Hydraulic creeping formwork combination system for double-end arc gradual change hollow pier

Through the double-ended circular arc gradient hollow pier hydraulic climbing formwork combination system, the hydraulic formwork and adjustable semicircular formwork are used to achieve gradual climbing, which solves the problems of long construction period and high safety risk in traditional construction methods, and improves construction efficiency and resource utilization. , suitable for the construction of double-ended circular arc gradient hollow piers for tall aqueducts.

CN221822753UActive Publication Date: 2024-10-11SINOHYDRO BUREAU 14 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420115546.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-10-11
Estimated Expiration
2034-01-17

AI Technical Summary

Technical Problem

The traditional double-ended circular arc gradient hollow pier construction method has the disadvantages of long construction period, large resource investment, and high safety risks, and the fully automatic hydraulic climbing form cannot effectively solve the problems of the double-ended circular arc section of the inner and outer molds and the gradual climbing of the inner mold. question.

Method used

A double-ended circular arc gradient hollow pier hydraulic climbing formwork combination system is adopted, including a hydraulic formwork system with standard section linear formwork and a removable and adjustable semicircular formwork. The double-ended arc gradient construction is realized through the gradual climbing of the hydraulic climbing formwork. Utilize the available The telescopically adjustable linear formwork and matching back rib support system solve the problem of gradual climbing of the internal mold.

Benefits of technology

It achieves fast, safe and efficient construction of double-ended circular arc gradient hollow piers, reduces the investment in custom formwork, improves resource utilization and construction efficiency, and is suitable for the engineering needs of tall and large aqueducts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221822753U_ABST
    Figure CN221822753U_ABST
Patent Text Reader

Abstract

The utility model relates to a hydraulic creeping formwork combination system for a double-end arc gradual change hollow pier. The hydraulic creeping formwork combination system comprises a formwork system, a climbing system, a hydraulic system, an operation platform unit and an embedded part. The template system comprises a linear template and a semicircular template, the linear template and the semicircular template are connected to form a runway-shaped outer mold and a D-shaped inner mold, and the linear template and the operation platform unit are connected to form a mold frame structure; a wall-attached connecting piece and an embedded part of the climbing system are connected with a fixed guide rail, and a guide rail and a formwork structure are fixed on a climbing cone; a pawl of the hydraulic system and a guide rail jacking hydraulic rod jointly act on a guide rail, and a hydraulic inclined strut is connected with the operation platform unit. The operation platform unit is arranged on the outer side of the guide rail, the platform beam and the platform protection form an operation platform, and the backward moving support is arranged below the platform beam and fixed through the creeping formwork tripod. According to the system, the occupation of the same-section semicircular formworks between the piers is staggered, the investment of customized formworks is reduced, the cost is reduced, and the self-gradual-change climbing construction of the formworks is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of bridge formwork systems, and in particular to a double-ended circular arc gradient hollow pier hydraulic climbing formwork combination system. Background Art

[0002] Western China is dominated by plateau terrain, with large undulating landforms, alternating peaks and depressions, steep slopes and deep valleys. Under these terrain conditions, tall aqueducts frequently appear in many water conservancy projects. Due to the characteristics of tall aqueducts with long pier heights, large design flow, and high requirements for engineering quality and durability, the aqueduct support system mostly adopts reinforced concrete hollow pier structures. During the construction of tall aqueducts, the construction of gradient hollow piers often becomes the focus of safety, quality, and construction period.

[0003] The traditional construction method of double-ended circular arc gradient hollow piers is to customize the molds for the entire pier and construct them one by one. The customized mold-turning construction method from one mold to the top causes the installation and disassembly project to take a long time, and the frequent hoisting operations have the problems of large resource investment, long process time, and high safety risks. At the same time, the turnover of the template is time-consuming, and repeated turnover will also cause damage to the template and difficulty in matching and assembling. The fully automatic hydraulic climbing formwork cannot effectively solve the problems of the double-ended circular arc segments of the inner and outer molds and the gradual climbing of the inner mold, and cannot be applied to the construction of double-ended circular arc gradient hollow piers. Utility Model Content

[0004] In order to solve or partially solve the problems existing in the related technology, the present application provides a double-ended circular arc gradient hollow pier hydraulic climbing formwork combination system, which consists of a hydraulic formwork system with a standard section straight line formwork and a detachable and adjustable semicircular formwork configured from the pier to the top. After the standard hydraulic climbing formwork system climbs and is fixed, the double-ended semicircular formwork of the same size is replaced to achieve the gradual climbing of the hydraulic climbing formwork.

