Concrete pouring full pipe chute device

By designing a concrete pouring chute device with a trumpet-shaped buffer tube and an acute-angle connecting inclined tube, the difficulty and high cost of chute production in bridge construction are solved, effective buffering and transportation control of concrete are achieved, and construction costs are reduced.

CN221855282UActive Publication Date: 2024-10-18CHINA RAILWAY JIUJIANG BRIDGE ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323387473.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-12
Publication Date
2024-10-18
Estimated Expiration
2033-12-12

AI Technical Summary

Technical Problem

In bridge construction, especially in the construction of arch bridge abutments in mountainous areas, due to the steep terrain and the large gap between the transportation channels between the abutments and abutments, the production of concrete pouring chutes is difficult and costly, and the existing technology cannot meet the demand.

Method used

A full-tube chute device for concrete pouring is designed, including chute pipe fittings and connecting inclined pipes. By setting up a trumpet-shaped buffer pipe and an acute-angle connecting inclined pipe, the primary and secondary buffering of concrete is achieved, the flow rate is reduced, segregation is avoided, and the chute is facilitated. Disassembly and length adjustment reduce construction costs.

Benefits of technology

It effectively reduces the manufacturing difficulty and cost of arranging buffers inside the chute, improves the concrete transportation control ability, adapts to complex environments, reduces construction costs, and has a simple structure and is easy to construct.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855282U_ABST
    Figure CN221855282U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of bridge construction, in particular to a concrete pouring full pipe chute device which comprises a chute pipe fitting and a communication inclined pipe, the chute pipe fitting comprises a first guide pipe, a second guide pipe and a standard guide pipe, and the two ends of the standard guide pipe are connected with the first guide pipe and the second guide pipe respectively; the first guide pipe comprises a first buffer pipe and a first connecting pipe, and the first buffer pipe is trumpet-shaped; the arrangement of the communicating inclined pipe is beneficial for the chute pipe fitting to adapt to the changeable environment of a mountain to be disassembled and assembled, the conveying direction of concrete can be changed to adapt to the environment, the speed of conveying the concrete to a pouring site can be reduced, and workers can conveniently control chute pouring; according to the structure, a buffer is not arranged on the inner side, the manufacturing difficulty is reduced, the machining cost is further reduced, the length of the chute can be set according to actual conditions, the structure is simple, and the construction cost is greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, in particular to a full-tube chute device for pouring concrete. Background Art

[0002] With the advancement of science and technology and the development of the construction industry, super-high and large-span concrete structures have emerged one after another, giant beams and giant frames are becoming more and more common, the size of components is increasing, and the construction environment is becoming more and more complex. In bridge construction, especially in the construction of arch abutments of arch bridges in mountainous areas, due to the steep terrain, the difference in the transportation channel between the arch abutment and the abutment is large, the difficulty and cost of building access roads are high, and the conventional ground pump and sky pump construction methods cannot meet the requirements of arch abutment concrete pouring. Usually, a long-distance transportation chute is installed to drain the concrete to the pouring site for pouring.

[0003] In the prior art, when concrete flows down from a height, a buffer device is usually arranged in the chute to slow down the concrete pouring speed and avoid concrete segregation. However, the diameter of the chute is usually small, and the chute with the buffer arranged inside is difficult to manufacture and has high processing costs, especially for the chute for long-distance transportation, the relative construction cost is greatly increased. Utility Model Content

[0004] The problem solved by the utility model is that it is difficult to manufacture a chute with a buffer arranged inside and the processing cost is high.

[0005] In order to solve the above problems, the utility model proposes the following technical solutions:

[0006] A full-tube chute device for pouring concrete, comprising a chute pipe and a connecting inclined pipe, wherein the chute pipe comprises a first guide pipe, a second guide pipe and a standard guide pipe, and the first guide pipe and the second guide pipe are connected to both ends of the standard guide pipe respectively;

[0007] The first guide tube includes a first buffer tube and a first connecting tube, the first buffer tube is trumpet-shaped, the end of the first buffer tube with a smaller diameter is connected to the standard guide tube, and the end of the first buffer tube with a larger diameter is connected to the first connecting tube;

[0008] The plurality of chute pipe fittings are connected in sequence through the connecting inclined pipe, and the connecting inclined pipe is connected between the first connecting pipe of the chute pipe fitting located at the lower end and the second guide pipe of the chute pipe fitting located at the upper end, and the angle between the axis of the connecting inclined pipe and the axis of the first connecting pipe is an acute angle.

