Bridge pier column creeping formwork construction system

By designing a climbing formwork construction system for bridge piers and using crawlers and construction elevators to achieve automated construction, the problem of multiple transportation modules and low automation in the existing technology has been solved, construction efficiency and safety have been improved, and costs have been reduced.

CN221837403UInactive Publication Date: 2024-10-15SICHUAN TOPODA MASCH TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202223078399.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2022-11-18
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing climbing formwork construction methods and devices for bridge pier columns have problems such as multiple transportation modules, low degree of automation, high construction costs, high safety hazards, and low operating efficiency.

Method used

A bridge pier column climbing formwork construction system is designed, including a crawler, guide frame, construction elevator and formwork system. The formwork system is driven up and down by the crawler. The construction elevator replaces the traditional ladder channel and uses variable floating connections and anti-fall protection. device to achieve automated construction and a safe and reliable construction process.

Benefits of technology

It greatly reduces the transportation and installation of modules, improves construction efficiency and safety, reduces construction costs, avoids high-altitude operations, and improves the working environment of construction personnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837403U_ABST
    Figure CN221837403U_ABST
Patent Text Reader

Abstract

The utility model provides a bridge pier column creeping formwork construction system. The bridge pier column creeping formwork construction system comprises a crawler, a guide frame, a construction elevator and a formwork system. The crawl device is mounted on a constructed bridge pier column and can move up and down along the bridge pier column; the guide frame is mounted on the crawl device and can be driven by the crawl device to move up and down along the bridge pier column; the template system is mounted on the crawl device by virtue of self weight and can be driven by the crawl device to move up and down along the bridge pier column; the construction hoist comprises a construction hoist operation platform and an annular lifting point frame, the annular lifting point frame is installed at the top end of the guide frame, the construction hoist operation platform is hoisted on the annular lifting point frame through a steel wire rope, and the construction hoist operation platform can ascend and descend along the constructed bridge pier column and the guide frame. According to the bridge pier column creeping formwork construction system, the construction progress of a pier can be ensured, the construction cost is saved, the construction efficiency is improved, and the construction labor intensity is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge pier construction, in particular to a bridge pier column climbing formwork construction system. Background Art

[0002] In bridge design, column piers are a commonly used structural type. The construction of piers is one of the key control nodes of bridge construction. In the prior art, the more common methods of bridge pier construction are hydraulic self-climbing formwork and flip formwork construction.

[0003] The construction method for highway bridges and municipal viaducts has long been to use block formwork connected by bolts to form an overall formwork system. Then, each time the formwork is raised, the formwork fastening bolts need to be loosened manually at high altitudes, which poses a great safety hazard and is time-consuming and labor-intensive. Building safety enclosures or ladder passages around them requires large measures costs and a long construction period, resulting in high construction costs.

[0004] Recently, new climbing formwork devices have begun to appear, such as the Chinese patent application with patent publication number CN113403946 A, which discloses a three-leaf pin-hinged bridge column and pier climbing formwork device, which adopts a three-leaf formwork structure and uses the up and down movement of the full-length tapered pin to achieve the closing and opening of the formwork, and adopts a hydraulic jacking and fulcrum conversion system to realize the self-climbing and descending function of the formwork system. At the same time, a ladder is raised and lowered together with the fulcrum conversion system, and standard sections of the ladder are added or removed at a low position, thereby reducing high-altitude operations. Compared with traditional purely mechanical operations, the technical solution of this patent application has achieved a certain degree of automation, greatly reduced high-altitude operations, and improved construction safety.

[0005] However, the existing pier construction devices and methods have the following obvious disadvantages:

[0006] 1. In the technical solution with patent publication number CN113403946 A, a multi-layer operating platform is designed on the template, and there are many installation modules. Although the ladder is installed at a low position, the number of ladder modules has not been reduced. As the height of the pier increases, the shaking of the ladder channel will be significantly enhanced. In addition, the ladder is hung on the fulcrum conversion system, which makes the fulcrum conversion system unevenly stressed and may scratch the surface of the pier.

[0007] 2. The system installation, disassembly, transportation, etc. in the technical solution with patent publication number CN113403946 A are still relatively complicated.

[0008] 3. The crawling device in the technical solution with patent publication number CN113403946 A still needs manual work to disassemble and assemble the mechanical locking bolts at high altitude, and the degree of automation is not high.

[0009] Therefore, the market urgently needs a bridge pier column climbing formwork construction system that can solve the problems in the existing technology, overcome the shortcomings of the existing bridge pier construction methods and devices, and can realize a bridge pier column climbing formwork construction system with fewer transport modules, high degree of automation, high operating efficiency, high safety and reliability, and low construction cost. Utility Model Content

[0010] In order to solve the problems in the prior art, the utility model provides a bridge pier climbing formwork construction system which is beneficial to saving construction costs, improving construction efficiency and reducing construction labor intensity.

[0011] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a bridge pier climbing formwork construction system, comprising a crawler, a guide frame, a construction elevator, and a formwork system; the crawler is installed on a completed bridge pier and can move up and down along the bridge pier; the guide frame is installed on the crawler and can be driven by the crawler to move up and down along the bridge pier; the formwork system is installed on the crawler by its own weight and can be driven by the crawler to move up and down along the bridge pier; the construction elevator comprises a construction elevator operating platform and an annular hanging point frame, the annular hanging point frame is installed on the top of the guide frame, the construction elevator operating platform is hoisted on the annular hanging point frame by a wire rope, and the construction elevator operating platform can be lifted up and down along the completed bridge pier and the guide frame.

