Assembly type concrete precast slab assembly experiment supporting structure

By designing the support structure for the prefabricated concrete panel assembly experiment, the problem of the lack of specialized support frames in the existing technology was solved, the efficiency and safety of the formwork splicing experiment was achieved, and the needs of different application conditions were met.

CN221823397UActive Publication Date: 2024-10-11中铁十四局集团房桥有限公司 +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323644801.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-10-11
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

The existing technology lacks a specialized support frame body for formwork splicing experiments. The ordinary support frame body has a complex structure and is difficult to adapt to the assembly requirements of the formwork, and it is difficult to position the formwork at different tilt angles.

Method used

A prefabricated concrete prefabricated plate assembly experimental support structure is designed, including prefabricated plate units, frame units, connecting screws, installation beams, adjustment seats and working platforms. Through the design of bolt connections and adjustment seats, the angle of the frame unit is realized Adjustment and stable connection of prefabricated panel units provide operating space and safety protection.

Benefits of technology

It realizes efficient experiments on formwork splicing performance, simplifies angle adjustment, improves the stability of the overall structure and construction safety, and meets the needs of different application conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221823397U_ABST
    Figure CN221823397U_ABST
Patent Text Reader

Abstract

The utility model discloses an assembly type concrete precast slab assembly experiment supporting structure, which belongs to the technical field of template supporting and comprises a precast slab unit, a frame body unit, a connecting screw rod, a mounting beam, an adjusting seat and a working platform, the adjacent prefabricated slab units are mutually spliced to form a template system; the frame body unit is correspondingly arranged on the outer side of the prefabricated slab unit and comprises a first stand column, a second stand column, a cross beam and an inclined strut. The connecting screw rod is arranged in the precast slab unit and the first upright post in a penetrating manner; the adjusting seat is arranged on the ground, and the top of the adjusting seat makes contact with the prefabricated slab unit. Bolt connection is adopted between the cross beam and the first stand column, between the cross beam and the second stand column, between the mounting beam and the first stand column and between the mounting beam and the second stand column, and before bolt fastening, the inclination angles of the first stand column and the second stand column can be freely adjusted so that the inclination angles can be matched with the arrangement state of the prefabricated slab unit; after the angles of the first and second columns are adjusted in place, the bolts are tightened, and angle adjustment is convenient and fast.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of template support, and in particular relates to an assembled concrete prefabricated board assembly experimental support structure. Background Art

[0002] Prefabricated concrete panels are components that are prefabricated into various forms and specifications outside a prefabrication plant or construction site, and then transported to the construction site for installation. They have the advantages of easy mechanized construction, fast construction speed, reduced labor intensity, improved productivity, and greatly shortened construction period.

[0003] In the field of non-disassembly formwork, prefabricated concrete panels are also widely used. With the gradual improvement of construction requirements, the structure of non-disassembly formwork needs to be optimized and upgraded. How to realize assembly process verification of assembled structure, whether its assembly accuracy and process meet the construction requirements, whether the structure is affected by water impact, construction concrete pressure measurement, self-weight, wind force and other loads, whether it can meet the application conditions, all the above performances need to be experimentally verified and proved. During the experiment, it is necessary to design an experimental support frame to carry out the splicing operation and simulated support of the non-disassembly formwork. However, there is currently no special support frame for formwork splicing experiments. Ordinary support frames not used for experiments have complex structures, which are difficult to adapt to the assembly of formwork in a targeted manner, and it is difficult to achieve the positioning of formwork at different inclination angles. Utility Model Content

[0004] The utility model aims to provide a prefabricated concrete panel assembly test support structure to solve the problem that there is no special support frame for template splicing experiments in the above-mentioned background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A prefabricated concrete precast panel assembly experimental support structure, comprising a precast panel unit, a frame unit, a connecting screw, a mounting beam, an adjusting seat and a working platform; adjacent precast panel units are spliced ​​with each other to form a template system; the frame unit is correspondingly arranged on the outside of the precast panel unit, comprising a first column, a second column, a crossbeam and a diagonal brace; the first column is arranged in close contact with the precast panel unit; the second column is parallel to the first column; the two ends of the crossbeam are respectively connected to the first column and the second column; one end of the diagonal brace is connected to the crossbeam, and the other end is connected to the first column; the connecting screw is passed through the precast panel unit and the first column, and fixing nuts are arranged at both ends; the mounting beam is arranged on the ground, and the first column and the second column are arranged on the mounting beam; the adjusting seat is arranged on the ground, and its top is in contact with the precast panel unit located at the bottom; two laterally adjacent frame units are connected to each other by a connecting beam, and the working platform is arranged on the connecting beam.

