Saddle bridge for cable-stayed bridge construction

By designing a saddle bridge for the construction of cable-stayed bridges, and by connecting and lifting the tower ends of the cable-stayed cables, the problems of long installation time and large lateral stress on the cable towers during the installation process of the cable-stayed cables are solved, and the construction time is shortened and the Improvement of structural stability.

CN221855280UActive Publication Date: 2024-10-18THE QINGDAO ENG CO LTD OF CHINA RAILWAY NO 10 ENG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323543897.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-25
Publication Date
2024-10-18
Estimated Expiration
2033-12-25

AI Technical Summary

Technical Problem

In the existing cable-stayed bridge construction methods, the cable-stayed cables occupy the road for a long time and are difficult to install at high places during the installation process, resulting in excessive lateral stress on the cable tower and affecting the structural strength.

Method used

Design a saddle bridge for cable-stayed bridge construction, including a working chamber with a guide tube. By connecting and lifting the tower ends of the two cable-stayed cables, the installation time and lateral force are reduced, using round tubes or rectangular tubes. The box-like structure of the work compartment and lifting eye design ensure accurate and safe installation.

Benefits of technology

It shortens the installation and construction time of the cable stay, reduces the lateral force on the cable tower during the installation process, and improves the construction efficiency and structural stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855280U_ABST
    Figure CN221855280U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of bridge building construction, in particular to a saddle bridge for cable-stayed bridge construction. Comprising a working bin with end plates at the two ends, a manhole communicated with an inner cavity of the working bin is formed in the upper end of the working bin, lifting lugs connected with a winch are arranged on the upper portions of the two ends of the working bin, guide pipes used for installing stay cables are fixedly inserted into the end plates, each guide pipe is of a round pipe structure, the inner end of each guide pipe inclines upwards, and the outer end of each guide pipe inclines downwards. According to the saddle bridge for cable-stayed bridge construction, the time for stay cable installation and construction can be shortened, and lateral stress of a cable tower in the stay cable installation process is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of bridge construction, and more specifically, to a saddle bridge used for cable-stayed bridge construction. Background Art

[0002] A cable-stayed bridge, also known as a cable-stayed bridge, is a type of bridge in which the main beam is directly pulled onto the bridge tower by many cables. It is a structural system composed of a pressure-bearing tower, a tensioned cable, and a bending beam body. It is mainly composed of a cable tower, a main beam, and a cable-stayed cable. The structural characteristics of a cable-stayed bridge can reduce the bending moment in the beam body, lower the building height, reduce the structural weight, and save materials. A box beam is a type of beam in bridge engineering. It is hollow inside and has flanges on both sides of the upper part, similar to a box, hence the name. Box beams of reinforced concrete structures are divided into prefabricated box beams and cast-in-place box beams. Box beams prefabricated in an independent site can be erected in combination with a bridge erection machine after the lower project is completed, which can speed up the project progress and save construction time; cast-in-place box beams are mostly used for large continuous bridges.

[0003] Most existing cable-stayed bridge construction methods are to clean the bridge deck and install the cable after the construction of the bridge tower and box girder is completed. This brings two technical difficulties. First, a long full-height scaffolding needs to be built to support the weight of the box girder during the construction of the box girder. The scaffolding can only be removed after the cable is installed. The scaffolding is difficult to erect and takes a long time to construct the road. Second, it is difficult to install the cable. Due to the long length and weight of the cable, the higher the installation position, the greater the lateral tension. When installing the cable, the bridge deck needs to be cleared, and the cable can be installed on the cable tower by using a winch and a tower crane. Before the symmetrical installation is completed, the asymmetric lateral tension of the cable on the cable tower is very large, which poses a great test to the structural strength of the cable tower.