[0012] According to a preferred technical solution, the bridge pier climbing formwork construction system also includes a wind cable frame, which is installed on the formwork system, and a variable floating connection is adopted between the wind cable frame and the formwork system; a plurality of wire rope hanging points are arranged on the top of the wind cable frame, and the wind cable frame is fixed to the ground by wire ropes connected to the wire rope hanging points.

[0013] A preferred technical solution is that the variable floating connection between the wind cable rack and the formwork system includes a T-shaped sliding plate arranged at the bottom of the wind cable rack, a sliding cover plate installed on the formwork system, and a sliding bottom plate installed on the formwork system; the sliding cover plate and the sliding bottom plate form a cavity for the T-shaped sliding plate to slide; when the formwork system is in a closed state, the T-shaped sliding plate abuts against the outer side of the sliding cover plate, and the steel wire rope on the wind cable rack transfers the force to the formwork system to stabilize the wind cable rack and the formwork system, and at this time, there is a certain gap between the T-shaped sliding plate and the inner side of the sliding cover plate.

[0014] The preferred technical solution is that a detachable straightening device is provided at the contact point between the wind cable rack and the steel cage of the completed bridge pier, and the straightening device includes a ship-shaped contact plate, and the upper and lower ends of the ship-shaped contact plate have inclined surfaces with a certain slope. The ship-shaped contact plate is connected with the pin hole on the wind cable rack through a pin shaft. The wind cable rack has a plurality of pin holes that match the ship-shaped contact plate. During operation, after the wind cable rack is hoisted, the ship-shaped contact plate of the straightening device contacts the steel cage on the completed bridge pier to achieve the straightening of the wind cable rack and the formwork system. When the construction is completed and disassembly is required, if the wind cable rack needs to be lowered along with the formwork system, the operator takes the construction elevator to remove the ship-shaped contact plate.

[0015] A preferred technical solution is that the crawler is provided with a friction block, which is located at the place where the formwork system contacts the crawler; and the crawler is also installed with a vertical block for limiting the radial position of the formwork system, and a horizontal block for limiting the vertical position of the formwork system; the friction block, vertical block and horizontal block are combined to form a U-shaped groove for installing the formwork system on the crawler.

[0016] A preferred technical solution is that multiple sets of crawler guide devices are installed on the upper and lower parts of the crawler, and the crawler guide devices include a hollow support, roller, pin, connecting rod, pull rod and spring installed on the crawler; the middle of the connecting rod is rotatably installed on the support through the pin; the roller is rotatably installed on one end of the connecting rod, and the pull rod is installed on the other end of the connecting rod; the spring is sleeved on the pull rod, and one end of the spring is abutted against a flange provided on the pull rod, and the other end of the spring is abutted against the hollow support; the connecting rod installed on the support through the pin, the roller installed at one end of the connecting rod, and the pull rod installed at the other end of the connecting rod and sleeved with a spring constitute a lever structure as a whole.

[0017] A preferred technical solution is that multiple sets of crawler guide devices are installed on the upper and lower parts of the crawler, and the crawler guide devices include a sleeve installed on the crawler, and a roller shaft and a wheel roller inserted in the sleeve; the roller shaft can slide in the sleeve; one end of the roller shaft is threaded and a stop nut is detachably installed, and the other end of the roller shaft is provided with a roller support; the roller is rotatably installed on the roller support; a spring is sleeved on the roller shaft, one end of the spring is against the sleeve, and the other end of the spring is against the roller support.

[0018] As a preferred technical solution, the crawler can be integrated with an anti-fall protection device to achieve an anti-fall protection function.

[0019] According to a preferred technical solution, the crawler comprises two hoops arranged vertically; a driving device for driving the hoops to move up and down is connected between the two hoops; and each of the hoops is provided with a hoops locking device, which can lock or loosen the hoops;

[0020] The clamp locking device comprises a clamp locking cylinder, a clamp pull rod, a clamp sleeve, a disc spring, a cover plate, and a tie rod bolt; the disc spring is sleeved on the clamp pull rod, and the clamp sleeve is sleeved on the disc spring; one end of the disc spring abuts against the clamp pull rod, and the other end of the disc spring abuts against the clamp sleeve; one end of the clamp sleeve is fixedly connected to the cylinder body of the clamp locking cylinder, and the other end of the clamp sleeve is fixedly connected to one end of the clamp to be locked; the cover plate is fixedly connected to the other end of the clamp to be locked; the clamp pull rod is provided with a clamp that cooperates with the tie rod bolt The inner thread of the pull rod bolt passes through the cover plate and is connected with the inner thread on the clamp pull rod; rotating the pull rod bolt can drive the other end of the clamp to be locked and one end of the clamp to be locked to approach each other, thereby locking the clamp to be locked; the piston of the clamp locking cylinder can abut against or disengage from the clamp pull rod, driving the clamp pull rod to move in the clamp sleeve, driving the other end of the clamp to be locked to move away from or approach one end of the clamp to be locked, thereby loosening the clamp to be locked or locking the clamp to be locked.

[0021] According to a preferred technical solution, a pressure plate is detachably mounted on the cover plate; after the pressure plate is installed in place, it abuts against the nut of the pull rod bolt.

