Screening device suitable for construction waste

By using the cleaning mechanism of the rotating shaft and the support rod in the construction waste screening device, the problem of floc garbage clogging the filter screen is solved, the effective separation and collection of floc is achieved, and the efficiency and equipment of construction waste classification are improved. stability.

CN221832742UActive Publication Date: 2024-10-15WUHAN ZHIJINYAN ENVIRONMENTAL TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202322843467.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-10-20
Publication Date
2024-10-15
Estimated Expiration
2033-10-20

AI Technical Summary

Technical Problem

In the process of sorting construction waste, flocs such as cloth can easily block the filter screen and affect the working efficiency of the vibration mechanism.

Method used

A cleaning mechanism is designed that includes a rotating shaft, a support rod and a driving part. The support rod hooks the fallen floc, separates the floc through the rotating shaft and collects it into a collection box to avoid clogging.

Benefits of technology

It effectively avoids entanglement or blockage of equipment caused by floc waste, and improves the classification efficiency of construction waste and the working stability of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221832742U_ABST
    Figure CN221832742U_ABST
Patent Text Reader

Abstract

The utility model discloses a screening device suitable for construction waste, and belongs to the technical field of construction waste treatment equipment, the screening device comprises a cleaning mechanism and a conveying belt, the cleaning mechanism comprises a rotating shaft, a plurality of supporting rods and a driving part, and the supporting rods are fixedly connected with the side wall of the rotating shaft, so that when the driving part drives the rotating shaft to rotate, the driving part drives the rotating shaft to rotate; the multiple supporting rods rotate along with the rotating shaft and then are located under the output end of the conveying belt through the rotating shaft, so that when the construction waste breaks away from the conveying belt and falls off, the construction waste can firstly penetrate through all the supporting rods, and floccules in the construction waste can be separated from the construction waste along with rotation of all the supporting rods; and therefore, construction waste without floccules is obtained, and the situation that follow-up equipment is blocked due to the floccule waste is effectively avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction waste treatment equipment, in particular to a screening device suitable for construction waste. Background Art

[0002] In the process of recycling construction waste, construction waste needs to be classified using a vibration mechanism. For example, the authorization announcement number CN209093869U is called a vibration mechanism for construction waste treatment process, which includes a support frame, a screen box, a discharging mechanism and a driving mechanism. A feed port is fixed at one end of the top of the screen box, and the feed port is connected to the inside of the screen box. It also includes a protective mechanism for reducing the splashing of construction waste, which avoids the splashing of construction waste from the feed port and effectively avoids the problem of splashing construction waste injuring workers.

[0003] However, existing construction waste contains a variety of debris, such as cloth scraps, concrete blocks and steel bars, among which flocculent waste (such as cloth scraps) is prone to entanglement during vibration and is very likely to clog the filter screen, affecting the working efficiency of the vibration mechanism. Utility Model Content

[0004] In view of this, it is necessary to provide a screening device suitable for construction waste, so as to solve the technical problem in the prior art that flocculent waste (such as cloth scraps) easily clogs the filter screen when classifying construction waste.

[0005] The utility model provides a screening device suitable for construction waste, including a cleaning mechanism and a conveyor belt;

[0006] The cleaning mechanism includes a rotating shaft, a plurality of support rods and a driving member, one end of each of the support rods is fixedly connected to the side wall of the rotating shaft, and the other end of each of the support rods extends in a direction away from the rotating shaft. The rotating shaft is located directly below the output end of the conveyor belt, and the conveyor belt is used to drive the construction waste to pass through each of the support rods. The driving member is located at one end of the rotating shaft, and the driving member is used to drive the rotating shaft to rotate so that the flocs in the construction waste are hooked away by each of the support rods during the falling process.

[0007] In one of the embodiments, it also includes a vibration mechanism, the input end of the vibration mechanism is located directly below the rotating shaft, the vibration mechanism includes a filter screen, a pair of baffles and an exciter, the two baffles are fixedly connected to the two sides of the filter screen, and the exciter is connected to the baffles and is used to drive the filter screen to vibrate.

[0008] In one of the embodiments, a buffer spring is provided at the bottom of the baffle.

[0009] In one of the embodiments, a spray pipe is provided on the top of the baffle.

[0010] In one embodiment, the cleaning mechanism further comprises a collection box, and the collection box is located at the input end of the vibration mechanism.

