Chain bucket replacing device

By designing a chain bucket replacement device, the chain bucket segments are replaced piece by piece in a bottom-in and bottom-out manner, which solves the problems of high safety risks and low efficiency in high-altitude hoisting in the existing technology, and achieves safe, efficient, and low-cost chain bucket replacement. .

CN221853107UActive Publication Date: 2024-10-18WISCO MCC IND TECH SERVICE CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420626792.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-28
Publication Date
2024-10-18
Estimated Expiration
2034-03-28

AI Technical Summary

Technical Problem

The chain bucket replacement process of the existing chain bucket conveyor involves high-altitude hoisting, which leads to high safety risks, low replacement efficiency, and high maintenance costs.

Method used

A chain bucket replacement device is designed, which uses the first conveying component and the second conveying component combined with a power mechanism and a crane to replace the chain bucket segments piece by piece by moving in and out to avoid high-altitude operations and achieve a zero-height working surface. The power mechanism drives the old chain bucket section to run along the second track, and the new chain bucket section enters from the first track, gradually completing the replacement.

Benefits of technology

It improves the safety and efficiency of chain bucket replacement, reduces the frequency of use and maintenance costs of large lifting equipment, and achieves efficient, safe and cost-saving chain bucket replacement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221853107U_ABST
    Figure CN221853107U_ABST
Patent Text Reader

Abstract

The utility model discloses a chain bucket replacing device. The technical problem that in the prior art, the safety risk of replacing a chain bucket of a chain bucket conveyor is large is solved. The chain bucket replacing device comprises a first conveying assembly and a second conveying assembly, the first conveying assembly comprises a first rail used for conveying a new chain bucket section, the first rail is close to a tail wheel of the chain bucket conveyor, the first rail extends in the length direction of the horizontal tail section, and the height of the first rail is flush with the top of the tail wheel; the second conveying assembly comprises a second rail used for conveying the old chain bucket section, the second rail is in butt joint with the lower guide rail of the horizontal tail section, and the second rail is located below the first rail; the power mechanism is used for driving the old chain bucket section, so that the old chain bucket section runs along the second track; and the crane is used for hoisting the new chain bucket section to the first track. According to the chain bucket replacement device, the replacement position of the chain bucket is located at the zero-height horizontal tail section, the working face is concentrated, safety control of the working process is better facilitated from the source, high-altitude hoisting operation is avoided, and the chain bucket replacement device is safer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of chain bucket replacement of chain bucket conveyors, and specifically relates to a chain bucket replacement device. Background Art

[0002] Bucket chain conveyor is a kind of transport equipment that drives the chain to pull the bucket filled with materials along the track for horizontal or vertical transport. It is widely used in the transportation of various loose materials in desulfurization and denitrification equipment, mining, metallurgy, coal and other industries due to its advantages of flexible layout, large conveying capacity, long service life and large conveying height. The chain and bucket of the bucket chain conveyor are the main transport equipment. The bucket chain of the bucket chain conveyor is usually composed of a large number of single bucket chains, and the overall length of the bucket chain is generally more than 100 meters.

[0003] After a certain period of use, the chain and bucket (chain bucket for short) of the chain bucket conveyor need to be replaced as a whole. In the prior art, the chain bucket segment is often assembled on site in advance, the cover plate on the top of the chain bucket conveyor box is removed, and the old chain is removed from the top box section by section (each section is 10m), and a new chain bucket segment is installed each time a section is removed. Specifically, each time a section is removed, two 10t guide chains are used to fix and lock the two ends of the chain, and the removed old chain bucket segment is lifted to the ground by a crane, and then the new chain bucket segment is lifted to the top box, and the new chain bucket segment is spliced ​​at the original disconnected positions at both ends, the guide chain is loosened, and the drive motor of the chain bucket conveyor is started, and the old chain segment in the box is operated to the position where the top cover plate is removed, and the chain bucket is removed and replaced section by section.

[0004] This replacement method uses high-altitude lifting, which makes the chain bucket replacement and lifting process have great safety risks. Utility Model Content

[0005] In order to solve the current technical problem of high safety risk in chain bucket replacement, the present application provides a chain bucket replacement device.