[0005] The first aspect of the present application provides a hydraulic climbing formwork combination system for a double-ended circular arc gradient hollow pier, comprising: a formwork system, a climbing system, a hydraulic system, an operating platform unit and embedded parts; the formwork system comprises a straight formwork and a semicircular formwork, the straight formwork and the semicircular formwork are connected to form a "runway-type" outer formwork and a "D-type" inner formwork, and the straight formwork and the operating platform unit are connected to form a formwork structure; the climbing system comprises a guide rail, a climbing cone and a wall-attached connector, the wall-attached connector and the embedded parts are connected to fix the guide rail, and the guide rail and the formwork structure are fixed on the climbing cone; the hydraulic system comprises a ratchet, a hydraulic diagonal brace and a guide rail lifting hydraulic rod, the ratchet and the guide rail lifting hydraulic rod act together on the guide rail, and the hydraulic diagonal brace is connected to the operating platform unit; the operating platform unit is arranged on the outside of the guide rail, and comprises a rearward moving bracket, a platform beam, a platform protection and a climbing formwork tripod; the platform beam and the platform protection constitute an operating platform, a rearward moving bracket is arranged under the platform beam, and the rearward moving bracket is fixed by the climbing formwork tripod.

[0006] Optionally, in some embodiments of the first aspect,

[0007] Straight line templates include straight line standard outer templates, straight line standard inner templates and special-shaped straight line templates.

[0008] Optionally, in some embodiments of the first aspect,

[0009] The semicircular template includes a 90° outer template and a 90° inner template.

[0010] Optionally, in some embodiments of the first aspect,

[0011] Adjustable corbels are provided on the semicircular template.

[0012] Optionally, in some embodiments of the first aspect,

[0013] The embedded parts include tail supports and wall-attached embedded parts. The tail supports are fixedly connected to the tail of the guide rail, and the wall-attached embedded parts are fixedly connected to the formwork structure.

[0014] Optionally, in some embodiments of the first aspect,

[0015] The operating platform includes the top platform, the middle climbing platform and the bottom platform.

[0016] The technical solution provided by this application may have the following beneficial effects:

[0017] 1. The hydraulic climbing formwork + replacement of the outer mold double-end arc and inner mold formwork with the same section is used to solve the problem of long time, large resource investment and high safety risk in the construction process of customized mold turning from one mold to the top. At the same time, it solves the problem that the fully automatic hydraulic climbing formwork cannot realize the double-end arc gradual climbing construction, and is more applicable to the double-end arc gradual hollow pier.

[0018] 2. The construction method of hydraulic climbing touch + replacement of double-end arc and inner mold templates of the outer mold with the same section is adopted. According to the production task of the trough pier project, the template system can be configured in 2:1 to organize the construction of high piers first and low piers later (hydraulic mold frame system with built-in straight line template: detachable and adjustable double-end semicircular template), staggering the occupancy of semicircular templates with the same section between piers, reducing the investment in customized templates and reducing costs; making resource investment more scientific and the turnover utilization rate higher.

[0019] 3. The use of retractable and adjustable straight formwork at both ends and the matching back rib support system solves the problem of limited use caused by the gradual increase of the trough pier and the gradual reduction of the internal space of the trough pier, and realizes the self-gradual climbing construction of the standard section of the inner formwork.

[0020] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] The above and other objects, features and advantages of the present application will become more apparent through a more detailed description of exemplary embodiments of the present application in conjunction with the accompanying drawings, wherein the same reference numerals generally represent the same components in the exemplary embodiments of the present application.

[0022] Figure 1 It is a schematic diagram of the planar structural layout of the double-end circular arc gradient hollow pier hydraulic climbing formwork combination system shown in the embodiment of the present application;

[0023] Figure 2 It is a schematic diagram of the formwork structure of the hydraulic climbing formwork combination system of the double-end circular arc gradient hollow pier shown in the embodiment of the present application;

[0024] Reference numerals:

[0025] 1-straight formwork, 2-semicircular formwork, 3-guide rail, 4-hydraulic diagonal brace, 5-rearward bracket, 6-platform beam, 7-platform protection, 8-climbing formwork tripod, 9-tail support, 10-wall embedded parts, 11-climbing cone, 12-adjustable corbel, 13-ratchet, 14-guide rail lifting hydraulic rod, 15-bottom platform, 16-middle climbing frame platform, 17-top platform. DETAILED DESCRIPTION

[0026] The embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although the embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to make the present application more thorough and complete, and to fully convey the scope of the present application to those skilled in the art.

[0027] It should be understood that although the terms "first", "second", "third", etc. may be used in this application to describe various information, this information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of this application, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.

[0028] In the description of the present application, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0029] Unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0030] The technical solution of the embodiments of the present application is described in detail below with reference to the accompanying drawings.

