Creeping formwork device for expressway bent cap construction
By designing the climbing formwork device, using the alternate rising and falling mechanism of the hoop and the jacking piece, combined with the remote control system, the problems of heavy high-altitude work and high construction costs in traditional highway cap beam construction have been solved, and efficient and safe capping has been achieved. Beam construction.
Patent Information
- Application Number
- CN202420207254.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-01-29
AI Technical Summary
The traditional highway cap beam construction method involves a large amount of high-altitude operations, high construction risks, and high costs. It also requires high foundation bearing capacity and risks of settlement and damage.
Design a climbing formwork device, including two sets of hoops and lifting parts. The hoops can be alternately raised or lowered through hydraulic jacks or telescopic screws. Combined with a remote control system, it can reduce the workload of high-altitude operations and improve the degree of automation.
It effectively reduces the amount of high-altitude work, improves construction efficiency and safety, reduces construction costs, simplifies the installation and removal process of formwork, and enhances the versatility and utilization of formwork.
Smart Images

Figure CN221822754U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge engineering and highway cap beam construction, in particular to a climbing formwork device used for highway cap beam construction. Background Art
[0002] The cap beam refers to the beam installed on the top of the frame pile pier to support, distribute and transfer the load of the superstructure, also known as the cap beam. Its main function is to support the superstructure of the bridge and transfer all the loads to the lower structure. The traditional cap beam construction is divided into the ground bracket method, the hoop method and the through-bar method. The ground bracket method is generally used for short piers with good foundations, and the hoop method and through-bar method are generally used for high piers.
[0003] Among them: the support method is currently the most commonly used method. The support can be set up with universal rods or steel pipe supports. The weight of all temporary facilities and the weight of the cap beam construction are all supported by the support. Its advantage is that it can be randomly changed according to the height of the pier, and there is no need to set embedded parts on the pier, which will not affect the appearance of the pier. However, it has high requirements on the bearing capacity of the foundation, and each construction must be carried out to install and dismantle the supporting structure, formwork, and construction operation platform, resulting in a large amount of high-altitude operations, complicated procedures, and a large number of consumables and mechanical equipment. Therefore, the construction risk is high, the construction efficiency is low, and the construction cost is high. The through-rod method is to reserve holes on the pier to install through-rods, and then set up Bailey beams and other supporting structures between the through-rods to support the cap beam formwork. The through-rod method has no requirements for the foundation, but the through-rod method will destroy the bearing capacity of the pier to a certain extent, and there is also the risk of settlement during installation. The clamp method is to install the clamp at the appropriate position on the pier and clamp it with the pier to generate the maximum static friction to support the cap beam formwork to complete the pouring construction of the cap beam. The clamp method has no requirements for the foundation, and the installation height can change with the height of the pier, and it has strong adaptability. However, the clamp method still needs to install the clamp at high altitude. How to further reduce the amount of high-altitude work has become a focus of attention. Utility Model Content
[0004] The utility model discloses a climbing formwork device for highway cap beam construction, which can further reduce the workload of high-altitude operations during cap beam construction.
[0005] To achieve the above purpose, the technical solution of the utility model is:
[0006] A climbing formwork device for highway cap beam construction, comprising:
[0007] A climbing formwork mechanism, which is provided with at least two groups, each group includes a hoop and a lifting member, the hoop includes a first hoop and a second hoop arranged below the first hoop, a retractable lifting member is connected between the first hoop and the second hoop, and the lifting member is used to drive the first hoop and the second hoop to rise or fall alternately;
[0008] The cap beam template is detachably fixedly connected to the first clamp, matches the size of the cap beam, and the bottom template is provided with a pier accommodating hole for accommodating the pier to pass through.
[0009] Furthermore, the lifting member is a hydraulic jack or a telescopic screw.
[0010] Further, the first hoop comprises a first hoop body, a first hoop ring rib, a first hoop clamping jack and a first hoop lifting piece connecting unit; the first hoop body is provided with at least two pieces, and the two ends of the two first hoop bodies are detachably connected together through the first hoop clamping jacks, respectively, and can be matched and sleeved on the periphery of the pier column; the first hoop ring rib is provided around the outer side of the first hoop body, and the first hoop ring rib is connected to one end of the first hoop lifting piece connecting unit, and the first hoop lifting piece connecting unit is evenly arranged around the first hoop body, and the other end extends out of the first hoop ring rib to be connected to one end of the lifting piece;
[0011] The second hoop includes a second hoop body, a second hoop ring rib, a second hoop clamping jack and a second hoop lifting piece connecting unit; the second hoop body is provided with at least two pieces, and the two ends of the two second hoop bodies are detachably connected together through the second hoop clamping jacks, and can be matched and sleeved on the periphery of the pier column; the outer side of the second hoop body is annularly provided with the second hoop ring rib, and the second hoop ring rib is connected to the second hoop lifting piece connecting unit, and the second hoop lifting piece connecting unit is evenly arranged around the second hoop body, and the other end extends out of the first hoop ring rib for connecting to the other end of the lifting piece.
[0012] Furthermore, the lifting member, the first clamping hoop clamping jack, and the second clamping hoop clamping jack are connected to a remote control system.