[0006] The present application provides a chain bucket replacement device, which is suitable for replacing a chain bucket of a chain bucket conveyor including a horizontal tail section, and the chain bucket replacement device includes:

[0007] A first conveying assembly, comprising a first track for conveying a new bucket chain segment, the first track being close to a tail wheel of the bucket chain conveyor, the first track extending along the length direction of the horizontal tail segment, and having a height flush with the top of the tail wheel;

[0008] A second conveying assembly includes a second track for conveying the old chain bucket segment, the second track is docked with the lower guide rail of the horizontal tail segment, and the second track is located below the first track;

[0009] A power mechanism, used for driving the old chain bucket segment to make the old chain bucket segment run along the second track;

[0010] A crane is used to lift the new chain bucket segment to the first track.

[0011] In some embodiments, the first conveying assembly and the second conveying assembly both include a third track and a fourth track, and both of the third tracks are movable so that one end of the third track of the first conveying assembly can be switchably docked with the corresponding fourth track and the first track, and one end of the third track of the second conveying assembly can be switchably docked with the corresponding fourth track and the second track, and an extension direction of the fourth track is set at an angle to an extension direction of the first track and the second track, and the crane is used to lift a new chain bucket segment to the fourth track.

[0012] In some embodiments, the chain bucket replacement device also includes a bracket and a base, the bracket is rotatably connected to the base via a rotating shaft extending in a vertical direction, the two third rails are both installed on the bracket, and the bracket is connected to a plurality of rollers.

[0013] In some embodiments, the first conveying assembly further includes an operating rod, and two operating rods are provided. The two operating rods are respectively located on both sides of the third track along the width direction.

[0014] In some embodiments, the length of the operating rod is the same as that of the third track, and the operating rod is parallel to the third track.

[0015] In some embodiments, the second track is arranged at an angle, and an upper end of the second track is close to the lower guide rail.

[0016] In some embodiments, the power mechanism includes a winch located at one end of the second track away from the chain bucket conveyor, a traction rope of the winch is connected to the old chain bucket segment, and there is a gap between the winch and the second track for accommodating the old chain bucket segment.

[0017] In some embodiments, two traction ropes are provided, and the two traction ropes are respectively connected to two sides of the old bucket segment along the width direction.

[0018] In some embodiments, the power mechanism further includes a driving member and a head wheel of the chain bucket conveyor, the output end of the driving member is drivingly connected to the head wheel, and the chain bucket of the chain bucket conveyor is engaged with the head wheel.

[0019] In some embodiments, the first track and the second track are each provided with two limiting surfaces which are arranged opposite to each other and perpendicular to the running direction of the chain bucket conveyor, and the two limiting surfaces are respectively abutted against the outer side surfaces of the sprocket of the chain bucket conveyor for limiting.

[0020] The chain bucket replacement device provided according to the embodiment of the present application is suitable for replacing the chain bucket of a chain bucket conveyor including a horizontal tail section. The chain bucket replacement device includes a first conveying component, a second conveying component, a power mechanism and a crane. The crane is used to lift the new chain bucket segment to the first track. The first conveying component includes a first track for conveying the new chain bucket segment. The first track is close to the tail wheel of the chain bucket conveyor. The first track extends along the length direction of the horizontal tail section and the height is flush with the top of the tail wheel. Therefore, the first track can convey the new chain bucket segment to engage with the tail wheel. The second conveying component includes a second track for conveying the old chain bucket segment. The second track is located below the first track. The second track is docked with the lower guide rail of the horizontal tail section. Therefore, the disconnected chain bucket assembly can run from the lower guide rail to the second track, that is, the old chain bucket segment moves to the second track. The power mechanism can drive the old chain bucket segment to make the old chain bucket segment run along the second track, so that the disconnected chain bucket assembly leaves from the bottom, and the new chain bucket segment connected to the chain bucket assembly enters from the top, gradually completing the replacement of the chain bucket.