[0011] In one embodiment, a plurality of through holes are formed on the side wall of the collection box, and each of the support rods passes through each of the through holes as the rotating shaft rotates.

[0012] In one of the embodiments, each of the support rods passes through each of the through holes from the collecting box toward the vibration mechanism.

[0013] In one embodiment, each of the support rods is in a bent state.

[0014] In one of the embodiments, a first bracket is provided at the bottom of the driving member.

[0015] In one embodiment, a second bracket is provided at one end of the rotating shaft away from the driving member, the second bracket is provided with a circular hole, a bearing is embedded in the circular hole, the end of the rotating shaft is fixedly connected to the inner ring of the bearing, and the outer ring of the bearing is fixedly connected to the circular hole.

[0016] Compared with the prior art, the screening device for construction waste provided by the utility model has the following beneficial effects:

[0017] A number of support rods are fixedly connected to the side wall of the rotating shaft, so that when the driving member drives the rotating shaft to rotate, the number of support rods will rotate along with the rotating shaft, and the rotating shaft is located just below the output end of the conveyor belt, so that when the construction waste falls off the conveyor belt, the construction waste will first pass through the support rods, and the flocs in the construction waste will be hooked by the support rods. The flocs are separated from the construction waste as the support rods rotate, thereby obtaining floc-free construction waste, which effectively avoids the entanglement or blockage of subsequent equipment caused by the flocs.

[0018] The above description is only an overview of the technical solution of the utility model. In order to more clearly understand the technical means of the utility model and implement it according to the contents of the specification, the preferred embodiments of the utility model are described in detail as follows in conjunction with the accompanying drawings. The specific implementation method of the utility model is given in detail by the following embodiments and their drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present application. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0020] Figure 1A three-dimensional diagram of a screening device suitable for construction waste provided by the utility model;

[0021] Figure 2 for Figure 1 A top view of

[0022] Figure 3 for Figure 2 Sectional view of AA in the middle;

[0023] Figure 4 for Figure 2 Schematic diagram of the explosion of the cleaning mechanism.

[0024] The accompanying drawings are marked as follows: 1. cleaning mechanism; 11. rotating shaft; 111. second bracket; 1111. round hole; 112. bearing; 12. support rod; 13. driving member; 131. first bracket; 14. collecting box; 141. through hole; 2. conveyor belt; 21. output end of conveyor belt; 3. vibration mechanism; 31. filter screen; 32. baffle; 321. buffer spring; 322. spray pipe; 33. exciter; 34. input end of vibration mechanism. DETAILED DESCRIPTION

[0025] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings, wherein the accompanying drawings constitute a part of the present application and are used together with the embodiments of the present invention to illustrate the principles of the present invention, but are not used to limit the scope of the present invention.

[0026] See also Figure 1-Figure 4 , the utility model provides a screening device suitable for construction waste, comprising a cleaning mechanism 1 and a conveyor belt 2;

[0027] The cleaning mechanism 1 includes a rotating shaft 11, a plurality of support rods 12 and a driving member 13. One end of each support rod 12 is fixedly connected to the side wall of the rotating shaft 11, and the other end of each support rod 12 extends in a direction away from the rotating shaft 11. The rotating shaft 11 is located directly below the output end of the conveyor belt 2. The conveyor belt 2 is used to drive the construction waste to pass through each support rod 12. The driving member 13 is located at one end of the rotating shaft 11. The driving member 13 is used to drive the rotating shaft 11 to rotate so that the flocs in the construction waste are hooked away by each support rod 12 during the falling process.

[0028] Specifically, a plurality of support rods 12 are fixedly connected to the side wall of the rotating shaft 11, so that when the driving member 13 drives the rotating shaft 11 to rotate, the plurality of support rods 12 rotate along with the rotating shaft 11, and the rotating shaft 11 is located directly below the output end 21 of the conveyor belt, so that when the construction waste falls off the conveyor belt 2, the construction waste will first pass through the support rods 12, and the flocs in the construction waste will be hooked by the support rods 12, and the flocs will be separated from the construction waste as the support rods 12 rotate, thereby obtaining floc-free construction waste, which effectively avoids the entanglement or blockage of subsequent equipment caused by the flocs.