[0013] Furthermore, the cap beam template includes a bottom template, a side template and an end template; the front and rear sides of the bottom template are respectively hinged to the side templates, and the left and right sides are respectively hinged to the end template;
[0014] The cap beam formwork and the climbing formwork mechanism are connected via a load-bearing crossbeam, and the length of the load-bearing crossbeam is adjustable.
[0015] Furthermore, the front and rear sides of the bearing beam or the bottom mold are respectively hinged to one end of the side mold opening and closing jack at intervals, and the other end of the side mold opening and closing jack is hinged to the middle or upper part of the side mold; the left and right ends of the bearing beam or the bottom mold are respectively hinged to one end of the end mold adjustable support rod and / or the end mold opening and closing jack at intervals, and the other end of the end mold adjustable support rod and / or the end mold opening and closing jack is hinged to the middle or upper part of the end mold.
[0016] Furthermore, the front and rear sides of the load-bearing beam or the bottom mold are respectively hinged to one end of an adjustable support rod of the side mold at intervals, and the other end of the adjustable support rod of the side mold is hinged to the middle or upper part of the side mold.
[0017] Further, the side mold includes a side mold panel, the side mold panel includes a side mold fixing module and a side mold adjusting module, the side mold fixing module and the side mold adjusting module are detachably connected together to form the side mold panel, and the side mold adjusting module is replaceable;
[0018] The bottom mold comprises a bottom mold panel, the bottom mold panel comprises a bottom mold fixing module and a bottom mold adjusting module, the bottom mold fixing module and the bottom mold adjusting module are detachably connected together to form the bottom mold panel, the bottom mold adjusting module is replaceable, and the bottom mold fixing module and the bottom mold adjusting module are both divided into two detachably connected parts from the transverse center line of the cap beam template;
[0019] The end mold comprises an end mold panel, and the end mold panel is divided into two parts that can be detachably connected together from the transverse center line of the cap beam template.
[0020] Furthermore, a limiting block is arranged at intervals at the position where the bottom mold and the side mold are close to each other, and an insertable wedge block is matched and arranged between the limiting block and the side mold. Furthermore, one end of the wedge block is connected to one end of a flexible connector, and the other end of the flexible connector is connected to the side mold or the bottom mold.
[0021] The climbing formwork device described above for highway cap beam construction is installed and debugged on the bottom platform of the pier 9 during construction, and then the load-bearing crossbeam, bottom form, end form adjustable strut 3 and side form adjustable strut, side form, end form, side form opening and closing jack are installed in sequence, the remote control system is debugged, and the jacking parts, the first clamping hoop clamping jack, and the second clamping hoop clamping jack are connected. After the installation is completed, the load-bearing pre-compression is carried out. After the pre-compression is completed, the climbing formwork mechanism is started to climb to the specified position, and the cap beam reinforcement is tied or the tied reinforcement is hoisted into the mold as a whole. Finally, after checking that everything is correct, the concrete can be poured.
[0022] The utility model has the following advantages:
[0023] (1) By adopting the climbing formwork device of the utility model, the assembly of the hoop and the cap beam formwork can be completed on the ground, avoiding the high-altitude hoisting installation and dismantling of the formwork, construction platform and other structures in the traditional way, reducing the construction difficulty and risk, and improving the construction efficiency.
[0024] (2) The utility model adopts the above-mentioned climbing formwork device for construction, which can greatly reduce the construction cost compared with the ground support method.
[0025] (3) The utility model further provides a remote control system, and the ascent and descent of the climbing formwork mechanism can be realized by the remote control system, thereby improving the degree of automation and construction efficiency of the cap beam construction.
[0026] (4) The utility model further provides a modular design for the cap beam formwork, thereby improving the versatility and utilization rate of the formwork, and at the same time improves the formwork structure, thereby simplifying the construction procedures such as formwork replacement and removal.
[0027] (5) The utility model reduces the cost of cap beam construction and improves construction efficiency by reducing the amount of high-altitude work, improving the degree of automation of construction, and simplifying the construction process. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a main structural schematic diagram of an embodiment of the utility model.
[0029] Figure 2 yes Figure 1 Schematic diagram of the left view structure.
[0030] Figure 3 It is a structural diagram of the cap beam formwork.
[0031] Figure 4 yes Figure 3 Schematic diagram of the top view structure.
[0032] Figure 5 yes Figure 3 Schematic diagram of the left view structure.
[0033] Figure 6 yes Figure 3 Schematic diagram of the structure of section 2-2 or 3-3.
[0034] Figure 7 yes Figure 3 Schematic diagram of the structure of section 1-1.
[0035] Figure 8 yes Figure 3 Schematic diagram of the enlarged structure of part A.
[0036] Fig. 9 It is a schematic diagram of the main structure of the base mold.
[0037] Fig.10 yes Fig. 9 Schematic diagram of the top view structure.
[0038] Fig.11 It is a schematic diagram of the main structure of the side mold.
[0039] Fig.12 yes Fig.11 Schematic diagram of the top view structure.
[0040] Fig.13 It is a schematic diagram of the main structure of the end mold.
[0041] Fig.14 yes Fig.13 Schematic diagram of the right view structure.