[0031] like Figure 1 and Figure 2 As shown in the figure, the hydraulic climbing formwork combination system of the double-end circular arc gradient hollow pier includes: formwork system, climbing system, hydraulic system, operating platform unit and embedded parts. The system uses the ZPM100 hydraulic climbing formwork, which is combined with the hydraulic climbing formwork system with the standard section straight formwork 1 and the detachable and adjustable semicircular formwork 2 configured from the top of the pier to achieve the purpose of gradual climbing construction of the double-end circular arc gradient hollow pier; its formwork layer height is 4.65m, the standard layer casting height is 4.5m, the lower part overlaps 10cm, and the upper part is 5cm higher. The hydraulic formwork frame system with the standard section straight formwork 1 is self-gradually climbed, and the inner and outer double-end semicircular formworks 2 of the same size are replaced at the same time to achieve double-end gradual change. At the same time, the two ends of the straight formwork 1 and the matching back rib support system are set as retractable adjustment systems to solve the use restrictions caused by the reduction of the internal space of the trough pier.

[0032] Formwork system: including straight segment formwork and semicircular formwork 2. The straight segment formwork 1 and the semicircular formwork 2 are connected to form a "runway-type" outer formwork and a "D-type" inner formwork. The two "D-type" inner formwork arcs are mirrored outward. The straight segment formwork includes 4 straight segment formworks 1, which are applied to the inner and outer formworks of the straight segment of the trough pier. They are fixed to the back rib beam of the operating platform unit by bolts for self-gradient climbing. The outer formwork includes 2 straight segment straight segment formworks 1, and the inner formwork includes 2 straight segment formworks 1 and 4 heterogeneous straight segment formworks 1; the semicircular formwork 2 includes 4 90° outer formworks and 4 90° inner formworks, which are configured from pier to top. During the climbing process from bottom to top, they are replaced according to the matching of the same size section, so as to meet the purpose of climbing construction of double-end circular arc gradient hollow piers. The semicircular formwork 2 is applied to the double-end circular arc section of the trough pier, and the end face parameters are slightly corrected by the adjustment bracket 12 attached to the formwork. At the same time, according to the pier height, semicircular gradient templates of the same size are cut from top to bottom for matching and replacement, so as to achieve the purpose of gradually climbing from bottom to top of the same trough pier.

[0033] Climbing system: includes guide rail 3, climbing cone 11 and wall-attached connector. The wall-attached connector is connected with the embedded parts to fix the guide rail 3, provide a climbing track for the gradual construction of hydraulic climbing formwork, and achieve climbing by contracting the climbing cone 11.

[0034] Hydraulic system: including ratchet 13, hydraulic diagonal brace 4, guide rail lifting hydraulic rod 14; the ratchet 13 and guide rail lifting hydraulic rod 14 act together on the guide rail 3, connected to the upper platform through the hydraulic diagonal brace 4, and the hydraulic adjustment formwork is synchronized with the reduction of the trough pier section.

[0035] The operating platform unit includes a rearward support 5, a platform beam 6, a platform protection 7, and a climbing formwork tripod 8. The rearward support 5 is the main load-bearing component of the cantilever platform, and is fixed by the climbing formwork tripod 8, so that the platform force is transferred to the climbing frame and the guide rail 3, and finally to the poured concrete section. A platform beam 6 is arranged above the rearward support 5, and a protection is arranged on the free surface of the platform beam 6, thereby forming an operating platform to provide an operating space for the operators. The operating platform is arranged according to actual needs, including a top platform 17, a middle climbing frame platform 16, and a bottom platform 15.

[0036] Embedded parts: including tail support 9 and wall-attached embedded parts 10; wherein the tail support 9 is used to fix the tail of the guide rail 3, and the wall-attached embedded parts 10 are mainly used to fix the guide rail 3, the template and the frame.

[0037] The linear formwork 1 is connected with the operating platform unit to form a formwork structure, the formwork structure and the climbing system form a climbing formwork structure, and the climbing formwork structure and the hydraulic system form a hydraulic climbing formwork structure.

[0038] like Figure 2 As shown, the formwork structure in this application is divided into four working platforms from bottom to top: -1, +1, +2, +3:

[0039] (1) -1 layer (hanging platform): mainly used for removing anchor cones, modifying the concrete surface of the pier, and setting up the support of the working platform for entrances and exits.

[0040] (2) +1 layer (climbing platform): It is the operating platform of the climbing device.

[0041] (3) +2 layer (formwork platform): mainly used for the installation, adjustment, and removal of formwork, and the installation of anchor cones.

[0042] (4) +3 layer (transition platform): mainly used for the transition between upper and lower channels and for fixing pull rods.

[0043] (5) +4 layer (top platform): mainly used for the steel bar binding of the piers in the uncast concrete section and as a working platform during concrete pouring.

