Embedded conveying pipeline
By designing multi-functional reinforcing components and connection positioning components in pre-embedded transmission pipelines, the inconvenience and corrosion problems of pipeline installation and maintenance in the existing technology are solved, the corrosion resistance and service life of the pipelines are extended, and the protective performance is enhanced. and convenience.
Patent Information
- Application Number
- CN202420591182.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-03-26
AI Technical Summary
The existing embedded transmission pipelines have a single structure in terms of installation and maintenance, which is not easy to disassemble and replace. Moreover, long-term use will cause corrosion and shorten the service life.
A type of pre-embedded transmission pipeline No. 1 and No. 2 is designed, which are integrated with multi-functional reinforced components to increase anti-corrosion, anti-oxidation, high temperature resistance, waterproof and anti-seepage and thermal insulation functions, and are sealed and connected through connecting positioning components. Fixed positioning, convenient for installation and later disassembly and maintenance.
It realizes the convenient disassembly and assembly of the pipeline, resists corrosion and extends the service life, and enhances the protective performance and convenience of use of the pipeline.
Smart Images

Figure CN221824742U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of pipelines, in particular to a pre-buried conveying pipeline. Background Art
[0002] In life or industrial production, we may encounter long-distance and long-distance steam supply needs. The steam supply is generally transported through pipelines. At present, the pipelines for steam transportation include polyurethane foam plastics, stainless steel insulation pipes, PPR aluminum-plastic steady-state composite insulation pipes, high-density polyethylene pre-buried insulation pipes, PPR insulation pipes, PRC composite insulation pipes, etc.; chemical, smelting, cement, textile, pharmaceutical and other major production links have a large demand for steam; these steams are produced at the heat source and then distributed to specific users through the steam network; the steam transportation process generally adopts the pipeline transportation method. Due to the high temperature of steam, the use of steam transportation pipelines can reduce the heat dissipation of the pipeline, so as to reduce the amount of condensed water generated by steam condensation due to heat dissipation, thereby ensuring the steam dryness.
[0003] The common pre-buried conveying pipeline has a relatively simple structure during installation and use. Usually, the pipelines are positioned by glue during installation. The subsequent pipeline maintenance is relatively unchanged, inconvenient to disassemble and replace, and the operation is relatively cumbersome. In addition, the long-term use of the pre-buried pipeline will cause corrosion and other conditions, reducing the service life, which has a certain adverse effect on people's use process. For this reason, we propose a pre-buried conveying pipeline. Utility Model Content
[0004] Technical problem solved: In view of the deficiencies in the prior art, the utility model provides a pre-buried conveying pipeline, which has the advantages of convenient disassembly and assembly, corrosion resistance, and increased service life. The multifunctional reinforcement components are integrally formed with the inner walls of the No. 1 pre-buried conveying pipeline and the No. 2 pre-buried conveying pipeline, which can enhance their anti-corrosion, anti-oxidation, high temperature resistance, waterproof and anti-seepage, and heat preservation functions. The sealing connection ring is sleeved on the outer wall of the inserted anti-slip positioning pipe through the setting connection positioning component, and the positioning bolt passes through the positioning sealing ring block and is fixed to the two ends of the connecting positioning pipe fitting. Then, the inserted anti-slip positioning pipe is respectively inserted into the inner side of one end of the No. 1 pre-buried conveying pipeline and the No. 2 pre-buried conveying pipeline, and fixed by the external positioning thread groove and the internal positioning thread groove, which is convenient for installation and convenient for disassembly, inspection, and replacement at a later time, which can effectively solve the problems in the background technology.
[0005] Technical solution: To achieve the above-mentioned purpose, the technical solution adopted by the utility model is: a pre-buried conveying pipeline, including a No. 1 pre-buried conveying pipeline and a No. 2 pre-buried conveying pipeline, the inner sides of the No. 1 pre-buried conveying pipeline and the No. 2 pre-buried conveying pipeline are integrally formed with a multifunctional reinforcement component, the No. 1 pre-buried conveying pipeline and the No. 2 pre-buried conveying pipeline are positioned by a connecting positioning component, and the multifunctional reinforcement component includes an anti-corrosion reinforcement layer, an inner anti-oxidation layer, a high temperature resistant reinforcement layer, a waterproof and anti-seepage layer and a high-efficiency thermal insulation layer.
[0006] Preferably, the anti-corrosion reinforcement layer is located on the surface of the inner wall of the No. 1 pre-buried conveying pipeline, the inner anti-oxidation layer is located on the surface of the anti-corrosion reinforcement layer, the high-temperature resistant reinforcement layer is located on the surface of the inner anti-oxidation layer, the waterproof and anti-seepage layer is located on the surface of the high-temperature resistant reinforcement layer, and the high-efficiency thermal insulation layer is located on the surface of the waterproof and anti-seepage layer.