[0004] Chinese Patent No. 2023102774449 discloses "A Construction Method for Cast-in-Place Box Girders of Cable-Stayed Bridges", which utilizes each embedded beam in conjunction with each upper supporting beam located on the top edge of the cast block as a cantilever casting support skeleton for cantilever casting of segment No. 1 on the side span side and main span side to each segment with subsequent sequence numbers and adjacent segments to be cast in the joint section, or utilizes each embedded beam in conjunction with each upper supporting beam located on the top edge of the cast block and the inclined cable as a cantilever casting support skeleton for cantilever casting of segment No. 1 on the side span side and main span side to each segment with subsequent sequence numbers and adjacent segments to be cast in the joint section. This construction method does not require the use of traditional hanging baskets and full-floor scaffolding for cantilever casting construction of cast-in-place box girders, causes less damage to the overall structure of the bridge deck, and has a simple process. However, due to the limited cantilever length of the casting support frame, in order to avoid excessive sagging of the bridge deck, when the box girder segment constructed using this cantilever casting method reaches a certain length, it is necessary to combine the full-floor scaffolding to build the casting support frame of the cast-in-place box girder. In addition, this construction method still has the problem of lateral force on the cable tower when installing the inclined cable. Summary of the invention

[0005] The utility model aims to provide a saddle bridge for cable-stayed bridge construction, so as to shorten the installation construction time of the cable-stayed cable and reduce the lateral force of the cable tower during the installation of the cable-stayed cable.

[0006] The utility model discloses a saddle bridge for cable-stayed bridge construction, comprising a working chamber with end plates at both ends, wherein the upper end of the working chamber is provided with a manhole connected to the inner cavity thereof, the upper parts of the two ends of the working chamber are provided with lifting ears for connecting a winch, and a guide pipe for installing a cable-stayed cable is fixedly inserted on the end plate, wherein the guide pipe is a round tube structure, the inner end of the guide pipe is inclined upward, and the outer end is inclined downward.

[0007] Through this solution, the tower ends of the two inclined cables can be connected together through the saddle bridge, so as to facilitate the simultaneous lifting and installation of the tower ends of the two inclined cables, shorten the installation construction time of the inclined cables, and reduce the lateral force on the cable tower during the installation of the inclined cables.

[0008] Preferably, the working chamber is a tubular structure with a circular cross-section.

[0009] Through this solution, the working chamber with a circular tubular structure has high strength, compact structure, and is easy to install and position.

[0010] Preferably, the working chamber is a rectangular box-shaped structure.

[0011] Through this solution, the installation position of the working chamber of the rectangular box-shaped structure is accurately positioned, which is convenient for production and manufacturing.

[0012] Preferably, a winch connection point is provided at the upper end of the lifting lug, and a guide rope connection point is provided at the lower end.

[0013] This solution can avoid interference between the winch wire rope and the guide rope, making it easier to lift and position the saddle bridge.

[0014] Preferably, a compartment cover is provided on the manhole.

[0015] Through this solution, water can be prevented from entering the working chamber, and the interior of the working chamber can be kept dry.

[0016] Preferably, reinforcing ribs are fixedly welded between the inner wall of the working chamber and the outer wall of the guide tube, and a plurality of the reinforcing ribs are evenly distributed around the axis of the guide tube.

[0017] Through this solution, the guide tube is firmly connected to the working chamber, and the inclination angle of the guide tube is accurately positioned.

[0018] Due to the adoption of the above technical scheme, the saddle bridge for cable-stayed bridge construction described in the utility model can shorten the installation construction time of the cable-stayed cables and reduce the lateral force on the cable tower during the installation of the cable-stayed cables. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the present invention and, together with the description, serve to explain the principles of the present invention.

[0020] Figure 1 It is a structural schematic diagram of a cast-in-place box girder cable-stayed bridge in the utility model.

[0021] Figure 2 It is a schematic diagram of the local structure of the upper end of the cable tower when the end of the cable tower is lifted.

[0022] Figure 3 It is a cross-sectional structural schematic diagram of an embodiment of the utility model.

[0023] Figure 4 It is a three-dimensional structural schematic diagram of an embodiment of the utility model. DETAILED DESCRIPTION

[0024] Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that unless otherwise specifically stated, the relative arrangements of components and steps, numerical expressions and numerical values ​​set forth in these embodiments do not limit the scope of the present invention.

[0025] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the present invention, its application, or uses.

[0026] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered as part of the specification.

[0027] In all examples shown and discussed herein, any specific values ​​should be interpreted as merely exemplary and not limiting. Therefore, other examples of the exemplary embodiments may have different values.

[0028] It should be noted that like reference numerals and letters refer to similar items in the following figures, and therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.

