By using railway communication positioning devices in railway construction, real-time positioning and information transmission between engineering vehicles, construction workers and dispatch centers are realized, which solves potential safety hazards caused by untimely information transmission and improves the safety and efficiency of construction. .
Patent Information
- Application Number
- CN202323189096.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-25
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2033-11-25
AI Technical Summary
During the railway track laying construction process, untimely or incorrect information transmission may lead to safety hazards and affect construction speed and safety.
A railway communication positioning device is designed, including a control unit, communication unit, alarm unit, display unit and positioning unit. Through wireless communication and buzzer alarm, real-time positioning and information between engineering vehicles, construction workers and dispatch centers are realized. Delivery to ensure timely and accurate information delivery.
It effectively avoids safety accidents caused by untimely information transmission when people are dispersed, ensures the timeliness and accuracy of vehicle avoidance, and realizes low-cost and high practicability of long-distance information transmission.
Smart Images

Figure CN221851930U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of production management, in particular to a railway communication positioning device and system. Background Art
[0002] Research on the construction dispatching system of engineering lines is a compulsory course for the track laying project of Changda High-speed Railway. With the rapid development of information technology, more and more intelligent systems are being implemented in railway infrastructure. The dispatching system actually applied by the management and dispatching center of the Nanyanjiang Intercity Railway Engineering Line in Jiangsu, China has realized basic functions such as train location positioning, data report generation, and real-time video monitoring, which has provided a great auxiliary role for the construction speed and safe operation of railway track laying to a large extent, but there is still room for improvement. For example, in the duties of the liaison officer stationed at the engineering dispatching center, according to the information platform, before a vehicle, train, or single machine is about to pass through the protection section, an early warning is given to the construction site, and according to the instructions of the dispatching, the construction site is required to get off the road to avoid and determine that the conditions for driving are met; the contact methods of the construction person in charge and the on-site protection personnel at the construction site are mastered, and communication with the construction site is kept unimpeded. For information that affects driving, such as the inability to get off the road and withdraw from the site in time, feedback from the site must be reported to the on-duty dispatching as soon as possible. Among them, when the liaison officer stationed at the engineering dispatching center notices that a vehicle is about to pass through the station, he notifies the driving driver to control the start and stop of the vehicle through an intercom, a dispatching phone, etc., and the relevant person in charge notifies the workers to get on and off the road. For example, the duties of the train dispatcher include checking the train number, departure location, departure time, arrival location, expected arrival time, occupied line, operation section, stop or operation mileage range, driver's name and phone number, construction and supervision unit additional personnel phone number and other information with the operation driver before departure, so as to prevent "losing the car" and "wrong handling" from happening; monitoring the large screen of the engineering dispatch center that displays on-site images, keeping track of the driving dynamics at any time, and timely capturing illegal construction and driving behaviors and reporting them according to regulations. In this process, a person is arranged at each station of a project line to monitor driving safety manually at the engineering dispatch center, and is responsible for the safety operation of each station. In this process, there are many processes of repeated information confirmation and transmission, and there is a possibility of untimely or erroneous information transmission, which leads to major safety hazards. Therefore, timely and accurate transmission of information is still the top priority of engineering line track laying construction, and it is also an important guarantee for further realizing rapid and safe track laying, which prompts the dispatching and command system to be suitable for popular track laying projects and achieve standardization, scientificization and integration. Utility Model Content
[0003] In order to solve the above problems, the utility model provides a railway communication positioning device and system.
[0004] The utility model adopts the following technical scheme: a railway communication positioning device, comprising:
[0005] Control unit;
[0006] A communication unit connected to the control unit;
[0007] an alarm unit connected to the control unit;
[0008] A display unit connected to the control unit;
[0009] A positioning unit is connected to the control unit.
[0010] In some embodiments, an intercom is also included.
[0011] In some embodiments, a key unit is included, and the key unit is connected to the control unit.
[0012] In some embodiments, the button unit includes a button SW1 for stopping the alarm unit from alarming.
[0013] In some embodiments, the button unit includes a button SW2 for sending emergency avoidance instruction information.
[0014] A railway communication positioning system, comprising:
[0015] The construction worker installs the device using the railway communication positioning device;
[0016] The on-site person in charge uses the railway communication positioning device;
[0017] The engineering vehicle device end adopts the railway communication positioning device;
[0018] Dispatching center end;
[0019] The construction worker's device end is communicated with the on-site supervisor's device end and the engineering vehicle's device end respectively; the dispatch center end is communicated with the on-site supervisor's device end and the engineering vehicle's device end respectively; the on-site supervisor's device end and the engineering vehicle's device end are communicated with each other.