[0007] Furthermore, the prefabricated panel unit includes a panel, a supporting grid and load-bearing protrusions; the supporting grid is arranged on the inner side of the panel; the load-bearing protrusions are arranged at intervals on the surface of the supporting grid; and the prefabricated panel unit is spliced ​​with transverse through seams and longitudinal staggered seams.

[0008] Furthermore, the frame unit corresponds to the arrangement of the load-bearing protrusions in the longitudinal direction.

[0009] Furthermore, the length of the mounting beam is greater than that of the cross beam, a diagonal brace is arranged between the outer end of the mounting beam and the second column, and the mounting beam is connected to the ground by bolts.

[0010] Furthermore, the adjustment seat includes a telescopic rod, a top plate and a bottom plate; the bottom plate is fixed on the ground; the telescopic rod is fixed on the bottom plate; the top plate is fixed on the top of the telescopic rod and contacts the prefabricated panel unit.

[0011] Furthermore, a guardrail is arranged around the working platform, and a vertical ladder is arranged between adjacent working platforms; and a staircase is arranged obliquely between the working platform and the ground.

[0012] Furthermore, through holes are correspondingly provided on the panel, the supporting grid and the load-bearing protrusions, and embedded sleeves are arranged in the through holes, and the embedded sleeves match the connecting screws.

[0013] Furthermore, the height of the first column is greater than that of the second column, and a diagonal brace is provided between the top end of the first column and the cross beam.

[0014] Furthermore, two cross beams are arranged on each second column at intervals.

[0015] Furthermore, hinge blocks are arranged on the installation beam, the first column, the second column and the cross beam, the diagonal brace is hinged to the hinge block, and the diagonal brace is a brace rod with adjustable length.

[0016] The utility model has the following beneficial effects:

[0017] The utility model provides an assembled concrete prefabricated panel assembly experimental support structure, wherein bolts are used to connect the cross beam and the first column, the cross beam and the second column, the installation beam and the first column, and the installation beam and the second column. Before the bolts are tightened, the inclination angle of the first column and the second column can be freely adjusted to adapt to the setting state of the prefabricated panel unit. After the angle of the first column and the second column is adjusted into place, the bolts are tightened and the diagonal brace is installed. The overall structure is simple, the angle adjustment is convenient and quick, and the efficiency of the template splicing performance experiment is improved.

[0018] The utility model provides an assembled concrete prefabricated panel assembly experimental support structure, in which a working platform is arranged between adjacent frame units to provide an operating space for the assembly operation, and the working safety of construction workers can be ensured by arranging a guardrail.

[0019] The utility model provides an assembled concrete prefabricated panel assembly experimental support structure, which realizes stable connection between a first column and a prefabricated panel unit by arranging a connecting screw.

[0020] The utility model provides an assembled concrete prefabricated panel assembly experimental support structure, in which diagonal braces are arranged between components of the frame unit, thereby improving the overall stability.

[0021] The utility model provides an assembled concrete prefabricated panel assembly experimental support structure, in which a support grid is arranged on the panel to increase the structural strength of the panel; load-bearing protrusions are arranged on the support grid to enhance the connection strength between the prefabricated panel unit and the post-cast concrete structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the overall structure of the assembly experiment support structure involved in the utility model;

[0023] Figure 2 It is a schematic diagram of the splicing of the prefabricated panel units involved in the utility model;

[0024] Figure 3 It is a schematic diagram of the positions of the prefabricated panel unit and the frame unit involved in the utility model;

[0025] Figure 4 This is a schematic diagram of the installation of the frame unit involved in the utility model;

[0026] Figure 5 It is a schematic diagram of the frame unit of the prefabricated panel unit involved in the utility model in an inwardly inclined state;

[0027] Figure 6 It is a schematic diagram of the frame unit of the prefabricated panel unit involved in the present utility model in an outwardly inclined state.

[0028] In the figure: 1-precast panel unit, 11-panel, 12-support grid, 13-load-bearing protrusion, 2-frame unit, 21-first column, 22-second column, 23-crossbeam, 24-diagonal brace, 3-connecting screw, 4-installation beam, 5-support seat, 6-working platform, 7-guardrail, 8-stairs. Implementation