[0029] like Figure 3 , Figure 4As shown, the saddle bridge used for cable-stayed bridge construction described in the utility model includes a working chamber 11 with end plates 10 at both ends, and a manhole 12 connected to its inner cavity is arranged at the upper end of the working chamber 11. The cross-section of the working chamber 11 can be a circular tubular structure or a rectangular box-like structure. Its internal space is relatively large, which can facilitate construction personnel to enter the working chamber 11 for operation. The manhole 12 at the upper end of the working chamber 11 can facilitate the construction personnel to enter and exit. To prevent water from entering, a chamber cover can be added to the working chamber 11 after installation. The upper parts of the two ends of the working chamber 11 are provided with lifting ears 13 connected to the winch 42, and the end plates 10 are fixedly inserted with a guide pipe 14 for installing the inclined cable 9. The guide pipe 14 is a circular tube structure, the inner end of the guide pipe 14 is inclined upward, and the outer end is inclined downward. The inclination angle of the guide pipe 14 matches the designed inclination angle of the inclined cable 9 after installation.

[0030] As a further improvement of the utility model, Figure 4 As shown, the upper end of the lifting lug 13 is provided with a winch connection point 131, and the lower end is provided with a guide rope connection point 132. When in use, the winch connection point 131 is used to connect the wire rope of the winch for lifting the saddle bridge, and the guide rope connection point 132 is used to connect the guide rope for adjusting the position of the saddle bridge.

[0031] As a further improvement of the utility model, Figure 3 As shown, reinforcing ribs 141 are fixedly welded between the inner wall of the working chamber 11 and the outer wall of the guide tube 14 , and a plurality of the reinforcing ribs 141 are evenly distributed around the axis of the guide tube 14 .

[0032] like Figure 1 , Figure 2 As shown, the construction of a saddle bridge for cable-stayed bridge construction according to the utility model includes the following steps:

[0033] Step 1: After the construction of the cable tower cap 1 is completed, a pier 2 is built on the cable tower cap 1, and a segment box beam concrete and a lower solid section 3 of the cable tower are poured on the pier 2. A cable tower main section 4 is built above the lower solid section 3 of the cable tower, and a cable lifting passage 5 that runs through the upper and lower parts is reserved at the central axis position of the cable tower main section 4. A tower end installation position for installing the inclined cable is reserved at a designed height position on the cable tower, and the tower end installation position is a cable cap 6 fixedly arranged on the inner wall of the cable tower on the side of the cable lifting passage 5; Figure 2 As shown, the cable support 6 has a horizontal installation surface protruding from the inner wall of the cable tower, which can be used to support and install the tower end of the inclined cable.

[0034] Due to the existence of the cable lifting channel 5, the main section 4 of the cable tower is divided into two independent tower columns by the cable lifting channel 5. In order to improve the stability of the top of the tower column, a cap beam 41 can be provided at the upper end of the main section 4 of the cable tower, and a winch 42 is installed at the upper end of the cap beam 41. The winch 42 is used to lift the tower end of the inclined cable when installing the inclined cable, and can also be used to lift the working cage to lift the workers onto the cable cap 6 for construction work.

[0035] Step 2: Building box beams and load-bearing box beams 7 with bridge end mounting positions 8 symmetrically on both sides of the cable tower;

[0036] Step three: Install the cable-stayed cable 9. Simultaneously unfold two cables 9 of the same length on the bridge deck on both sides of the main section 4 of the cable tower, and connect the tower ends of the two cables 9 together at the bottom of the cable lifting channel 5; lift the connected cable tower ends to the designed height and place them on the cable pedestal 6; install the bridge end of the cable-stayed cable 9 to the bridge end mounting position 8 of the load-bearing box girder 7; the connection method of the cable-stayed cable 9 and the bridge end mounting position 8 can adopt the existing construction method of the cable-stayed bridge, which will not be repeated here.

[0037] In order to facilitate connection and tension adjustment, the tower ends of the inclined cables usually need to be connected together through connectors. Figure 3 , Figure 4 The saddle bridge shown connects the tower ends of two inclined cables together, and the two inclined cables are respectively connected to the two ends of the saddle bridge; the two ends of the saddle bridge are provided with lifting ears 13, and after the saddle bridge and the tower ends of the inclined cables are lifted to the designed height by the wire rope of the winch 42 connected to the lifting ears, the saddle bridge is pulled toward the cable support 6 by the guide rope connected to the lifting ears, and the saddle bridge is placed on the cable support 6.