[0022] A preferred technical solution is that a plurality of groups of variable diameter guide mechanisms are installed on the construction elevator operating platform of the construction elevator, and the variable diameter guide mechanisms include a fixed guide wheel group and a telescopic guide wheel group;

[0023] The fixed guide wheel group includes a fixed bracket and an elastic guide wheel group, and the elastic guide wheel group is installed on the construction hoist operating platform through the fixed bracket;

[0024] The telescopic guide wheel group includes a driving mechanism, a telescopic bracket and an elastic guide wheel group, and the elastic guide wheel group is installed on the construction elevator platform through the telescopic bracket; the telescopic bracket includes a slide rail and a sliding bracket; the slide rail is installed on the construction elevator operating platform, and the elastic guide wheel group of the telescopic guide wheel group is installed on the sliding bracket; the driving mechanism can drive the sliding bracket to slide on the slide rail, thereby driving the elastic guide wheel group of the telescopic guide wheel group to move.

[0025] The elastic guide wheel group includes a sleeve, and a roller shaft and a roller inserted in the sleeve; the roller shaft can slide in the sleeve; a stop nut is detachably installed at one end of the roller shaft, and a roller support is provided at the other end of the roller shaft; the roller is rotatably installed on the roller support; a spring is sleeved on the roller shaft, one end of the spring is against the sleeve, and the other end of the spring is against the roller support.

[0026] Another object of the utility model is to provide a bridge pier climbing formwork construction method, which comprises the following steps:

[0027] Step S1: Install the bridge pier climbing formwork construction system

[0028] S1 a. Install the crawler on the bridge pier that has been installed with steel cage and cast to a certain height;

[0029] S1b. Insert the formwork system into the bridge pier from the top and place it on the top of the crawler;

[0030] S1 c. The guide frame is mounted on the crawler;

[0031] S1 d. Installation of construction hoist;

[0032] S1 e. Complete the functional debugging of crawlers, formwork, and construction elevators;

[0033] S1 f. Insert the wind cable rack from the top to complete the connection with the formwork system;

[0034] Step S2: pouring bridge pier concrete

[0035] S2a. After the climbing formwork construction system is installed, the formwork system is closed and the crawler is locked;

[0036] S2b. Straighten the formwork system, check the steel cage, and secure the steel wire rope on the wind cable rack;

[0037] S2c. Pouring concrete for the first section of bridge piers;

[0038] Step S3: Install the next section of steel cage

[0039] When the concrete strength reaches the construction requirements, the next section of standard length steel cage is installed. After the operation is completed, the construction elevator operating platform is lowered to the lowest position;

[0040] Step S4: Climbing of the bridge pier climbing formwork construction system

[0041] S4a. After the construction hoist operating platform has dropped to the lowest position, the steel wire rope on the construction hoist is released to a certain length to ensure that the construction hoist operating platform is not lifted upwards during the process of the crawler driving the formwork system to climb;

[0042] S4b. When the concrete strength reaches the construction requirements, the formwork system is opened when appropriate, and the formwork system is separated from the bridge piers;

[0043] S4c. The hoop at the bottom of the crawler is locked, the hoop at the top of the remotely operated crawler is released, and the drive device of the crawler drives the hoop at the top to move upward, raising the formwork system and the wind cable rack by one stroke;

[0044] S4d. The remotely operated crawler clamp at the top is locked, and the clamp at the bottom is released. The crawler drive device drives the clamp at the bottom to move upward, driving the guide frame to rise by one stroke;

[0045] S4e. Repeat steps S4c to S4d until the height reaches the predetermined height, the crawler is remotely locked, the formwork system is closed, and the formwork system is straightened to pour the next section of the bridge pier concrete;

[0046] Step S5, repeat steps S3 to S4 until the casting of the bridge pier is completed.

[0047] Step S6: Dismantling of the bridge pier climbing formwork construction system

[0048] S6a. Remove the wind cable rack and formwork system, lift the wind cable rack from the top of the bridge pier with a crane, and complete the overall removal of the wind cable rack;

[0049] S6b. Lower the construction hoist operating platform to the lowest position;

[0050] S6c. The hoop at the top of the crawler remains locked, the hoop at the bottom is released by remote control, and the drive device of the crawler drives the hoop at the bottom to move downward, driving the guide frame to descend a stroke;

[0051] S6d. The hoop at the bottom of the crawler remains locked, the hoop at the top is released by remote control, and the drive device of the crawler drives the hoop at the top to move downward, driving the template system to descend a stroke;

[0052] S6e. Repeat steps S6c to S6d to lower the bridge pier climbing formwork construction system with the wind cable rack removed to a low position on the ground;

[0053] S6f. At a low position on the ground, dismantle the construction hoist, guide frame, formwork system and crawler in sequence to complete the dismantling.

[0054] Compared with the prior art, the beneficial effects of the utility model are:

[0055] 1. The utility model uses a construction elevator to replace the traditional ladder channel and fixed operating platform, which greatly reduces the transportation modules and installation modules of the entire system and improves the installation efficiency. The construction elevator is designed as a ring platform, which can achieve full coverage of the entire column height working surface. Compared with the mode of combining the traditional ladder channel and the fixed operating platform, it has the advantage of a wider operating range.