[0020] In some embodiments, the dispatch center includes:
[0021] computer;
[0022] a communication unit connected to the computer;
[0023] an alarm unit connected to the computer;
[0024] A display unit is connected to the computer.
[0025] In some embodiments, the dispatch center also includes a walkie-talkie.
[0026] A method for using a railway communication positioning system, comprising:
[0027] S100: The engineering vehicle sends an emergency avoidance command signal to the worker's device end, the on-site person in charge's device end and the dispatch center end through the communication unit;
[0028] S200: The dispatch center transmits the signal to the device of the person in charge on site and confirms whether the avoidance signal is received;
[0029] S300: The dispatch center commands the vehicle to stop or pass after a certain period of time, and the dispatch center displays the worker's position information to determine whether the emergency avoidance is completed;
[0030] S400: The dispatch center and the on-site person in charge transmit information and confirm it for the second time.
[0031] Compared with the prior art, the utility model has the following beneficial effects:
[0032] (1) The utility model is applied to the avoidance of vehicles during the railway track laying process, whereby the engineering vehicle directly issues avoidance prompts to the workers, thereby avoiding safety accidents caused by emergency situations such as untimely information transmission when the personnel are dispersed.
[0033] (2) When the utility model is used for vehicle avoidance during the track laying process, the person in charge on site can check the location of all persons to see whether they have evacuated.
[0034] (3) The utility model can realize long-distance information transmission and has the characteristics of low cost and strong practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 This is a diagram of the rapid communication and positioning device for the engineering line traffic dispatching system;
[0036] Figure 2 It is a structural block diagram of the rapid communication positioning device and application method of the engineering line traffic dispatching system;
[0037] Figure 3 It is the circuit diagram of the key unit;
[0038] Figure 4 This is the circuit diagram of alarm unit 1;
[0039] Figure 5 This is the circuit diagram of the alarm unit 3;
[0040] Figure 6 is a circuit diagram of the communication unit 1;
[0041] Figure 7 It is the circuit diagram of the positioning unit;
[0042] Figure 8 To display the circuit diagram of the unit;
[0043] Fig. 9 is the circuit diagram of the power supply unit;
[0044] Fig.10 is the circuit diagram of the control unit;
[0045] Fig.11 is the circuit diagram of the communication unit 2;
[0046] Fig.12 This is the circuit diagram of alarm unit 2. DETAILED DESCRIPTION
[0047] In order to make the purpose and advantages of the utility model more clearly understood, the utility model is further described below in conjunction with embodiments; it should be understood that the specific embodiments described herein are only used to explain the utility model and are not used to limit the utility model.
[0048] The preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only used to explain the technical principles of the present invention and are not intended to limit the protection scope of the present invention.
[0049] During railway laying construction, there are often many repeated information confirmation and transmission processes, and there is a possibility of untimely or erroneous information transmission, leading to major safety hazards. Therefore, timely and accurate transmission of information remains the top priority of engineering line laying construction, and is also an important guarantee for further realizing rapid and safe track laying, prompting the dispatching and command system to become more "digitalized".
[0050] A railway communication positioning device, comprising:
[0051] Control unit,
[0052] A communication unit connected to the control unit;
[0053] an alarm unit connected to the control unit;
[0054] A display unit connected to the control unit;
[0055] A positioning unit connected to the control unit;
[0056] The key unit is connected to the control unit.
[0057] The key unit includes a key SW1 for stopping the alarm unit from alarming.
[0058] The key unit includes a key SW2 for sending emergency avoidance instruction information.
[0059] Also includes an intercom.
[0060] Specifically, the positioning unit adopts the GT-U8 positioning module, the communication unit adopts the HC-14 wireless module, the display unit adopts the OLED display screen, the alarm unit adopts the buzzer module and the voltage regulator indicator light, the control unit adopts the STM32F103C8T6 microcontroller, the power supply unit adopts the 3.3V voltage regulator circuit and the +5V system voltage regulator circuit, and the key unit is composed of four touch keys.