[0007] Preferably, the anti-corrosion reinforcement layer, the inner anti-oxidation layer, the high temperature resistant reinforcement layer, the waterproof and anti-seepage layer and the high-efficiency thermal insulation layer are all integrally formed with the inner wall of the No. 1 pre-buried conveying pipeline.
[0008] Preferably, the connecting and positioning assembly includes an internal positioning thread groove, a connecting and positioning pipe fitting, an insertable anti-drop positioning pipe, an external positioning thread groove, a positioning sealing ring block, a sealing connecting ring and a positioning bolt, and the internal positioning thread grooves are all opened on the inner walls of both ends of the No. 1 pre-buried conveying pipeline and the multifunctional reinforcement assembly.
[0009] Preferably, the insertion anti-slip positioning tube is located at both ends of the connection positioning pipe, the external positioning thread groove is opened on one side of the outer wall of the insertion anti-slip positioning tube, and the positioning sealing ring block is located on one side of the outer wall of the sealing connection ring.
[0010] Preferably, one end of the inserted anti-detachment positioning tube is fixedly connected to both ends of the connecting positioning pipe fitting, the inner wall of the positioning sealing ring block is fixedly connected to one side of the outer wall of the sealing connecting ring sleeve, the inner wall of the sealing connecting ring sleeve is sleeved on the outer wall of the inserted anti-detachment positioning tube, and the positioning bolts pass through the inner wall of the positioning sealing ring block and are fixed to both ends of the connecting positioning pipe fitting.
[0011] Preferably, the sealing connection rings are both located on the inner sides of the No. 1 pre-buried conveying pipeline and the No. 2 pre-buried conveying pipeline.
[0012] Preferably, the connecting positioning pipe fittings are positioned with the inner walls of the No. 1 pre-buried conveying pipeline and the No. 2 pre-buried conveying pipeline 4 by inserting the anti-drop positioning pipe, the external positioning thread groove and the internal positioning thread groove.
[0013] Beneficial effects: Compared with the prior art, the utility model provides a pre-buried conveying pipeline, which has the following beneficial effects:
[0014] 1. The pre-buried conveying pipeline is integrally formed with the inner wall of the No. 1 pre-buried conveying pipeline and the No. 2 pre-buried conveying pipeline through the multifunctional reinforcing components, which can enhance its anti-corrosion, anti-oxidation, high temperature resistance, waterproof and anti-seepage, and heat preservation effects.
[0015] 2. This kind of pre-buried conveying pipeline, through the connection positioning component set up, the sealing connection ring is set on the outer wall of the inserted anti-dropping positioning tube, the positioning bolt passes through the positioning sealing ring block and is fixed to the two ends of the connecting positioning pipe fitting, and then the inserted anti-dropping positioning tube is respectively inserted into the inner side of one end of the No. 1 pre-buried conveying pipeline and the No. 2 pre-buried conveying pipeline, and fixed by the external positioning thread groove and the internal positioning thread groove, which is convenient for installation and easy to disassemble, inspect and replace at a later time. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 The utility model is a schematic diagram of the overall structure of a pre-buried conveying pipeline.
[0017] Figure 2 The utility model is a partial structural schematic diagram of a connection and positioning component in a pre-buried conveying pipeline.
[0018] Figure 3 It is a disassembled schematic diagram of a connecting and positioning pipe fitting and a sealing connection ring in a pre-buried conveying pipeline of the utility model.
[0019] Figure 4 It is a structural cross-sectional view of a multifunctional reinforcement component in a pre-buried conveying pipeline of the utility model.
[0020] In the figure: 1. No. 1 embedded conveying pipeline; 2. Multifunctional reinforcement component; 3. Connection and positioning component; 4. No. 2 embedded conveying pipeline; 201. Anti-corrosion reinforcement layer; 202. Internal anti-oxidation layer; 203. High-temperature resistant reinforcement layer; 204. Waterproof and anti-seepage layer; 205. High-efficiency thermal insulation layer; 301. Internal positioning thread groove; 302. Connection and positioning pipe fittings; 303. Insert anti-slip positioning pipe; 304. External positioning thread groove; 305. Positioning sealing ring block; 306. Sealing connection ring; 307. Positioning bolt. DETAILED DESCRIPTION
[0021] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0022] like Figure 1-4As shown, a pre-buried conveying pipeline includes a No. 1 pre-buried conveying pipeline 1 and a No. 2 pre-buried conveying pipeline 4. The inner sides of the No. 1 pre-buried conveying pipeline 1 and the No. 2 pre-buried conveying pipeline 4 are integrally formed with a multifunctional reinforcement component 2. The No. 1 pre-buried conveying pipeline 1 and the No. 2 pre-buried conveying pipeline 4 are positioned by a connecting positioning component 3. The multifunctional reinforcement component 2 includes an anti-corrosion reinforcement layer 201, an inner anti-oxidation layer 202, a high-temperature resistant reinforcement layer 203, a waterproof and anti-seepage layer 204 and a high-efficiency thermal insulation layer 205, which can enhance the service life of the No. 1 pre-buried conveying pipeline 1 and the No. 2 pre-buried conveying pipeline 4 within a certain range.