[0056] 2. After the upper and lower clamps of the crawler are adjusted into place, they can be locked and opened remotely by automatic mechanical locks, and the relative movement between the upper and lower clamps can be achieved through a driving device (such as a lifting cylinder), so that the crawler and its load can climb and descend by themselves without the need for other lifting equipment.

[0057] 3. Multiple sets of crawler guide devices are integrated at the high and low positions of the crawler, which can realize the centering function of the crawler relative to the bridge pier and avoid the scratching of the pier surface during the crawling process. The contact point between the crawler and the formwork system is designed with a stopper block to limit the radial opening range of the formwork system, which can ensure uniform gap when the formwork system is opened, avoid the phenomenon of one side of the formwork rubbing against the pier, reduce the obstruction during the crawling process, and ensure the beauty of the outer surface of the pier.

[0058] 4. The crawler is integrated with an anti-fall protection device to realize the anti-fall protection function. The speed switch senses the falling speed of the crawler and sends a signal to control the electromagnet to be energized, so that the oil cylinder of the clamp locking device is depressurized. Under the action of the spring, the upper and lower clamps of the crawler are locked, thereby preventing the crawler from falling further and enhancing the safety of the system.

[0059] 5. The guide frame is fixed on the lower clamp of the crawler to ensure that there is only one variable diameter shoulder during the up and down movement of the construction elevator. The construction elevator is equipped with multiple sets of variable diameter guide mechanisms, which include a fixed guide wheel group and a telescopic guide wheel group; the fixed guide wheel group is located on the top, and the telescopic guide wheel group is located on the bottom. When the construction elevator is in a low position, the rollers of the telescopic guide wheel group extend out to contact the pier, and the telescopic guide wheel group guides on the bridge pier (at this time, the fixed guide wheel group is suspended in the air, or the fixed guide wheel group guides on the guide frame during the diameter change transition process, and the telescopic guide wheel group guides on the bridge pier at the same time); when the construction elevator is in a high position, the telescopic guide wheel group retracts, and the fixed guide wheel group guides on the guide frame (or the rollers of the telescopic guide wheel group are flush with the rollers of the fixed guide wheel group, and the rollers of the telescopic guide wheel group and the rollers of the fixed guide wheel group are guided together on the guide frame). In this way, the construction elevator can not only cover the columns that have been cast, but also cover the columns to be cast, and ensure smooth and reliable up and down operation.

[0060] 6. The wind cable rack is integrated with a detachable and adjustable position straightening device. The ship-shaped contact plate of the straightening device is designed with inclined surfaces on the upper and lower sides, so there will be no blocking when it contacts the steel cage, thus avoiding the blocking problem of the system running up and down. At the same time, the straightening device can effectively contact the steel cage of the cast bridge pier to straighten the wind cable rack, and then realize the straightening and adjustment of the formwork system.

[0061] 7. The utility model uses a construction elevator to replace the traditional ladder and fixed operating platform, greatly reducing the transportation and installation modules, and completely solving the problem that the higher the pier is, the more difficult it is to erect the ladder channel in the past. It only needs to release the corresponding length of wire rope every time it is lifted to a certain height. Construction workers take the construction elevator to work at high places, avoiding the physical exertion caused by climbing steps and the like, and improving the working environment of construction workers.

[0062] 8. After the pier construction is completed, the utility model can crawl back to the ground through the crawler and then be disassembled and removed, which greatly reduces the high-altitude work and improves the safety of the system.

[0063] In summary, the bridge pier climbing formwork system and construction method of the utility model greatly reduce the construction cost of the pier, greatly improve the construction efficiency, greatly reduce the high-altitude operations, greatly improve the safety, and greatly improve the working environment of the construction workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] Figure 1 The utility model is a schematic diagram of the overall structure of a bridge pier climbing formwork construction system.

[0065] Figure 2 The utility model is a schematic diagram of the connection relationship between the construction hoist, crawler and guide frame.

[0066] Figure 3 The utility model is a schematic diagram of the connection relationship between the crawler, the template system and the wind cable rack.

[0067] Figure 4 It is a partial structural schematic diagram of the connection between the crawler and the template system of the utility model.

[0068] Figure 5 for Figure 4 Schematic diagram of the enlarged structure of part A in the middle.

[0069] Figure 6 It is a partial structural schematic diagram of the connection between the template system and the wind cable rack of the utility model.

[0070] Figure 7 for Figure 6 Schematic diagram of the enlarged structure of part B in the middle.

[0071] Figure 8 It is a partial structural schematic diagram of the connection between the wind cable rack and the steel cage of the utility model.

[0072] Fig. 9 for Figure 8 Schematic diagram of the enlarged structure of part C in the middle.

[0073] Fig.10 It is a schematic diagram of the overall structure of the operating platform of the construction elevator of the utility model.

[0074] Fig.11 It is a partial structural schematic diagram of the operating platform of the construction hoist of the utility model.

[0075] Fig.12 Schematic diagram of the working principle of the variable diameter guide mechanism of the construction elevator when the bridge pier is in the low position.

[0076] Fig.13 It is a schematic diagram of the working principle of the variable diameter guide mechanism of the construction elevator during the variable diameter guide transition stage.

[0077] Fig.14 It is a schematic diagram of the working principle of the variable diameter guide mechanism of the construction elevator when the guide frame is in the high position.

[0078] Fig.15 It is a schematic diagram of the structure of the telescopic guide wheel group of the variable diameter guide mechanism.

