Temporary supporting structure for steel truss girder bridge component assembly

By installing temporary matching parts at the joints of the steel truss bridge components and using a crane for precise positioning and fixation, the problems of long construction period and difficult to control positioning accuracy in the cantilever bridge erecting machine process are solved, achieving a more economical and Efficient steel truss bridge construction.

CN221822741UActive Publication Date: 2024-10-11NINGBO MUNICIPAL ENG CONSTR GROUP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323485115.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-20
Publication Date
2024-10-11
Estimated Expiration
2033-12-20

AI Technical Summary

Technical Problem

During the construction process of the all-welded steel truss bridge, the cantilever bridge erecting machine technology has problems such as long construction period, high cost, difficulty in controlling component positioning accuracy, difficulty in controlling welding deformation, and difficulty in setting up personnel working channels, especially when constructing without a supporting platform. More difficult.

Method used

The crane-based cantilever assembly method is used to install temporary matching parts at the joints of the components, and pins and bolts are used to achieve precise positioning and fixation of the components to avoid lateral deflection and operate in windless and gentle conditions. restrictions.

Benefits of technology

It effectively controls the assembly and positioning accuracy between components, shortens the construction period, reduces mechanical consumption, improves construction efficiency and safety, and meets the requirements of steel structure installation specifications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822741U_ABST
    Figure CN221822741U_ABST
Patent Text Reader

Abstract

The utility model discloses a temporary supporting structure for assembling steel truss girder bridge components, which is mounted at the position of a splicing seam of two components, and the two components are correspondingly a first component and a second component; comprising a temporary matching piece; the temporary matching piece comprises two split bodies, namely a matching piece split body a and a matching piece split body b correspondingly, and the matching piece split body a and the matching piece split body b are installed on the two components respectively; through bolt holes and through pin holes are formed in the fixed surfaces of the matching part split body a and the matching part split body b; bolts are assembled in the through bolt holes, and pins are assembled in the through pin holes. Therefore, according to the utility model, the cantilever hoisting scattered component can be accurately positioned, the lateral deviation of the component in the conventional unsupported state during hoisting is avoided, and the limitation that the component must be operated in the windless and gentle breeze states is eliminated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of bridge construction, and particularly relates to a temporary supporting structure for assembling steel truss bridge components. Background Art

[0002] The construction process of all-welded steel truss bridges needs to consider many factors, which are affected by the construction hydrological environment, nearby ground buildings, underground pipelines, and construction costs and cycles. At the same time, when erecting bridge segments, as the bridge span extends toward the center of the river, the cost of using the underbridge support system will increase significantly, and the cantilever bridge erection machine on the bridge is usually used for the operation.

[0003] However, engineering practice shows that the time required for a single installation and removal of a bridge erection machine is relatively long (about 14 to 21 days), and the amount of machinery required is not low (7 shifts for a 200T truck crane, 6 shifts for a 130T truck crane, and 15 shifts for an 80T truck crane). When the number of sections assembled at a time by a cantilever bridge erection machine (or the "aerial work platform" described in the aforementioned patent scheme) is small (2 to 3 sections), the cantilever bridge erection machine process is not economical. Engineering practice shows that when a cantilever bridge erection machine is used to assemble a fully welded steel truss bridge, the construction period required for a single section is approximately 7 days (for thin plates, the number of welds exceeding 30mm is less than 30%) to 10 days (for thick plates, the number of welds exceeding 30mm is more than 30%). The assembly time of a cantilever bridge erection machine is close to or even exceeds the component hoisting time, so it is not suitable.

[0004] When there is a conflict between the aerial work platform and the existing structure, mainly in the first section (near the main pier), and when the lower operating platform of the cantilever bridge-erecting machine conflicts with the existing bridge piers, it is still necessary to adopt the cantilever scattered parts assembly process without a temporary support platform, which is very costly and takes a longer construction period.

