Tunnel concrete construction alarm device

By installing photoelectric displacement sensors and buzzer alarm devices at the tunnel concrete construction site, the shortcomings of traditional manual monitoring methods are solved, real-time monitoring and alarming of concrete density is achieved, and construction quality and safety are ensured.

CN221823819UInactive Publication Date: 2024-10-11云南省滇中引水工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420561763.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the tunnel concrete construction process, traditional monitoring methods rely on artificial naked eye observation and hearing, which can easily lead to construction quality accidents or safety accidents. In particular, it is difficult to monitor the density of concrete during the top arch concrete backfilling process.

Method used

A tunnel concrete construction alarm device is designed, including a base, a support forearm, a support cross arm and a photoelectric displacement sensor. It is installed on the back rib of the steel formwork trolley formwork system through the telescopic design of the support cross arm and the screw drive mechanism. A photoelectric displacement sensor is used to monitor the displacement changes of the template system in real time, and an alarm signal is issued through a buzzer.

Benefits of technology

It achieves accurate monitoring of the density of concrete, avoids construction quality problems and safety accidents caused by incomplete or over-filling, ensures construction quality and safety, and the device has a simple structure, easy installation and low cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221823819U_ABST
    Figure CN221823819U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of construction structures, in particular to a tunnel concrete construction alarm device which comprises a base, the base is installed on a back rib of a steel mould trolley formwork system, the bottom of the base is connected with a support front arm, the bottom end of the support front arm is connected with a support cross arm, and one end of the support cross arm is provided with a support rear arm. The top end of the support rear arm is connected with a photoelectric displacement sensor, the output end of the photoelectric displacement sensor is connected with a buzzer through a wire, and the buzzer is installed at the position where constructors can receive signals conveniently. According to the tunnel concrete construction alarm device, effective monitoring of the displacement of the formwork system and the compactness of the concrete in the tunnel concrete construction process is achieved. According to the device, the photoelectric displacement sensor is used for accurately measuring the infinitesimal displacement of a template system, and the buzzer is used for sending out an alarm signal in time, so that the construction quality problem and safety accidents caused by incompact or excessive filling of concrete are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction structures, in particular to a tunnel concrete construction alarm device. Background Art

[0002] In recent years, underground tunnel projects have gradually become an important part of infrastructure construction. In order to improve water flow conditions, tunnels are usually lined with concrete, and lining concrete construction is generally carried out using steel formwork trolleys. During the construction process, it is a common method to pump concrete into the warehouse with a drag pump. However, during the process of arch concrete entering the warehouse, some problems often occur, such as cavities or mold explosion. When the concrete is not filled densely, cavities will be generated, and the quality of the structural concrete cannot be guaranteed. On the contrary, if the filling is excessive, the pressure of the concrete may cause the steel formwork trolley template and the support system to be compressed and deformed, which will lead to serious deformation of the structural concrete and even damage to the steel formwork trolley, which may cause safety accidents in serious cases.

[0003] During the tunnel concrete construction process, monitoring the displacement of the formwork system is a necessary means to ensure construction quality and safety. Especially during the top arch concrete backfill construction process, since one end overlaps with the poured concrete to form a closed and dense space, it becomes difficult to observe and monitor whether the concrete is filled densely. Traditional monitoring methods mainly rely on manual visual observation, or rely on experienced formwork workers and pump workers to judge the density of concrete through hearing. However, these methods are limited by multiple factors such as manual experience and working conditions, and are prone to errors, which may lead to construction quality accidents or safety accidents. Utility Model Content

[0004] The purpose of the utility model is to provide a tunnel concrete construction alarm device to solve the problem that the traditional monitoring method proposed in the above background technology mainly relies on manual naked eye observation, or relies on experienced formwork workers and pump workers to judge the density of concrete through hearing. However, these methods are limited by multiple factors such as manual experience and working conditions, and are prone to errors, which may lead to the occurrence of construction quality accidents or safety accidents.