[0042] Fig.15 It is a schematic diagram of the main structure of the climbing formwork mechanism.
[0043] Fig.16 yes Fig.15 Schematic diagram of the right view structure.
[0044] Fig.17 yes Fig.15 Schematic diagram of the top view structure.
[0045] In the figure, side mold 1, side mold panel 101, side mold fixing module 101a, side mold adjustment module 101b, side mold large back rib 102, side mold small back rib 103, first side mold hinge seat 104, second side mold hinge seat 105, end mold 2, end mold panel 201, end mold small back rib 202, end mold large back rib 203, first end mold hinge seat 204, second end mold hinge seat 205, end mold large back rib connecting plate 206, end mold adjustable support rod 3, bottom mold 4, pier column accommodating hole 401, bottom mold panel 402, bottom mold fixing module 402a, bottom mold adjustment module 402b, bottom mold large back rib 403, bottom mold small back rib 404, first bottom mold hinge seat 405, second bottom mold Articulated seat 406, bottom mold large back rib connecting plate 407, third bottom mold articulated seat 408, bearing beam 5, first hoop 6, first hoop body 601, first hoop annular rib 602, first hoop lifting piece connecting unit 603, first hoop clamping jack 604, first hoop fastening bolt 605, lifting piece 7, second hoop 8, second hoop body 801, second hoop annular rib 802, second hoop lifting piece connecting unit 803, second hoop clamping jack 804, second hoop fastening bolt 805, pier 9, end mold connecting rod 10, side mold adjustable support rod 11, side mold opening and closing jack 12, limit block 13, wedge block 14, flexible connector 15. DETAILED DESCRIPTION
[0046] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0047] In the description of the present utility model, it should be noted that the terms "upper" and "lower" etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships in which the utility model product is usually placed when in use. They are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they cannot be understood as limitations on the present utility model.
[0048] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0049] A climbing formwork device for highway cap beam construction, combined with Figure 1 and Figure 2 As shown, it includes a climbing formwork mechanism and a cap beam template, wherein: the climbing formwork mechanism is provided with at least two groups, each group includes a hoop and a jacking piece 7, the hoop includes a first hoop 6 and a second hoop 8 arranged below the first hoop 6, and a retractable jacking piece 7 is connected between the first hoop 6 and the second hoop 8, and the jacking piece 7 is used to drive the first hoop 6 and the second hoop 8 to alternately rise or fall; the cap beam template is detachably fixedly connected to the top of the first hoop 6, matching the size of the cap beam, and the bottom formwork 4 is provided with a pier column accommodating hole 401 for accommodating the pier column 9 to pass through. Two or more groups of climbing formwork mechanisms jointly support a cap beam template, and the climbing formwork mechanism climbs upward along the pier column 9, driving the cap beam template to climb to the top of the pier column 9, so that the assembly of the hoop and the cap beam template can be completed on the ground, which greatly reduces the amount of high-altitude operations, reduces construction risks, and improves construction efficiency. In addition, the use of the above-mentioned climbing formwork device for construction can greatly reduce the construction cost compared with the ground support method.
[0050] Furthermore, the lifting member 7 is a hydraulic jack or a telescopic screw, preferably a hydraulic jack, which can be remotely controlled, more convenient to operate, and can meet greater bearing capacity requirements. Fig.15 and Fig.16 As shown in the figure, what is shown is a hydraulic jack.
[0051] Furthermore, this embodiment provides a preferred structure of the first clamp 6 and the second clamp 8, combined with Fig.15 and Fig.16 As shown, the first hoop 6 includes a first hoop body 601, a first hoop ring rib 602, a first hoop clamping jack 604 and a first hoop lifting piece connecting unit 603; the first hoop body 601 is provided with at least two pieces, and the two ends of the two first hoop bodies 601 are detachably connected together through the first hoop clamping jack 604, which can be matched and sleeved on the periphery of the pier 9. The two ends of the first hoop body 601 protrude outward to facilitate the connection of the first hoop body 601, which is similar to the conventional hoop setting, and the connection between the first hoop clamping jack 604 and the first hoop body 601, combined with Fig.17As shown, grooves can be provided at the top and bottom of both ends of the first clamp body 601 to accommodate the insertion of the piston rod of the first clamp jack 604, and first clamp jack connecting plates are correspondingly provided at the fixed end and the telescopic end of the first clamp jack 604. During installation, first clamp jacks 604 are provided at the top and bottom of both ends of the first clamp body 601, that is, at least four first clamp jacks 604 are generally matched, and the first clamp jack connecting plates at the fixed end and the telescopic end of the first clamp jack 604 are inserted into the outer side of one end of the first clamp body 601 to clamp the two first clamp bodies 601. 