[0023] Furthermore, the anti-corrosion reinforcement layer 201 is located on the surface of the inner wall of the No. 1 pre-buried conveying pipeline 1, the inner anti-oxidation layer 202 is located on the surface of the anti-corrosion reinforcement layer 201, the high-temperature resistant reinforcement layer 203 is located on the surface of the inner anti-oxidation layer 202, the waterproof and anti-seepage layer 204 is located on the surface of the high-temperature resistant reinforcement layer 203, and the high-efficiency thermal insulation layer 205 is located on the surface of the waterproof and anti-seepage layer 204. The high-efficiency thermal insulation layer 205 is made of polyurethane foam material, which can enhance the overall thermal insulation effect.
[0024] Furthermore, the anti-corrosion reinforcement layer 201, the inner anti-oxidation layer 202, the high temperature resistant reinforcement layer 203, the waterproof and anti-seepage layer 204 and the high-efficiency thermal insulation layer 205 are all integrally formed with the inner wall of the No. 1 pre-buried conveying pipeline 1 to enhance stability.
[0025] Furthermore, the connection positioning component 3 includes an internal positioning thread groove 301, a connection positioning pipe fitting 302, an insertion anti-drop positioning tube 303, an external positioning thread groove 304, a positioning sealing ring block 305, a sealing connection ring 306 and a positioning bolt 307. The internal positioning thread groove 301 is opened on the inner wall at both ends of the No. 1 pre-buried conveying pipeline 1 and the multifunctional reinforcement component 2, and the internal positioning thread groove 301 and the external positioning thread groove 304 are adapted to each other.
[0026] Furthermore, the insertion anti-slip positioning tube 303 is located at both ends of the connecting positioning pipe 302, the external positioning thread groove 304 is opened on one side of the outer wall of the insertion anti-slip positioning tube 303, and the positioning sealing ring block 305 is located on one side of the outer wall of the sealing connection ring 306, which can enhance the sealing performance.
[0027] Furthermore, one end of the inserted anti-slip positioning tube 303 is fixedly connected to both ends of the connecting positioning pipe 302, the inner wall of the positioning sealing ring block 305 is fixedly connected to one side of the outer wall of the sealing connecting ring 306, the inner wall of the sealing connecting ring 306 is sleeved on the outer wall of the inserted anti-slip positioning tube 303, and the positioning bolts 307 penetrate the inner wall of the positioning sealing ring block 305 and are fixed to both ends of the connecting positioning pipe 302 to enhance firmness.
[0028] Furthermore, the sealing connection rings 306 are located inside the No. 1 pre-buried conveying pipeline 1 and the No. 2 pre-buried conveying pipeline 4 to enhance the sealing during connection.
[0029] Furthermore, the connecting positioning pipe 302 is positioned with the inner walls of the No. 1 pre-buried conveying pipeline 1 and the No. 2 pre-buried conveying pipeline 4 by inserting the anti-slip positioning pipe 303, the external positioning thread groove 304 and the internal positioning thread groove 301, which is convenient for installation and also easy for disassembly, maintenance and overhaul at a later time.
[0030] Working principle: A pre-buried conveying pipeline comprises a No. 1 pre-buried conveying pipeline 1, a multifunctional reinforcing component 2, a connecting and positioning component 3 and a No. 2 pre-buried conveying pipeline 4. The No. 1 pre-buried conveying pipeline 1 and the No. 2 pre-buried conveying pipeline 4 are connected and positioned by the connecting and positioning component 3. The multifunctional reinforcing component 2 is formed integrally with the inner walls of the No. 1 pre-buried conveying pipeline 1 and the No. 2 pre-buried conveying pipeline 4. The anti-corrosion reinforcing layer 201 is made of rubber material to enhance the anti-corrosion effect. The inner anti-oxidation layer 202 is made of polyethylene material to enhance the anti-oxidation effect. The high-temperature resistant reinforcing layer 203 is made of propylene material to enhance the high-temperature resistant effect. The waterproof and anti-seepage layer 204 is made of polyethylene to enhance the waterproof and anti-seepage effect. The effective insulation layer 205 is made of polyurethane foam, which can enhance the overall insulation effect and, to a certain extent, enhance the service life of the No. 1 pre-buried conveying pipeline 1 and the No. 2 pre-buried conveying pipeline 4. Through the setting of the connection positioning component 3, the sealing connection ring 306 is sleeved on the outer wall of the insertion anti-detachment positioning tube 303, and the positioning bolt 307 penetrates the positioning sealing ring block 305 and is fixed to the two ends of the connection positioning pipe 302. Then, the insertion anti-detachment positioning tube 303 is respectively inserted into the inner side of one end of the No. 1 pre-buried conveying pipeline 1 and the No. 2 pre-buried conveying pipeline 4, and fixed through the external positioning thread groove 304 and the internal positioning thread groove 301, which is convenient for installation and convenient for disassembly, maintenance and replacement at a later time.
