Auxiliary tool for submerged-arc welding of tower column flange
By designing the tower flange submerged arc welding auxiliary tooling and using positioning holes and bolts to fasten the flange ends, the problems of unstable rotation and rubber wheel wear during the welding process of wind power tower towers are solved, and the welding quality and tooling are improved. The versatility reduces costs.
Patent Information
- Application Number
- CN202320061405.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-01-10
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2033-01-10
AI Technical Summary
During the welding process of wind power tower columns, the quality of flange ring welds in the existing technology is not up to standard, the rotation speed is unstable, and the rubber wheels are heated and worn seriously, resulting in shortened service life.
Design an auxiliary tooling for submerged arc welding of the tower column flange, including left and right welding roller frames and fixed plates. The flange ends are tightened through positioning holes and bolts to ensure rotational stability and reduce thermal effects by increasing the contact area.
It improves the welding quality and rotational stability, extends the service life of the rubber wheel, and reduces the number of tooling and production costs.
Smart Images

Figure CN221833524U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of flange tooling, and particularly relates to a tower column flange submerged arc welding auxiliary tooling. Background Art
[0002] According to the needs of wind turbine tower columns, our company has developed a new high-neck flange + high-tension flange structure. This structure has poor rotation speed stability during welding. In the existing technology, the steel pipe column is directly placed on the roller frame for rotation welding. During the rotation welding process, because the large-diameter steel pipe is a straight seam welded pipe and the single piece is heavy, when passing through the weld excess height, the rotation is unstable and the speed suddenly drops or the inertia causes acceleration, resulting in the flange ring weld quality not meeting the standard. If the flange is placed directly on the rubber wheel of the roller frame, the rubber wheel will heat up due to the rapid heat conduction during the welding process, which will cause serious wear over time and shorten the service life of the rubber roller. Based on this situation, it is urgently necessary to improve the technical process and develop a tower column flange submerged arc welding auxiliary tooling. Utility Model Content
[0003] In order to solve the above problems, the utility model decides to develop a tower column flange submerged arc welding auxiliary tooling.
[0004] A tower column flange submerged arc welding auxiliary tooling comprises a left welding roller frame, a right welding roller frame, a left flange fixing plate, and a right flange fixing plate, wherein the left welding roller frame is provided with a left flange fixing plate, and the right welding roller frame is provided with a right flange fixing plate; a wind power tower column to be welded with a weld comprises a high-tension flange end, a main column, and a high-neck flange end, wherein the two ends of the main column are respectively provided with a high-tension flange end and a high-neck flange end, and the high-tension flange end and the high-neck flange end are respectively provided with a left bolt hole and a right bolt hole; the left flange fixing plate is provided with a left positioning hole corresponding to the left bolt hole on the high-tension flange end, and the right flange fixing plate is provided with a right positioning hole corresponding to the right bolt hole on the high-neck flange end.
[0005] Furthermore, a plurality of groups of left positioning holes are arranged on the left flange fixing plate, and each group of left positioning holes respectively corresponds to left bolt holes on the high-tension flange ends of different diameters.
[0006] Furthermore, a plurality of groups of right positioning holes are arranged on the right flange fixing plate, and each group of right positioning holes respectively corresponds to right bolt holes on the high-neck flange ends of different diameters.
[0007] Furthermore, the left welding roller frame is provided with a left front supporting wheel and a left rear supporting wheel, the right welding roller frame is provided with a right front supporting wheel and a right rear supporting wheel, the left front supporting wheel and the left rear supporting wheel are provided with a left flange fixing plate, and the right front supporting wheel and the right rear supporting wheel are provided with a right flange fixing plate.
[0008] The diameter of the circumscribed circle of the reinforcing rib plate at the high-tension flange end is larger than the diameter of the high-tension flange. The diameter of the high-tension flange on the same main column component, that is, the maximum circumscribed circle size of the circumferential rib plate, is equal to the diameter of the high-neck flange.
[0009] Directions:
[0010] 1. Prepare the connecting bolts: The specifications of the first type of connecting bolts are based on the thickness of the high-neck flange end and the thickness of the right flange fixing plate + margin; the specifications of the second type of connecting bolts are based on the height of the high-tension flange rib plate + the thickness of the high-tension flange end + the thickness of the left flange fixing plate + margin;
[0011] 2. First, place the wind turbine tower column to be welded on the fixed material rack, suspend the high-tension flange end and the high-neck flange end in the air, and install the right flange fixing plate at the right end. First, use the first type of connecting bolts to connect the right flange fixing plate and the high-neck flange end, and fasten them through the four right positioning holes in the symmetrical direction of the cross center; then use the second type of connecting bolts to connect the left flange fixing plate and the high-tension flange end, and fasten them through the four left positioning holes in the symmetrical direction of the cross center; avoid loosening and dislocation during rotation, which will cause the main column pipe fittings to rotate unstably, and the connection and installation of the two ends are completed;
[0012] 3. After the installation of the left flange fixing plate and the right flange fixing plate is completed, the main column pipe is hoisted to the submerged arc welding station and rolled on the left welding roller frame and the right welding roller frame for welding of the weld.