01, and then fasten the two ends of the first hoop body 601 protruding outwards and the first hoop clamping jack connecting plate together through a pin shaft or a bolt, so that the connection between the two ends of the first hoop body 601 can be achieved. Of course, this embodiment only provides a connection structure, and other structures that can realize the connection between the first hoop clamping jack 604 and the first hoop body 601 are also possible; the outer side of the first hoop body 601 is annularly provided with a first hoop ring rib 602, and the first hoop ring rib 602 is connected to the first hoop body 601 to strengthen the strength of the first hoop body 601. At the same time, the first hoop ring rib 602 is connected to the first hoop lifting piece. The first hoop jacking member connection unit 603 is evenly arranged around the first hoop body 601, and the other end extends out of the first hoop ring rib 602 to be connected to one end of the jacking member 7. In order to maintain the balance of the support of the jacking member 7, the jacking member 7 is provided with at least two, and the embodiment shows four. In the above structure, the first hoop clamps the piston rod of the jack 604 to contract, so that the first hoop 6 clamps the pier 9, and conversely, the first hoop clamps the piston rod of the jack 604 to contract and extend, so that the first hoop 6 is loosened; the second hoop 8 has a similar structure to the first hoop 6, including a second hoop body 801, a second hoop ring rib 8 02. The second hoop clamping jack 804 and the second hoop lifting piece connecting unit 803; the second hoop body 801 is provided with at least two pieces, and the two ends of the two second hoop bodies 801 are detachably connected together through the second hoop clamping jacks 804, and can be matched and sleeved on the outer periphery of the pier 9; the outer side of the second hoop body 801 is ringed with a second hoop ring rib 802, and the second hoop ring rib 802 is connected to the second hoop lifting piece connecting unit 803. The second hoop lifting piece connecting unit 803 is evenly distributed around the second hoop body 801, and the other end extends out of the first hoop ring rib 602 for connecting with the other end of the lifting piece 7. The parts similar to the structure of the first hoop 6 will not be described here, but it should be noted that, according to the position arrangement of the lifting member 7, the telescopic end of the lifting member 7 is connected to the bottom surface of the first hoop lifting member connection unit 603, and the fixed end is connected to the top surface of the second hoop lifting member connection unit 803. The connection method can be a detachable connection method such as bolt connection and pin connection. The orthographic projections of the center lines of the first hoop 6 and the second hoop 8 coincide.During the climbing formwork process, first make the second hoop 8 hold the pier 9 tightly, the first hoop 6 is relatively loosened, the lifting piece 7 is extended, and the first hoop 6 is driven to rise. After extending to a certain position, the first hoop 6 is held tightly to the pier 9, the second hoop 8 is relatively loosened, the lifting piece 7 is contracted, and the second hoop 8 is driven to rise. Repeat the above steps until the cap beam formwork moves to the designed position, forming a walking hoop movement mode. After the casting of the cap beam is completed, the climbing formwork mechanism can be operated in reverse to achieve the downward movement.
[0052] Furthermore, the jacking member 7, the first clamping hoop clamping jack 604, and the second clamping hoop clamping jack 804 are connected to the remote control system. The remote control system can adopt a variety of control systems, such as a PLC control system. In this way, during the movement of the climbing formwork mechanism, the remote control system is used to control the first clamping hoop clamping jack 604 and the second clamping hoop clamping jack 804 to clamp the pier 9, and control the jacking member 7 to climb alternately, so as to realize the key processes such as the overall automation of the climbing formwork mechanism, such as the ascent, descent, and load-bearing. The climbing formwork mechanism and the cap beam formwork are installed on the bottom platform of the pier 9. After the installation is completed, the climbing formwork mechanism drives the cap beam formwork to rise along the pier 9 to the designated position of the cap beam construction, thereby avoiding the process of high-altitude installation of the traditional working formwork frame and reducing the construction difficulty and construction risk. Of course, in order to further ensure the safety of the clamp construction, bolt holes can be correspondingly provided at both ends of the first clamp body 601 and the second clamp body 801. When the climbing formwork mechanism rises to the designated position for the cap beam construction, the clamp fastening bolts are passed through the bolt holes, and the nuts are tightened to further tighten the first clamp 6 and the second clamp 8, which can better ensure the load-bearing capacity of the climbing formwork mechanism. In addition, rubber material can be laid on the inner side of the first clamp body 601 and the second clamp body 801 as an anti-slip layer, so as to increase the friction between the clamp and the pier column 9, and use the vertical friction between the clamp and the pier column 9 to support the self-weight of the cap beam construction structure on the upper part of the walking clamp and other vertical load forces.
[0053] In the above structure, a clamp clamping jack is designed between the two clamp bodies to automatically clamp. After the cap beam reaches the designated construction position of the cap beam through the climbing formwork, the clamp fastening bolts are manually installed. That is, during the construction of the cap beam, the first clamp 6 and the second clamp 8 are used as load-bearing and positioning structures, and bolt connection and fastening are safer and more stable. In the process of the cap beam template rising and falling along the pier column, the clamping jack is used to remotely control the automatic tightening and loosening of the clamp. The first clamp 6 and the second clamp 8 are tightened and loosened in turn, and take turns as the clamping force points of the cap beam climbing formwork, realizing the automatic rising and falling of the cap beam climbing formwork.
