Assembly type building foundation of transformer substation
Through prefabricated construction technology and the use of prefabricated components and reinforced concrete components, the problems of pollution, construction schedule control and weather effects in traditional cast-in-situ concrete construction have been solved, and efficient and environmentally friendly substation building foundation construction has been achieved.
Patent Information
- Application Number
- CN202420348309.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-26
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-02-26
AI Technical Summary
The traditional cast-in-place concrete construction method has problems such as difficult garbage disposal, dust and noise pollution, difficulty in controlling the construction period, vulnerability to weather effects, and errors and material waste caused by human factors.
Adopting prefabricated construction methods, including prefabricated piles, prefabricated cap frames, prefabricated beams, cast-in-place cap cores and prefabricated columns, factory-like implementation is achieved through the combination of reinforced concrete prestressed pipe piles, grouting sleeves and steel column anchor bolts Production and on-site assembly, reducing on-site operations and material waste.
It improves project quality and construction efficiency, reduces resource and energy consumption, shortens the construction period, reduces the risk of construction accidents, and reduces the dependence of construction on meteorological factors.
Smart Images

Figure CN221822947U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building engineering, and in particular to an assembled building foundation for a transformer substation. Background Art
[0002] At present, the construction method of the substation building foundation is the traditional cast-in-place concrete method, that is, pouring concrete in the formwork of the building foundation at the construction site, and then removing the formwork after it is formed. This method has the following disadvantages:
[0003] 1. The waste generated by cast-in-place operations is large and construction waste is difficult to handle;
[0004] 2. Cast-in-place wet operations cause dust pollution, noise pollution and other pollution problems, and are also prone to waste water resources;
[0005] 3. Most of the cast-in-place operations are on-site operations, which are greatly affected by the weather and the construction period is difficult to control;
[0006] 4. On-site operations are prone to errors and rework due to human factors, which leads to waste of materials. In addition, the number of construction workers is decreasing while their wages are increasing. Utility Model Content
[0007] The technical problem to be solved by the utility model is to overcome the deficiencies in the prior art and provide a substation assembled building foundation.
[0008] In order to solve the above technical problems, the utility model discloses an assembled building foundation of a substation, comprising precast piles, a precast pedestal frame, precast beams, a cast-in-place pedestal core and precast columns, the cast-in-place pedestal core being fixedly connected in the precast pedestal frame, the top of the precast pile being fixedly connected to the bottom of the cast-in-place pedestal core, at least one side of the precast pedestal frame being provided with a pedestal through groove, the end of the precast beam being clamped in the pedestal through groove and fixedly connected to the cast-in-place pedestal core, and the bottom of the precast column being fixedly connected to the top of the cast-in-place pedestal core.
[0009] Furthermore, the precast piles are reinforced concrete prestressed pipe piles connected to the cast-in-place cap core.
[0010] Furthermore, the precast beam anchoring steel bars in the precast beam extend outwards at both ends and are connected to the cast-in-place cap core.
[0011] Furthermore, the prefabricated column is pre-embedded with a steel bar connection grouting sleeve for connection, the cast-in-place pedestal core is installed with pedestal core steel bars for connecting to the steel bar connection grouting sleeve, and grouting material is filled between the steel bar connection grouting sleeve and the pedestal core steel bars.
[0012] Furthermore, the prefabricated column is pre-embedded with steel column anchor bolts for connection, and the upper ends of the steel column anchor bolts extend out of the prefabricated column.
[0013] Furthermore, the lower end of the steel column anchor bolt is in an "L" shape.
[0014] Compared with the prior art, the advantages of the utility model are:
[0015] The utility model can improve the engineering quality and construction efficiency. Through standardized design, factory production and assembly construction, manual operation and labor intensity are reduced, the quality of components and construction is ensured, thereby improving the engineering quality and construction efficiency.
