Building pile foundation positioning equipment
By using guide rods, sliding slides, threaded rods and other structures in construction pile foundation positioning equipment, the precise positioning and support of prefabricated piles of different specifications is achieved, which solves the problem of inconvenient adjustment and misalignment of existing equipment, improves docking efficiency and Accuracy.
Patent Information
- Application Number
- CN202420401477.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-01
- Publication Date
- 2024-10-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing building pile foundation positioning equipment can only centrally position and support square-structured prefabricated piles, and cannot effectively adjust prefabricated piles of different specifications. As a result, the reinforcing bars and reserved holes are easily misaligned, affecting the docking efficiency.
A building pile foundation positioning equipment is designed. The lifting plate is adjusted vertically through four guide rods. The two positioning mold shells realize the lifting adjustment function. By sliding the first and second sliding seats, threaded rods and limit blocks, Forming a square structure, prefabricated piles with circular or square structures can be plugged and installed to achieve precise center positioning.
It achieves precise positioning and support of prefabricated piles of different specifications, ensuring that the centers of prefabricated piles and foundation piles are in a straight line, avoiding misalignment of insertion bars and reserved holes, and improving docking efficiency and accuracy.
Smart Images

Figure CN221822908U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of pile foundation positioning equipment, and more specifically, to a building pile foundation positioning equipment. Background Art
[0002] In building construction, precast piles can be produced in factories and transported to construction sites. The precast piles are lifted vertically by using lifting equipment and docked with the cast concrete foundation piles of the building. This is conducive to shortening the construction period and reducing the difficulty of construction. In the process of lifting the precast piles for docking, the lifting equipment needs to ensure that the pile body structure of the precast piles remains vertical and is kept in line with the center of the foundation piles, so as to achieve the purpose of accurate docking. In the process of pile connection, the precast piles that are usually lifted are in a suspended state and cannot meet the center docking effect. Special attention should be paid to whether the dowel bars for docking are misaligned with the reserved holes, thereby slowing down the efficiency of docking. The existing public technology number is CN219992456U, which proposes a positioning device for building pile foundation construction. When the first screw loosens the first support shaft and the second support shaft respectively, the relative positions of the first support shaft, the second support shaft, the third buckle plate and the fourth buckle plate can be adjusted. When the first screw rod clamps the first support shaft and the second support shaft respectively, the relative positions of the first support shaft, the second support shaft, the third buckle plate and the fourth buckle plate can be determined. Finally, the spacing between the fasteners composed of the first buckle plate and the second buckle plate and the fasteners composed of the third buckle plate and the fourth buckle plate is changed. During the adjustment process, the spacing adjustment work can be completed by rotating the first screw rod respectively. It is easy to operate, save time and effort. In view of the above-mentioned related technologies, the utility model inventor believes that the following defects still exist: the positioning equipment in the comparative literature can only perform center positioning and support purposes for the precast piles of square structure. When the specifications of the precast piles change, the precast piles are only clamped during the adjustment period. The adjustment stroke of each adjustment mechanism cannot be controlled, and then the center of the precast pile and the foundation pile is no longer in the same straight line, which is easy to cause the misalignment of the inserted reinforcement and the reserved hole. In view of this, we propose a building pile foundation positioning device. Utility Model Content
[0003] 1. Technical problems to be solved
[0004] The purpose of the present application is to provide a building pile foundation positioning device, which solves the problem that the positioning devices in the comparative literature in the above-mentioned background technology can only perform center positioning and support purposes on precast piles with square structures. When the specifications of the precast piles change, only the clamping effect is achieved on the precast piles during the adjustment period, and the adjustment stroke of each adjustment mechanism cannot be controlled, so that the centers of the precast piles and the foundation piles are no longer on the same straight line, which easily causes the technical problem of misalignment between the inserted reinforcement and the reserved hole. When the precast piles are docked with the building pile foundation, the lifting plate is vertically adjusted by four guide rods on the horizontally installed base, so that the two positioning mold shells can achieve the lifting and adjusting functions. The two positioning mold shells can be plugged and matched to facilitate assembly and sleeve installation of the outside of the precast piles. The first slide seat and the second slide seat vertically arranged on each positioning mold shell can be slidably adjusted respectively, and the displacement stroke can be controlled by the corresponding scale line, so that the square structure formed by the two first positioning axes and the two second positioning axes can be plugged and installed with precast piles of different specifications of circular or square structures, so that the precast pile positioning and support processing is realized during the docking process, the center of the precast pile is positioned, and the technical effect of the purpose of accurately docking the building pile foundation is achieved.