[0021] Since the entire replacement process is based on a "segment" consisting of multiple sections, rather than replacing the chain bucket section by section, and it is also driven by a power mechanism, the replacement efficiency is higher. Because the chain bucket is replaced at the horizontal tail section of the chain bucket conveyor at zero height, the working surface is concentrated, which is more conducive to the safety control of the operation process from the source, avoiding high-altitude lifting operations, with low safety risks, greatly saving the use of large lifting equipment, and lowering maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 The schematic diagram of the structure of the chain bucket conveyor in the related art is shown.

[0023] Figure 2 A structural schematic diagram showing the cooperation between the chain bucket replacement device and the chain bucket conveyor in an embodiment of the present application is shown.

[0024] Figure 3 A schematic diagram of the assembly of the first track and the second track and the chain bucket conveyor in the chain bucket replacement device of an embodiment of the present application is shown.

[0025] Figure 4 The assembly diagram of the upper guide rail, sprocket and lower guide rail of the chain bucket conveyor is shown.

[0026] Figure 5 A schematic diagram of the assembly of the first track, the second track, the third track and the chain bucket conveyor in a chain bucket replacement device according to an embodiment of the present application is shown.

[0027] Figure 6 A schematic diagram of the assembly of the first track, the second track, the third track and the chain bucket conveyor in a chain bucket replacement device according to another embodiment of the present application is shown.

[0028] Figure 7 It is shown that in the chain bucket replacement device of the embodiment of the present application, the first track is respectively connected with the third track and the fourth track.

[0029] Description of reference numerals:

[0030] 110 - first rail, 120 - second rail, 130 - third rail, 140 - fourth rail, 150 - winch; 160 - bracket, 161 - roller, 170 - base, 180 - rotating shaft, 190 - first mounting frame.

[0031] 200-chain bucket conveyor, 210-horizontal tail section, 220-vertical section, 230-horizontal head section, 240-box, 250-head wheel, 260-tail wheel, 270-upper guide rail, 280-lower guide rail, 290-sprocket.

[0032] 300-old chain bucket segment, 400-new chain bucket segment, DETAILED DESCRIPTION

[0033] In order to make the technical personnel in the technical field to which the present application belongs to understand the present application more clearly, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0034] The present application provides a chain bucket replacement device, which is suitable for replacing the chain bucket of a chain bucket conveyor including a horizontal tail section. The chain bucket sections of the chain bucket conveyor are replaced section by section by a bottom-in and bottom-out method. There is no high-altitude operation, high safety, large working space, and easy concentration of operators, which is highly efficient.

[0035] See also Figure 1 The chain bucket conveyor 200 includes two horizontal sections and a vertical section 220. Both ends of the vertical section 220 are connected to the two horizontal sections to form a Z-shaped chain bucket conveyor 200, wherein the horizontal section located at the lower part is the above-mentioned horizontal tail section 210, and the horizontal section located at the upper part is the horizontal head section 230.

[0036] The chain bucket conveyor 200 includes a box body 240, a chain bucket section, a head wheel 250 and a tail wheel 260. There are multiple chain bucket sections, and the multiple chain bucket sections are connected end to end in sequence to form a ring. The head wheel 250 is located at the horizontal head section 230, and the tail wheel 260 is located at the horizontal tail section 210. The annular chain bucket is engaged with the head wheel 250 and the tail wheel 260 to deliver the material added from the horizontal tail section 210 to the horizontal head section 230.

[0037] See also Figure 1 as well as Figure 4 The chain bucket conveyor 200 also includes an upper guide rail 270 and a lower guide rail 280, which are arranged vertically opposite to each other and are both located in the horizontal tail section 210. The upper guide rail 270 and the lower guide rail 280 are both close to the tail wheel 260, and the chain bucket runs on the upper guide rail 270 and the lower guide rail 280.

[0038] The chain bucket replacement device provided in the embodiment of the present application includes a first conveying assembly, a second conveying assembly, a power mechanism and a crane.

