High-temperature sintering furnace adopting wet hydrogen water bath device
By introducing a wet hydrogen water bath device and a multi-pipe control valve system into the high-temperature sintering furnace, the problem that existing sintering furnaces can only be introduced with a single protective gas has been solved, enabling flexible switching and purity adjustment of multiple protective gases, thus improving the applicability of the sintering furnace.
Patent Information
- Application Number
- CN202420423459.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-03-05
AI Technical Summary
Existing sintering furnaces can only be purged with one type of protective gas, which cannot meet the needs of different applications and leads to limitations in their use.
Design a high-temperature sintering furnace using a wet hydrogen water bath device. Through the combination of multiple pipes and control valves, flexible switching and adjustment of dry hydrogen, wet hydrogen, nitrogen and their mixtures can be achieved. Combined with the use of water bath device and water replenishment tank, the diversity and purity of protective gases can be ensured.
It enables flexible switching and adjustment of various protective gases, improving the applicability of the sintering furnace and the purity of the protective gases, and meeting the sintering requirements of different applications.
Smart Images

Figure CN221825869U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sintering furnaces, in particular to a high-temperature sintering furnace adopting a wet hydrogen water bath device. Background Art
[0002] High-temperature hydrogen sintering furnace is a sintering equipment that uses hydrogen as a protective atmosphere and can be used for ceramic metallization. Studies have shown that in the process of ceramic metallization, adding water vapor to hydrogen to form wet hydrogen has many benefits. Water vapor in wet hydrogen can react with the organic binder of the ceramic to prevent the blackening of the ceramic glaze; water vapor reacts with Mn to generate MnO to prevent light transmission and silver bubbles caused by molybdenum-manganese alloys; molybdenum dioxide and gaseous molybdenum oxide generated by the reaction with molybdenum are beneficial to the sintering of molybdenum particles and can improve the metallization strength. Sintering furnaces for different purposes often require different protective atmospheres, such as dry hydrogen, wet hydrogen, a mixture of hydrogen and nitrogen, etc. At present, only one protective gas can be introduced into the sintering furnace, which brings many limitations to the use of the sintering furnace. Summary of the invention
[0003] In view of this, it is necessary to provide a high-temperature sintering furnace using a wet hydrogen water bath device that is convenient for replacing the protective gas.
[0004] A high-temperature sintering furnace using a wet hydrogen water bath device comprises a first hydrogen inlet pipeline, a water bath device, a second hydrogen inlet pipeline, a wet hydrogen outlet pipeline, a mixed gas outlet pipeline, a gas mixing tank, a furnace chamber, a first nitrogen inlet pipeline, a second nitrogen inlet pipeline, a third nitrogen inlet pipeline, a water replenishment tank, and a water replenishment pipeline; the outlet of the first hydrogen inlet pipeline is connected to the inlet of the water bath device; the outlets of the second hydrogen inlet pipeline and the wet hydrogen outlet pipeline are connected to the inlet of the mixed gas outlet pipeline, and the wet hydrogen outlet pipeline is connected to the inlet of the mixed gas outlet pipeline. The air inlet of the air outlet pipe is communicated with the air outlet of the water bath device; the air outlet of the mixed gas outlet pipe is communicated with the air inlet of the gas mixing tank, and the air outlet of the gas mixing tank is communicated with the air inlet of the furnace chamber; the first nitrogen inlet pipe is communicated with the second hydrogen inlet pipe, the second nitrogen inlet pipe is communicated with the first hydrogen inlet pipe, the third nitrogen inlet pipe is communicated with the air inlet of the water replenishment tank, the water outlet of the water replenishment tank is communicated with the water inlet of the water replenishment pipe, and the water outlet of the water replenishment pipe is communicated with the water inlet of the water bath device.
[0005] Preferably, the high-temperature sintering furnace using the wet hydrogen water bath device also includes a first three-way control valve, which is arranged on the second hydrogen inlet pipeline, and the first three-way control valve is also connected to the first nitrogen inlet pipeline.
[0006] Preferably, the high-temperature sintering furnace using the wet hydrogen water bath device also includes a second three-way control valve, and the second three-way control valve is respectively connected to the second hydrogen inlet pipeline, the wet hydrogen outlet pipeline, and the mixed gas outlet pipeline.