[0016] The utility model can reduce resource and energy consumption, reduce construction waste, and protect the environment. Since the component production is factory-based, material and energy consumption are under control; less building materials and electricity are consumed during the construction phase. Construction dust and construction waste are greatly reduced;
[0017] The utility model can shorten the construction period and improve labor productivity. Since the component production and on-site construction are carried out simultaneously in two places, the construction, decoration and equipment installation are completed at one time, which greatly shortens the -T- period compared with the traditional construction method and can adapt to the current large-scale urbanization process in my country;
[0018] The utility model can reduce construction accidents. Compared with traditional buildings, industrialized buildings have a shorter construction period, fewer processes, and a smaller demand for on-site workers, which can further reduce the probability of construction accidents.
[0019] The construction of the utility model is less affected by meteorological factors. Most of the components of the industrialized construction method are produced in the factory, and the on-site assembly work is basically done, and the construction period is short. It is less affected by meteorological factors such as rainfall, strong wind, ice and snow. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The drawings that constitute part of this application are used to provide a further understanding of the utility model. The illustrative embodiments of the utility model and their descriptions are used to explain the utility model and do not constitute improper limitations on the utility model. In the drawings:
[0021] Figure 1 It is a schematic diagram of the main view of the assembled building foundation of the substation disclosed in the embodiment of the utility model;
[0022] Figure 2 This is a schematic diagram of the installation structure of the assembled building foundation of the substation disclosed in the embodiment of the utility model;
[0023] Figure 3 This is a schematic diagram of the structure of a prefabricated column disclosed in an embodiment of the utility model.
[0024] Legend:
[0025] 1. Precast piles; 2. Precast cap frames; 3. Precast beams; 4. Cast-in-place cap cores; 5. Precast columns; 6. Cap grooves; 7. Precast beam anchoring steel bars; 8. Steel bar connection grouting sleeves; 9. Cap core steel bars; 10. Steel column anchor bolts. DETAILED DESCRIPTION
[0026] In order to facilitate the understanding of the present invention, the present invention will be described more comprehensively and meticulously below in conjunction with the accompanying drawings and preferred embodiments of the specification, but the protection scope of the present invention is not limited to the following specific embodiments.
[0027] like Figure 1-3 As shown, the utility model discloses a substation assembled building foundation, including a precast pile 1, a precast cap frame 2, a precast beam 3, a cast-in-place cap core 4 and a precast column 5, wherein the precast pile 1, the precast cap frame 2, the precast beam 3 and the precast column 5 are all precast in the factory and installed on site. The precast pile 1 adopts a reinforced concrete prestressed pipe pile connected to the cast-in-place cap core 4, which is pressed into the stratum by a pile driver to support the entire building foundation. A square casting cavity is provided in the middle of the precast cap frame 2, and the cast-in-place cap core 4 is fixedly connected to the casting cavity in the precast cap frame 2 and formed by on-site casting. At least one side of the precast cap frame 2 is provided with a cap groove 6, and the end of the precast beam 3 is clamped in the cap groove 6 and fixedly connected to the cast-in-place cap core 4. Specifically, the precast beam anchoring steel bar 7 in the precast beam 3 extends to the outside of both ends and is connected to the cast-in-place cap core 4 (formed in one piece by on-site casting). The precast pedestal frames 2 are connected by precast beams 3 to form a solid whole. The provision of pedestal through grooves 6 facilitates the rapid installation and precise positioning of the precast beams 3. The bottom of the precast column 5 is fixedly connected to the top of the cast-in-place pedestal core 4. The precast column 5 is used to install the steel frame structure, which is convenient for the later installation of the various components of the substation.
[0028] In this embodiment, in order to realize the skeleton connection between the cast-in-place cap core 4 and the prefabricated column 5, a steel bar connection grouting sleeve 8 is provided at the bottom of the prefabricated column 5, and a cap core steel bar 9 for connecting to the steel bar connection grouting sleeve 8 is installed in the cast-in-place cap core 4, and grouting material is filled between the steel bar connection grouting sleeve 8 and the cap core steel bar 9. Among them, a casting hole is provided on the steel bar connection grouting sleeve 8, so that after the steel bar connection grouting sleeve 8 of the prefabricated column 5 is aligned and inserted into the cap core steel bar 9, grouting material can be injected from the outside of the prefabricated column 5, and finally a fixedly integrated concrete anchor body is formed.