[0005] like Figure 1 As shown in the figure, the support conditions for building a truss bridge on a common water body in reality are that the main span of the main bridge has several segments (8), most of which are located in the mudflat area, which has the conditions for building a trestle and a temporary support system; while the remaining segments (2) are located above the river channel. The cost of building a trestle or support system underwater will inevitably increase, and the use of conventional cantilever bridge erection machines will extend the construction period. In addition, the conventional cantilever crane assembly process has the following problems:

[0006] (1) The positioning accuracy of components is difficult to control. When there is a supporting platform, the components only need to be hoisted to the platform, and then they can be accurately positioned using vertical jacks and lateral hand winches. After positioning, the components are in a supported state, and no lateral displacement will occur before the temporary fixed components (code plate system) are installed. However, when there is no supporting working platform, hoisting equipment is required for positioning. At this time, from the time the components are accurately positioned to the time the temporary fixed components (code plate system) are installed, lateral displacement caused by hoisting mechanical factors (it is extremely difficult to control the crane to be completely stable during the hoisting stage, and it must operate in a windless or light wind state. On open water (Class A sites described in the "Highway Bridge Wind Resistance Design Code"), similar construction conditions are difficult to control) is inevitable and uncontrollable;

[0007] (2) The welding deformation of a single component is difficult to control. The temporary supporting operation platform can bear the weight of two lower chords and one lower bridge deck at the same time, so that the three components can be formed into a whole and then spliced ​​with the completed steel truss of the previous section. When there is no operation platform, the lower chord must be assembled separately and separately with the lower chord of the completed steel truss of the previous section before the bridge deck is connected to it as a whole. At this time, the welding deformation of a single lower chord segment in the "cantilever state" is not subject to any constraints, and it is very easy to cause lateral and height deviations due to uneven cooling of the weld. Taking the assembly of the lower chord of the first section of the main bridge as an example, the maximum lateral deviation of a single section after welding was 4.5 cm, and the maximum height deviation was 6 cm, which could not meet the requirements of the steel structure installation specification.

[0008] (3) The conflict between the setting of personnel operation channels and the convenience of channel installation, removal and movement. If a personnel operation platform is not provided during the cantilever assembly stage, it will violate the relevant requirements of the national construction safety regulations. However, if a personnel operation platform is provided, the operation cycle and mechanical consumption of its installation, removal and movement should be controlled within 1 day. Otherwise, the implementation of this process will not be advanced.

[0009] Therefore, it is necessary to design a shorter and more economical cantilever assembly construction method for all-welded steel truss bridge components without a supporting platform. Utility Model Content

[0010] Purpose of the utility model: In view of the above existing problems and shortcomings, the proposed solution is to use a crane-based cantilever assembly method to complete a single assembly of 2-3 segments of cantilever assembly. In order to realize the crane-based cantilever assembly method, the utility model provides a temporary support structure for assembling steel truss bridge components, which can accurately position the cantilevered components, avoid lateral deviation during the conventional unsupported state component hoisting, and remove the restriction that the operation must be carried out in a windless or light wind state.

[0011] In order to achieve the above technical objectives, the utility model will adopt the following technical solutions:

[0012] A temporary supporting structure for assembling steel truss bridge components, installed at the location of the splicing seam of two components, the two components corresponding to the first and second components; comprising a temporary matching component; the temporary matching component comprises two splits, corresponding to the matching component split a and the matching component split b, the matching component split a and the matching component split b are respectively installed on the two components; and the fixing surfaces of the matching component split a and the matching component split b are provided with through bolt holes and through pin holes; and the through bolt holes are equipped with bolts, and the through pin holes are equipped with pins.

[0013] Preferably, the temporary matching piece is made of angle steel.

[0014] Preferably, the middle position of the temporary matching part is reinforced by a stiffening plate.

[0015] Preferably, the temporary matching piece is symmetrically provided with two through bolt holes on both sides of the stiffening plate; the temporary matching piece is symmetrically provided with two through pin holes on both sides of the stiffening plate; the two through bolt holes are located on the inner sides of the two through pin holes.

[0016] Preferably, the axial length of the pin is longer than the axial length of the bolt.