[0061] The following explains Figure 3 The electrical connections of the schematic diagram need to be explained Figure 3 yes Figure 1 In the main control schematic diagram of machine 1, machine 2 and machine 3, all connections in the diagram are network labels. It should be noted that this connection method has the same function as the solid line connection. In addition, "connected" and "connected" both indicate that there is a circuit connection in the physical circuit, so this shall not be used to limit the scope of protection of the utility model.
[0062] In the positioning unit, GT-U8 positioning module port 1 is connected to the +5V power supply, GT-U8 positioning module port 2 is connected to GND, and GT-U8 positioning module port 4 (TX pin) is connected to control unit port PA10.
[0063] In the communication unit 1 or the wireless serial port module 1, the HC-14 wireless module port 1 is connected to the +3.3V power supply unit 1, the HC-14 wireless module port 2 is connected to the GND, and the HC-14 wireless module port 3 (RX pin) is connected to the control unit port PA9.
[0064] In the communication unit 2 or the wireless serial port module 2, the HC-14 wireless module port 1 is connected to the +3.3V power supply unit 1, the HC-14 wireless module port 2 is connected to the GND, the HC-14 wireless module port 3 (RX pin) is connected to the control unit port PA2, and the HC-14 wireless module port 4 (TX pin) is connected to the control unit port PA3.
[0065] The OLED in the display unit communicates with the MCU through LLC communication. The OLED display port 1 is connected to GND, the OLED display port 2 is connected to the +3.3V power supply unit 1, the OLED display port 3 (SCL) is connected to the control unit port PB8, and the OLED display port 4 (SDA) is connected to the control unit port PB9.
[0066] In alarm unit 1, it is used for voltage collection and low voltage alarm. The port connected to the 10K R1 resistor and the 30K R3 resistor is connected to the control unit port PA1, the other end interface of the 10K R1 resistor is connected to VCC, and the other end interface of the 30K R3 resistor is connected to GND.
[0067] In alarm unit 2, one end of the 1K R10 resistor is connected to GND, the other end of the 1K R10 resistor is connected to the negative end of the D3 diode, and the positive end of the D3 diode is connected to the +5V power supply unit 2.
[0068] In the alarm unit 3, the buzzer module port 1 is connected to the +5V power supply unit 2, the buzzer module port 2 is connected to the control unit PB5, and the buzzer module port 3 is connected to GND.
[0069] In the key unit, one end of key SW1 is connected to GND, and the other end of key SW1 is connected to control unit PB0, one end of key SW2 is connected to GND, and the other end of key SW2 is connected to control unit PB1, one end of key SW3 is connected to GND, and the other end of key SW3 is connected to control unit PB3, one end of key SW4 is connected to GND, and the other end of key SW4 is connected to control unit PB4.
[0070] A railway communication positioning system, comprising:
[0071] The construction worker installs the device using the railway communication positioning device;
[0072] The on-site person in charge uses the railway communication positioning device described above;
[0073] The engineering vehicle device end adopts the railway communication positioning device;
[0074] Dispatching center end;
[0075] The construction worker's device end is communicated with the on-site supervisor's device end and the engineering vehicle's device end respectively; the dispatch center end is communicated with the on-site supervisor's device end and the engineering vehicle's device end respectively; the on-site supervisor's device end and the engineering vehicle's device end are communicated with each other.
[0076] The dispatch center includes:
[0077] computer;
[0078] a communication unit connected to the computer;
[0079] an alarm unit connected to the computer;
[0080] A display unit connected to the computer;
[0081] Intercom, to communicate with other parties.
[0082] Specifically, the engineering vehicles, on-site supervisors, and construction workers are all equipped with the railway communication positioning device of the utility model, and the dispatching center is equipped with a dispatching device consisting of a computer, a display unit (display), a communication unit (HC-14 wireless module), and an alarm unit (buzzer, indicator light). At the same time, the engineering vehicles, on-site supervisors, and the dispatching center continue to use existing intercoms for voice communication, meeting the voice information transmission and secondary information confirmation needs between the engineering vehicles and the dispatching center and between the dispatching center personnel and the on-site supervisors.
[0083] To ensure that the communication capability of the device is continuously maintained, when the battery power of the device of the utility model is low, the control unit collects the PA1 pin voltage of the alarm unit 1 through the ADC. When the voltage is lower than 1.2 times the minimum normal operating voltage, the collected digital quantity will be lower than the alarm standard, thereby controlling the control unit buzzer to sound, and the voltage stabilizing indicator light of the alarm unit 2 will be displayed to remind the construction worker to pay attention to the power status of the device.