[0031] It should be noted that, in this article, relational terms such as first and second (number one, number two), etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "including one..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0032] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A pre-buried conveying pipeline, comprising a first pre-buried conveying pipeline (1) and a second pre-buried conveying pipeline (4), characterized in that: The inner sides of the No. 1 pre-buried conveying pipeline (1) and the No. 2 pre-buried conveying pipeline (4) are both integrally formed with a multifunctional reinforcing component (2); the No. 1 pre-buried conveying pipeline (1) and the No. 2 pre-buried conveying pipeline (4) are positioned by a connecting positioning component (3); the multifunctional reinforcing component (2) comprises an anti-corrosion reinforcing layer (201), an inner anti-oxidation layer (202), a high temperature resistant reinforcing layer (203), a waterproof and anti-seepage layer (204) and a high-efficiency thermal insulation layer (205).
2. The pre-buried conveying pipeline according to claim 1, characterized in that: The anti-corrosion reinforcement layer (201) is located on the surface of the inner wall of the No. 1 pre-buried conveying pipeline (1), the inner anti-oxidation layer (202) is located on the surface of the anti-corrosion reinforcement layer (201), the high-temperature resistant reinforcement layer (203) is located on the surface of the inner anti-oxidation layer (202), the waterproof and anti-seepage layer (204) is located on the surface of the high-temperature resistant reinforcement layer (203), and the high-efficiency thermal insulation layer (205) is located on the surface of the waterproof and anti-seepage layer (204).
3. The pre-buried conveying pipeline according to claim 2, characterized in that: The anti-corrosion reinforcement layer (201), the inner anti-oxidation layer (202), the high temperature resistant reinforcement layer (203), the waterproof and anti-seepage layer (204) and the high-efficiency thermal insulation layer (205) are all integrally formed with the inner wall of the No. 1 pre-buried transport pipeline (1).
4. The pre-buried conveying pipeline according to claim 3, characterized in that: The connection and positioning assembly (3) comprises an inner positioning thread groove (301), a connection and positioning pipe fitting (302), an insertion anti-drop positioning pipe (303), an outer positioning thread groove (304), a positioning sealing ring block (305), a sealing connection ring (306) and a positioning bolt (307), wherein the inner positioning thread groove (301) is provided on the inner walls of both ends of the No. 1 pre-buried conveying pipeline (1) and the multifunctional reinforcement assembly (2).
5. The pre-buried conveying pipeline according to claim 4, characterized in that: The insertion anti-slip positioning tube (303) is located at both ends of the connection positioning tube (302), the external positioning thread groove (304) is opened on one side of the outer wall of the insertion anti-slip positioning tube (303), and the positioning sealing ring block (305) is located on one side of the outer wall of the sealing connection ring (306).
6. The pre-buried conveying pipeline according to claim 5, characterized in that: One end of the inserted anti-slip positioning tube (303) is fixedly connected to both ends of the connecting positioning pipe (302), the inner wall of the positioning sealing ring block (305) is fixedly connected to one side of the outer wall of the sealing connection ring (306), the inner wall of the sealing connection ring (306) is sleeved on the outer wall of the inserted anti-slip positioning tube (303), and the positioning bolts (307) penetrate the inner wall of the positioning sealing ring block (305) and are fixed to both ends of the connecting positioning pipe (302).
7. The pre-buried conveying pipeline according to claim 6, characterized in that: The sealing connection rings (306) are both located on the inner sides of the No. 1 pre-buried conveying pipeline (1) and the No. 2 pre-buried conveying pipeline (4).
8. The pre-buried conveying pipeline according to claim 7, characterized in that: The connecting and positioning pipe fitting (302) is positioned with the inner walls of the No. 1 pre-buried conveying pipeline (1) and the No. 2 pre-buried conveying pipeline (4) by inserting the anti-dropping positioning pipe (303), the external positioning thread groove (304) and the internal positioning thread groove (301).