[0017] Preferably, the component is a lower chord of a steel truss bridge segment; the two lower chords are connected by three temporary matching parts; one of the temporary matching parts is arranged at the joint position between the two lower chord top plates, and the remaining two temporary matching parts are arranged one by one at the two joint positions between the two lower chord webs.

[0018] Beneficial effects: Compared with the prior art, the utility model has the following advantages:

[0019] The utility model designs a temporary support structure for assembling steel truss bridge components, which can effectively control the positioning accuracy when assembling components. At the same time, the utility model adopts a pin shaft for temporary positioning, and then adopts a bolt to achieve the tightening between the two, so that the accuracy of assembling components can be better controlled, avoiding the lateral deviation of conventional unsupported components during hoisting, and removing the restriction that the work must be done in a windless or light wind state. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the side support conditions of the fully welded steel truss bridge of the utility model;

[0021] Figure 2 It is a schematic diagram of cantilever assembly during the implementation phase of the crane-based cantilever assembly method;

[0022] Figure 3A schematic diagram of the crane's travel limit position state when implementing the crane-based cantilever assembly method for scattered parts;

[0023] Figure 4 Schematic diagram of the crane operating radius and the lower chord operating radius when implementing the crane-based cantilever assembly method for loose parts;

[0024] Figure 5 Schematic diagram of the crane operating radius and upper bridge deck operating radius when implementing the crane-based cantilever assembly method for scattered parts;

[0025] Figure 6 It is a structural schematic diagram of the bridge segment of the utility model;

[0026] Figure 7 This is a state diagram of the truss bridge of the utility model when it is corrected and docked by temporary matching parts;

[0027] Figure 8 It is a schematic diagram of the lateral state of the truss bridge of the utility model when the docking is corrected by a temporary matching piece;

[0028] Fig. 9 It is a structural schematic diagram of the temporary matching piece of the utility model;

[0029] Fig.10 It is a schematic diagram of the lateral structure of the temporary matching piece of the utility model.

[0030] Among them, there are an upper chord 11, a lower bridge deck 12, a lower chord 13, a first web member 14, a second web member 15; a temporary matching part 22, a stiffening plate 23, and a pin 24. DETAILED DESCRIPTION

[0031] The present invention is further explained below in conjunction with the accompanying drawings and specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. After reading the present invention, various equivalent forms of modifications to the present invention by those skilled in the art all fall within the scope defined by the claims attached to this application.

[0032] Figures 2 to 5 A structural schematic diagram of a cantilever assembly method for segments using a crane is disclosed, which specifically uses a crawler crane to walk on the trestle to complete the cantilever operation of the segments. Specifically, after the operator completes the installation of the operating platform, the crawler crane is used on the trestle to complete the assembly of the main span steel structure of the 14#-15# segment. Figure 2-Figure 5As shown. The maximum operating radius of a 150-ton crawler crane is 30m. Among them, the minimum operating radius of the lower chord is 14.7m, and the minimum operating radius of the upper bridge deck is 11.1m, which meets the operating requirements of a 150-ton crawler crane. When the crawler crane's forward position limit state is located at a minimum distance of 1000mm from the front end of the crawler crane's crawler to the end of the trestle, it can meet the lifting requirements of each component, thereby determining the crawler crane's lifting tonnage and operating radius. The specific splicing steps are as follows:

[0033] Component lifting: The crane running on the trestle will lift the components to the corresponding assembly positions one by one;

[0034] Positioning and matching: When the component is hoisted to the corresponding position, the component is initially positioned by means of traction ropes and fixed limiters, and then temporary matching pieces are fixed on the horizontal edges of the component (i.e., the locations of the splicing seams or butt joints). The temporary matching pieces are made of angle steels, and bolt holes and pin holes are provided on the fixing surfaces of the angle steels.