[0007] Preferably, the high-temperature sintering furnace using the wet hydrogen water bath device also includes a third three-way control valve, and the third three-way control valve is arranged on the first hydrogen inlet pipeline, and the third three-way control valve is also connected to the second nitrogen inlet pipeline.
[0008] Preferably, the first hydrogen gas inlet pipeline, the second hydrogen gas inlet pipeline and an external hydrogen gas transmission pipeline are connected.
[0009] Preferably, the first nitrogen intake pipeline, the second nitrogen intake pipeline, the third nitrogen intake pipeline and an external nitrogen gas transmission pipeline are connected.
[0010] Preferably, the water bath device and the water replenishment tank are provided with drain ports to discharge air in time.
[0011] Preferably, the water replenishment tank is provided with a distilled water filling port for timely filling of distilled water.
[0012] Beneficial effects: Compared with the prior art, the high-temperature sintering furnace using the wet hydrogen water bath device of the utility model can introduce a variety of protective gases, such as dry hydrogen, wet hydrogen, a mixture of dry hydrogen and nitrogen, and a mixture of wet hydrogen and nitrogen. It is also convenient to adjust the type of protective gas introduced without disassembling the pipeline.
[0013] The utility model can adjust the flow rate of hydrogen entering the water bath device, thereby adjusting the water vapor content in the wet hydrogen.
[0014] The utility model can discharge air from a water bath device or a water supply tank by introducing nitrogen, so that the protective gas entering the furnace is purer. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a process flow chart of the utility model using a wet hydrogen water bath device.
[0016] In the figure: a first hydrogen inlet pipeline 1, a water bath device 2, a second hydrogen inlet pipeline 3, a wet hydrogen outlet pipeline 4, a mixed gas outlet pipeline 5, a gas mixing tank 6, a furnace chamber 7, a first nitrogen inlet pipeline 8, a second nitrogen inlet pipeline 9, a third nitrogen inlet pipeline 10, a water supply tank 11, a water supply pipeline 12, a first three-way control valve 13, a second three-way control valve 14, a third three-way control valve 15, an exhaust port 16, and a distilled water filling port 17. DETAILED DESCRIPTION
[0017] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments are briefly introduced below. Obviously, the drawings described below are some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0018] Please see Figure 1 A high-temperature sintering furnace using a wet hydrogen water bath device 2 comprises a first hydrogen inlet pipeline 1, a water bath device 2, a second hydrogen inlet pipeline 3, a wet hydrogen outlet pipeline 4, a mixed gas outlet pipeline 5, a gas mixing tank 6, a furnace chamber 7, a first nitrogen inlet pipeline 8, a second nitrogen inlet pipeline 9, a third nitrogen inlet pipeline 10, a water replenishment tank 11, and a water replenishment pipeline 12; the outlet of the first hydrogen inlet pipeline 1 is connected to the inlet of the water bath device 2; the outlets of the second hydrogen inlet pipeline 3 and the wet hydrogen outlet pipeline 4 are connected to the inlet of the mixed gas outlet pipeline 5, and the wet The air inlet of the hydrogen outlet pipe 4 is communicated with the air outlet of the water bath device 2; the air outlet of the mixed gas outlet pipe 5 is communicated with the air inlet of the mixing tank 6, and the air outlet of the mixing tank 6 is communicated with the air inlet of the furnace chamber 7; the first nitrogen inlet pipe 8 is communicated with the second hydrogen inlet pipe 3, the second nitrogen inlet pipe 9 is communicated with the first hydrogen inlet pipe 1, the third nitrogen inlet pipe 10 is communicated with the air inlet of the water replenishment tank 11, the water outlet of the water replenishment tank 11 is communicated with the water inlet of the water replenishment pipe 12, and the water outlet of the water replenishment pipe 12 is communicated with the water inlet of the water bath device 2.