[0038] like Figure 2 As shown, during construction, the saddle bridge is first placed at the bottom of the cable lifting channel 5, the tower ends of the two inclined cables 9 are respectively passed through the guide pipes 14 and fixed from the inside of the working chamber 11, and then the wire rope 421 suspended from the winch 42 is connected to the lifting lug 13 by a three-point hanging method, and then the two guide ropes 422 are also connected to the lifting lug 13; the winch 42 is started to reel in the wire, and the saddle bridge is lifted to a position slightly higher than the cable support 6, and then the guide rope 422 is pulled sideways by manual or crane, so that the saddle bridge moves slightly to one side and is just above the cable support 6, and then the winch 42 is started to release the wire, and the saddle bridge is placed on the cable support 6 to complete the installation of the tower end of the inclined cable.

[0039] Step 4: Repeat the above steps 2 and 3 until all the stay cables 9 are installed. After the stay cables 9 are installed, the construction personnel enter the working chamber 11 through the manhole 12 and use the through-hole jack to adjust the tension of the stay cables 9 in a conventional manner.

[0040] In addition, in step 1, a clamping groove 61 is provided on the cable support 6, and the shape of the clamping groove 61 matches the outer contour of the saddle bridge. In step 3, the saddle bridge with the tower end of the inclined cable installed is placed on the cable support 6 and clamped into the clamping groove 61. In this way, it can be ensured that the saddle bridge is firmly installed and will not slip off the cable support 6.

[0041] In step 1, when building the main section 4 of the cable tower, Figure 2 As shown, prestressed beam mounting holes 43 are symmetrically preset on the main section 4 of the cable tower on both sides of the cable lifting channel 5. The prestressed beam mounting holes 43 are two in a group, and one is set on each of the two towers on both sides of the cable lifting channel 5. The shape of the prestressed beam mounting hole 43 matches the outer contour shape of the catch 441 at the end of the prestressed beam 44; in step 4: after all the inclined cables 9 are installed, the prestressed beam 44 is inserted and fixed in the prestressed beam mounting hole 43. The prestressed beam 44 can be formed in one piece by a steel section, or it can be a reinforced concrete prefabricated part. Both ends of the prestressed beam 44 are provided with protruding catches 441. During installation, the prestressed beam 44 is hoisted to the position of the prestressed beam mounting hole 43 by a crane, and the catch 441 is correspondingly inserted into the prestressed beam mounting hole 43. Of course, the method of erecting a scaffold can also be adopted. First, the prestressed beam 44 is hoisted onto the scaffold, and then the construction personnel insert the catch 441 of the prestressed beam 44 into the prestressed beam mounting hole 43.

[0042] Although some specific embodiments of the present invention have been described in detail by way of examples, it should be understood by those skilled in the art that the above examples are for illustration only and are not intended to limit the scope of the present invention. It should be understood by those skilled in the art that the above embodiments may be modified without departing from the scope and spirit of the present invention. The scope of the present invention is defined by the appended claims.

Claims

1. A saddle bridge for cable-stayed bridge construction, comprising a working chamber (11) with end plates (10) at both ends, a manhole (12) communicating with the inner cavity of the working chamber (11) is arranged at the upper end, and lifting ears (13) for connecting a winch (42) are arranged at the upper parts of both ends of the working chamber (11), characterized in that: A guide tube (14) for installing the inclined cable (9) is fixedly inserted on the end plate (10); the guide tube (14) is a round tube structure; the inner end of the guide tube (14) is inclined upward and the outer end is inclined downward.

2. A saddle bridge for cable-stayed bridge construction according to claim 1, characterized in that: The working chamber (11) is a tubular structure with a circular cross section.

3. The saddle bridge for cable-stayed bridge construction according to claim 1, characterized in that: The working chamber (11) is a rectangular box-shaped structure.

4. A saddle bridge for cable-stayed bridge construction according to any one of claims 1 to 3, characterized in that: The upper end of the lifting lug (13) is provided with a winch connection point (131), and the lower end is provided with a guide rope connection point (132).

5. A saddle bridge for cable-stayed bridge construction according to any one of claims 1 to 3, characterized in that: The manhole (12) is provided with a bin cover (121).

6. A saddle bridge for cable-stayed bridge construction according to any one of claims 1 to 3, characterized in that: A reinforcing rib (141) is fixedly welded between the inner wall of the working chamber (11) and the outer wall of the guide tube (14), and a plurality of the reinforcing ribs (141) are evenly distributed around the axis of the guide tube (14).