[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] like Figure 1-4 As shown, the utility model provides an assembled concrete prefabricated panel assembly experimental support structure, including a prefabricated panel unit 1, a mounting beam 4, a frame unit 2, a connecting screw 3 and a working platform 6; adjacent prefabricated panel units 1 are spliced ​​together to form a template system, and the inner side of the template system is in contact with the post-cast concrete structure; the mounting beam 4 is set on the ground; the frame unit 2 is set on the outer side of the prefabricated panel unit 1 corresponding to the prefabricated panel unit 1, and is gradually installed with the installation of the prefabricated panel unit 1, including a first column 21, a second column 22, a cross beam 23 and a diagonal brace 24; the first column 21 is arranged in close contact with the prefabricated panel unit 1, and its bottom is fixedly connected to the mounting beam 4; the second column 22 is set It is arranged on the side of the first column 21 away from the prefabricated panel unit 1, and is arranged on the mounting beam 4 in parallel with the first column 21; the two ends of the cross beam 23 are respectively connected to the first column 21 and the second column 22; one end of the diagonal brace 24 is connected to the cross beam 23, and the other end is connected to the first column 21, so as to enhance the stability of the frame unit 2; the connecting screw 3 is passed through the prefabricated panel unit 1 and the first column 21, and fixing nuts are arranged at both ends thereof, so as to realize the connection between the prefabricated panel unit 1 and the frame unit 2; the two laterally adjacent frame units 2 are connected to each other through a connecting beam, and the connecting beam is connected to the cross beam 23, and the working platform 6 is arranged on the connecting beam to provide a working space for the construction personnel.

[0031] The prefabricated panel unit 1 includes a panel 11, a support grid 12 and a load-bearing protrusion 13; the side of the panel 11 close to the post-cast concrete structure is the inner side, and the side away from the concrete structure is the outer side; the support grid 12 is arranged on the inner side of the panel 11; the load-bearing protrusions 13 are arranged at intervals on the surface of the support grid 12. Grooves and tenons are arranged on the splicing side of the prefabricated panel unit 1 to achieve mortise and tenon connection between adjacent prefabricated panel units 1. Through holes are correspondingly opened on the panel 11, the support grid 12 and the load-bearing protrusion 13, and embedded sleeves are arranged in the through holes, and the embedded sleeves match the connecting screws 3.

[0032] The prefabricated panel units 1 are spliced ​​with horizontal through seams and vertical staggered seams, and the load-bearing protrusions 13 are arranged in multiple rows at intervals in the vertical direction. The distance of the vertical staggered seams of the prefabricated panel units 1 is sufficient to make the load-bearing protrusions 13 of the upper and lower adjacent prefabricated panel units 1 correspond to each other, which is convenient for the subsequent connection with the frame unit 2. The frame unit 2 corresponds to the arrangement of the load-bearing protrusions 13 in the longitudinal direction.

[0033] The length of the installation beam 4 is greater than that of the cross beam 23, and a diagonal brace 24 is arranged between the outer end of the installation beam 4 away from the prefabricated panel unit 1 and the second column 22. The installation beam 4 is fixed on the ground by chemical anchor bolts. Two cross beams 23 are arranged on each second column 22 at intervals, and diagonal braces 24 are arranged between adjacent cross beams 23 and between the cross beam 23 and the installation beam 4.

[0034] The height of the first column 21 is greater than that of the second column 22, and a diagonal brace 24 is provided between the top of the first column 21 and the cross beam 23 located above. A hinge block is provided on the mounting beam 4, the first column 21, the second column 22 and the cross beam 23, and the diagonal brace 24 is hingedly connected to the hinge block. The first column 21 includes two vertical parts connected to each other, and the connecting screw 3 is connected to one of the vertical parts, so that the upper and lower adjacent frame units 2 are aligned and connected, and are kept aligned and connected with the prefabricated panel unit 1.

[0035] The prefabricated panel unit 1 has three installation forms, including vertical, inward-inclined and outward-inclined. When the prefabricated panel unit 1 is in a vertical state, the first column 21 and the second column 22 are both arranged vertically. Figure 5 As shown, when the prefabricated panel unit 1 is in an inwardly inclined state, the first column 21 and the second column 22 are both synchronously inclined inwardly; Figure 6 As shown, when the prefabricated panel unit 1 is in an outward tilted state, the first column 21 and the second column 22 are both synchronously tilted outwardly. The diagonal brace 24 is a brace with adjustable length, and the crossbeam 23 always maintains a horizontal state.

[0036] Bolt connections are adopted between the cross beam 23 and the first column 21, between the cross beam 23 and the second column 22, between the mounting beam 4 and the first column 21, and between the mounting beam 4 and the second column 22. Before the bolts are tightened, the inclination angles of the first column 21 and the second column 22 can be freely adjusted to adapt to the setting state of the prefabricated panel unit 1. After the angles of the first column 21 and the second column 22 are adjusted to the right position, the bolts are tightened and then the diagonal brace 24 is installed.

[0037] Pads are provided at both ends of the connecting screw rod 3 , and the pads are in contact with the first column 21 and the load-bearing protrusion 13 respectively, so as to avoid structural damage caused by excessive local force.