[0054] The cap beam formwork can adopt the existing structure. Furthermore, the present embodiment provides a more preferred cap beam formwork, which includes a bottom formwork 4, a side formwork 1 and an end formwork 2; the front and rear sides of the bottom formwork 4 are respectively hinged to the side formwork 1, and the left and right sides are respectively hinged to the end formwork 2, so as to facilitate the demoulding operation after the cap beam is cast; the cap beam formwork and the climbing formwork mechanism are connected by a load-bearing crossbeam 5, and the length of the load-bearing crossbeam 5 is adjustable. The connection method between the climbing formwork mechanism and the load-bearing crossbeam 5 can adopt the connection method between the clamp and the load-bearing crossbeam 5 in the existing clamp method construction, or can adopt a pin connection method, such as the top of the first clamp 6 is connected to a beam connecting plate, the beam connecting plate is provided with a pin hole, and the load-bearing crossbeam 5 is also provided with a corresponding pin hole, and the connection between the first clamp 6 and the load-bearing crossbeam 5 can be achieved through a pin. The length of the load-bearing crossbeam 5 is adjustable, so that the climbing formwork device of this embodiment can adapt to the installation requirements of cap beams of different lengths. Adjustable method, combined with Figure 1 As shown, the bearing beam 5 may include a bearing beam fixed section and a bearing beam adjustment section, which are connected together to form a whole bearing beam 5. According to the length requirement of the cap beam, bearing beam adjustment sections of different lengths can be replaced. In order to ensure the overall balance and bearing capacity, two bearing beam fixed sections are preferably provided, which are respectively connected to the two ends of the bearing beam adjustment section. The bearing beam 5 is used to transfer the vertical force of the self-weight of the upper cap beam formwork and other construction loads to the climbing formwork mechanism.
[0055] Furthermore, in order to facilitate the realization of automated mold opening and closing, the cap beam template is further optimized in this embodiment. The front and rear sides of the bearing crossbeam 5 or the bottom mold 4 are respectively hinged to one end of the side mold opening and closing jack 12 at intervals, and the other end of the side mold opening and closing jack 12 is hinged to the middle or upper part of the side mold 1. The side mold 1 can be pulled outward by contracting the side mold opening and closing jack 12 to realize automated mold opening. Conversely, the side mold opening and closing jack 12 is extended and can be pushed inward to realize automated mold closing. The side mold opening and closing jack 12 can also be connected to a remote control system and remotely controlled by the remote control system. Since the side molds are relatively long, for the number of side mold opening and closing jacks 12, it is best to match at least two side mold opening and closing jacks 12 to each side mold 1, and they are symmetrically arranged relative to the vertical center line of the side mold 1 to ensure that both sides of the side mold 1 can be driven at the same time, and the mold closing accuracy is higher. The left and right ends of the bearing crossbeam 5 or the bottom mold 4 are respectively hinged to one end of the end mold adjustable strut 3 and / or the end mold opening and closing jack, and the other end of the end mold adjustable strut 3 and / or the end mold opening and closing jack is hinged to the middle or upper part of the end mold 2. The end mold 2 is relatively short, and the mold opening can be better achieved by extending or shortening the end mold adjustable strut 3. At the same time, it can also play a role in limiting the support of the end mold 2 during concrete pouring, and assist in improving the strength and rigidity of the end mold 2; the end mold adjustable strut 3 can adopt a threaded adjustable strut structure or a screw adjustable strut structure. Of course, if the end mold 2 is relatively long, the end mold opening and closing jack can also be used according to the situation, and the hydraulic jack structure can be used to achieve the opening and closing of the end mold 2.
[0056] Furthermore, the front and rear sides of the load-bearing beam 5 or the bottom mold 4 are respectively hinged to one end of the side mold adjustable strut 11 at intervals, and the other end of the side mold adjustable strut 11 is hinged to the middle or upper part of the side mold 1. The side mold adjustable strut 11 is spaced apart from the side mold opening and closing jack 12. The side mold opening and closing jack 12 mainly plays the role of opening and closing the mold, and ensures the overall strength and rigidity of the side mold 1. The side mold adjustable strut 11 mainly has two functions. One is to fine-tune the position through the side mold adjustable strut 11 when the side mold 1 is closed. The second is to replace the role of the traditional tension rod to provide limited support for the side mold 1 during pouring, withstand the lateral pressure and other loads of the concrete, ensure that the distance between the front and rear side molds meets the design requirements, and simplify the construction process at the same time. Combined with Figure 4-7 As shown, in order to facilitate the separation of the bearing crossbeam 5 and the cap beam template when lowering, the side mold adjustable support rod 11, the side mold opening and closing jack 12, the end mold adjustable support rod 3 and / or one end of the end mold opening and closing jack are all hinged to the bottom mold 4. This embodiment also provides a more specific connection method, combined with Fig. 9 and Fig.10As shown, the bottom mold 4 includes a bottom mold panel 402, a bottom mold large back rib 403, a bottom mold small back rib 404, a first bottom mold hinge seat 405, a second bottom mold hinge seat 406 and a third bottom mold hinge seat 408, wherein the shape of the bottom mold panel 402 is arranged according to the conventional cap beam bottom mold panel; the bottom surface of the bottom mold panel 402 is fixed with bottom mold small back ribs 404 at intervals in the horizontal direction, and the bottom surface of the bottom mold small back ribs 404 is fixedly connected with bottom mold large back ribs 403 at intervals in the vertical direction, and the front end and the rear end of the bottom mold large back rib 403 extend out of the front side and the rear side of the bottom mold 4 respectively, and the bottom mold large back rib 40 A second bottom mold articulated seat 406 is provided at a position close to the front and rear sides of the bottom mold panel 402 for articulating with the side mold 1; a first bottom mold articulated seat 405 is provided above the front and rear ends of the bottom mold large back rib 403 for articulating with one end of the side mold adjustable support rod 11 and the side mold opening and closing jack 12; the side mold adjustable support rod 11 and the side mold opening and closing jack 12 are provided with corresponding pin holes, so as to realize articulation with the first bottom mold articulated seat 405; third bottom mold articulated seats 408 are provided at the left and right ends of the bottom mold panel 402 for articulating with the end mold 2.