[0029] In this embodiment, in order to facilitate the connection of the steel frame structure of the substation, the prefabricated column 5 is pre-buried with a steel column anchor bolt 10 for connection, and the upper end of the steel column anchor bolt 10 extends out of the prefabricated column 5, so that it can be fixed to the base of the steel frame structure of the substation through a nut. In order to improve the tensile strength of the steel column anchor bolt 10, the lower end of the steel column anchor bolt 10 is in an "L" shape, so that the bottom of the steel column anchor bolt 10 can be more firmly embedded therein.
[0030] The construction process of the substation prefabricated building foundation of the utility model is as follows:
[0031] 1. First, pour the foundation cushion layer on the treated foundation (or the construction plane after the pile foundation construction is completed), and install and position the prefabricated cap frame 2;
[0032] 2. After the prefabricated cap frames 2 are hoisted, the prefabricated beams 3 are hoisted in sequence, and both ends of the prefabricated beams 3 are placed on the prefabricated cap frames 2, and the steel bars reserved at the ends extend into the hollow area of the prefabricated cap frames 2;
[0033] 3. After the precast beam 3 is hoisted, a cap core steel bar 9 is reserved in the precast cap frame 2. After the cap core steel bar 9 is tied, concrete is poured into the pouring cavity in the precast cap frame 2 to form a cast-in-place cap core 4.
[0034] 4. After the concrete strength in the precast cap frame 2 reaches the standard, the precast column 5 is hoisted, and the grouting sleeve 8 pre-buried in the steel bar connection at the foot of the precast column 5 is grouted by a grouting pump to connect the precast column 5 with the cast-in-place cap core 4 as a whole;
[0035] 5. After the strength of the grouting material reaches the standard, the upper structure of the foundation can be installed, and the lower foundation has been connected into a whole through various components.
[0036] Although the present invention has been disclosed as a preferred embodiment, it is not intended to limit the present invention. Any technician familiar with the art can use the above disclosed technical content to make many possible changes and modifications to the technical solution of the present invention without departing from the scope of the technical solution of the present invention, or modify it into an equivalent embodiment of equivalent changes. Therefore, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention should fall within the scope of protection of the technical solution of the present invention.
Claims
1. A substation assembled building foundation, characterized in that: The invention comprises a precast pile (1), a precast pedestal frame (2), a precast beam (3), a cast-in-place pedestal core (4) and a precast column (5); the cast-in-place pedestal core (4) is fixedly connected in the precast pedestal frame (2); the top of the precast pile (1) is fixedly connected to the bottom of the cast-in-place pedestal core (4); at least one side surface of the precast pedestal frame (2) is provided with a pedestal through groove (6); the end of the precast beam (3) is clamped in the pedestal through groove (6) and fixedly connected to the cast-in-place pedestal core (4); the bottom of the precast column (5) is fixedly connected to the top of the cast-in-place pedestal core (4).
2. The substation assembled building foundation according to claim 1, characterized in that: The prefabricated pile (1) is a reinforced concrete prestressed pipe pile connected to the cast-in-place cap core (4).
3. The substation assembled building foundation according to claim 2 is characterized in that: The precast beam anchoring steel bars (7) in the precast beam (3) extend outwards at both ends and are connected to the cast-in-place foundation core (4).
4. The assembled building foundation of a substation according to any one of claims 1 to 3, characterized in that: The prefabricated column (5) is pre-buried with a steel bar connection grouting sleeve (8) for connection, and the cast-in-place cap core (4) is installed with a cap core steel bar (9) for connection to the steel bar connection grouting sleeve (8), and grouting material is filled between the steel bar connection grouting sleeve (8) and the cap core steel bar (9).
5. The assembled building foundation of a substation according to any one of claims 1 to 3, characterized in that: The prefabricated column (5) is pre-buried with a steel column anchor bolt (10) for connection, and the upper end of the steel column anchor bolt (10) extends out of the prefabricated column (5).
6. The assembled building foundation of a substation according to claim 5, characterized in that: The lower end of the steel column anchor bolt (10) is in an "L" shape.