[0079] Fig.16 It is a schematic diagram of the overall structure of the elastic guide wheel group of the telescopic guide wheel group.

[0080] Fig.17 It is a schematic diagram of the cross-sectional structure of the elastic guide wheel group of the telescopic guide wheel group.

[0081] Fig.18 The figure is a schematic diagram of the overall structure of the crawler of the utility model.

[0082] Fig.19 Schematic diagram of the overall structure of the crawler guide device in Example 1.

[0083] Fig. 20 This is a schematic diagram of the cross-sectional structure of the crawler guide device in Example 1.

[0084] Fig.21 Schematic diagram of the overall structure of the crawler guide device in other embodiments.

[0085] Fig. 22 It is a schematic diagram of the cross-sectional structure of the crawler guide device in other embodiments.

[0086] Fig.23 It is a schematic diagram of the structure of the clamp locking device of the utility model in the locked state.

[0087] Fig.24 It is a structural schematic diagram of the utility model when the clamp locking device is in a loosened state. DETAILED DESCRIPTION

[0088] An embodiment of a bridge pier climbing formwork construction system of the utility model is further described with reference to the accompanying drawings.

[0089] Embodiment 1, as Figures 1 to 24 As shown, a bridge pier climbing formwork construction system includes a crawler 1, a guide frame 2, a construction elevator 3, and a formwork system 4; the crawler 1 is installed on the completed bridge pier 01, and can move up and down along the bridge pier 01; the guide frame 2 is installed on the crawler 1, and can be driven by the crawler 1 to move up and down along the bridge pier 01; the formwork system 4 is installed on the crawler 1 by its own weight, and can be driven by the crawler 1 to move up and down along the bridge pier 01; the construction elevator 3 includes a construction elevator operating platform 31 and an annular hanging point frame 32, the annular hanging point frame 32 is installed on the top of the guide frame 2, the construction elevator operating platform 31 is hoisted on the annular hanging point frame 32 by a wire rope, and the construction elevator operating platform 31 can be lifted and lowered along the completed bridge pier 01 and the guide frame 2.

[0090] The bridge pier climbing formwork construction system also includes a wind cable frame 5, which is installed on the formwork system 4, and a variable floating connection is adopted between the wind cable frame 5 and the formwork system 4; a plurality of wire rope hanging points are arranged on the top of the wind cable frame 5, and the wind cable frame 5 is fixed to the ground by the wire ropes connected to the wire rope hanging points.

[0091] The variable floating connection between the wind cable frame 5 and the formwork system 4 includes a T-shaped sliding plate 51 arranged at the bottom of the wind cable frame 5, a sliding cover plate 41 installed on the formwork system 4, and a sliding bottom plate 42 installed on the formwork system 4; the sliding cover plate 41 and the sliding bottom plate 42 form a cavity for the T-shaped sliding plate 51 to slide; when the formwork system 4 is in a closed state, the T-shaped sliding plate 51 is abutted against the outer side of the sliding cover plate 41, and the steel wire rope on the wind cable frame 5 transfers the force to the formwork system 4, stabilizing the wind cable frame 5 and the formwork system 4, and at this time, there is a certain gap between the T-shaped sliding plate 51 and the inner side of the sliding cover plate 41.

[0092] A detachable straightening device is provided at the contact point between the wind cable frame 5 and the steel cage 02 of the completed bridge pier 01. The straightening device includes a ship-shaped contact plate 52. The upper and lower ends of the ship-shaped contact plate 52 have inclined surfaces with a certain slope. The ship-shaped contact plate 52 is connected with the pin hole on the wind cable frame 5 through a pin. The wind cable frame 5 has a plurality of pin holes that match the ship-shaped contact plate 52. During operation, after the wind cable frame 5 is hoisted, the ship-shaped contact plate 52 of the straightening device contacts the steel cage 02 on the completed bridge pier 01, so as to realize the straightening of the wind cable frame 5 and the formwork system 4. When the construction is completed and it needs to be disassembled, if the wind cable frame 5 needs to be lowered along with the formwork system 4, the operator takes the construction elevator 3 to come up and disassemble the ship-shaped contact plate 52.

[0093] The crawler 1 is provided with a friction block 11, and the friction block 11 is located at the place where the template system 4 contacts the crawler 1; and the crawler 1 is also installed with a vertical block 12 for limiting the radial position of the template system 4, and a horizontal block 13 for limiting the vertical position of the template system 4; the friction block 11, the vertical block 12, and the horizontal block 13 are combined to form a U-shaped groove for installing the template system 4 on the crawler 1.

[0094] The upper and lower parts of the crawler 1 are both equipped with multiple sets of crawler guide devices, and the crawler guide devices include a hollow support 61, a roller 62, a pin 63, a connecting rod 64, a pull rod 65 and a spring 66 installed on the crawler 1; the middle of the connecting rod 64 is rotatably installed on the support 61 through the pin 63; the roller 62 is rotatably installed at one end of the connecting rod 64, and the pull rod 65 is installed at the other end of the connecting rod 64; the spring 66 is sleeved on the pull rod 65, and one end of the spring 66 is abutted against a flange provided on the pull rod 65, and the other end of the spring 66 is abutted against the hollow support 61; the connecting rod 64 installed on the support 61 through the pin 63, the roller 62 installed at one end of the connecting rod 64, and the pull rod 65 installed at the other end of the connecting rod 64 and sleeved with the spring 66 constitute a lever structure as a whole.