[0013] The beneficial effects achieved by the utility model are as follows: the problem of stability in the rotary welding process is solved and the quality of welding is improved; according to the flange specifications, the welding auxiliary wheel and the inner diameter connecting surface are designed and processed, and four positioning holes can be set around the center cross line and the flange hole spacing according to a certain range of flange diameters; the left flange fixing plate and the right flange fixing plate are fixed on the flanges at both ends of the tower column, thereby increasing the contact area with the rubber wheel and increasing the gap between the flange and the rubber wheel at the same time, with basically no thermal energy influence; it is made to rotate at a steady speed on the roller frame as a support point, so as to achieve the quality standards of the appearance of the circumferential weld; the inner circle of this tooling can be processed with a variety of hole spacings according to the needs of the tower column, so as to achieve versatility and greatly reduce the number of tooling and production costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a schematic diagram of the installation structure of the tower flange submerged arc welding auxiliary tooling;
[0015] Figure 2 A schematic diagram of the structure of a wind power tower column to be welded;
[0016] Figure 3 This is the left view of the tower flange submerged arc welding auxiliary tooling;
[0017] Figure 4 It is a three-dimensional diagram of a high tension flange;
[0018] The accompanying drawings in the figure are marked as follows:
[0019] 1 high tension flange end, 2 main column, 3 high neck flange end, 4 left flange fixing plate, 5 right flange fixing plate, 6 left rear supporting wheel, 7 right front supporting wheel, 8 left front supporting wheel, 9 left bolt hole, 10 right bolt hole, 11 left locating hole, 12 right locating hole, 13 first group of left locating holes, 14 second group of left locating holes, 15 third group of left locating holes. DETAILED DESCRIPTION
[0020] Example 1
[0021] like Figure 1-4 A tower column flange submerged arc welding auxiliary tooling, comprising a left welding roller frame, a right welding roller frame, a left flange fixing plate 4, and a right flange fixing plate 5, wherein the left welding roller frame is provided with a left front supporting wheel 8 and a left rear supporting wheel 6, and the right welding roller frame is provided with a right front supporting wheel 7 and a right rear supporting wheel, and the left front supporting wheel 8 and the left rear supporting wheel 6 are provided with a left flange fixing plate 4, and the right front supporting wheel 7 and the right rear supporting wheel are provided with a right flange fixing plate 5; the wind power tower column to be welded includes a high tension flange end 1, a main column 2, and a high neck flange End 3, the two ends of the main column 2 are respectively provided with a high-tension flange end 1 and a high-neck flange end 3, the place where the main column 2 is connected with the high-tension flange end 1 and the high-neck flange end 3 is the place where a weld is required, and the high-tension flange end 1 and the high-neck flange end 3 are respectively provided with a left bolt hole 9 and a right bolt hole 10; the left flange fixing plate 1 is provided with a left positioning hole 11 corresponding to the left bolt hole 9 on the high-tension flange end 1, and the right flange fixing plate 5 is provided with a right positioning hole 12 corresponding to the right bolt hole 10 on the high-neck flange end 3.
[0022] The left flange fixing plate 4 is provided with a plurality of groups of left positioning holes 11, each group of left positioning holes 11 respectively corresponds to the left bolt holes 11 on the high tension flange end 4 of different diameters. The right flange fixing plate 5 is provided with a plurality of groups of right positioning holes 12, each group of right positioning holes 12 respectively corresponds to the right bolt holes 10 on the high neck flange end 3 of different diameters.
Claims
1. A tower column flange submerged arc welding auxiliary tooling, characterized in that: The invention comprises a left welding roller frame, a right welding roller frame, a left flange fixing plate (4), and a right flange fixing plate (5), wherein the left welding roller frame is provided with a left flange fixing plate (4), and the right welding roller frame is provided with a right flange fixing plate (5); a wind power tower column to be welded with a weld comprises a high tension flange end (1), a main column (2), and a high neck flange end (3), wherein the two ends of the main column (2) are respectively provided with a high tension flange end (1) and a high neck flange end (3), and the high tension flange end (1) and the high neck flange end (3) are respectively provided with a left bolt hole (9) and a right bolt hole (10); the left flange fixing plate (4) is provided with a bolt hole for connecting with the high tension flange end (1), and a bolt hole (10) for connecting with the high tension flange end (1). A left positioning hole (11) corresponding to the left bolt hole (9) on the tension flange end (1), and a right positioning hole (12) corresponding to the right bolt hole (10) on the high neck flange end (3) are arranged on the right flange fixing plate (5); a plurality of groups of left positioning holes (11) are arranged on the left flange fixing plate (4), and each group of left positioning holes (11) respectively corresponds to the left positioning holes (11) on the high tension flange end (1) of different diameters; and a plurality of groups of right positioning holes (12) are arranged on the right flange fixing plate (5), and each group of right positioning holes (12) respectively corresponds to the right bolt hole (10) on the high neck flange end (3) of different diameters.
2. The tower column flange submerged arc welding auxiliary tooling according to claim 1, characterized in that: The left welding roller frame is provided with a left front supporting wheel (8) and a left rear supporting wheel (6), the right welding roller frame is provided with a right front supporting wheel (7) and a right rear supporting wheel, the left front supporting wheel (8) and the left rear supporting wheel (6) are provided with a left flange fixing plate (4), and the right front supporting wheel (7) and the right rear supporting wheel are provided with a right flange fixing plate (5).