[0057] Based on the specific structure of the bottom mold 4, this embodiment also provides a hinged connection method between the bottom mold 4 and the side mold 1, and between the bottom mold 4 and the end mold 2. Fig.11 and Fig.12 As shown, the side mold 1 includes a side mold panel 101, a large side mold back rib 102, a small side mold back rib 103, a first side mold hinge seat 104 and a second side mold hinge seat 105. The shape of the side mold panel 101 is arranged according to the conventional cap beam side mold panel. On the outer side of the side mold panel 101, the small side mold back ribs 103 are longitudinally connected at intervals, and the middle part of the outer side of the small side mold back rib 103 is transversely connected with the large side mold back rib 102. The small side mold back rib 103 and the large side mold back rib 102 can enhance the supporting strength of the side mold panel 101. ; On the outside of the large back rib 102 of the side mold, a first side mold articulated seat 104 is connected, which is used to articulate with the other end of the side mold adjustable support rod 11 and the side mold opening and closing jack 12. The side mold adjustable support rod 11 and the side mold opening and closing jack 12 are provided with corresponding pin holes, which can realize the articulation with the first side mold articulated seat 104; A second side mold articulated seat 105 is provided at the bottom of the small back rib 103 of the side mold, which can be matched with the second bottom mold articulated seat 406 to insert a pin shaft to realize an articulated connection, thereby realizing the articulation of the side mold 1 and the bottom mold 4. Combined Fig.13 and Fig.14As shown, the end mold 2 includes an end mold panel 201, a small back rib 202 of the end mold, a large back rib 203 of the end mold, a first end mold articulated seat 204 and a second end mold articulated seat 205. The end mold panel 201 is arranged according to a conventional cap beam end mold panel. The outer side of the end mold panel 201 is vertically fixed with small back ribs 202 of the end mold, and the middle part of the outer side of the small back ribs 202 of the end mold is laterally fixed with large back ribs 203 of the end mold. The small back ribs 202 of the end mold and the large back ribs 203 of the end mold can enhance the supporting strength of the end mold panel 201; the outer side of the large back rib 203 of the end mold is connected to the first end mold articulated seat 204, which is hinged to the other end of the end mold adjustable support rod 3 and / or the end mold opening and closing jack through the first end mold articulated seat 204, and the end mold adjustable support rod 3 and / or the end mold opening and closing jack The other end of the mold closing jack is provided with a corresponding pin hole, so that it can be hinged with the first end mold hinge seat 204. As for the hinge structure at one end of the end mold adjustable support rod 3, the present embodiment also provides a preferred method. End mold connecting rods 10 are respectively connected to the two ends of the two load-bearing beams 5, and end mold connecting rod hinge seats are correspondingly provided on the end mold connecting rods 10. One end of the end mold adjustable support rod 3 and / or the end mold opening and closing jack is provided with a corresponding pin hole, so that it can be hinged with the end mold connecting rod hinge seat; the bottom of the end mold small back rib 202 is connected to the second end mold hinge seat 205, and the second end mold hinge seat 205 can match the third bottom mold hinge seat 408 to insert the pin shaft to achieve hinged connection, thereby realizing the hinge of the end mold 2 and the bottom mold 4.