[0095] Of course, in other embodiments, the crawler guide devices installed on the upper and lower parts of the crawler 1 can also adopt other similar structures, such as Fig.21 and Fig. 22As shown, the crawler guide device includes an elastic guide wheel group 8 installed on the crawler 1, and the elastic guide wheel group 8 includes a sleeve 81 installed on the crawler 1, and a roller shaft 82 and a roller 62 inserted in the sleeve 81; the roller shaft 82 can slide in the sleeve 81; a stop nut 83 is detachably installed at one end of the roller shaft 82, and a roller support 84 is provided at the other end of the roller shaft 82; the roller 62 is rotatably installed on the roller support 84; a spring 66 is sleeved on the roller shaft 82, one end of the spring 66 is against the sleeve 81, and the other end of the spring 66 is against the roller support 84.

[0096] The crawler 1 can be integrated with an anti-fall protection device to realize the anti-fall protection function. For example, the speed switch senses the falling speed of the crawler 1, sends a signal to control the electromagnet to be energized, thereby controlling the clamp locking cylinder 71 of the clamp locking device 7 to release pressure, and the upper and lower clamps 14 of the crawler 1 are locked under the action of the disc spring 74 of the clamp locking device 7, thereby preventing the crawler 1 from falling further and enhancing the safety of the system.

[0097] The crawler 1 includes two hoops 14 arranged vertically; a driving device 15 for driving the hoops to move up and down is connected between the two hoops 14; each of the hoops 14 is equipped with a hoops locking device 7, which can lock or loosen the hoops 14;

[0098] The clamp locking device 7 includes a clamp locking cylinder 71, a clamp rod 72, a clamp sleeve 73, a disc spring 74, a cover plate 75, and a pull rod bolt 76; the disc spring 74 is sleeved on the clamp rod 72, and the clamp sleeve 73 is sleeved on the disc spring 74; one end of the disc spring 74 abuts against the clamp rod 72, and the other end of the disc spring 74 abuts against the clamp sleeve 73; one end of the clamp sleeve 73 is fixedly connected to the cylinder body of the clamp locking cylinder 71, and the other end of the clamp sleeve 73 is fixedly connected to one end of the clamp 14 to be locked; the cover plate 75 is fixedly connected to the other end of the clamp 14 to be locked; the clamp rod 72 is provided with a The inner thread of the pull rod bolt 76 is matched, and the screw rod of the pull rod bolt 76 passes through the cover plate 75 and is matched with the inner thread on the clamp pull rod 72; rotating the pull rod bolt 76 can drive the other end of the clamp 14 to be locked and one end of the clamp 14 to be locked to approach each other, locking the clamp 14 to be locked; the piston of the clamp locking cylinder 71 can be against or disengaged from the clamp pull rod 72, driving the clamp pull rod 72 to move in the clamp sleeve 73, driving the other end of the clamp 14 to be locked away from or close to one end of the clamp 14 to be locked, loosening the clamp 14 to be locked or locking the clamp 14 to be locked.

[0099] The cover plate 75 is also detachably provided with a pressure plate 77; after being installed in place, the pressure plate 77 abuts against the nut of the tie rod bolt 76. By adopting a method in which the pressure plate 77 is detachably provided on the cover plate 75 (the detachable method includes bolt connection, etc.) to abut against the tie rod bolt 76, when the clamp 14 needs to be loosened, the force on the clamp rod 72 can be directly applied to the cover plate 75 through the pressure plate 77 through the tie rod bolt 76, thereby driving the other end of the clamp 14 to be loosened away from the end of the clamp 14 to be locked, and loosening the clamp 14 to be locked, which is conducive to saving the stroke of the clamp locking cylinder 71 when loosening, or in other words, when the stroke of the clamp locking cylinder 71 is constant, the loosening gap of the clamp 14 is larger.

[0100] A plurality of groups of variable diameter guide mechanisms are installed on the construction hoist operating platform 31 of the construction hoist 3, and the variable diameter guide mechanisms include a fixed guide wheel group 33 and a telescopic guide wheel group 34;

[0101] The fixed guide wheel group 33 includes a fixed bracket 35 and an elastic guide wheel group 8, and the elastic guide wheel group 8 is installed on the construction hoist operating platform 31 through the fixed bracket 35;

[0102] The telescopic guide wheel group 34 includes a driving mechanism 36 (the driving mechanism can be a power device such as a telescopic cylinder or an electric cylinder, and a telescopic cylinder is used in this embodiment), a telescopic bracket 37 and an elastic guide wheel group 8, and the elastic guide wheel group 8 is installed on the construction elevator platform 31 through the telescopic bracket 37; the telescopic bracket 37 includes a slide rail 38 and a sliding bracket 39; the slide rail 38 is installed on the construction elevator operating platform 31, and the elastic guide wheel group 8 of the telescopic guide wheel group 34 is installed on the sliding bracket 39; the cylinder end of the telescopic cylinder 36 is fixed on the construction elevator platform 31, and the piston end of the telescopic cylinder 36 is connected to the sliding bracket 39 of the telescopic bracket 37. The telescopic cylinder 36 can drive the sliding bracket 39 to slide on the slide rail 38, thereby driving the elastic guide wheel group 8 of the telescopic guide wheel group 34 to move;

[0103] like Fig.16 and Fig.17 As shown, the elastic guide wheel group 8 includes a sleeve 81, and a roller shaft 82 and a roller 62 inserted in the sleeve 81; the roller shaft 82 can slide in the sleeve 81; a stop nut 83 is detachably installed at one end of the roller shaft 82, and a roller support 84 is provided at the other end of the roller shaft 82; the roller 62 is rotatably installed on the roller support 84; a spring 66 is sleeved on the roller shaft 82, one end of the spring 66 is against the sleeve 81, and the other end of the spring 66 is against the roller support 84.