[0039] See also Figure 2 The first conveying assembly includes a first track 111, which is used to convey a new chain bucket segment 400 and is close to the tail wheel 260 of the chain bucket conveyor 200. The first track 111 extends along the length direction of the horizontal tail segment 210 and is flush with the top of the tail wheel 260. That is to say, the first track 111 and the upper guide rail 270 are respectively located on both sides of the tail wheel 260, and the first track 111 and the upper guide rail 270 are collinear. After the annular chain bucket in the chain bucket conveyor 200 is disconnected at the tail wheel 260, it can be connected to the new chain bucket segment 400 on the first track 111. The new chain bucket segment 400 can run from the first track 111 and the tail wheel 260 to the upper guide rail 270 in sequence. Please continue to refer to Figure 2 The second conveying assembly includes a second track 120, which is used to convey the old chain bucket segment 300 and is located below the first track 111. The second track 120 is docked with the lower guide rail 280 of the horizontal tail section 210, so that the annular chain bucket with a broken end can run along the lower guide rail 280 to the second track 120; the power mechanism is used to drive the old chain bucket segment 300 so that the old chain bucket segment 300 runs along the second track 120, thereby driving other old chain bucket segments 300 in the box 240 of the chain bucket conveyor 200 and the connected new chain bucket segment 400 to run. The crane is used to lift the new chain bucket segment 400 to the first track 111, and the crane can be a crane with a rated weight of 50 tons.

[0040] The following describes the use process of the chain bucket replacement device. First, the annular chain bucket in the chain bucket conveyor 200 is disconnected at the tail wheel 260. At this time, the annular chain bucket forms a chain bucket assembly having a first end and a second end, wherein the first end is located at the lower guide rail 280, and the second end is located at the upper guide rail 270. The chain bucket assembly includes a plurality of chain bucket segments connected in sequence, and the length of each chain bucket segment can be 5-10 meters, such as 8m, 10m, etc. First, the new chain bucket segment 400 is hoisted to the first track 111 by a crane, and then the new chain bucket segment 400 on the first track 111 is connected to the second end of the chain bucket assembly. The power mechanism drives the first end so that the first end gradually runs to the second track 120, thereby driving the second end into the chain bucket conveyor 200, and the new chain bucket segment 400 also enters the chain bucket conveyor 200 along with the second end. When the newly connected chain bucket segments 400 are about to enter the chain bucket conveyor 200, the power mechanism stops working, disconnects the old chain bucket segments 300 on the second track 120 from the chain bucket assembly in the chain bucket conveyor 200, and the disconnected old chain bucket segments 300 are taken out of the second track 120 by the power mechanism for transportation and recycling. Repeat the above steps until all the old chain bucket segments 300 are replaced by new chain bucket segments 400, and connect the first end and the second end of the new chain bucket assembly to complete the replacement of the chain bucket.

[0041] In some embodiments, see Figure 5 as well as Figure 6 The first conveying assembly and the second conveying assembly both include a third rail 130 and a fourth rail 140. The extension direction of the fourth rail 140 is set at an angle to the extension directions of the first rail 111 and the second rail 120. The two third rails 112 are movable so that one end of the third rail 112 of the first conveying assembly can be switchably connected with the corresponding fourth rail 113 and the first rail 111. The crane is used to lift the new chain bucket segment to the fourth rail 113 and then move it to the third rail 112. The movement of the third rail 112 drives the new chain bucket segment to move until the third rail 112 is connected to the first rail 111, and then the new chain bucket segment on the third rail 112 is moved to the first rail 111. Similarly, the third track 130 of the second conveying assembly is movable, and one end of the third track 130 of the second conveying assembly can be switchably docked with the corresponding fourth track 140 and the second track 120. Specifically, the third track 130 is first docked with the second track 120, and the old chain bucket segment is moved from the second track 120 to the third track 130. The third track 130 is moved so that the third track 130 is docked with the fourth track 140, and then the old chain bucket segment on the third track 130 is moved to the fourth track 140. In this way, the chain bucket can be replaced in a limited working space.

[0042] In some embodiments, please refer to Figure 5 as well as Figure 6The third track 130 of the first conveying assembly is located above the third track 130 of the second conveying assembly, and the fourth track 140 of the first conveying assembly is located above the fourth track 140 of the second conveying assembly.

