Building pipeline arrangement device based on BIM technology

By using clamping devices and moving devices in building pipeline arrangement devices, the problem of unstable pipeline fixation is solved, stable arrangement of pipelines in different sizes is achieved, and safety and work efficiency are improved.

CN221839099UActive Publication Date: 2024-10-15NANTONG SIJIAN CONSTR GRP
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420424449.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-06
Publication Date
2024-10-15
Estimated Expiration
2034-03-06

AI Technical Summary

Technical Problem

Existing building pipeline arrangement devices cannot be adjusted and fixed according to different pipeline sizes, resulting in unstable pipeline arrangement, which may cause safety accidents and reduce work efficiency.

Method used

A building pipeline arrangement device based on BIM technology is designed, using clamping devices and moving devices, through the connection of bolts and fixed parts and the use of rotating plates, to achieve flexible fixation of pipelines and ensure the stability of pipelines in different sizes. arrangement.

Benefits of technology

Through the design of the clamping device and the moving device, the problem of unstable pipeline fixation is avoided, the safety and work efficiency of the pipeline arrangement are improved, and it can adapt to the stable fixation of pipelines of different sizes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221839099U_ABST
    Figure CN221839099U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pipeline arrangement, and discloses a building pipeline arrangement device based on BIM technology, which comprises a base, fixing plates are fixed on the lower parts of the two sides of the base, the lower parts of the fixing plates are rotatably connected with a rotating plate I through bolts, and a chute is arranged in the middle of the upper side of the base. An I-shaped plate is slidably connected into the base sliding groove, a limiting block is arranged in the middle of the base sliding groove, two fixing columns are fixed to the upper side of the I-shaped plate, a clamping device is arranged between the two fixing columns, first fixing pieces are fixed to the lower portions of the fixing columns through bolts, and moving devices are arranged on the upper portions of the fixing columns. The building pipeline fixing device has the advantages that by means of the clamping device and the moving device, the problems that when pipelines are fixed, adjustment and fixation cannot be conducted according to the sizes of different pipelines, so that the building pipelines are not stable enough during arrangement and fixation, safety accidents are prone to being caused, and working efficiency is reduced are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline arrangement, and specifically refers to a building pipeline arrangement device based on BIM technology. Background Art

[0002] BIM technology is a new tool for architecture, engineering and civil engineering. The term Building Information Model or Building Information Model was created by Autodesk. It is used to describe computer-aided design that is mainly based on three-dimensional graphics, object-oriented, and related to architecture. In existing building designs, in order to effectively integrate resources and save space, the pipelines of water, heating and electrical professional equipment are usually arranged in a centralized manner, so the complexity of underground pipelines is quite high.

[0003] When fixing pipelines, existing building pipeline arranging devices cannot adjust and fix them according to different pipeline sizes, which makes the building pipelines unstable when arranged and fixed, easily causing safety accidents and reducing work efficiency. Utility Model Content

[0004] In order to solve the above problems, the utility model provides a building pipeline layout device based on BIM technology, which avoids the problem that when fixing the pipeline, the pipeline cannot be adjusted and fixed according to different pipeline sizes, making the building pipeline unstable when arranged and fixed, easily causing safety accidents and reducing work efficiency.

[0005] In order to solve the above technical problems, the technical solution provided by the utility model is: a building pipeline layout device based on BIM technology, including a base, fixed plates are fixed on the lower part of both sides of the base, the lower part of the fixed plate is rotatably connected to a rotating plate by bolts, a slide groove is provided in the middle part of the upper side of the base, an I-shaped plate is slidably connected inside the slide groove of the base, a limited block is provided in the middle part of the slide groove of the base, two fixed columns are fixed on the upper side of the I-shaped plate, a clamping device is provided between the two fixed columns, a fixing part is fixed to the lower part of the fixed column by bolts, and a moving device is provided on the upper part of the fixed column.

[0006] As an improvement, the clamping device includes a clamping member 1 fixedly connected to a fixing member 1 by bolts, a clamping member 2 is arranged above the clamping member 1, the clamping member 2 is fixedly connected to a moving device by bolts, and the clamping member 2 has multiple fixing bolts connected to its internal threads.

[0007] As an improvement, the moving device includes a fixing member 2 fixedly connected to the clamping member 2, the fixing member 2 is rotatably connected to a rotating plate 2 via bolts on the side away from the clamping member 2, a sliding column is fixed inside the fixing member 2, and the sliding column is slidably connected to the fixing column.

[0008] As an improvement, a threaded hole is provided on one side of the fixed column close to the second rotating plate, and a sliding groove is provided on one side of the fixed column close to the sliding column.

[0009] As an improvement, threaded holes are provided on the base and the I-shaped plate, and the I-shaped plate and the base are fixed by bolts.

[0010] The advantages of the utility model compared with the prior art are: through the clamping device and the moving device, it is avoided that when the pipeline is fixed, the pipeline cannot be adjusted and fixed according to different pipeline sizes, which makes the building pipeline unstable when arranged and fixed, easily causing safety accidents and reducing work efficiency. The fixed plate and the rotating plate on the base are combined, which is convenient for adjusting the pipeline position. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the overall structure of the utility model.

[0012] Figure 2 It is a partial structural schematic diagram of the utility model.