[0005] 2. Technical solution
[0006] The technical solution of the present application provides a building pile foundation positioning device, comprising: an adjustable lifting seat, the adjustable lifting seat comprising a base, four guide rods are fixedly arranged on the upper surface of the base, the guide rods are slidably connected with a lifting plate, a stud is rotatably installed on the base, the stud thread penetrates the lifting plate, the upper surface of the lifting plate is threadedly connected with two L-shaped seats by bolts, the L-shaped seats are respectively fixedly connected with a positioning mold shell, a first positioning component and a second positioning component are installed on the positioning mold shell, the first positioning component comprises a first threaded rod, the first threaded rod is threadedly connected with a first threaded rod A slide seat, a first positioning shaft is rotatably mounted on the first slide seat, the second positioning assembly includes a plug-in block, the plug-in block is plug-fitted and connected with two positioning mold shells, and a hexagon socket bolt is threadedly connected between the end of the plug-in block and the positioning mold shell, a limit block is fixedly provided on the plug-in block, a second threaded rod is rotatably mounted on the limit block, the second threaded rod is threadedly connected with the second slide seat, a second positioning shaft is rotatably mounted on the second slide seat, the two first positioning shafts and the two second positioning shafts form a square structure, and a prefabricated pile is plug-in mounted between the first positioning shaft and the second positioning shaft.
[0007] By adopting the above technical scheme, the stud is rotated to make the lifting plate slide along the four guide rods on the base, and then the corresponding positioning formwork is driven by the two L-shaped seats to realize the lifting function. When the precast pile is docked with the building pile foundation, two plug-in blocks are plugged and installed between the two positioning formworks, and the limiting fixing treatment is realized by using the hexagon socket bolts. When the two positioning formworks are plugged and connected, the second slide seat in the second positioning assembly can be limited, so that the second slide seat can realize the sliding effect by rotating the second threaded rod. Then the square structure formed by the two first positioning shafts and the two second positioning shafts can be plugged and installed with the precast piles of circular or square structure, and the first positioning shaft and the second positioning shaft can be adjusted, so that the positioning and supporting treatment of precast piles of different specifications can be realized, so that the precast piles can be vertically dropped and the purpose of precise docking with the building pile foundation can be achieved.
[0008] Optionally, four anchor bolts are threadedly installed on the base, and nuts are fixedly sleeved at the bottom ends of the studs.
[0009] By adopting the above technical solution, the base is fixedly installed by four anchor bolts, and the base needs to be horizontally processed during installation to ensure that the two positioning mold shells are always in a horizontal state.
[0010] Optionally, the positioning mold shell has a concave structure, and is provided with an insertion groove, a limit groove, an L-shaped groove, an arc groove and a screw hole at both ends of the positioning mold shell. The insertion groove and the limit groove are connected, and the insertion block and the limit block are respectively inserted and installed. The inner thread of the screw hole is used to install the hexagonal bolt, and the second threaded rod is rotatably installed in the arc groove. The positioning mold shell is slidably installed with the second slide seat through the L-shaped groove, and a convex slide groove is provided on the upper surface of the positioning mold shell, and the first slide seat is slidably installed in the convex slide groove.
[0011] By adopting the above technical solution, the plug-in block is inserted into the plug-in groove, and the limit block is arranged in the limit groove. Then the two positioning mold shells are plugged in and matched, and the hexagon socket bolts are used to thread the plug-in block. The limit block is limited by the limit groove, and the second threaded rod is rotatably installed in the arc groove, so that the second threaded rod can rotate stably and drive the second slide seat to slide along the L-shaped groove opened in the positioning mold shell.
[0012] Optionally, two vertically arranged scale lines are provided on the upper surface of the positioning mold shell, and the two scale lines are respectively arranged at the first slide seat and the second slide seat.
