Mortise and tenon joint repairing structure for concrete cracks
Through the combination of the mortise and tenon synthesis method and the anti-seepage layer, the problem of crack recurrence caused by thermal expansion and cold contraction in traditional concrete crack repair technology is solved, and stable repair of concrete cracks and water seepage are achieved.
Patent Information
- Application Number
- CN202420369137.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-11
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure CN221823477U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building crack repair, in particular to a concrete crack mortise and tenon repair structure. Background Art
[0002] Concrete is the largest building material currently used and has been widely used in houses, roads, bridges, hydraulic engineering, marine engineering and other projects. However, concrete has disadvantages such as high brittleness and low tensile strength. During use, cracks are often inevitable due to the influence of the surrounding environment. When the cracks exceed the specification limit, it will accelerate the damage to the building structure and shorten the service life of the building. Therefore, repairing cracks plays a vital role in improving the durability of concrete structures.
[0003] At present, there are two main traditional repair processes for cracks in concrete structures: ① Fill the cracks and apply waterproof coating; ② Fill and repair the cracks directly with cement mortar. However, concrete cracks repaired by the above traditional processes always recur and cannot be cured at one time. The main reason is that the thermal expansion and contraction coefficients between the repair material and the concrete are different. Because flexible waterproof coatings and rigid concrete, wet cement mortar and dry concrete are difficult to blend together, they will repel each other due to different thermal expansion and contraction coefficients while they are expanding and contracting, and they will shrink in opposite directions at low temperatures, causing the filling material in the crack to disconnect again, and the waterproof layer on the crack will also detach from the surface of the crack, causing peeling and shelling. This is the cause of secondary water seepage in the cracks.
[0004] Based on this, there is an urgent need to provide a new repair structure for concrete cracks to solve the above-mentioned technical problems. Utility Model Content
[0005] The purpose of the utility model is to provide a concrete crack mortise and tenon repair structure, which can use the mortise and tenon synthesis method to make the cement mortar layer and the concrete where the crack is located become an integral structure, so that no secondary shrinkage joints will be generated, thereby completely solving the problem of water seepage in concrete cracks.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] The utility model provides a concrete crack mortise and tenon repair structure, comprising a repair groove opened along the length direction of the crack on a concrete structure and a repair body filled in the repair groove; the repair groove comprises a first groove body and a pair of second groove bodies, the pair of second groove bodies are arranged on both sides of the first groove body and are connected to the first groove body; the depth of the second groove body is greater than the depth of the first groove body;
[0008] Wherein, the second trough body is composed of an upper trough and a lower trough, the lower trough is formed by digging downward from the bottom of the upper trough; the lower trough is a dovetail trough, the outer trough wall of the upper trough is an inclined wall coplanar with the outer trough wall of the dovetail trough; and a riveted body protruding between a pair of the dovetail troughs is formed on the concrete structure.
[0009] Furthermore, the depth of the first groove body is 0.8-1.5 dm.
[0010] Furthermore, the depth of the second tank body is 1.5-3.0 dm.
[0011] Furthermore, the width of the first trough body is 8-12 dm, and the first trough body is formed by excavating toward both sides with the crack as the midpoint.
[0012] Furthermore, the width of the top of the second trough body is 8 to 12 dm.
[0013] Furthermore, the inclination angle of the groove wall of the second groove body is 30° to 80°.
[0014] Furthermore, the repair groove is opened along the length direction of the crack and extends outwards from both ends of the crack by 40 to 60 dm respectively.
[0015] Furthermore, the repair body is cast by concrete mortar.
[0016] Furthermore, an anti-seepage layer is provided between the repair groove and the repair body.
[0017] Furthermore, the anti-seepage layer is formed by coating an epoxy resin material on the surface of the repair groove.
[0018] Furthermore, a waterproof roll is laid on the surface of the anti-seepage layer.
[0019] Furthermore, the waterproof coiled material comprises polypropylene cloth.
[0020] Furthermore, a steel mesh is laid on the waterproof coiled material.
[0021] Compared with the prior art, the technical solution of the utility model has achieved the following beneficial effects:
[0022] The concrete crack mortise and tenon repair structure provided by the utility model forms a mortise and tenon structure between the repair body and the concrete structure, so that the cement mortar layer and the concrete where the crack is located become an integral structure, and thus no shrinkage joints will be generated secondary, thereby completely solving the problem of water seepage in concrete cracks. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The technical solutions and other beneficial effects of the present invention will be made apparent by describing in detail the specific embodiments of the present invention in conjunction with the accompanying drawings.
[0024] Figure 1 It is a cross-sectional schematic diagram of the concrete crack mortise and tenon repair structure of the utility model (excluding the repair body, and the dotted lines are the boundaries of each groove body);
[0025] Figure 2 It is a cross-sectional schematic diagram of the concrete crack mortise and tenon repair structure of the utility model (including the repair body);
[0026] Figure 3 It is a schematic diagram of the construction steps of the concrete crack mortise and tenon repair structure of the utility model;
[0027] Wherein: 1. concrete structure; 11. riveted body; 2. repairing groove; 21. first groove body; 22. second groove body; 221. upper groove; 222. lower groove; 3. repairing body. DETAILED DESCRIPTION
[0028] In order to make the purpose, technical solution and beneficial effects of this application more clear, the following further describes this application in detail in conjunction with the accompanying drawings and specific implementation methods. It should be understood that the specific implementation methods described in this specification are only for explaining this application, not for limiting this application.