[0043] In some embodiments, see Figure 6 The chain bucket replacement device also includes a bracket 160 and a base 170. The bracket 160 is rotatably connected to the base 170 via a rotating shaft 130 extending in the vertical direction. The two third rails 130 are both installed on the bracket 160. The bracket 160 is connected to a plurality of rollers 161. The rollers 161 contact the platform and can support the bracket 160. By rotating the bracket 160, the bracket 160 drives the two third rails 130 to rotate synchronously. While the old chain bucket segment 300 is transferred from the third rail 130 of the second conveying component to the fourth rail 140, the new chain bucket segment 400 is transferred from the fourth rail 113 of the first conveying component to the third rail 112. The rotation of the two third rails 130 is achieved in one operation, and the structure is more concise. In other embodiments, the two third rails 130 can be respectively connected to the brackets with rollers, and the two can move independently without interfering with each other.

[0044] In some embodiments, the first conveying assembly further includes an operating rod connected to the bracket, and two operating rods are provided, and the two operating rods are respectively located on both sides of the third track rod in the width direction. The operator can act on the operating rod to change the position of the third track 112. Since the operating rod is located on the outside of the third track, the two operating rods are located on both sides of the new chain bucket segment 400 in the width direction, which is highly safe and prevents the operator from accidentally touching the new chain bucket segment 400.

[0045] In some embodiments, the length of the operating rod is the same as that of the third track 130 , and the operating rod is parallel to the third track 130 .

[0046] Since the sprocket wheel 290 of the chain bucket segment can rotate by itself and the length of the chain bucket segment is not particularly long, the operation of the new chain bucket segment 400 and the old chain bucket segment 300 on the fourth track 140 and the third track 130 can be achieved by pushing by the operator.

[0047] In some embodiments, see Figure 2 , the second track 120 is tilted, and the upper end of the second track 120 is close to the lower guide rail 280. When the old chain bucket segment 300 runs from the lower guide rail 280 to the second track 120, the power mechanism saves effort and energy. The angle between the second track 120 and the horizontal direction can be 30°, or 35°, etc., which is not limited in this application. It should be noted that even if the second track 120 is tilted, the friction resistance between the old chain bucket segment 300 and the second track 120 is very large, and it cannot slide along the second track 120 by itself under the action of gravity. Therefore, there is no need to set a locking structure to stop the movement of the old chain bucket segment 300.

[0048] In some embodiments, see Figure 5 Under the condition that the second track 120 is tilted, the third track 130 of the second conveying assembly is tilted, and the inclination directions of the second track 120 and the third track 130 are consistent, so that when the second track 120 and the third track 130 are docked, an inclined track is formed for the old chain bucket segment to pass through.

[0049] In some embodiments, see Figure 2 The power mechanism includes a winch 150 located at one end of the second track 120 away from the chain bucket conveyor 200. The winch 150 and the second track 120 have a gap for accommodating the old chain bucket segment 300. The traction rope of the winch 150 is connected to the old chain bucket segment 300. Under the condition of using the winch 150 as the power mechanism, in some embodiments, two traction ropes are provided, and the two traction ropes are respectively connected to both sides of the old chain bucket segment 300 along the width direction to improve the stability of the old chain bucket segment 300 being transported along the second track 120. The winch 150 can be a 3-ton winch 150.

[0050] Since the chain bucket assembly in the chain bucket conveyor 200 is very long, in order to improve the efficiency of the chain bucket assembly, in some embodiments, the power mechanism also includes a driving member and a head wheel 250 of the chain bucket conveyor 200, the output end of the driving member is in transmission connection with the head wheel 250, and the chain bucket of the chain bucket conveyor 200 is engaged with the head wheel 250. The driving member is a driving motor, and when in use, the head wheel 250 can be rotated in an inching manner, thereby driving the chain bucket in the chain bucket conveyor 200 to run. Since it is driven by the driving member of the chain bucket conveyor 200, the chain bucket is replaced in an upper-in-lower-out manner.