[0013] By adopting the above technical solution, the first slide and the second slide can control the sliding stroke through the scale line when sliding along the positioning mold shell, so that the two first positioning axes and the two second positioning axes can form a square structure, so that the center of the precast pile can be positioned.
[0014] Optionally, the first threaded rod and the second threaded rod are vertically distributed, and the first threaded rod is rotatably connected to the positioning mold shell.
[0015] By adopting the above technical solution, when the first threaded rod rotates, the corresponding first sliding seat can slide along the positioning mold shell, and the position of the corresponding first positioning axis can be adjusted.
[0016] 3. Beneficial effects
[0017] One or more technical solutions provided in the technical solution of the present application have at least the following technical effects or advantages: when docking the precast piles with the building pile foundation, the lifting plate is vertically adjusted through four guide rods on the horizontally installed base, so that the two positioning mold shells can realize the lifting and adjusting function, and the two positioning mold shells can be plugged and connected, which is convenient for assembly and sleeve installation on the outside of the precast piles. The first slide seat and the second slide seat vertically arranged on each positioning mold shell can be slidably adjusted respectively, and the displacement stroke can be controlled by the corresponding scale lines, so that the square structure formed by the two first positioning axes and the two second positioning axes can be plugged and installed with precast piles of different specifications of circular or square structures, so as to realize the positioning and support processing of the precast piles during the docking process, so that the center of the precast piles can be positioned and processed, and the purpose of precise docking with the building pile foundation can be achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the overall structure of a building pile foundation positioning device disclosed in a preferred embodiment of the present application;
[0019] Figure 2 A schematic diagram of the structure of an adjustable lifting seat of a building pile foundation positioning device disclosed in a preferred embodiment of the present application;
[0020] Figure 3 A schematic diagram of the decomposed structure of a positioning formwork of a building pile foundation positioning device disclosed in a preferred embodiment of the present application;
[0021] Figure 4 A building pile foundation positioning device disclosed in a preferred embodiment of the present application Figure 3 The enlarged structural diagram at A in the middle;
[0022] Figure 5 A building pile foundation positioning device disclosed in a preferred embodiment of the present application Figure 3 The enlarged structural diagram at B in the middle;
[0023] Explanation of the numbers in the figure: 1. Adjustable lifting seat; 11. Base; 12. Anchor bolt; 13. Guide rod; 14. Stud; 141. Nut; 15. Lifting plate; 2. Precast pile; 3. Positioning mold shell; 31. L-shaped seat; 32. Plug-in slot; 321. Limit slot; 33. L-shaped slot; 34. Scale line; 35. Screw hole; 36. Convex slide slot; 37. Arc slot; 4. First positioning component; 41. First threaded rod; 42. First slide seat; 43. First positioning shaft; 5. Second positioning component; 51. Plug-in block; 511. Limit block; 52. Second threaded rod; 53. Hexagon socket bolt; 54. Second slide seat; 55. Second positioning shaft. DETAILED DESCRIPTION
[0024] The present application is further described in detail below in conjunction with the accompanying drawings.
[0025] Reference Figures 1 to 5The embodiment of the present application provides a building pile foundation positioning device, comprising: an adjustable lifting seat 1, the adjustable lifting seat 1 includes a base 11, four guide rods 13 are fixedly arranged on the upper surface of the base 11, and the guide rods 13 are slidably connected to a lifting plate 15, a stud 14 is rotatably installed on the base 11, and the stud 14 threadedly penetrates the lifting plate 15, and the upper surface of the lifting plate 15 is threadedly connected with two L-shaped seats 31 by bolts, and the L-shaped seats 31 are respectively fixedly connected with a positioning mold shell 3, and a first positioning component 4 and a second positioning component 5 are installed on the positioning mold shell 3, and the first The positioning assembly 4 includes a first threaded rod 41, the first threaded rod 41 is threadedly connected to a first slide 42, a first positioning shaft 43 is rotatably mounted on the first slide 42, the second