[0019] When the second hydrogen inlet pipeline 3 is ventilated, the first nitrogen inlet pipeline 8 is cut off, and the wet hydrogen outlet pipeline 4 is cut off, dry hydrogen is introduced into the furnace; when the second hydrogen inlet pipeline 3 is ventilated, the first nitrogen inlet pipeline 8 is ventilated, and the wet hydrogen outlet pipeline 4 is cut off, a mixed gas of dry hydrogen and nitrogen is introduced into the furnace; when the second hydrogen inlet pipeline 3 is cut off, the first nitrogen inlet pipeline 8 is ventilated, and the wet hydrogen outlet pipeline 4 is cut off, nitrogen is introduced into the furnace; when the second hydrogen inlet pipeline 3 is cut off, the first hydrogen inlet pipeline 1 is ventilated, the first nitrogen inlet pipeline 8 is cut off, and the wet hydrogen outlet pipeline 4 is ventilated, wet hydrogen is introduced into the furnace; when the second hydrogen inlet pipeline 3 is cut off, the first hydrogen inlet pipeline 1 is ventilated, the first nitrogen inlet pipeline 8 is ventilated, and the wet hydrogen outlet pipeline 4 is ventilated, a mixed gas of wet hydrogen and nitrogen is introduced into the furnace.
[0020] In addition, the high-temperature sintering furnace using the wet hydrogen water bath device 2 of the utility model can also discharge the air or hydrogen in the water bath device 2 or the water replenishment tank 11 in time.
[0021] When it is necessary to discharge the air in the water bath device 2, the first hydrogen inlet pipeline 1 is cut off, the second nitrogen inlet pipeline 9 is ventilated, the wet hydrogen outlet pipeline 4 is cut off, the water inlet is closed, and the exhaust port 16 is opened. Then, as nitrogen is introduced into the water bath device 2, the hydrogen in the water bath device 2 or the air released from the water can be discharged.
[0022] When the air in the water replenishment tank 11 needs to be discharged, the third nitrogen inlet pipe 10 is opened, the water replenishment pipe 12 is closed, the water inlet is closed, and the exhaust port 16 is opened. Then, as nitrogen is introduced into the water replenishment tank 11, the hydrogen in the water replenishment tank 11 or the air released from the water can be discharged.
[0023] In a preferred embodiment, the water introduced into the water replenishment tank 11 is distilled water.
[0024] The water bath device 2 of the present invention is a conventional device and will not be described in detail. The main purpose is to provide hot water with a constant temperature. In this case, the amount of water vapor generated is also relatively stable.
[0025] In a preferred embodiment, the high-temperature sintering furnace using the wet hydrogen water bath device 2 also includes a first three-way control valve 13, which is arranged on the second hydrogen inlet pipe 3, and the first three-way control valve 13 is also connected to the first nitrogen inlet pipe 8.
[0026] The first three-way control valve 13 controls the outflow of hydrogen from the second hydrogen inlet pipe 3 and the outflow of nitrogen from the first nitrogen inlet pipe 8. Depending on the type of protective gas required by the furnace chamber 7, it can be controlled whether dry hydrogen or nitrogen finally enters the furnace chamber 7.
[0027] In a preferred embodiment, the high-temperature sintering furnace using the wet hydrogen water bath device 2 also includes a second three-way control valve 14, and the second three-way control valve 14 is connected to the second hydrogen inlet pipeline 3, the wet hydrogen outlet pipeline 4, and the mixed gas outlet pipeline 5 respectively.
[0028] The second three-way control valve controls the outflow of gas in the second hydrogen inlet pipe 3 and the outflow of gas in the wet hydrogen outlet pipe 4 to the mixed gas pipe. According to the type of protective gas required by the furnace chamber 7, it can control whether wet hydrogen or dry hydrogen or nitrogen finally enters the furnace chamber 7.
[0029] In a preferred embodiment, the high-temperature sintering furnace using the wet hydrogen water bath device 2 also includes a third three-way control valve 15, and the third three-way control valve 15 is arranged on the first hydrogen intake pipe 1, and the third three-way control valve 15 is also connected to the second nitrogen intake pipe 9.
[0030] The third three-way control valve 15 controls the outflow of hydrogen from the first hydrogen inlet pipe 1 and the outflow of nitrogen from the second nitrogen inlet pipe 9. Depending on whether the water bath 2 needs to be supplied with hydrogen or air needs to be exhausted, hydrogen or nitrogen is selected to enter the water bath 2.
[0031] In a preferred embodiment, the first hydrogen inlet pipeline 1 and the second hydrogen inlet pipeline 3 are connected to an external hydrogen gas transmission pipeline, which centrally supplies gas to the first hydrogen inlet pipeline 1 or the second hydrogen inlet pipeline 3 .