[0005] To achieve the above-mentioned purpose, the utility model provides a tunnel concrete construction alarm device, including a base, which is installed on the back rib of the steel mold trolley template system, the bottom of the base is connected to the bracket front arm, the bottom end of the bracket front arm is connected to the bracket cross arm, one end of the bracket cross arm is installed with the bracket rear arm, the top of the bracket rear arm is connected to the photoelectric displacement sensor, the output end of the photoelectric displacement sensor is connected to a buzzer through a wire, the buzzer is installed in a place where construction personnel can easily receive signals, and the top of the base is installed on the back rib.

[0006] Preferably, threaded sleeves are installed at both ends of the bracket cross arm, one end of the bracket cross arm is connected to the bottom end of the bracket front arm by bolts, and the other end of the bracket cross arm is connected to the bottom end of the bracket rear arm by bolts.

[0007] Preferably, the forearm of the bracket is embedded in the base and rigidly connected to the base.

[0008] Preferably, the bracket cross arm includes a telescopic rod in the middle, both ends of the telescopic rod are provided with sleeves, locking bolts are installed on the sleeves, the bottom end of the locking bolts is pressed and fixed on the telescopic rod, and the threaded sleeve is installed on the outer end of the sleeve.

[0009] Preferably, a screw rod is installed inside the back rib, one end of the screw rod is driven to rotate by a screw motor, a screw slider is installed on the screw rod, an opening is provided at the bottom of the back rib, the bottom of the screw slider is slidably matched with the opening, and the bottom outer wall of the screw slider is welded and fixed to the base.

[0010] Preferably, the other end of the screw rod is rotatably connected to the inner wall of the back rib via a bearing.

[0011] Preferably, the bottom ends of the rear arm and the front arm of the bracket are both provided with through holes, through which bolts pass and are threadedly connected with the threaded sleeves.

[0012] Preferably, a limit plate is vertically installed at one end of the back rib, and the limit plate is used to limit the upward swing range of the bracket cross arm.

[0013] Compared with the prior art, the utility model has the following beneficial effects:

[0014] In the tunnel concrete construction alarm device, the utility model provides a tunnel concrete construction alarm device, which realizes the effective monitoring of the displacement of the formwork system and the density of concrete during the tunnel concrete construction process through innovation in structural design. The device uses a photoelectric displacement sensor to accurately measure the tiny displacement of the formwork system, and promptly sends out an alarm signal through a buzzer to remind construction personnel to take corresponding measures, thereby avoiding construction quality problems and safety accidents caused by loose or excessive concrete filling. The device is installed on the back rib of the steel formwork trolley formwork system through a base. The combination of the bracket front arm, the bracket cross arm and the bracket rear arm forms a stable support structure, ensuring the accurate measurement of the photoelectric displacement sensor. At the same time, the telescopic design of the bracket cross arm enables the device to adapt to different construction environments and needs. In addition, the screw transmission mechanism inside the back rib realizes the fine-tuning function of the base, further improving the accuracy of the measurement.

[0015] In actual application, the device can monitor the displacement changes of the formwork system in real time. When the displacement exceeds the preset threshold, the buzzer immediately sends out an alarm signal to remind construction personnel to adjust the concrete pumping speed in time or take other necessary measures to ensure construction quality and safety. At the same time, the device has a simple structure, easy installation, low cost, and has broad application prospects and promotion value. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 2 This is a schematic diagram of the structure of the cross arm of the bracket in the utility model;

[0018] Figure 3 It is a schematic diagram of the internal structure of the back rib in the utility model.

[0019] The meaning of each number in the figure is:

[0020] 1. Base; 2. Bracket; 21. Bracket front arm; 22. Bracket cross arm; 221. Sleeve; 222. Telescopic rod; 223. Locking bolt; 224. Threaded sleeve; 23. Bracket rear arm; 3. Photoelectric displacement sensor; 4. Buzzer; 5. Back rib; 51. Screw; 52. Screw motor; 53. Screw slider; 54. Opening. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] The utility model provides a tunnel concrete construction alarm device, such as Figure 1-Figure 3As shown, the base 1 includes a base 1, which is installed on the back rib 5 of the steel mold trolley template system. The bottom of the base 1 is connected to a bracket forearm 21, the bottom end of the bracket forearm 21 is connected to a bracket cross arm 22, one end of the bracket cross arm 22 is installed with a bracket rear arm 23, the top of the bracket rear arm 23 is connected to a photoelectric displacement sensor 3, the output end of the photoelectric displacement sensor 3 is connected to a buzzer 4 through a wire, and the buzzer 4 is installed in a place where construction personnel can easily receive signals. The top of the base 1 is installed on the back rib 5. The base 1 is the basic part of the device, which is installed on the back rib 5 of the steel mold trolley template system. The top of the base 1 is connected to the back rib 5 to ensure that the entire device is firmly installed at the construction site. The base 1 not only provides stable support for other components, but also plays a role in transmitting and dispersing stress. The bottom end of the bracket forearm 21 is connected to the base 1, and its main function is to connect the base 1 with the bracket cross arm 22 to form a stable support structure. Through the bracket forearm 21, the stability and reliability of the entire device are enhanced. The support cross arm 22 is a key component connecting the support front arm 21 and the support rear arm 23. One end of it is connected to the bottom end of the support front arm 21, and the other end is installed with the support rear arm 23. The design of the support cross arm 22 enables the entire device to adapt to different construction environments and requirements, and also facilitates the installation and adjustment of the device. The support rear arm 23 is installed at one end of the support cross arm 22, and the top of it is connected with the photoelectric displacement sensor 3. The main function of the support rear arm 23 is to fix the photoelectric displacement sensor 3 in an appropriate position so that the displacement of the template system can be accurately measured. The photoelectric displacement sensor 3 is one of the core components of the device, which is responsible for real-time monitoring of the displacement changes of the template system. When the template system is displaced, the photoelectric displacement sensor 3 can accurately measure the distance and direction of the displacement, and transmit these data to the buzzer 4 through a wire. The buzzer 4 is installed in a place where construction personnel can easily receive signals. Its main function is to determine whether an alarm needs to be issued according to a preset threshold after receiving the data transmitted by the photoelectric displacement sensor 3. When the displacement of the formwork system exceeds a preset threshold, the buzzer 4 will immediately emit a loud alarm to remind the construction personnel to adjust the concrete pumping speed in time or take other necessary measures to ensure the construction quality and safety.

[0023] In this embodiment, threaded sleeves 224 are installed at both ends of the bracket cross arm 22, one end of the bracket cross arm 22 is connected to the bottom end of the bracket front arm 21 by bolts, and the other end of the bracket cross arm 22 is connected to the bottom end of the bracket rear arm 23 by bolts, so as to facilitate the angle adjustment and locking of the bracket cross arm 22.

[0024] Specifically, the bracket forearm 21 is embedded in the base 1 and rigidly connected to the base 1 , which facilitates the fixation of the bracket forearm 21 .

[0025] Furthermore, the bracket cross arm 22 includes a telescopic rod 222 in the middle, and sleeves 221 are provided at both ends of the telescopic rod 222. A locking bolt 223 is installed on the sleeve 221. The bottom end of the locking bolt 223 is pressed and fixed on the telescopic rod 222. A threaded sleeve 224 is installed at the outer end of the sleeve 221 to facilitate the extension and shortening of the bracket cross arm 22.

[0026] Furthermore, a screw rod 51 is installed inside the back rib 5, one end of which is driven to rotate by a screw motor 52, a screw slider 53 is installed on the screw rod 51, an opening 54 is provided at the bottom of the back rib 5, the bottom of the screw slider 53 slides with the opening, the bottom outer wall of the screw slider 53 is welded and fixed to the base 1, and the screw slider 53 is driven to move by the rotation of the screw rod 51, thereby realizing the position adjustment of the base 1.

[0027] Furthermore, the other end of the screw rod 51 is rotatably connected to the inner wall of the back rib 5 via a bearing, so that the screw rod 51 can rotate stably.

[0028] Furthermore, the bottom ends of the bracket rear arm 23 and the bracket front arm 21 are both provided with through holes, through which bolts pass and are threadedly connected with the threaded sleeve 224, so as to facilitate the fixation of the bracket rear arm 23 and the bracket front arm 21.

[0029] Furthermore, a limit plate is vertically installed at one end of the back rib 5, and the limit plate is used to limit the upward swing range of the bracket cross arm 22, so that the angle adjustment of the bracket cross arm 22 will not be too large.