[0104] In this embodiment, the construction method of the bridge pier column climbing formwork construction system of the utility model is as follows:

[0105] Step S1: Install the bridge pier climbing formwork construction system

[0106] S1 a. Install the crawler on the bridge pier that has been installed with steel cage and cast to a certain height;

[0107] S1 b. Insert the formwork system into the bridge pier from the top and place it on the top of the crawler;

[0108] S1 c. The guide frame is mounted on the crawler;

[0109] S1 d. Installation of construction hoist;

[0110] S1 e. Complete the functional debugging of crawlers, formwork, and construction elevators;

[0111] S1 f. Insert the wind cable rack from the top to complete the connection with the formwork system;

[0112] Step S2: pouring bridge pier concrete

[0113] S2a. After the climbing formwork construction system is installed, the formwork system is closed and the crawler is locked;

[0114] S2b. Straighten the formwork system, check the steel cage, and secure the steel wire rope on the wind cable rack;

[0115] S2c. Pouring concrete for the first section of bridge piers;

[0116] Step S3: Install the next section of steel cage

[0117] When the concrete strength reaches the construction requirements, the next section of standard length steel cage is installed. After the operation is completed, the construction elevator operating platform is lowered to the lowest position;

[0118] Step S4: Climbing of the bridge pier climbing formwork construction system

[0119] S4a. After the construction hoist operating platform has dropped to the lowest position, the steel wire rope on the construction hoist is released to a certain length to ensure that the construction hoist operating platform is not lifted upwards during the process of the crawler driving the formwork system to climb;

[0120] S4b. When the concrete strength reaches the construction requirements, the formwork system is opened when appropriate, and the formwork system is separated from the bridge piers;

[0121] S4c. The hoop at the bottom of the crawler is locked, the hoop at the top of the remotely operated crawler is released, and the drive device of the crawler drives the hoop at the top to move upward, raising the formwork system and the wind cable rack by one stroke;

[0122] S4d. The remotely operated crawler clamp at the top is locked, and the clamp at the bottom is released. The crawler drive device drives the clamp at the bottom to move upward, driving the guide frame to rise by one stroke;

[0123] S4e. Repeat steps S4c to S4d until the height reaches the predetermined height, the crawler is remotely locked, the formwork system is closed, and the formwork system is straightened to pour the next section of the bridge pier concrete;

[0124] Step S5, repeat steps S3 to S4 until the casting of the bridge pier is completed.

[0125] Step S6: Dismantling of the bridge pier climbing formwork construction system

[0126] S6a. Remove the wind cable rack and formwork system, lift the wind cable rack from the top of the bridge pier with a crane, and complete the overall removal of the wind cable rack;

[0127] S6b. Lower the construction hoist operating platform to the lowest position;

[0128] S6c. The hoop at the top of the crawler remains locked, the hoop at the bottom is released by remote control, and the drive device of the crawler drives the hoop at the bottom to move downward, driving the guide frame to descend a stroke;

[0129] S6d. The hoop at the bottom of the crawler remains locked, the hoop at the top is released by remote control, and the drive device of the crawler drives the hoop at the top to move downward, driving the template system to descend a stroke;

[0130] S6e. Repeat steps S6c to S6d to lower the bridge pier climbing formwork construction system with the wind cable rack removed to a low position on the ground;

[0131] S6f. At a low position on the ground, dismantle the construction hoist, guide frame, formwork system and crawler in sequence to complete the dismantling.

[0132] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. It should be pointed out that any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A bridge pier climbing formwork construction system, characterized by: It includes a crawler, a guide frame, a construction elevator, and a formwork system; the crawler is installed on a completed bridge pier and can move up and down along the bridge pier; the guide frame is installed on the crawler and can be driven by the crawler to move up and down along the bridge pier; the formwork system is installed on the crawler by its own weight and can be driven by the crawler to move up and down along the bridge pier; the construction elevator includes a construction elevator operating platform and an annular hanging point frame, the annular hanging point frame is installed on the top of the guide frame, the construction elevator operating platform is hoisted on the annular hanging point frame by a wire rope, and the construction elevator operating platform can be lifted up and down along the completed bridge pier and the guide frame.

2. A bridge pier climbing formwork construction system according to claim 1, characterized in that: It also includes a wind cable frame, which is installed on the template system, and a variable floating connection is adopted between the wind cable frame and the template system; a plurality of wire rope hanging points are arranged on the top of the wind cable frame, and the wind cable frame is fixed to the ground by wire ropes connected to the wire rope hanging points.