[0044] Construction process flow: Construction preparation → Construction of the first section of the trough pier → Hoisting of the frame → Installation of the standard section formwork → Hoisting of the inner formwork and construction platform → Hoisting of the semicircular formwork 2 → Concrete pouring → Removal of the semicircular formwork 2 → Climbing of the frame → Installation of steel bars and embedded parts for the extended trough pier → Gradual adjustment of the standard section formwork and formwork system into position → Lifting of the inner formwork platform into position → Installation of the matching semicircular formwork 2 with the same section → Concrete pouring of the next section → Multiple lifting of the climbing frame and inner formwork platform → Simultaneous matching and replacement of the semicircular formwork 2 → Construction of the pier top section → Removal of the climbing formwork system → Transfer to the next pier position → Until the trough pier construction is completed.

[0045] Gradual climbing working state of hydraulic climbing formwork: The climbing of hydraulic climbing formwork is realized by the hydraulic cylinder alternately lifting the guide rail 3 and the formwork. The climbing formwork is fixed on the embedded climbing cone 11 as a whole. After the formwork tie rod is released and the formwork enters the lifting state, the climbing formwork frame is lifted. After the standard hydraulic climbing formwork system is climbed and fixed, the double-end semicircular formwork 2 of the same size is replaced to realize the gradual climbing of the hydraulic climbing formwork.

[0046] 1. Initial state of the climbing formwork: The guide rail 3 and the formwork are fixed by pre-embedded climbing cones 11 in the slot pier and connected to the wall-attached device.

[0047] 2. Lifting of guide rail 3: After demolding, install connecting screws and wall attachment devices on the climbing cone 11 left by demolding, and lift guide rail 3 by adjusting the directions of upper and lower ratchets 13. After guide rail 3 is lifted to the embedded support, the operator goes to the lower platform to remove the embedded support and conical joint at the lower platform.

[0048] 3. Lifting of the climbing formwork: After releasing the tie rods on the formwork, the formwork is lifted and lowered. Under the condition that the guide rail 3 remains stationary, the oil cylinder is activated after adjusting the direction of the upper and lower ratchets 13, and the formwork begins to move upward relative to the guide rail 3. The purpose of climbing each compartment is achieved by alternately attaching the guide rail 3 and the formwork to the wall and lifting each other.

[0049] 4. Replacement status of the double-end arc gradient template: Before the straight line template 1 and the mold frame system climb, remove the template of the outer mold arc section and the inner mold template of the previous stage. After the straight line template 1 and the mold frame system climb, perform self-adjustment gradient into place and match the semicircular template 2 with the same section for assembly and reinforcement to complete the gradient climbing of the hydraulic climbing template.

[0050] Finally, it should be noted that, in this article, relationships such as first and second, etc. are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms include, include or any other variations are intended to cover non-exclusive inclusion, so that a process, method, article or device that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0051] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0052] The embodiments of the present application have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or improvements to the technology in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.

Claims

1. A double-ended circular arc gradient hollow pier hydraulic climbing formwork combination system, characterized in that: include: Formwork system, climbing system, hydraulic system, operating platform unit and embedded parts; the formwork system includes a straight formwork and a semicircular formwork, the straight formwork is connected with the semicircular formwork to form a "runway-type" outer formwork and a "D-type" inner formwork, and the straight formwork is connected with the operating platform unit to form a formwork structure; the climbing system includes a guide rail, a climbing cone and a wall-attached connector, the wall-attached connector is connected and fixed to the embedded part, and the guide rail and the formwork structure are fixed on the climbing cone; the hydraulic system includes a ratchet, a hydraulic diagonal brace and a guide rail lifting hydraulic rod, the ratchet and the guide rail lifting hydraulic rod act together on the guide rail, and the hydraulic diagonal brace is connected to the operating platform unit; the operating platform unit is arranged on the outside of the guide rail, and includes a rearward moving bracket, a platform beam, a platform protection and a climbing formwork tripod; the platform beam and the platform protection constitute an operating platform, the rearward moving bracket is arranged below the platform beam, and the rearward moving bracket is fixed by the climbing formwork tripod.

2. The double-end circular arc gradient hollow pier hydraulic climbing formwork combination system according to claim 1 is characterized in that: The straight line template comprises a straight line standard outer template, a straight line standard inner template and a special-shaped straight line template.

3. The double-end circular arc gradient hollow pier hydraulic climbing formwork combination system according to claim 1 is characterized in that: The semicircular template includes a 90° outer template and a 90° inner template.

4. The double-end circular arc gradient hollow pier hydraulic climbing formwork combination system according to claim 1 is characterized in that: The semicircular template is provided with an adjusting corbel.

5. The double-end circular arc gradual hollow pier hydraulic climbing formwork combination system according to claim 1 is characterized in that: The embedded parts include a tail support and a wall-attached embedded part. The tail support is fixedly connected to the tail of the guide rail, and the wall-attached embedded part is fixedly connected to the formwork structure.

6. The double-end circular arc gradual hollow pier hydraulic climbing formwork combination system according to claim 1 is characterized in that: The operating platform comprises a top platform, a middle climbing frame platform and a bottom platform.