[0058] Furthermore, in order to meet the casting dimensions of cap beams of different lengths, this embodiment provides a more preferred side form 1 and bottom form 4 structure, wherein the lengths of the side form panel 101 and the bottom form panel 402 are adjustable, and the adjustable manner, combined with Fig.11 and Fig.12 As shown, the side form panel 101 includes a side form fixing module 101a and a side form adjustment module 101b. The side form fixing module 101a and the side form adjustment module 101b are detachably connected together to form the side form panel 101, and the side form adjustment module 101b is replaceable; specifically, the side form adjustment module 101b also needs to be installed with a side form large back rib 102 and a side form small back rib 103, and a first side form hinge seat 104 and a second side form hinge seat 105 are set as needed. In order to better ensure the strength, two side form fixing modules 101a are provided, and one side form adjustment module 101b is provided. The two sides of the side form adjustment module 101b are respectively connected to the side form fixing module 101a by bolts. The side form adjustment module 101b is shorter in length, and the side form fixing module 101a is longer in length, which is set according to the different sizes of the cap beams in the actual project construction; combined with Fig. 9 and Fig.10As shown, the bottom mold panel 402 includes a bottom mold fixing module 402a and a bottom mold adjusting module 402b, the bottom mold fixing module 402a and the bottom mold adjusting module 402b are detachably connected together to form the bottom mold panel 402, the bottom mold adjusting module 402b is replaceable, and the bottom mold adjusting module 402b also needs to be installed with a bottom mold large back rib 403 and a bottom mold small back rib 404, and a first bottom mold hinge seat 405 and a second bottom mold hinge seat 406 are set as needed. In order to better ensure the strength, the bottom mold fixing module 402a is provided with two pieces, and the bottom mold adjusting module 402b is provided with one piece. The two sides of the bottom mold adjusting module 402b are respectively connected to the bottom mold fixing module 402a by bolts, and the bottom mold adjusting module 402b is shorter in length, and the bottom mold fixing module 402a is longer in length, which is set according to the different sizes of the cap beams in the actual project construction. The bottom mold fixing module 402a and the side mold fixing module 101a can be selected to have the same length. In addition, the bottom mold fixing module 402a and the bottom mold adjusting module 402b are divided into two parts that can be detachably connected together from the transverse center line of the cap beam template. Correspondingly, the bottom mold large back rib 403 is also formed by two sections of bottom mold large back rib segments that can be detachably connected together. The front end and the rear end of the bottom mold large back rib segment are also respectively connected with a bottom mold large back rib connecting plate 407. The bottom mold large back rib connecting plate 407 can be used to achieve connection with the inner end of the bottom mold large back rib segment, as well as connection between the outer end of the bottom mold large back rib segment and the bearing crossbeam 5. In the detachable connection method, bolt connection is the most convenient; The end form 2 includes an end form panel 201, which is divided into two parts that can be detachably connected from the transverse center line of the cap beam template. Correspondingly, the end form large back rib 203 is also formed by two sections of end form large back rib segments that can be detachably connected together. The inner ends of the end form large back rib segments are connected through the end form large back rib connecting plate 209. The end form large back rib segments can also be connected to the end form small back rib 202 through the end form large back rib connecting plate 209. The bolt connection is the most convenient way to detachably connect. The two symmetrical end form modules are connected as a whole at the center through the bolts on the template connecting plate and the bolts at the end form large back rib connecting plate 209. Both the end form 2 and the bottom form 4 can be split into two parts, which can be conveniently split into two parts from the transverse center line of the cap beam template and transported to the next cap beam construction site.
[0059] Furthermore, a limiting block 13 is provided at intervals between the bottom mold 4 and the side mold 1. Figure 8 As shown, an insertable wedge block 14 is matched between the stop block 13 and the side mold 1. The wedge block 14 has a small bottom and a large top. It can be inserted between the stop block 13 and the side mold 1 and pressed tightly. The stop block 13 and the second bottom mold hinge seat 406 can be set at intervals. Generally, each side mold 1 is matched with two second bottom mold hinge seats 406 to meet the hinge requirements. The two second bottom mold hinge seats 406 are symmetrical relative to the vertical center line of the cap beam, and the stop block 13 is correspondingly set on the other bottom mold large back ribs 403. Figure 5-8 As shown, the positions where the limit blocks 13 and the second bottom mold hinge seat 406 are alternately arranged can be set according to the situation. The wedge block 14 inserted between the limit block 13 and the side mold 1, the wedge block 14 supports the hinge position of the bottom mold 4 and the side mold 1, can prevent the mortar from leaking at the joint of the side mold 1 and the bottom mold 4 during the cap beam construction and pouring. Furthermore, one end of the wedge block 14 is connected to one end of the flexible connector 15, and the other end of the flexible connector 15 is connected to the side mold 1 or the bottom mold 4. The flexible connector 15 can be suspended on the side mold 1 or the bottom mold 4 by a rope or chain to prevent the side mold from being lost after being manually removed during demoulding. According to the position of the wedge block 14, it is more appropriate to hang it on the small back rib 103 of the side mold.
[0060] For the above-mentioned preferred structure, this embodiment further provides a construction method, which specifically includes: installing and debugging a climbing formwork mechanism on the bottom platform of the pier 9 → installing the load-bearing beam 5 → installing the bottom formwork 4 → installing the end formwork adjustable struts 3 and the side formwork adjustable struts 11 → installing the side formwork 1 and the end formwork 2 → installing the side formwork opening and closing jacks 12 → debugging the remote control system, connecting with the jacking part 7, the first clamping hoop clamping jack 604, the second clamping hoop clamping jack 804 and the side formwork opening and closing jacks 12 → end formwork opening and closing debugging → side formwork automatic opening and closing debugging → load-bearing pre-compression → starting the climbing formwork mechanism to climb to the designed position → tying the cap beam steel bars or hoisting the tied steel bars into the mold as a whole → pouring concrete after inspection.
[0061] The dismantling process specifically includes: removing one end of the side formwork adjustable strut 11 connected to the side formwork 1, removing the wedge block 14 → starting the side formwork hydraulic mold closing and demolding jack 12, controlling the side formwork 1 to automatically demold as a whole → manually adjusting the end formwork adjustable strut 3 to demold the end formwork. If necessary, hydraulic automatic mold closing and demolding can be designed as the side formwork 1 → the climbing formwork mechanism first descends 80-120mm to separate the cap beam formwork from contact with the cap beam, completing the overall demolding → starting the climbing formwork mechanism, and descending as a whole to the bottom platform of the pier 9 → removing the front and rear connections of the bottom formwork 4 and the end formwork 2 divided by the transverse center line of the cap beam formwork, hoisting and transporting the two cap beam formwork modules as a whole, and carrying out the construction of the next cap beam.