positioning assembly 5 includes a plug-in block 51, the plug-in block 51 is plug-matched with the two positioning mold shells 3, and a hexagon socket bolt 53 is threadedly connected between the end of the plug-in block 51 and the positioning mold shell 3, a limit block 511 is fixedly provided on the plug-in block 51, a second threaded rod 52 is rotatably mounted on the limit block 511, the second threaded rod 52 is threadedly connected to a second slide 54, and the second slide 54 is rotatably mounted on the second slide The second positioning shaft 55 is dynamically installed, the two first positioning shafts 43 and the two second positioning shafts 55 form a square structure, and the precast pile 2 is plugged and installed between the first positioning shaft 43 and the second positioning shaft 55. By rotating the stud 14, the lifting plate 15 slides along the four guide rods 13 on the base 11, and then the corresponding positioning formwork 3 is driven by the two L-shaped seats 31 to realize the lifting function. When the precast pile 2 is docked with the building pile foundation, two plug-in blocks 51 are plugged and installed between the two positioning formworks 3, and the limit fixing treatment is realized by using the hexagon socket bolts 53, and the two When the positioning formwork shells 3 are plugged in and connected, the second slide seat 54 in the second positioning assembly 5 can be limited, so that the second slide seat 54 can achieve a sliding effect by rotating the second threaded rod 52, and then the square structure formed by the two first positioning shafts 43 and the two second positioning shafts 55 can be plugged in and installed with a circular or square precast pile 2, and the first positioning shaft 43 and the second positioning shaft 55 can be adjusted, and then the positioning and supporting processing of precast piles 2 of different specifications can be realized, so that the precast pile 2 can be vertically dropped and the purpose of precise docking with the building pile foundation can be achieved.
[0026] Reference Figure 1 and Figure 2 Four anchor bolts 12 are threadedly installed on the base 11, and a nut 141 is fixedly sleeved at the bottom end of the stud 14. The base 11 is fixedly installed by the four anchor bolts 12, and the base 11 needs to be horizontally processed during installation to ensure that the two positioning mold shells 3 are always in a horizontal state.
[0027] Reference Figures 3 to 5The positioning mold shell 3 is a concave structure, and both ends of the positioning mold shell 3 are provided with a plug-in groove 32, a limit groove 321, an L-shaped groove 33, an arc groove 37 and a screw hole 35. The plug-in groove 32 and the limit groove 321 are connected, and the plug-in block 51 and the limit block 511 are respectively inserted and installed. The hexagon socket bolt 53 is installed in the screw hole 35, and the second threaded rod 52 is rotatably installed in the arc groove 37. The positioning mold shell 3 is slidably installed with the second slide seat 54 through the L-shaped groove 33. The upper surface of the positioning mold shell 3 is provided with a convex slide groove 36, and the convex The first slide seat 42 is slidably installed in the L-shaped slide groove 36, the plug-in block 51 is plugged into the plug-in groove 32, and the limit block 511 is set in the limit groove 321. Then the two positioning mold shells 3 are plugged into each other and threadedly connected with the plug-in block 51 using the hexagon socket bolt 53. The limit block 511 is limited by the limit groove 321, and the second threaded rod 52 is rotatably installed in the arc groove 37, so that the second threaded rod 52 can rotate stably and drive the second slide seat 54 to slide along the L-shaped groove 33 opened in the positioning mold shell 3.
[0028] Reference Figure 3 and Figure 4 Two vertically arranged scale lines 34 are provided on the upper surface of the positioning formwork 3, and the two scale lines 34 are respectively arranged at the first slide 42 and the second slide 54. When the first slide 42 and the second slide 54 slide along the positioning formwork 3, the sliding stroke can be controlled by the scale lines 34, so that the two first positioning axes 43 and the two second positioning axes 55 can form a square structure, so that the precast pile 2 can be centrally positioned.
[0029] Reference Figures 3 to 5 The first threaded rod 41 and the second threaded rod 52 are vertically distributed, and the first threaded rod 41 is rotatably connected to the positioning mold shell 3. When the first threaded rod 41 rotates, the corresponding first slide seat 42 can slide along the positioning mold shell 3, and the position of the corresponding first positioning shaft 43 can be adjusted.