[0029] First, start the driving member 13, and the rotating shaft 11 drives the support rods 12 to rotate; then, the construction waste is transported to the top of the cleaning mechanism 1 along the conveyor belt 2 and begins to fall; finally, the construction waste passes through the support rods 12 during the falling process, and the flocs in the construction waste are hooked by the support rods 12, and the flocs are separated from the construction waste as the support rods 12 rotate, so that the construction waste without flocs enters the next step of the work process.

[0030] Furthermore, in the present embodiment, a vibration mechanism 3 is also included, the input end 34 of the vibration mechanism is located directly below the rotating shaft 11, the vibration mechanism 3 includes a filter 31, a pair of baffles 32 and a vibrator 33, the two baffles 32 are fixedly connected to the two sides of the filter 31, and the vibrator 33 is connected to the baffles 32 and is used to drive the filter 31 to vibrate. Specifically, the baffle 32 is used to prevent the construction waste from rolling out of the filter 31 during the vibration process. The filter 31 is in an inclined state, and the construction waste is moved to a designated position with the filter 31 by its own gravity. The vibrator 33 (the vibrator 33 is a prior art in the art and will not be described here) is used to drive the filter 31 to vibrate, so that the classification effect between large-volume waste and small-volume waste in the construction waste is better.

[0031] It should be noted that the cleaning mechanism 1 is not connected to the vibration mechanism 3 to prevent the vibration generated by the vibration mechanism 3 from affecting the cleaning mechanism 1 .

[0032] Further, in this embodiment, a buffer spring 321 is provided at the bottom of the baffle 32. Specifically, the buffer spring 321 is used to prevent the vibration of the exciter 33 from being directly transmitted to the ground, thereby damaging the ground.

[0033] Furthermore, in this embodiment, a spray pipe 322 is provided on the top of the baffle 32. Specifically, the spray pipe 322 is used to prevent dust. Construction waste will generate a certain amount of dust during the falling process. At the same time, the construction waste will further increase the dust after hitting each support rod 12. In order to reduce the harm caused by the dust of construction waste, the spray pipe 322 sprays water mist toward the location where the construction waste falls.

[0034] Furthermore, in this embodiment, the cleaning mechanism 1 further includes a collection box 14, which is located at the input end 34 of the vibration mechanism. Specifically, the collection box 14 is used to recycle the flocculent garbage. When each support rod 12 drives the flocculent garbage to enter the collection box 14 from top to bottom, the flocculent garbage falls to the bottom of the collection box 14 due to its own gravity.

[0035] It should be noted that the collection box 14 is not connected to the vibration mechanism 3 to prevent the vibration generated by the vibration mechanism 3 from affecting the collection box 14 .

[0036] Furthermore, in this embodiment, the side wall of the collection box 14 is provided with a plurality of through holes 141, and each support rod 12 passes through each through hole 141 as the rotating shaft 11 rotates. Specifically, in order to prevent the flocculent garbage from sticking to each support rod 12, the width of each support rod 12 is consistent with the width of each through hole 141. When each support rod 12 passes through each through hole 141, the garbage stuck to the support rod 12 will be abutted by the two side walls of each through hole 141 and fall into the collection box 14.

[0037] Furthermore, in this embodiment, each support rod 12 passes through each through hole 141 from the collection box 14 toward the vibration mechanism 3. Specifically, in order to make each support rod 12 better hook the flocculent garbage, the rotation direction of each support rod 12 is opposite to the direction in which the construction waste falls. At the same time, in order to ensure that the flocculent garbage on each support rod 12 falls into the collection box 14, each support rod 12 can only pass through each through hole 141 from the collection box 14 toward the vibration mechanism 3.

[0038] Furthermore, in this embodiment, each support rod 12 is in a bent state. Specifically, the bending direction of each support rod 12 is consistent with the rotation direction of each support rod 12 , and during the rotation of each support rod 12 , the flocculent garbage is effectively prevented from sliding off each support rod 12 .

[0039] Furthermore, in this embodiment, a first bracket 131 is provided at the bottom of the driving member 13. Specifically, the driving member 13 adopts a servo motor, and due to the tilted state of the filter 31, the input end 34 of the vibration mechanism has a certain height, and the first bracket 131 is used to support the driving member 13 so that the driving member 13 and the rotating shaft 11 are located in the same horizontal plane.

