High-pressure jet grouting combined pile landslide retaining structure

By embedding steel cages in high-pressure jet grouting piles and connecting them to tie beams, combined with the setting of inclined jet grouting piles and anchor cables, the problem of insufficient tensile and shear strength of traditional high-pressure jet grouting piles is solved, and rapid construction and High stability and anti-slip effect, reducing costs and maintenance requirements.

CN221837609UActive Publication Date: 2024-10-15CHONGQING INST OF GEOLOGY & MINERAL RESOURCES +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420391098.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2024-10-15
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

Traditional high-pressure jet grouting piles have low tensile and shear strengths in slope support, resulting in poor stability during the construction process. Increasing the number of piles and the interlocking between piles to improve strength will increase the workload and cost.

Method used

A high-pressure jet grouting composite pile structure is adopted. A steel cage is embedded in the jet grouting pile and connected with the tie beam to form an overall structure to enhance the tensile and shear resistance. When necessary, jet grouting inclined piles and anchor cables are set to improve the Support stability.

Benefits of technology

The anti-sliding performance and construction efficiency of the slope support structure are improved, the risk of landslides is reduced, stress concentration is reduced, the service life of the structure is extended, and maintenance costs are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837609U_ABST
    Figure CN221837609U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of slope supporting and retaining, and discloses a high-pressure jet grouting combined pile landslide supporting and retaining structure which comprises a supporting pile part, the supporting pile part comprises a connecting beam and a plurality of rows of jet grouting pile parts, each jet grouting pile part comprises a plurality of jet grouting piles, and reinforcement cages are embedded in the jet grouting piles. A plurality of groups of steel bar beams are arranged, bound and fixed with the exposed top of the steel bar cage, and then concrete is poured to form a connecting beam. The anti-sliding structure is rapid in construction, stable in structure and high in shear strength.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of slope retaining, in particular to a high-pressure rotary grouting combined pile landslide retaining structure. Background Art

[0002] The most mature type of anti-slide pile used in the landslide (slope) control project is the ordinary excavation type anti-slide pile. As a large-section excavation type anti-slide pile, it utilizes the high compressive performance of concrete in bending deformation and the high tensile and shear performance of reinforced concrete. When it is arranged at a certain interval to control the landslide, it can provide good anti-slide force and limit the development and decline of the landslide. In practice, the environment around the foundation pit is often complex, and the traditional anti-slide pile design cannot meet a variety of landslide conditions. The anti-slide stability during use is poor. In recent years, high-pressure rotary jet piles have also begun to be widely used in foundation pit support and slope support. The traditional high-pressure rotary jet pile process only uses high-pressure jetting to mix cement slurry with soil to form cement soil piles, which improves the physical and mechanical properties of the passive zone soil to a certain extent, but the tensile and shear strengths are still low. If the tensile and shear strengths of the passive zone soil are to be further improved, a large number of high-pressure rotary jet piles must be arranged, and even the piles need to be interlocked to play the role of high-pressure rotary jet piles as passive zone soil reinforcements, which greatly increases the workload, is costly, and is more difficult to construct. Therefore, it is necessary to provide an anti-slip structure which is fast to construct and has a stable structure and high shear strength. Utility Model Content

[0003] The utility model aims to provide a high-pressure rotary grouting combined pile landslide retaining structure, so as to provide an anti-sliding structure with fast construction, stable structure and high shear strength.

[0004] To achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a high-pressure rotary jet composite pile landslide retaining structure, including a supporting pile part, the supporting pile part includes a connecting beam and a plurality of rows of rotary jet pile parts, the rotary jet pile part includes a plurality of rotary jet piles, each of the rotary jet piles is embedded with a steel cage, and a plurality of groups of steel beams are provided, which are exposed on the top of the steel cage and fixed with binding, and then concrete is poured to form a connecting beam.

[0005] The beneficial effects of this program are:

[0006] By embedding a steel cage in the jet grouting pile and pouring concrete on the top to form a connecting beam, the jet grouting pile and the connecting beam become an integral structure, which improves the stability of the retaining structure, effectively resists the force of slope sliding, and reduces the risk of landslides. By setting the steel cage to connect with the steel beam in the connecting beam, the tensile and shear resistance of the high-pressure jet grouting pile is enhanced, enabling it to better resist deformation and damage of the slope, thereby improving the anti-sliding performance.

[0007] Compared with ordinary excavation anti-slide piles, high-pressure rotary jet grouting technology can improve the efficiency of engineering construction, has a faster construction speed, and can complete the construction of slope retaining structures in a shorter time, which is beneficial to the control of engineering progress.

[0008] Preferably, as an improvement, the spacing between adjacent jet grouting piles ranges from 1000 to 2000 mm, and the diameter of the jet grouting piles ranges from 500 to 900 mm.

[0009] The beneficial effects are as follows: compared with improving the structural strength by interlocking the pile bodies, the connection strength has been improved by using steel bars in this technical solution. At the same time, there are gaps between adjacent jet grouting piles. On the one hand, the number of jet grouting piles processed per unit area is reduced, which can improve construction efficiency. On the other hand, it can help drain the slope and avoid the problem of retaining structure landslides caused by the inability to drain water when it rains.