[0013] As shown in the figure: 1. Base; 2. Fixed plate; 3. Rotating plate 1; 4. I-plate; 5. Limit block; 6. Fixed column; 7. Clamping device; 701. Clamping part 1; 702. Clamping part 2; 703. Fixing bolt; 8. Fixed part 1; 9. Moving device; 901. Fixed part 2; 902. Rotating plate 2; 903. Sliding column. DETAILED DESCRIPTION

[0014] The utility model is further described in detail below in conjunction with the accompanying drawings.

[0015] In the specific implementation of the utility model, Figure 1 to Figure 2 A building pipeline arrangement device based on BIM technology comprises a base 1, fixed plates 2 are fixed to the lower parts of both sides of the base 1, and a rotating plate 3 is rotatably connected to the lower part of the fixed plate 2 by bolts, and the arrangement device is fixed to the specified position as a whole by moving the base 1 to a specified position and rotating the rotating plate 3 by bolts;

[0016] A slide groove is provided in the middle of the upper side of the base 1, and an I-shaped plate 4 is slidably connected inside the slide groove of the base 1. Threaded holes are provided on the base 1 and the I-shaped plate 4. The I-shaped plate 4 and the base 1 are fixed by bolts. A limited block 5 is provided in the middle of the slide groove of the base 1 to limit the movement of the I-shaped plate 4. Two fixed columns 6 are fixed on the upper side of the I-shaped plate 4. A clamping device 7 is provided between the two fixed columns 6 to clamp the pipeline. A fixing piece 8 is fixed to the lower part of the fixed column 6 by bolts, and a moving device 9 is provided on the upper part of the fixed column 6;

[0017] The clamping device 7 includes a clamping member 1 701 fixedly connected to the fixing member 1 8 by bolts, a clamping member 2 702 is arranged above the clamping member 1 701, the clamping member 2 702 is fixedly connected to the moving device 9 by bolts, and a plurality of fixing bolts 703 are threadedly connected inside the clamping member 2 702;

[0018] During the implementation of the utility model, the pipeline is placed between the clamping member 1 701 and the clamping member 2 702, and the moving device 9 is controlled to clamp the pipeline. When the pipeline is too small, the fixing bolt 703 is rotated to fix the pipeline.

[0019] The moving device 9 includes a second fixing member 901 fixedly connected to the second clamping member 702, the second fixing member 901 is rotatably connected to the second rotating plate 902 by bolts on the side away from the second clamping member 702, a threaded hole is provided on the side of the fixing column 6 close to the second rotating plate 902, the second rotating plate 902 and the fixing column 6 are fixed by bolts, a sliding column 903 is fixed inside the second fixing member 901, a sliding groove is provided on the side of the fixing column 6 close to the sliding column 903, and the sliding column 903 is slidably connected to the fixing column 6;

[0020] During the implementation of the utility model, the sliding column 903 inside the fixing part 901 is controlled to rise and fall in the sliding groove of the fixing column 6, so that the clamping device 7 clamps the pipeline, and the rotating plate 902 is rotated to be fixedly connected with the fixing column 6 through bolts to fix the pipeline inside the clamping device 7.

[0021] The above description of the utility model and its implementation methods is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.

Claims

1. A building pipeline arrangement device based on BIM technology, characterized in that: The invention comprises a base (1), wherein fixed plates (2) are fixed at the lower parts of both sides of the base (1), the lower parts of the fixed plates (2) are rotatably connected to a rotating plate (3) by means of bolts, a sliding groove is arranged in the middle part of the upper side of the base (1), an I-shaped plate (4) is slidably connected inside the sliding groove of the base (1), a limiting block (5) is arranged in the middle part of the sliding groove of the base (1), two fixed columns (6) are fixed on the upper side of the I-shaped plate (4), a clamping device (7) is arranged between the two fixed columns (6), a fixing piece (8) is fixed to the lower part of the fixed column (6) by means of bolts, and a moving device (9) is arranged on the upper part of the fixed column (6).

2. The building pipeline arrangement device based on BIM technology according to claim 1, characterized in that: The clamping device (7) comprises a clamping member 1 (701) fixedly connected to a fixing member 1 (8) via bolts, a clamping member 2 (702) is arranged above the clamping member 1 (701), the clamping member 2 (702) is fixedly connected to a moving device (9) via bolts, and a plurality of fixing bolts (703) are threadedly connected inside the clamping member 2 (702).

3. The building pipeline arrangement device based on BIM technology according to claim 2 is characterized in that: The moving device (9) comprises a second fixing member (901) fixedly connected to the second clamping member (702); the second fixing member (901) is rotatably connected to a second rotating plate (902) via bolts on a side away from the second clamping member (702); a sliding column (903) is fixed inside the second fixing member (901); and the sliding column (903) is slidably connected to the fixing column (6).

4. The building pipeline arrangement device based on BIM technology according to claim 3 is characterized in that: A threaded hole is provided on one side of the fixed column (6) close to the second rotating plate (902), and a sliding groove is provided on one side of the fixed column (6) close to the sliding column (903).

5. The building pipeline arrangement device based on BIM technology according to claim 1, characterized in that: The base (1) and the I-shaped plate (4) are both provided with threaded holes, and the I-shaped plate (4) and the base (1) are fixed by bolts.

Citation Information

Cited By

  • Building pipeline arrangement device based on BIM technology

    CN223924103U