[0051] In some embodiments, the first track 111 and the second track 120 are each provided with two limiting surfaces that are relatively arranged along a direction perpendicular to the running direction of the bucket chain conveyor 200, and the two limiting surfaces are respectively abutted against the outer side surface of the sprocket 290 of the bucket chain conveyor 200 for limiting, further improving the stability of the bucket chain running on the first track 111 and the second track 120. In other embodiments, the third track 130 and the fourth track 140 are each provided with two limiting surfaces that are relatively arranged along a direction perpendicular to the running direction of the bucket chain conveyor 200, and the two limiting surfaces are respectively abutted against the outer side surface of the sprocket 290 of the bucket chain conveyor 200 for limiting.

[0052] In some embodiments, the chain bucket replacement device further includes a first mounting frame 190, and the first track 110 and the second track 120 are both mounted on the first mounting frame 190. The chain bucket replacement device further includes a second mounting frame, and the two fourth tracks 140 are both mounted on the second mounting frame.

[0053] It should be noted that in the present application, the first track 110 , the second track 120 , the third track 130 and the fourth track 140 all include two rows of running rails that cooperate with two sprockets of the chain bucket segment along the width direction.

[0054] The chain bucket replacement device provided in the present application is operated at the tail wheel 260 of the chain bucket conveyor 200. First, completely loosen the tension bolts at the tail of the conveyor chain of the chain bucket conveyor 200, put down the counterweight, and ensure that the conveyor chain is relaxed. Open the inspection port of the tail wheel 260 of the chain bucket conveyor 200, extend the first track 111 into the inspection port of the tail wheel 260, and approach the tail wheel 260. The second track 120 extends through the inspection port of the tail wheel 260 to the bottom of the tail wheel 260, and docks the second track 120 with the lower guide rail 280. Set a winch 150 at the end of the second track 120 away from the chain bucket conveyor 200. The traction rope of the winch 150 should be directly opposite to the center of the lower guide rail 280 of the chain bucket conveyor 200. The specific working process is as follows:

[0055] Remove the chain bucket connecting pin, take out the chain bucket, disconnect the connecting pin shaft of the conveyor chain, and leave the upper new chain connecting pin hole and the lower old chain traction hole. Use a crane to lift the assembled new chain bucket segment 400 to the fourth track 140 of the first conveyor assembly, and then dock the third track 130 of the first conveyor assembly with the fourth track 140. The operator manually pushes the new chain bucket segment 400 from the fourth track 140 to the third track 130, and then rotates the third track 130 around the rotating shaft 130 to dock with the first track 111, and then manually pushes the new chain bucket segment 400 from the third track 130 of the first conveyor assembly to the fourth track 140. The new chain bucket segment 400 on the fourth track 140 is connected to the second end of the chain bucket assembly left on the upper guide rail 270 in the box body 240 with a pin shaft, and the traction rope of the winch 150 is tied to the chain link of the first end of the truncated chain bucket assembly on the lower guide rail 280 in the box body 240. After re-powering the driving parts of the chain bucket conveyor 200, start the winch 150 and the jog chain bucket conveyor 200 synchronously, and the old chain bucket assembly is pulled out from the lower guide rail 280 surface in the box body 240, and the new chain bucket segment 400 is synchronously entered into the box body 240 from the upper guide rail 270 surface. When the old chain bucket segment 300 comes out for 10 meters, the power outage procedure is re-processed, the new chain bucket segment 400 is connected, the old chain bucket segment 300 is truncated, the traction rope is reconnected to the first end, and the chain bucket conveyor 200 is powered again. Repeat the above work until the entire chain bucket assembly is replaced.

[0056] The chain bucket replacement device provided by the present application has at least the following advantages:

[0057] (1) The present application adopts the bottom-in-bottom-out method to replace the chain bucket section in the chain bucket conveyor. All replacement operations are carried out at zero meters, and the working surface is concentrated, which is more conducive to the safety control of the operation process from the source, avoids high-altitude lifting operations, greatly saves the use of large lifting equipment, and has lower maintenance costs and high efficiency.

[0058] (2) A first rail 110 and a second rail 120 of different heights are provided. The first rail 110 and the second rail 120 are respectively on the same horizontal plane as the upper guide rail 270 and the lower guide rail 280 of the chain bucket conveyor 200, so that the new and old chain buckets can be replaced on the extended rails of the same working surface.