[0029] As described in the background technology, concrete cracks repaired with traditional processes always recur and cannot be cured in one go. The main reason is that the repair material and concrete have different coefficients of thermal expansion and contraction. Because flexible waterproof coatings and rigid concrete, wet cement mortar and dry concrete are difficult to fuse together, they will repel each other due to their different coefficients of thermal expansion and contraction, and at low temperatures, the two will shrink in opposite directions, causing the filler in the crack to disconnect again, and the waterproof layer on the crack will also detach from the surface of the crack, causing peeling and shelling, which will eventually lead to secondary water seepage in the crack.
[0030] In view of the above technical problems, the utility model provides a new type of concrete crack mortise and tenon repair structure, which can use the mortise and tenon synthesis method to make the cement mortar layer and the concrete where the crack is located become an integral structure, so that no secondary shrinkage joints will be generated, thereby completely solving the problem of water seepage in concrete cracks.
[0031] For details, see Figure 1-2 The concrete crack mortise and tenon repair structure of the utility model comprises a repair groove 2 opened along the length direction of the crack on a concrete structure 1 and a repair body 3 filled in the repair groove 2.
[0032] In the present invention, the repair groove 2 is a special-shaped groove, which includes a first groove body 21 and a pair of second groove bodies 22. The first groove body 21 is a square groove, which is formed by excavating on both sides with the crack as the midpoint. The width of the first groove body 21 can be determined according to the width of the crack, and can generally be 8 to 12dm, such as 8dm, 9dm, 10dm, 11dm, 12dm, etc. In a preferred embodiment, the width of the first groove body 21 is 10dm, that is, it is formed by excavating 5dm on both sides with the crack as the midpoint.
[0033] The depth of the first groove 21 can be determined according to the depth of the crack, and can generally be 0.8-1.5 dm, such as 0.8 dm, 0.9 dm, 1.0 dm, 1.1 dm, 1.2 dm, 1.3 dm, 1.4 dm, 1.5 dm, etc. In a preferred embodiment, the depth of the first groove 21 is 1.0 dm.
[0034] The length of the first groove 21 should be greater than the length of the crack to ensure a good repair effect. In some embodiments, the first groove 21 is opened along the length direction of the crack and extends 40 to 60 dm from both ends of the crack. For example, it can extend 40 dm, 45 dm, 50 dm, 55 dm, 60 dm, etc. from both ends of the crack.
[0035] See also Figure 1 A pair of second trough bodies 22 are disposed on both sides of the first trough body 21 and are connected to the first trough body 21. The depth of the second trough body 22 is greater than that of the first trough body 21. Specifically, the second trough body 22 is composed of an upper trough 221 and a lower trough 222, wherein the upper trough 221 has the same depth as the first trough body 21, and the lower trough 222 is formed by excavating downward from the bottom of the upper trough 221.
[0036] In the present invention, the lower groove 222 is a dovetail groove, and the outer groove wall of the upper groove 221 is an inclined wall coplanar with the outer groove wall of the dovetail groove. It should be noted that the "outer groove wall" here refers to the groove wall of the upper groove 221 and the lower groove 222 that is away from the first groove body 21. In addition, the pair of dovetail grooves are not connected, that is, the concrete structure 1 is formed with a riveted body 11 protruding between the pair of dovetail grooves.
[0037] In the present invention, the depth of the second groove body 22 can be 1.5-3.0dm, for example, 1.5dm, 1.6dm, 1.8dm, 2.0dm, 2.2dm, 2.4dm, 2.5dm, 2.6dm, 2.8dm, 3.0dm, etc. In a preferred embodiment, the depth of the second groove body 22 is 2.0dm, wherein the depth of the upper groove 221 and the lower groove 222 are both 1dm.
[0038] In the present invention, the width of the top of the second slot body 22 can be 8-12dm, such as 8dm, 9dm, 10dm, 11dm, 12dm, etc. In a preferred embodiment, the width of the top of the second slot body 22 is 10dm.
[0039] In the present invention, the inclination angle of the groove wall of the second groove body 22 can be 30° to 80°, such as 30°, 35°, 40°, 45°, 50°, 55°, 60°, 65°, 70°, 75°, 80°, etc. It should be pointed out that the inclination angle here refers to the acute angle between the groove wall and the groove bottom of the second groove body 22. If the inclination angle is less than 30°, it will not only make the groove body difficult to process, but also make the cement mortar pouring poor, affecting the strength of the repair body 3; if the inclination angle is greater than 80°, it will cause insufficient riveting strength between the repair body 3 and the concrete structure 1.