[0040] Furthermore, in this embodiment, a second bracket 111 is provided at one end of the rotating shaft 11 away from the driving member 13, and a circular hole 1111 is provided in the second bracket 111, and a bearing 112 is embedded in the circular hole 1111, and the end of the rotating shaft 11 is fixedly connected to the inner ring of the bearing 112, and the outer ring of the bearing 112 is fixedly connected to the circular hole 1111. Specifically, the function of the second bracket 111 is to support the rotating shaft 11 so that the two ends of the rotating shaft 11 are of the same height, and at the same time, in order not to affect the rotation of the rotating shaft 11, a bearing 112 is provided at the connection between the second bracket 111 and the rotating shaft 11.

[0041] The specific working process of the utility model is as follows: first, the driving member 13 is started, and the rotating shaft 11 drives each support rod 12 to rotate; then, the construction waste is transported to the top of the cleaning mechanism 1 along the conveyor belt 2 and begins to fall; then, the construction waste passes through each support rod 12 during the falling process, and the floccules in the construction waste are hooked by each support rod 12, and the floccules are separated from the construction waste as the support rods 12 rotate, and when each support rod 12 is transferred into the collection box 14, the floccules are separated with their own weight. The waste will fall into the collection box 14 with force, and when each support rod 12 passes through the through hole 141, the flocculent garbage stuck on the support rod 12 will be abutted by the two sides of the through hole 141 and fall into the collection box 14; finally, the construction waste without floccules will fall into the filter net 31, and the vibrator 33 will drive the filter net 31 and the baffle 32 to vibrate together, and the smaller construction waste will pass through the filter net 31 and fall to the designated position, and the larger construction waste will slide to the designated position along with the filter net 31, thus completing the classification of construction waste.

[0042] The above are only preferred specific implementation methods of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by any technician familiar with the technical field within the technical scope disclosed in the present invention should be covered within the protection scope of the present invention.

Claims

1. A screening device suitable for construction waste, It is characterized in that Including cleaning mechanism and conveyor belt; The cleaning mechanism includes a rotating shaft, a plurality of support rods and a driving member, one end of each of the support rods is fixedly connected to the side wall of the rotating shaft, and the other end of each of the support rods extends in a direction away from the rotating shaft. The rotating shaft is located directly below the output end of the conveyor belt, and the conveyor belt is used to drive the construction waste to pass through each of the support rods. The driving member is located at one end of the rotating shaft, and the driving member is used to drive the rotating shaft to rotate so that the flocs in the construction waste are hooked away by each of the support rods during the falling process.

2. A screening device suitable for construction waste according to claim 1, It is characterized in that It also includes a vibration mechanism, the input end of which is located directly below the rotating shaft. The vibration mechanism includes a filter, a pair of baffles and an exciter. The two baffles are fixedly connected to the two sides of the filter. The exciter is connected to the baffles and is used to drive the filter to vibrate.

3. A screening device suitable for construction waste according to claim 2, It is characterized in that A buffer spring is arranged at the bottom of the baffle.

4. A screening device suitable for construction waste according to claim 2, It is characterized in that A spray pipe is arranged on the top of the baffle.

5. A screening device suitable for construction waste according to claim 2, It is characterized in that The cleaning mechanism also includes a collection box, which is located at the input end of the vibration mechanism.

6. A screening device suitable for construction waste according to claim 5, It is characterized in that The side wall of the collection box is provided with a plurality of through holes, and each of the support rods penetrates each of the through holes as the rotating shaft rotates.

7. A screening device suitable for construction waste according to claim 6, It is characterized in that Each of the support rods passes through each of the through holes from the collecting box toward the vibration mechanism.

8. A screening device suitable for construction waste according to claim 1, It is characterized in that Each of the support rods is in a bent state.

9. A screening device suitable for construction waste according to claim 1, It is characterized in that A first bracket is provided at the bottom of the driving member.

10. A screening device suitable for construction waste according to claim 1, It is characterized in that A second bracket is provided at one end of the rotating shaft away from the driving member. The second bracket is provided with a circular hole. A bearing is embedded in the circular hole. The end of the rotating shaft is fixedly connected to the inner ring of the bearing, and the outer ring of the bearing is fixedly connected to the circular hole.

Citation Information

Cited By

  • Garbage sorting integrated equipment

    CN121178449A