[0059] (2) Both third rails 130 are configured to be rotatable around the rotating shaft 130, so that the third rail 130 of the first conveying assembly can be switchably connected to the first rail 110 and the corresponding fourth rail 140, and the third rail 130 of the second conveying assembly can be switchably connected to the second rail 120 and the corresponding fourth rail 140, thereby solving the problem of limited working space and reducing construction costs.

[0060] (3) The pre-assembly is divided into sections, that is, the replacement is done in sections. The chain bucket conveyor 200 is driven by a winch and pulled upward and downward to achieve intermittent semi-automatic replacement operations, which greatly saves maintenance time from the original 72 hours to 36 hours. The construction plan is simple and efficient.

[0061] In the present application, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0062] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise" and "counterclockwise" indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0063] In this application, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0064] In addition, the descriptions of "first", "second", etc. in this application are only for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" or "second" may explicitly or implicitly include one or more features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0065] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.

Claims

1. A chain bucket replacement device, suitable for replacing the chain bucket of a chain bucket conveyor including a horizontal tail section, characterized in that: The chain bucket replacement device comprises: A first conveying assembly, comprising a first track for conveying a new bucket chain segment, wherein the first track is close to a tail wheel of the bucket chain conveyor, and the first track extends along the length direction of the horizontal tail segment, and the height of the first track is flush with the top of the tail wheel; A second conveying assembly includes a second track for conveying the old chain bucket segment, the second track is docked with the lower guide rail of the horizontal tail segment, and the second track is located below the first track; A power mechanism, used for driving the old chain bucket segment to make the old chain bucket segment run along the second track; A crane is used to lift the new chain bucket segment to the first track.

2. The chain bucket replacement device according to claim 1, characterized in that: The first conveying assembly and the second conveying assembly both include a third track and a fourth track. Both of the third tracks are movable so that one end of the third track of the first conveying assembly can be switchably connected to the corresponding fourth track and the first track, and one end of the third track of the second conveying assembly can be switchably connected to the corresponding fourth track and the second track. The extension direction of the fourth track is set at an angle to the extension direction of the first track and the second track. The crane is used to lift the new chain bucket segment to the fourth track.

3. The chain bucket replacement device according to claim 2, characterized in that: The chain bucket replacement device also includes a bracket and a base. The bracket is rotatably connected to the base via a rotating shaft extending in a vertical direction. The two third rails are both installed on the bracket. The bracket is connected to a plurality of rollers.

4. The chain bucket replacement device according to claim 3, characterized in that: The first conveying assembly further includes an operating rod, and two operating rods are provided. The two operating rods are respectively located on both sides of the third track along the width direction.

5. The chain bucket replacement device according to claim 4, characterized in that: The length of the operating rod is the same as that of the third track, and the operating rod is parallel to the third track.

6. The chain bucket replacement device according to any one of claims 1 to 5, characterized in that: The second track is arranged to be inclined, and the upper end of the second track is close to the lower guide rail.

7. The chain bucket replacement device according to any one of claims 1 to 5, characterized in that: The power mechanism comprises a winch located at one end of the second track away from the chain bucket conveyor, a traction rope of the winch is connected to the old chain bucket segment, and a gap for accommodating the old chain bucket segment is provided between the winch and the second track.

8. The chain bucket replacement device according to claim 7, characterized in that: Two traction ropes are provided, and the two traction ropes are respectively connected to two sides of the old chain bucket segment along the width direction.

9. The chain bucket replacement device according to claim 7, characterized in that: The power mechanism also includes a driving member and a head wheel of the chain bucket conveyor. The output end of the driving member is transmission-connected to the head wheel, and the chain bucket of the chain bucket conveyor is meshed with the head wheel.

10. The chain bucket replacement device according to any one of claims 1 to 5, characterized in that: The first track and the second track are both provided with two limiting surfaces which are arranged opposite to each other and perpendicular to the running direction of the chain bucket conveyor, and the two limiting surfaces are respectively abutted against the outer side surfaces of the sprocket wheels of the chain bucket conveyor for limiting position.