[0084] A method for using a railway communication positioning system, comprising:
[0085] S100: The engineering vehicle sends an emergency avoidance command signal to the worker's device end, the on-site person in charge's device end and the dispatch center end through the communication unit.
[0086] When construction vehicles are on the track, according to the national track laying operation guidelines, it is necessary to ensure that there are no debris on the track and that construction workers must avoid it urgently. When the devices equipped with construction vehicles, construction workers and site managers share positioning information with each other, when approaching a safe distance, the control unit of the device automatically calculates the latitude and longitude information in the positioning information to control the buzzer alarm. The construction worker equipped with the device sends a received reply signal to the site manager and the device equipped with the construction vehicle by pressing the button SW1 to stop the buzzer alarm.
[0087] S200: The dispatch center transmits the information to the device of the person in charge on site and confirms whether the avoidance signal is received.
[0088] The dispatch center receives the positioning information and emergency avoidance signals from the construction vehicles, workers and site managers. The positioning information is displayed in real time. However, when the construction vehicles are close to the construction personnel, the dispatch center personnel will transmit the information to the site manager through the intercom and confirm whether the avoidance signal has been received. If there are special matters, they will be reported urgently through the intercom and the dispatch center will negotiate and arrange.
[0089] In case of emergency, the driver of the engineering vehicle manually sends the emergency avoidance command information by pressing the SW2 button and determines whether to control the vehicle to brake urgently. The worker end, the site manager end and the dispatch center end receive the avoidance information and quickly avoid it. If there are special matters, emergency reports are made through the intercom, and the dispatch center negotiates and arranges.
[0090] S300: The dispatch center instructs the vehicle to stop or pass after a corresponding period of time, and the dispatch center displays the worker's position information to determine whether the emergency avoidance is completed.
[0091] Specifically, if any special event occurs at any stage, the dispatch center will order the vehicle to stop. If there is no special event, the dispatch center will use the current speed of the engineering vehicle and the evacuation speed of the construction team displayed by the dispatch system as the basis, and determine whether the emergency avoidance has been completed after a corresponding period of time through the worker position information displayed by the dispatch center device. If a special event is found, the intercom will be used to urgently order the engineering vehicle to stop.
[0092] S400: The dispatch center and the on-site person in charge transmit information and confirm it for the second time.
[0093] After the personnel stationed at the dispatch center have calculated the distance between the personnel and the vehicle to be safe based on the computer, they will communicate with the on-site person in charge a second time via the walkie-talkie to confirm whether the person and the vehicle have been completely avoided.
[0094] If the construction team and the engineering vehicle are working together, the buzzer alarm will be canceled. After the collaborative work is completed, the buzzer alarm will be restored.
Claims
1. A railway communication positioning device, It is characterized in that include: Control unit, A communication unit connected to the control unit; An alarm unit connected to the control unit; A display unit connected to the control unit; A positioning unit is connected to the control unit.
2. The railway communication positioning device according to claim 1, It is characterized in that Also includes an intercom.
3. The railway communication positioning device according to claim 2, It is characterized in that It includes a key unit, which is connected to the control unit.
4. The railway communication positioning device according to claim 3, It is characterized in that The button unit includes a button SW1 for stopping the alarm unit from alarming.
5. The railway communication positioning device according to claim 4, It is characterized in that The button unit includes a button SW2 for sending emergency avoidance instruction information.
6. A railway communication positioning system, It is characterized in that include: The construction worker device adopts the railway communication positioning device as described in any one of claims 1 to 5; The on-site person in charge uses the railway communication positioning device as described in any one of claims 1 to 5; The engineering vehicle device end adopts the railway communication positioning device as described in any one of claims 1 to 5; Dispatching center end; The construction worker's device end is communicated with the on-site supervisor's device end and the engineering vehicle's device end respectively; the dispatch center end is communicated with the on-site supervisor's device end and the engineering vehicle's device end respectively; the on-site supervisor's device end and the engineering vehicle's device end are communicated with each other.
7. The railway communication positioning system according to claim 6, It is characterized in that The dispatch center terminal comprises: computer; a communication unit connected to the computer; an alarm unit connected to the computer; A display unit is connected to the computer.
8. The railway communication positioning system according to claim 7, It is characterized in that The dispatch center also includes an intercom.