Claims
1. A climbing formwork device for highway cap beam construction, characterized in that include: A climbing formwork mechanism, which is provided with at least two groups, each group includes a hoop and a lifting member, the hoop includes a first hoop and a second hoop arranged below the first hoop, a retractable lifting member is connected between the first hoop and the second hoop, and the lifting member is used to drive the first hoop and the second hoop to rise or fall alternately; The cap beam template is detachably fixedly connected to the first clamp, matches the size of the cap beam, and the bottom template is provided with a pier accommodating hole for accommodating the pier to pass through.
2. The climbing formwork device for highway cap beam construction according to claim 1 is characterized in that: The lifting member is a hydraulic jack or a telescopic screw.
3. The climbing formwork device for highway cap beam construction according to claim 1 or 2, characterized in that: The first hoop comprises a first hoop body, a first hoop ring rib, a first hoop clamping jack and a first hoop lifting piece connecting unit; the first hoop body is provided with at least two pieces, and the two ends of the two first hoop bodies are detachably connected together through the first hoop clamping jacks, respectively, and can be matched and sleeved on the periphery of the pier column; the first hoop ring rib is provided around the outer side of the first hoop body, and the first hoop ring rib is connected to one end of the first hoop lifting piece connecting unit, and the first hoop lifting piece connecting unit is evenly arranged around the first hoop body, and the other end extends out of the first hoop ring rib to be connected to one end of the lifting piece; The second hoop includes a second hoop body, a second hoop ring rib, a second hoop clamping jack and a second hoop lifting piece connecting unit; the second hoop body is provided with at least two pieces, and the two ends of the two second hoop bodies are detachably connected together through the second hoop clamping jacks, and can be matched and sleeved on the periphery of the pier column; the second hoop ring rib is arranged around the outer side of the second hoop body, and the second hoop ring rib is connected to the second hoop lifting piece connecting unit, and the second hoop lifting piece connecting unit is evenly arranged around the second hoop body, and the other end extends out of the first hoop ring rib for connecting to the other end of the lifting piece.
4. The climbing formwork device for highway cap beam construction according to claim 3 is characterized in that: The lifting member, the first clamping hoop clamping jack, and the second clamping hoop clamping jack are connected to a remote control system.
5. The climbing formwork device for highway cap beam construction according to claim 1 is characterized in that: The cap beam template comprises a bottom template, a side template and an end template; the front and rear sides of the bottom template are respectively hinged to the side templates, and the left and right sides are respectively hinged to the end template; The cap beam formwork and the climbing formwork mechanism are connected via a load-bearing crossbeam, and the length of the load-bearing crossbeam is adjustable.
6. The climbing formwork device for highway cap beam construction according to claim 5 is characterized in that: The front and rear sides of the bearing crossbeam or the bottom mold are respectively hinged to one end of the side mold opening and closing jack at intervals, and the other end of the side mold opening and closing jack is hinged to the middle or upper part of the side mold; the left and right ends of the bearing crossbeam or the bottom mold are respectively hinged to one end of the end mold adjustable support rod and / or the end mold opening and closing jack at intervals, and the other end of the end mold adjustable support rod and / or the end mold opening and closing jack is hinged to the middle or upper part of the end mold.
7. The climbing formwork device for highway cap beam construction according to claim 5 or 6, characterized in that: The front and rear sides of the load-bearing crossbeam or the bottom mold are respectively hinged to one end of the adjustable support rod of the side mold at intervals, and the other end of the adjustable support rod of the side mold is hinged to the middle or upper part of the side mold.
8. The climbing formwork device for highway cap beam construction according to claim 5 is characterized in that: The side mold comprises a side mold panel, and the side mold panel comprises a side mold fixing module and a side mold adjusting module, the side mold fixing module and the side mold adjusting module are detachably connected together to form the side mold panel, and the side mold adjusting module is replaceable; The bottom mold comprises a bottom mold panel, the bottom mold panel comprises a bottom mold fixing module and a bottom mold adjusting module, the bottom mold fixing module and the bottom mold adjusting module are detachably connected together to form the bottom mold panel, the bottom mold adjusting module is replaceable, and the bottom mold fixing module and the bottom mold adjusting module are both divided into two detachably connected parts from the transverse center line of the cap beam template; The end mold comprises an end mold panel, and the end mold panel is divided into two parts that can be detachably connected together from the transverse center line of the cap beam template.
9. The climbing formwork device for highway cap beam construction according to any one of claims 5 to 8, characterized in that: Limiting blocks are arranged at intervals at positions where the bottom mold is close to the side molds, and insertable wedge blocks are matched and arranged between the limiting blocks and the side molds.
10. The climbing formwork device for highway cap beam construction according to claim 9, characterized in that: One end of the wedge block is connected to one end of a flexible connector, and the other end of the flexible connector is connected to the side mold or the bottom mold.