3. A bridge pier climbing formwork construction system according to claim 2, characterized in that: The variable floating connection between the wind cable rack and the formwork system includes a T-shaped sliding plate arranged at the bottom of the wind cable rack, a sliding cover plate installed on the formwork system, and a sliding bottom plate installed on the formwork system; the sliding cover plate and the sliding bottom plate form a cavity for the T-shaped sliding plate to slide; when the formwork system is in a closed state, the T-shaped sliding plate abuts against the outer side of the sliding cover plate, and the steel wire rope on the wind cable rack transfers the force to the formwork system to stabilize the wind cable rack and the formwork system, and at this time, there is a certain gap between the T-shaped sliding plate and the inner side of the sliding cover plate.

4. A bridge pier climbing formwork construction system according to claim 1, characterized in that: The crawler is provided with a friction block, which is located at the place where the template system contacts the crawler; and the crawler is also installed with a vertical block for limiting the radial position of the template system, and a horizontal block for limiting the vertical position of the template system; the friction block, the vertical block and the horizontal block are combined to form a U-shaped groove for installing the template system on the crawler.

5. A bridge pier climbing formwork construction system according to claim 1, characterized in that: The upper and lower parts of the crawler are both equipped with multiple sets of crawler guide devices, and the crawler guide devices include a hollow support, roller, pin, connecting rod, pull rod and spring installed on the crawler; the middle of the connecting rod is rotatably installed on the support through the pin; the roller is rotatably installed on one end of the connecting rod, and the pull rod is installed on the other end of the connecting rod; the spring is sleeved on the pull rod, and one end of the spring is abutted against a flange provided on the pull rod, and the other end of the spring is abutted against the hollow support; the connecting rod installed on the support through the pin, the roller installed at one end of the connecting rod, and the pull rod installed at the other end of the connecting rod and sleeved with a spring constitute a lever structure as a whole.

6. A bridge pier climbing formwork construction system according to claim 1, characterized in that: A plurality of sets of crawler guide devices are installed at the upper and lower parts of the crawler, and the crawler guide devices include a sleeve installed on the crawler, and a roller shaft and a wheel roller inserted in the sleeve; the roller shaft can slide in the sleeve; one end of the roller shaft is threaded and a stop nut is detachably installed, and the other end of the roller shaft is provided with a roller support; the roller is rotatably installed on the roller support; a spring is sleeved on the roller shaft, one end of the spring is against the sleeve, and the other end of the spring is against the roller support.

7. A bridge pier climbing formwork construction system according to claim 1, characterized in that: The crawler comprises two hoops arranged up and down; a driving device for driving the hoops to move up and down is connected between the two hoops; each of the hoops is equipped with a hoops locking device, which can lock or loosen the hoops; The clamp locking device comprises a clamp locking cylinder, a clamp pull rod, a clamp sleeve, a disc spring, a cover plate, and a tie rod bolt; the disc spring is sleeved on the clamp pull rod, and the clamp sleeve is sleeved on the disc spring; one end of the disc spring abuts against the clamp pull rod, and the other end of the disc spring abuts against the clamp sleeve; one end of the clamp sleeve is fixedly connected to the cylinder body of the clamp locking cylinder, and the other end of the clamp sleeve is fixedly connected to one end of the clamp to be locked; the cover plate is fixedly connected to the other end of the clamp to be locked; the clamp pull rod is provided with a clamp that cooperates with the tie rod bolt The inner thread of the pull rod bolt passes through the cover plate and is connected with the inner thread on the clamp pull rod; rotating the pull rod bolt can drive the other end of the clamp to be locked and one end of the clamp to be locked to approach each other, thereby locking the clamp to be locked; the piston of the clamp locking cylinder can abut against or disengage from the clamp pull rod, driving the clamp pull rod to move in the clamp sleeve, driving the other end of the clamp to be locked to move away from or approach one end of the clamp to be locked, thereby loosening the clamp to be locked or locking the clamp to be locked.

8. A bridge pier climbing formwork construction system according to claim 7, characterized in that: A pressure plate is also detachably mounted on the cover plate; after the pressure plate is installed in place, it abuts against the nut of the pull rod bolt.

9. A bridge pier climbing formwork construction system according to claim 1, characterized in that: The construction hoist operating platform of the construction hoist is equipped with multiple sets of variable diameter guide mechanisms, and the variable diameter guide mechanisms include a fixed guide wheel group and a telescopic guide wheel group; The fixed guide wheel group includes a fixed bracket and an elastic guide wheel group, and the elastic guide wheel group is installed on the construction hoist operating platform through the fixed bracket; The telescopic guide wheel group includes a driving mechanism, a telescopic bracket and an elastic guide wheel group, and the elastic guide wheel group is installed on the construction elevator platform through the telescopic bracket; the telescopic bracket includes a slide rail and a sliding bracket; the slide rail is installed on the construction elevator operating platform, and the elastic guide wheel group of the telescopic guide wheel group is installed on the sliding bracket; the driving mechanism can drive the sliding bracket to slide on the slide rail, thereby driving the elastic guide wheel group of the telescopic guide wheel group to move.

10. A bridge pier climbing formwork construction system according to claim 9, characterized in that: The elastic guide wheel group includes a sleeve, and a roller shaft and a roller inserted in the sleeve; the roller shaft can slide in the sleeve; a stop nut is detachably installed at one end of the roller shaft, and a roller support is provided at the other end of the roller shaft; the roller is rotatably installed on the roller support; a spring is sleeved on the roller shaft, one end of the spring is against the sleeve, and the other end of the spring is against the roller support.