is an integrated structure, the outer diameter of the reinforcing ring 10 is adapted to the inner diameter of the tank body 4, the number of the plurality of reinforcing rings 10 is at least three, and they are respectively distributed at both ends and the middle of the tank body 4.
[0030] When in use, a switch door is provided on one side of the funnel section 401, which is not shown. In the process of forming the asphalt tank by bending and welding the plate, in order to prevent the asphalt tank from being deformed during long-term use, a number of reinforcement rings 10 are added inside the tank body 4. The reinforcement rings 10 are made of high-strength materials. The purpose is to support the tank body 4 to maintain its round shape during use, thereby increasing the service life of the tank. When adding materials, the cylinder 2 close to one side of the funnel section 401 is raised, and the switch of the funnel section 401 is turned on to add asphalt into the tank body. After the addition is completed, the cylinder 2 is restored and the switch of the funnel section 401 is turned off. When discharging materials, the cylinder 2 on one side of the end cover 6 is raised, and the switch of the funnel section 401 is turned on. Under the action of gravity, the asphalt is separated from the tank body. The setting of the funnel section 401 reduces the possibility of residual asphalt at the bottom connection seam of the cylinder. The setting of the end cover 6 is to facilitate the later cleaning of asphalt residues. By adding a smooth section 603, the threaded section 602 is protected from being invaded by asphalt, which is convenient for disassembly and assembly.
[0031] Example 2
[0032] See also Figures 1 to 3 , Figure 5The utility model provides a technical solution: a highway construction asphalt storage tank, a driving motor 7 is fixedly installed in the middle of the upper surface of the reference plate 1, a gear ring 9 is fixedly installed in the middle of the tank body 4, a transmission gear 8 is arranged on the output shaft of the driving motor 7, the transmission gear 8 is meshed with the gear ring 9, to ensure the meshing of the transmission gear 8 with the gear ring 9, a plurality of support wheels 3 are distributed in parallel on both sides of the tank body 4, the support wheels 3 are in contact with the tank body 4, the support wheels 3 and the support ring 5 need to ensure that the tank body 4 remains horizontal, a plurality of cross rods 11 are installed inside the reinforcement ring 10, and the plurality of cross rods are distributed in a ring array about the axis of the reinforcement ring 10, a cavity 1101 is arranged inside the cross rod, and a heating wire 12 is installed in the cavity 1101.
[0033] When in use, the ring layers of the tank body 4 include common structures such as an insulation layer, a heat insulating layer and a heating layer, which are not described in detail. In commonly used asphalt tanks, it is common practice to set a heating device in the side wall of the tank body and set a stirring device inside the tank body 4 to increase the heating efficiency. In this case, there is an inevitable situation that a part of the asphalt at the bottom of the tank body is permanently attached to the tank body wall, and the stirring shaft cannot be driven to rotate, so that uneven heating occurs. In this way, the heating time required when asphalt is needed during construction will be extended, affecting the construction time. When the utility model is working, by turning on the drive motor 7, the transmission gear 8 set on the output shaft of the drive motor 7 drives the gear ring 9 meshing therewith, and the gear ring 9 is fixed on the tank body 4, so that the rotation of the tank body 4 is realized, and the rotating tank body 4 does not have asphalt that is attached to the inner wall of the tank body 4, that is, the heating layer, for a long time, so as to avoid uneven heating. By adding a heating wire 12 in the cross stick 11, the heating speed of the asphalt is accelerated and the construction efficiency is increased.
[0034] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A highway construction asphalt storage tank, comprising a reference plate and a tank body, characterized in that: A plurality of cylinders are hingedly connected to the lower part of the reference plate, a support ring is fixedly installed on one side of the upper surface of the reference plate, a limit ring and two support wheels are fixedly connected to the other side of the upper surface of the reference plate, a funnel section is arranged on one side of the tank body, an end cover is threadedly connected to one side of the tank body, and a plurality of reinforcing rings are clamped inside the tank body; a driving motor is fixedly installed on the middle part of the upper surface of the reference plate, a gear ring is fixedly installed on the middle part of the tank body, and a plurality of cross sticks are installed inside the reinforcing ring; The cross-rods are distributed in a circular array about the axis of the reinforcing ring, and a cavity is arranged inside the cross-rods, in which a heating wire is installed.
2. A highway construction asphalt storage tank according to claim 1, characterized in that: A through hole is opened in the middle of the reference plate, the tank body passes through the through hole, the tank body is rotatably connected to the limiting ring, the funnel section is rotatably connected to the supporting ring, and the funnel section is adapted to the supporting ring.
3. A highway construction asphalt storage tank according to claim 1, characterized in that: A disassembly and assembly handle is fixedly installed on one side of the end cover, a circular threaded section is fixedly connected to the other side of the end cover, a smooth section is fixedly connected to the side of the threaded section away from the end cover, the thread of the threaded section is an external thread, and the size of the smooth section is adapted to the size of the tank body.
4. A highway construction asphalt storage tank according to claim 3, characterized in that: A matching thread is arranged inside one end of the tank body close to the end cover. The matching thread is an internal thread, and the matching thread is matched with the thread of the thread section and has the same length.
5. A highway construction asphalt storage tank according to claim 1, characterized in that: The reinforcement ring is an integrated structure, the outer diameter of the reinforcement ring is adapted to the inner diameter of the tank body, and the number of the reinforcement rings is at least three, which are respectively distributed at both ends and the middle of the tank body.
6. A highway construction asphalt storage tank according to claim 1, characterized in that: A transmission gear is arranged on the output shaft of the driving motor, and the transmission gear is meshed with the ring gear.
7. A road construction asphalt storage tank according to claim 6, characterized in that: In order to ensure the meshing of the transmission gear and the gear ring, a plurality of the support wheels are distributed in parallel on both sides of the tank body, the support wheels are in contact with the tank body, and the support wheels and the support rings need to ensure that the tank body remains level.