[0010] Preferably, as an improvement, it also includes a row of jet grouting inclined piles, which are arranged on the side of the supporting pile part close to the foot of the mountain to support the slope, and a steel cage is also provided inside the jet grouting inclined pile, and its top is tied and fixed to the steel bars inside the connecting beam.

[0011] The beneficial effects are: the setting of inclined spray piles can provide support force in the direction of landslide, effectively resist the sliding and tilting of the slope, and the setting of inclined spray piles can better resist the downward sliding of the soil, while increasing the stability of the overall support structure and reducing the load of the support piles and connecting beams. This can reduce the stress concentration of the structure, extend the service life of the structure, and reduce maintenance costs.

[0012] Preferably, as an improvement, the angle between the jet-jet inclined pile and the jet-jet pile is in the range of 20-40°.

[0013] The beneficial effects are: since the jet grouting inclined piles are set obliquely on the slope, the angle between the jet grouting inclined piles and the jet grouting piles ranges from 20-40°, which can better adapt to changes in terrain, and select different angles to disperse stress according to the slope gradient and the irregularity of the terrain, thereby improving the flexibility and adaptability of the retaining structure and improving the safety and reliability of the overall supporting structure.

[0014] Preferably, as an improvement, it further comprises an anchor cable part, which comprises a plurality of anchor cables, one end of each anchor cable is fixedly connected to a row of jet grouting piles on a side away from the foot of the mountain, and the other end of each anchor cable is anchored on the slope.

[0015] The beneficial effects are: the stability of the supporting structure can be increased by setting the anchor cables, and the anchor cables can be fixed on the slope to effectively resist the sliding and deformation of the slope, thereby improving the stability of the overall structure. The anchor cables can provide additional tensile support and play an important role in the stability of the slope.

[0016] Preferably, as an improvement, the angle between the anchor cable and the jet grouting pile is in the range of 10-35°.

[0017] The beneficial effect is that by properly setting the angle, the anchor cable can better withstand the tension during the construction process, improve its tensile strength, prevent the sliding and deformation of the slope, and enhance the stability of the overall structure.

[0018] Preferably, as an improvement, the reinforcement of the steel cage is steel bars with a diameter of 22-28 mm. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the structure of Embodiment 1 of the present utility model;

[0020] Figure 2 This is a schematic diagram of the top view of the structure of Example 1 of the utility model;

[0021] Figure 3 This is a schematic diagram of the distribution of the steel bar beams of Example 1 of the utility model;

[0022] Figure 4 This is a schematic diagram of the connection between the steel cage and the steel beam in Example 1 of the utility model;

[0023] Figure 5 This is a schematic diagram of the structure of Embodiment 2 of the present utility model;

[0024] Figure 6 This is a schematic diagram of the structure of Embodiment 3 of the present utility model;

[0025] Figure 7 This is a schematic diagram of the structure of Example 4 of the utility model. DETAILED DESCRIPTION

[0026] The following is further described in detail through specific implementation methods:

[0027] The reference numerals in the drawings of the specification include: connecting beam 1, steel beam 2, steel cage 3, jet grouting pile 4, jet grouting inclined pile 5, anchor cable 6.

[0028] Example 1

[0029] The embodiment is basically as follows Figure 1-Figure 4 As shown, Figure 1 and Figure 4 A high-pressure jet grouting composite pile landslide retaining structure shown in the figure comprises a supporting pile portion, the supporting pile portion comprises a connecting beam 1 and a plurality of rows of jet grouting pile portions, the jet grouting pile portion comprises a plurality of jet grouting piles 4, the spacing between adjacent jet grouting piles 4 ranges from 1000 to 2000 mm, the diameter of the jet grouting piles 4 ranges from 500 to 900 mm, as shown in the figure. Figure 2In the embodiment shown, the spacing between adjacent horizontal rows of jet grouting piles 4 is 1000mm, the spacing between adjacent vertical rows of jet grouting piles 4 is 2000mm, and the diameter of the jet grouting piles 4 is 500mm. Compared with the mutual engagement between the pile bodies to improve the structural strength, the connection strength has been improved by steel bars in this technical solution. At the same time, there are gaps between adjacent jet grouting piles 4. On the one hand, the number of jet grouting piles 4 processed per unit area is reduced, which can improve the construction efficiency. On the other hand, it can help drain the slope and avoid the problem of landslides of the retaining structure caused by the inability to drain water during rainy days. Figure 3 and Figure 4 The jet-jet pile 4 shown has a steel cage 3 embedded therein, and is provided with a plurality of steel beams 2 which are exposed and tied to the top of the steel cage 3 and then poured with concrete to form a connecting beam 1. In this embodiment, the reinforcement of the steel cage 3 is steel bars with a diameter of 22-28 mm.