[0035] Correction and fixation: On the temporary matching parts of the mounting surfaces of the two initially positioned components, firstly fix through the pin holes to achieve secondary positioning correction in the transverse direction of the bridge, and then install bolts in the bolt holes of the temporary matching parts to achieve secondary positioning correction in the longitudinal direction of the bridge between the components;

[0036] Welding and anchoring: After the components are corrected and fixed, they are welded and anchored by stiffening plates. After the welding is completed and firm, the temporary matching parts are removed; the remaining components are assembled and constructed in sequence according to the above steps to complete.

[0037] This solution is applicable to working radius not exceeding 30m (usually the cumulative length of 2 segments) and segment weight less than 15 tons (in the process of loose parts assembly, components in the 1 / 3 area of ​​the mid-span usually meet this requirement).

[0038] It can be seen that, when the utility model is performing cantilever assembly of segments, in order to effectively control the installation accuracy between components, a temporary support structure for assembling steel truss bridge components is developed, which is installed at the location of the joint of the two components, and includes a temporary matching part; the two components correspond to the first and second components; the temporary matching part is made of angle steel, including two split parts, corresponding to the matching part split a and the matching part split b, and the matching part split a and the matching part split b are respectively installed on the two components; and the fixing surfaces of the matching part split a and the matching part split b are provided with through bolt holes and through pin holes. First, a pin is installed in the through pin hole to realize the positioning of the first and second components in the transverse direction of the bridge. Then, bolts are installed in the through bolt holes to realize the positioning of the first and second components in the longitudinal direction of the bridge.

[0039] The temporary matching piece is symmetrically provided with two through bolt holes on both sides of the stiffening plate; the temporary matching piece is symmetrically provided with two through pin holes on both sides of the stiffening plate; the two through bolt holes are located inside the two through pin holes.

[0040] In order to improve the performance of the matching component split a and the matching component split b, the matching component split a and the matching component split b are equipped with stiffening plates.

[0041] Specifically, in order to control the installation accuracy of the rod, three temporary matching parts are set on each lower chord, as shown in Figure 7. Each temporary matching part is a 500mm L125*10 angle steel, in which a 12mm stiffening plate is welded in the middle of the angle steel. The two temporary matching parts are connected by two M22*80 bolts and 90mm ∅23.8~190 pins, as shown in Figure 7-10. When the crawler crane hoists the lower chord into place, the workers fine-tune the gap of the matching parts to accurately position it. When the lower chord is in the welding work with the previous segment, the other end is in the state of being lifted by the crawler crane. After the welding is completed and firm, the temporary matching parts are removed. The remaining components are constructed in sequence according to this method.

Claims

1. A temporary support structure for assembling steel truss bridge components, installed at the joint of two components, the two components corresponding to the first and second components; characterized in that: Includes temporary matching pieces; The temporary matching part includes two parts, namely matching part part a and matching part part b, which are respectively installed on two components; and the fixing surfaces of matching part part a and matching part part b are provided with through bolt holes and through pin holes; and the through bolt holes are equipped with bolts, and the through pin holes are equipped with pins.

2. The temporary supporting structure for assembling steel truss bridge members according to claim 1, characterized in that: The temporary matching piece is made of angle steel.

3. The temporary supporting structure for assembling steel truss bridge members according to claim 2, characterized in that: The middle position of the temporary matching part is reinforced by a stiffening plate.

4. The temporary supporting structure for assembling steel truss bridge members according to claim 3, characterized in that: The temporary matching piece is symmetrically provided with two through bolt holes on both sides of the stiffening plate; the temporary matching piece is symmetrically provided with two through pin holes on both sides of the stiffening plate; the two through bolt holes are located inside the two through pin holes.

5. The temporary supporting structure for assembling steel truss bridge members according to claim 4, characterized in that: The axial length of the pin is longer than the axial length of the bolt.

6. The temporary supporting structure for assembling steel truss bridge members according to claim 5, characterized in that: The component is a lower chord of a steel truss bridge segment; the two lower chords are connected by three temporary matching parts; one of the temporary matching parts is arranged at the joint position between the top plates of the two lower chords, and the remaining two temporary matching parts are arranged one by one at the two joint positions between the web plates of the two lower chords.