[0030] Working principle: The base 11 is fixedly installed by four anchor bolts 12, and the base 11 needs to be installed horizontally. The stud 14 is rotated by the nut 141 to make the lifting plate 15 slide along the four guide rods 13 on the base 11, so that the L-shaped seat 31 drives the corresponding positioning formwork 3 to realize the lifting function. When the prefabricated pile 2 is docked with the building pile foundation, two plug-in blocks 51 are installed between the two positioning formworks 3, and the limited fixing treatment is realized by using the hexagon socket bolts 53. When the two positioning formworks 3 are plugged and connected, the L-shaped groove 33 opened in the positioning formwork 3 can be slidably clamped with the second slide seat 54, and the second threaded rod 52 can be rotated to make the second slide seat 54 move along the two L-shaped grooves. The slide groove spliced by 33 realizes the sliding effect. When the first threaded rod 41 rotates, the corresponding first slide seat 42 can slide along the positioning mold shell 3, and the position of the corresponding first positioning axis 43 can be adjusted. Then the square structure formed by the two first positioning axes 43 and the two second positioning axes 55 can be plugged in and installed with a circular or square precast pile 2, and the adjusted positions of the first positioning axis 43 and the second positioning axis 55 can be respectively controlled by the corresponding scale lines 34 to realize the displacement stroke control processing, and then the positioning and supporting processing of precast piles 2 of different specifications can be realized, so that the precast pile 2 can be vertically dropped, the center of the precast pile 2 can be positioned, and the purpose of precise docking with the building pile foundation can be achieved.
Claims
1. A building pile foundation positioning device, characterized in that: The invention comprises: an adjustable lifting seat (1), wherein the adjustable lifting seat (1) comprises a base (11), four guide rods (13) are fixedly arranged on the upper surface of the base (11), the guide rods (13) are slidably connected with a lifting plate (15), a stud (14) is rotatably installed on the base (11), the stud (14) is threadedly penetrated through the lifting plate (15), the upper surface of the lifting plate (15) is threadedly connected with two L-shaped seats (31) through bolts, the L-shaped seats (31) are respectively fixedly connected with a positioning mold shell (3), the positioning mold shell (3) is respectively installed with a first positioning component (4) and a second positioning component (5), the first positioning component (4) comprises a first threaded rod (41), the first threaded rod (41) is threadedly connected with a first sliding seat (42), the first sliding seat (42 ) is rotatably mounted on a first positioning shaft (43), the second positioning assembly (5) includes a plug-in block (51), the plug-in block (51) is plug-fittedly connected to the two positioning mold shells (3), and a hexagon socket bolt (53) is threadedly connected between the end of the plug-in block (51) and the positioning mold shell (3), a limit block (511) is fixedly provided on the plug-in block (51), a second threaded rod (52) is rotatably mounted on the limit block (511), the second threaded rod (52) is threadedly connected to a second slide seat (54), a second positioning shaft (55) is rotatably mounted on the second slide seat (54), the two first positioning shafts (43) and the two second positioning shafts (55) form a square structure, and a prefabricated pile (2) is plug-fittedly mounted between the first positioning shaft (43) and the second positioning shaft (55).
2. A construction pile foundation positioning device according to claim 1, characterized in that: Four anchor bolts (12) are threadedly mounted on the base (11), and a nut (141) is fixedly sleeved at the bottom end of the stud (14).
3. A construction pile foundation positioning device according to claim 1, characterized in that: The positioning mold shell (3) is a concave structure. Both ends of the positioning mold shell (3) are provided with a plug-in groove (32), a limit groove (321), an L-shaped groove (33), an arc groove (37) and a screw hole (35). The plug-in groove (32) and the limit groove (321) are connected and are respectively plugged and installed with a plug-in block (51) and a limit block (511). The hexagon socket bolt (53) is installed in the internal thread of the screw hole (35). The second threaded rod (52) is rotatably installed in the arc groove (37). The second slide seat (54) is slidably installed in the positioning mold shell (3) through the L-shaped groove (33). The upper surface of the positioning mold shell (3) is provided with a convex slide groove (36), and the first slide seat (42) is slidably installed in the convex slide groove (36).
4. A construction pile foundation positioning device according to claim 1, characterized in that: The upper surface of the positioning mold shell (3) is provided with two vertically arranged scale lines (34), and the two scale lines (34) are respectively arranged at the first slide seat (42) and the second slide seat (54).
5. A construction pile foundation positioning device according to claim 1, characterized in that: The first threaded rod (41) and the second threaded rod (52) are vertically distributed, and the first threaded rod (41) is rotatably connected to the positioning mold shell (3).