[0030] The specific implementation process is as follows:

[0031] By embedding the steel cage 3 in the jet grouting pile 4 and pouring concrete on the top to form the connecting beam 1, the jet grouting pile 4 and the connecting beam 1 become an integral structure, so that the stability of the retaining structure is improved, and the force of slope sliding can be effectively resisted, and the risk of landslide is reduced. By setting the steel cage 3 to be connected with the steel beam 2 in the connecting beam 1, the tensile and shear resistance of the high-pressure jet grouting pile 4 is enhanced, so that it can better resist the deformation and damage of the slope, thereby improving the anti-sliding performance.

[0032] Compared with ordinary excavation anti-slide piles, high-pressure rotary jet grouting technology can improve the efficiency of engineering construction, has a faster construction speed, and can complete the construction of slope retaining structures in a shorter time, which is beneficial to the control of engineering progress.

[0033] Example 2

[0034] Example 2 Figure 5 As shown, the difference between Example 2 and Example 1 is that it also includes a row of jet-jet inclined piles 5, which are arranged on the side of the supporting pile part near the foot of the mountain to support the slope. A steel cage 3 is also arranged inside the jet-jet inclined pile 5, and its top is tied and fixed to the steel beam 2 inside the connecting beam 1. The setting of the jet-jet inclined piles can provide a supporting force facing the direction of the landslide, effectively resisting the sliding and tilting of the slope. The setting of the inclined jet piles can better resist the downward sliding of the soil, while increasing the stability of the overall support structure and reducing the load on the supporting piles and the connecting beam 1. In this way, the stress concentration of the structure can be reduced, the service life of the structure can be extended, and the maintenance cost can be reduced. Each jet-jet inclined pile 5 is opposite to a jet-jet pile 4 to provide a better support effect. The angle between the jet-jet inclined pile 5 and the jet-jet pile 4 is in the range of 20-40°, which can better adapt to the changes in the terrain and improve the safety and reliability of the overall support structure.

[0035] Example 3

[0036] Example 3 Figure 6 As shown, the difference between Example 3 and Example 2 is that it also includes an anchor cable 6, which includes multiple anchor cables 6, one end of each anchor cable 6 is fixedly connected to a row of jet grouting piles 4 on the side away from the foot of the mountain, and the other end of each anchor cable 6 is anchored on the slope. The angle between the anchor cable 6 and the jet grouting pile 4 is in the range of 10-35°. The stability of the supporting structure can be increased by setting the anchor cable 6, and the anchor cable 6 is fixed on the slope to effectively resist the sliding and deformation of the slope, thereby improving the stability of the overall structure. The anchor cable 6 can provide additional tensile support, which plays an important role in the stability of the slope.

[0037] Example 4

[0038] Example 4 Figure 7 As shown, the difference between Example 4 and Example 1 is that each row of rotary jet piles is staggered, and the above arrangement can prevent the loose soil on the slope from being lost with rainwater.

[0039] The above is only an embodiment of the utility model, and the common knowledge such as the known specific technical solutions and / or characteristics in the solution is not described in detail here. It should be pointed out that for those skilled in the art, without departing from the technical solution of the utility model, several deformations and improvements can be made, which should also be regarded as the protection scope of the utility model, and these will not affect the effect of the implementation of the utility model and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. A high-pressure jet grouting composite pile landslide retaining structure, characterized in that: It includes a supporting pile part, which includes a connecting beam and multiple rows of jet-jet pile parts. The jet-jet pile part includes multiple jet-jet piles. Steel cages are embedded in the jet-jet piles. Multiple groups of steel beams are exposed on the top of the steel cages and fixed with binding, and then concrete is poured to form a connecting beam.

2. A high-pressure jet grouting composite pile landslide retaining structure according to claim 1, characterized in that: The spacing between adjacent jet grouting piles ranges from 1000 to 2000 mm, and the diameter of the jet grouting piles ranges from 500 to 900 mm.

3. A high-pressure jet grouting composite pile landslide retaining structure according to claim 2, characterized in that: It also includes a row of jet-jet inclined piles, which are arranged on the side of the supporting piles close to the foot of the mountain to support the slope. A steel cage is also provided inside the jet-jet inclined piles, and the top of the steel cage is tied and fixed to the steel bars inside the connecting beam.

4. A high-pressure jet grouting composite pile landslide retaining structure according to claim 3, characterized in that: The angle between the jet grouting inclined pile and the jet grouting pile ranges from 20 to 40 degrees.

5. The high-pressure jet grouting composite pile landslide retaining structure according to claim 2, characterized in that: It also includes an anchor cable part, which includes a plurality of anchor cables, one end of each anchor cable is fixedly connected to a row of rotary jet piles on a side away from the foot of the mountain, and the other ends of each anchor cable are anchored on the slope.

6. A high-pressure jet grouting composite pile landslide retaining structure according to claim 5, characterized in that: The angle between the anchor cable and the jet grouting pile ranges from 10 to 35 degrees.

7. A high-pressure jet grouting composite pile landslide retaining structure according to any one of claims 1 to 6, characterized in that: The reinforcement of the steel cage is steel bars with a diameter of 22-28mm.