[0040] In the present invention, the repair body 3 is obtained by pouring concrete mortar into the repair groove 2 and solidifying it. Among them, after the cement mortar is completely solidified, a mortise and tenon structure is formed, which perfectly forms a mortise and tenon joint with the second groove body 22 (i.e., the mortise groove), and the two are completely integrated together to form a complete and indifferent mortise and tenon joint structure. The formation of this structure can prevent the new repair mortar and the concrete that produces the through crack from forming stratification and peeling, thereby achieving the purpose of repairing the crack in one go. Compared with the existing repair structure, the repair structure provided by the utility model will not produce shrinkage joints for the second time, so that the problem of water seepage in concrete cracks can be completely cured.
[0041] In some embodiments, an impermeable layer (not shown) is provided between the repair groove 2 and the repair body 3 to improve the impermeability. The impermeable layer can be formed by coating the surface of the repair groove 2 with conventional impermeable materials in the art, and commonly used impermeable materials include but are not limited to epoxy resin materials.
[0042] In some embodiments, a waterproof roll (not shown) is also laid on the surface of the anti-seepage layer to further enhance the anti-seepage capability. The waterproof roll includes but is not limited to polypropylene cloth.
[0043] In some embodiments, a steel mesh (not shown) is also laid on the waterproof coiled material to improve the strength of the repair body 3 and the bonding strength between the repair body 3 and the waterproof coiled material.
[0044] See also Figure 3 In a preferred embodiment, the construction steps of the concrete crack mortise and tenon repair structure are as follows:
[0045] (a) Locate the cracks on the concrete structure through the leak point.
[0046] (b) Determine the construction area. Use a marker to extend 40 to 60 dm outward from the front and rear ends of the crack, and 12 to 18 dm outward from the left and right sides of the crack, and circle the area with a marker.
[0047] (c) The repair groove construction of the mortise and tenon repair structure is completed in two steps:
[0048] (c1) In the area where the marker is positioned on the concrete base, cut a groove 8 to 12 dm wide and 0.8 to 1.5 dm deep extending 4 to 6 dm to the left and right of the crack, and then cut another groove 8 to 12 dm wide and 1.5 to 3.0 dm deep along the periphery of the marker;
[0049] (c2) Cut the mortise and tenon to form a repair groove.
[0050] (d) Use waterproof coating to make the repair groove anti-seepage.
[0051] (e) Use the propylene cloth process to further strengthen the anti-seepage treatment.
[0052] (f) Laying a steel mesh on the polypropylene cloth, and then filling the entire mortise and tenon groove with cement mortar, and after solidification, obtaining the mortise and tenon repair structure.
[0053] In summary, the concrete crack mortise and tenon repair structure provided by the utility model, through the mortise and tenon synthesis method, makes the cement mortar layer and the concrete where the crack is located become an integral structure, so that no secondary shrinkage joints will be generated, thereby completely solving the problem of water seepage in concrete cracks.
[0054] In summary, although the present invention has been disclosed as above in terms of preferred embodiments, the above preferred embodiments are not intended to limit the present invention. A person skilled in the art may make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, the scope of protection of the present invention shall be based on the scope defined in the claims.
Claims
1. A concrete crack mortise and tenon repair structure, characterized in that: The invention comprises a repair groove opened along the length direction of the crack on the concrete structure and a repair body filled in the repair groove; the repair groove comprises: a first tank; and A pair of second slots, respectively disposed on both sides of the first slot and connected to the first slot; the depth of the second slot is greater than the depth of the first slot; Wherein, the second trough body is composed of an upper trough and a lower trough, the lower trough is formed by digging downward from the bottom of the upper trough; the lower trough is a dovetail trough, the outer trough wall of the upper trough is an inclined wall coplanar with the outer trough wall of the dovetail trough; and a riveted body protruding between a pair of the dovetail troughs is formed on the concrete structure.
2. A concrete crack mortise and tenon repair structure according to claim 1, characterized in that: The depth of the first tank is 0.8-1.5 dm; and / or, The second tank has a depth of 1.5 to 3.0 dm.
3. A concrete crack mortise and tenon repair structure according to claim 1, characterized in that: The width of the first trough body is 8-12 dm, and the first trough body is formed by excavating toward both sides with the crack as the midpoint.
4. A concrete crack mortise and tenon repair structure according to claim 1, characterized in that: The width of the second groove top is 8 to 12 dm; and / or, The inclination angle of the groove wall of the second groove body is 30° to 80°.
5. The concrete crack mortise and tenon repair structure according to claim 1, characterized in that: The repair groove is opened along the length direction of the crack and extends outwards by 40 to 60 dm from both ends of the crack.
6. A concrete crack mortise and tenon repair structure according to claim 1, characterized in that: The repair body is formed by pouring concrete mortar.
7. The concrete crack mortise and tenon repair structure according to claim 1, characterized in that: An impermeable layer is also provided between the repair groove and the repair body; and / or, The anti-seepage layer is formed by coating the epoxy resin material on the surface of the repair groove.
8. A concrete crack mortise and tenon repair structure according to claim 7, characterized in that: The surface of the anti-seepage layer is also paved with a waterproof roll; and / or, The waterproof coiled material comprises polypropylene cloth.
9. A concrete crack mortise and tenon repair structure according to claim 8, characterized in that: A steel wire mesh is also laid on the waterproof coiled material.