[0032] In a preferred embodiment, the first nitrogen intake pipeline 8, the second nitrogen intake pipeline 9, and the third nitrogen intake pipeline 10 are connected to an external nitrogen gas delivery pipeline. The external nitrogen gas delivery pipeline centrally supplies gas to the first nitrogen pipeline, the second nitrogen intake pipeline 9, or the third nitrogen intake pipeline 10.
[0033] In a preferred embodiment, the water bath device 2 and the water replenishment tank 11 are provided with an exhaust port 16 to exhaust air in time.
[0034] In a preferred embodiment, the water replenishment tank 11 is provided with a distilled water filling port 17 for timely filling of distilled water.
[0035] The above disclosure is only a preferred embodiment of the present invention, and it certainly cannot be used to limit the scope of the present invention. A person skilled in the art can understand that all or part of the processes of the above embodiments and equivalent changes made according to the claims of the present invention still fall within the scope of the present invention.
Claims
1. A high temperature sintering furnace using a wet hydrogen water bath device, characterized in that: The invention comprises a first hydrogen inlet pipeline, a water bath device, a second hydrogen inlet pipeline, a wet hydrogen outlet pipeline, a mixed gas outlet pipeline, a gas mixing tank, a furnace chamber, a first nitrogen inlet pipeline, a second nitrogen inlet pipeline, a third nitrogen inlet pipeline, a water replenishment tank, and a water replenishment pipeline; the outlet of the first hydrogen inlet pipeline is connected to the inlet of the water bath device; the outlets of the second hydrogen inlet pipeline and the wet hydrogen outlet pipeline are connected to the inlet of the mixed gas outlet pipeline, and the inlet of the wet hydrogen outlet pipeline is connected to the inlet of the mixed gas outlet pipeline. The gas outlet of the mixed gas outlet pipeline is connected to the air inlet of the gas mixing tank, and the air outlet of the gas mixing tank is connected to the air inlet of the furnace chamber; the first nitrogen inlet pipeline is connected to the second hydrogen inlet pipeline, the second nitrogen inlet pipeline is connected to the first hydrogen inlet pipeline, the third nitrogen inlet pipeline is connected to the air inlet of the water replenishment tank, the water outlet of the water replenishment tank is connected to the water inlet of the water replenishment pipeline, and the water outlet of the water replenishment pipeline is connected to the water inlet of the water bath device.
2. The high temperature sintering furnace using a wet hydrogen water bath device as claimed in claim 1, characterized in that: The high-temperature sintering furnace using the wet hydrogen water bath device also includes a first three-way control valve, which is arranged on the second hydrogen inlet pipeline and is also connected to the first nitrogen inlet pipeline.
3. The high temperature sintering furnace using a wet hydrogen water bath device as claimed in claim 1, characterized in that: The high-temperature sintering furnace using the wet hydrogen water bath device also includes a second three-way control valve, which is connected to the second hydrogen inlet pipeline, the wet hydrogen outlet pipeline, and the mixed gas outlet pipeline respectively.
4. The high temperature sintering furnace using a wet hydrogen water bath device as claimed in claim 1, characterized in that: The high-temperature sintering furnace using the wet hydrogen water bath device also includes a third three-way control valve, which is arranged on the first hydrogen inlet pipeline and is also connected to the second nitrogen inlet pipeline.
5. The high temperature sintering furnace using a wet hydrogen water bath device as claimed in claim 1, characterized in that: The first hydrogen gas inlet pipeline, the second hydrogen gas inlet pipeline and an external hydrogen gas transmission pipeline are connected.
6. The high temperature sintering furnace using a wet hydrogen water bath device as claimed in claim 1, characterized in that: The first nitrogen intake pipeline, the second nitrogen intake pipeline, and the third nitrogen intake pipeline are connected to an external nitrogen gas transmission pipeline.
7. The high temperature sintering furnace using a wet hydrogen water bath device as claimed in claim 1, characterized in that: The water bath device and the water replenishment tank are provided with exhaust ports to exhaust air in time.
8. The high temperature sintering furnace using a wet hydrogen water bath device as claimed in claim 1, characterized in that: The water replenishment tank is provided with a distilled water filling port for timely filling of distilled water.