[0038] An adjustment seat 5 is arranged at the bottom of the prefabricated panel unit 1 located at the bottom, and the adjustment seat 5 is arranged on the ground, and comprises a telescopic rod, a top plate and a bottom plate; the bottom plate is fixed on the ground; the telescopic rod is fixed on the bottom plate; the top plate is fixed on the top of the telescopic rod and contacts with the prefabricated panel unit 1, so as to support the prefabricated panel unit 1 and realize the height adjustment of the prefabricated panel unit 1 at the same time.

[0039] A guardrail 7 is arranged around the working platform 6 , a vertical ladder is arranged between adjacent working platforms 6 , a staircase 8 is arranged obliquely between the working platform 6 and the ground, and the bottom of the staircase 8 is fixedly connected to the outer end of the mounting beam 4 .

[0040] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An assembled concrete prefabricated panel assembly experimental support structure, characterized in that: The present invention comprises a prefabricated panel unit (1), a frame unit (2), a connecting screw rod (3), a mounting beam (4), an adjusting seat (5) and a working platform (6); adjacent prefabricated panel units (1) are spliced ​​together to form a template system; the frame unit (2) is arranged correspondingly on the outside of the prefabricated panel unit (1), and comprises a first column (21), a second column (22), a crossbeam (23) and a diagonal brace (24); the first column (21) is arranged in close contact with the prefabricated panel unit (1); the second column (22) is parallel to the first column (21); the two ends of the crossbeam (23) are respectively connected to the first column (21) and the second column (22); (22); one end of the diagonal brace (24) is connected to the crossbeam (23), and the other end is connected to the first column (21); the connecting screw (3) is inserted into the prefabricated panel unit (1) and the first column (21), and fixing nuts are arranged at both ends; the mounting beam (4) is arranged on the ground, and the first column (21) and the second column (22) are arranged on the mounting beam (4); the adjusting seat (5) is arranged on the ground, and the top of the adjusting seat (5) is in contact with the prefabricated panel unit (1) located at the bottom; two laterally adjacent frame units (2) are connected to each other via a connecting beam, and the working platform (6) is arranged on the connecting beam.

2. The prefabricated concrete panel assembly experimental support structure according to claim 1, characterized in that: The prefabricated panel unit (1) comprises a panel (11), a supporting grid (12) and load-bearing protrusions (13); the supporting grid (12) is arranged on the inner side surface of the panel (11); the load-bearing protrusions (13) are arranged at intervals on the surface of the supporting grid (12); and the prefabricated panel unit (1) is spliced ​​with transverse through seams and longitudinal staggered seams.

3. The prefabricated concrete panel assembly experimental support structure according to claim 2 is characterized in that: The frame unit (2) is arranged correspondingly to the load-bearing protrusion (13) in the longitudinal direction.

4. The prefabricated concrete panel assembly experimental support structure according to claim 1, characterized in that: The length of the mounting beam (4) is greater than that of the cross beam (23), a diagonal brace (24) is provided between the outer end of the mounting beam and the second column (22), and the mounting beam (4) is connected to the ground via bolts.

5. The prefabricated concrete panel assembly experimental support structure according to claim 1, characterized in that: The adjustment seat (5) comprises a telescopic rod, a top plate and a bottom plate; the bottom plate is fixed on the ground; the telescopic rod is fixed on the bottom plate; the top plate is fixed on the top of the telescopic rod and is in contact with the prefabricated panel unit (1).

6. The prefabricated concrete panel assembly experimental support structure according to claim 1, characterized in that: A guardrail (7) is arranged around the working platform (6), and a vertical ladder is arranged between adjacent working platforms (6); and a staircase (8) is arranged obliquely between the working platform (6) and the ground.

7. The prefabricated concrete panel assembly experimental support structure according to claim 2, characterized in that: Through holes are correspondingly provided on the panel (11), the supporting grid (12) and the load-bearing protrusion (13), and embedded sleeves are arranged in the through holes, and the embedded sleeves match the connecting screw rods (3).

8. The prefabricated concrete panel assembly experimental support structure according to claim 1, characterized in that: The height of the first column (21) is greater than the height of the second column (22), and a diagonal brace (24) is provided between the top end of the first column and the crossbeam (23).

9. The prefabricated concrete panel assembly experimental support structure according to claim 1, characterized in that: Two cross beams (23) are arranged at intervals on each second upright column (22).

10. The prefabricated concrete panel assembly experimental support structure according to claim 4, characterized in that: The mounting beam (4), the first column (21), the second column (22) and the crossbeam (23) are all provided with hinge blocks, the diagonal brace (24) is hinged to the hinge blocks, and the diagonal brace (24) is a brace rod with adjustable length.