[0030] When the tunnel concrete construction alarm device of the utility model is used, firstly, during the construction process, the base 1 is firmly installed on the back rib 5 of the steel mold trolley template system, providing stable support for the entire device. The support structure composed of the bracket front arm 21, the bracket cross arm 22 and the bracket rear arm 23 not only ensures the accurate measurement of the photoelectric displacement sensor 3, but also adapts to different construction environments and requirements.

[0031] When concrete is pumped to the formwork system, the formwork system may undergo slight displacements due to the pressure and flow of the concrete. At this time, the photoelectric displacement sensor 3 will monitor these displacement changes in real time and transmit the measured data to the buzzer 4 through the wire.

[0032] After receiving the data, the buzzer 4 will make a judgment based on the preset threshold value. If the displacement of the template system exceeds the preset safety range, the buzzer 4 will immediately emit a loud alarm to remind the construction personnel to adjust the concrete pumping speed in time or take other necessary measures to ensure the construction quality and safety.

[0033] In addition, the device is also designed with flexible adjustment functions. The telescopic design and bolt connection method of the bracket cross arm 22 enable the device to adapt to different construction environments and requirements. At the same time, the screw transmission mechanism inside the back rib 5 realizes the fine-tuning function of the base 1, further improving the accuracy of the measurement.

[0034] Finally, it should be noted that the photoelectric displacement sensor 3, buzzer 4, etc. in this embodiment, the electronic components in the above parts are all universal standard parts or parts known to technical personnel in this field, and their structures and principles can be known to technical personnel in this field through technical manuals or through conventional experimental methods. In the idle part of this device, all the above-mentioned electrical components are connected by wires respectively. The specific connection means should refer to the working sequence between the electrical components in the above-mentioned working principle to complete the electrical connection, which are all well-known technologies in the field.

[0035] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. A tunnel concrete construction alarm device, comprising a base (1), characterized in that: The base (1) is mounted on a back rib (5) of a steel mold trolley template system; the bottom of the base (1) is connected to a support front arm (21); the bottom end of the support front arm (21) is connected to a support cross arm (22); one end of the support cross arm (22) is mounted with a support rear arm (23); the top end of the support rear arm (23) is connected to a photoelectric displacement sensor (3); the output end of the photoelectric displacement sensor (3) is connected to a buzzer (4) via a wire; and the top of the base (1) is mounted on the back rib (5).

2. The tunnel concrete construction alarm device according to claim 1 is characterized in that: Threaded sleeves (224) are installed at both ends of the support cross arm (22), one end of the support cross arm (22) is connected to the bottom end of the support front arm (21) by bolts, and the other end of the support cross arm (22) is connected to the bottom end of the support rear arm (23) by bolts.

3. The tunnel concrete construction alarm device according to claim 1 is characterized in that: The support forearm (21) is embedded in the base (1) and rigidly connected to the base (1).

4. The tunnel concrete construction alarm device according to claim 2 is characterized in that: The bracket cross arm (22) comprises a telescopic rod (222) in the middle, sleeves (221) are sleeved at both ends of the telescopic rod (222), a locking bolt (223) is installed on the sleeve (221), the bottom end of the locking bolt (223) is pressed and fixed on the telescopic rod (222), and the threaded sleeve (224) is installed on the outer end of the sleeve (221).

5. The tunnel concrete construction alarm device according to claim 1 is characterized by: A screw rod (51) is installed inside the back rib (5), one end of the screw rod (51) is driven to rotate by a screw motor (52), a screw slider (53) is installed on the screw rod (51), an opening (54) is provided at the bottom of the back rib (5), the bottom of the screw slider (53) is slidably matched with the opening, and the bottom outer wall of the screw slider (53) is welded and fixed to the base (1).

6. The tunnel concrete construction alarm device according to claim 5 is characterized by: The other end of the screw rod (51) is rotatably connected to the inner wall of the back rib (5) via a bearing.

7. The tunnel concrete construction alarm device according to claim 2 is characterized by: The bottom ends of the bracket rear arm (23) and the bracket front arm (21) are both provided with through holes, through which bolts pass and are threadedly connected with the threaded sleeve (224).

8. The tunnel concrete construction alarm device according to claim 1 is characterized by: A limit plate is vertically mounted on one end of the back rib (5), and the limit plate is used to limit the upward swinging range of the bracket cross arm (22).