[0009] The utility model provides a concrete pouring full-tube chute device, which has, but is not limited to, the following beneficial effects compared to the prior art:

[0010] Concrete flows from the connecting inclined pipe into the first connecting pipe of the first guide pipe. Since the angle between the axis of the connecting inclined pipe and the end of the axis of the first connecting pipe away from the first buffer pipe is an acute angle, the concrete first hits the inner wall of the first connecting pipe when entering the first connecting pipe, achieving a preliminary buffering effect, and then flows from the first connecting pipe into the first buffer pipe. Since the first buffer pipe is trumpet-shaped, when the concrete flows down along the first buffer pipe, the first buffer pipe has a further buffering effect on the concrete, which can offset the impact force of part of the concrete flowing out, reduce the flow rate of the concrete, and avoid concrete segregation. Since the connecting inclined pipe is connected to the chute pipe at the lower end The first connecting pipe is connected to the second guide pipe of the chute pipe at the upper end, so that the chute pipe always keeps the first guide pipe facing upward and the second guide pipe facing downward, which makes it easier for concrete to flow down from a high place under the action of gravity; the setting of the connecting inclined pipe is conducive to the disassembly and assembly of the chute pipe to adapt to the changing environment of the mountain, and can also change the conveying direction of concrete to adapt to the environment, which is conducive to reducing the speed of concrete conveying to the pouring site and facilitating workers to control the pouring of the chute; the structure avoids arranging a buffer on the inside, which is conducive to reducing the difficulty of production and thus reducing the processing cost, and the length of the chute can be set according to the actual situation, the structure is simple and the construction cost is greatly reduced.

[0011] Preferably, the second guide tube includes a second buffer tube and a second connecting tube, the second buffer tube is trumpet-shaped, the end of the second buffer tube with a smaller diameter is connected to the standard guide tube, and the end of the second buffer tube with a larger diameter is connected to the second connecting tube; the connecting inclined tube is connected between the first connecting tube of the chute pipe fitting located at the lower end and the second connecting tube of the chute pipe fitting located at the upper end.

[0012] Preferably, the chute pipe fitting further comprises a sealing flange plate, and the lower end of the second connecting pipe of the second guide pipe is sealed by the sealing flange plate; the connecting inclined pipe is connected to the side wall of the second connecting pipe of the chute pipe fitting located at the upper end.

[0013] Preferably, the chute pipe further comprises a connecting flange, and the first buffer pipe is connected to the standard conduit via the connecting flange; and the second buffer pipe is connected to the standard conduit via the connecting flange.

[0014] Preferably, the chute pipe further comprises a lifting ring, and the two lifting rings are respectively used to be installed on the ends of the first guide pipe and the second guide pipe.

[0015] Preferably, the concrete pouring full-tube chute device also includes a feeding assembly, which includes a first feeding funnel and a feeding chute, the feeding chute is connected to the lower end of the first feeding funnel, and the feeding chute is inclined.

[0016] Preferably, the feed chute is connected to the chute pipe at the uppermost end via the connecting inclined pipe, and the feed chute and the connecting inclined pipe have the same inclination angle.

[0017] Preferably, the feeding assembly also includes a second feeding funnel, a feeding conduit and a feeding guide pipe, the upper end of the second feeding funnel is used to receive the bottom of the feeding chute, the lower end of the second feeding funnel is connected to the feeding conduit, the lower end of the feeding conduit is connected to the feeding guide pipe, and the feeding guide pipe is connected to the first connecting pipe of the chute pipe located at the uppermost end through the connecting inclined pipe.

[0018] Preferably, the concrete pouring full-tube chute device also includes a material discharge component, and the material discharge component includes a material discharge funnel and a material discharge chute, and the lower end of the material discharge funnel is connected to the material discharge chute.

[0019] Preferably, the material discharge assembly also includes a material discharge conduit and a material discharge guide pipe, the material discharge guide pipe is connected to the second connecting pipe of the chute pipe located at the lower end through the connecting inclined pipe, the lower end of the material discharge guide pipe is connected to the material discharge conduit, and the upper end of the material discharge funnel is used to receive the bottom of the material discharge conduit. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a schematic diagram of the chute pipe structure of the concrete pouring full-tube chute device according to an embodiment of the utility model;

[0021] Figure 2 The schematic diagram of the structure of the chute pipe and the feeding assembly of the utility model embodiment is as follows Figure 1 ;

[0022] Figure 3 The schematic diagram of the structure of the chute pipe and the feeding assembly of the utility model embodiment is as follows Figure 2 ;

[0023] Figure 4 The schematic diagram of the structure of the chute pipe and the material feeding assembly of the embodiment of the utility model is as follows: Figure 1 ;

[0024] Figure 5 The schematic diagram of the structure of the chute pipe and the material feeding assembly of the embodiment of the utility model is as follows: Figure 2 .

[0025] Description of reference numerals:

[0026] 1 chute pipe fitting, 11 first guide pipe, 111 first buffer pipe, 112 first connecting pipe, 12 second guide pipe, 121 second buffer pipe, 122 second connecting pipe, 13 standard conduit, 14 connecting flange, 15 lifting ring, 16 sealing flange plate, 2 connecting inclined pipe, 3 feeding assembly, 31 first feeding funnel, 32 feeding chute, 33 second feeding funnel, 34 feeding conduit, 35 feeding guide pipe, 4 unloading assembly, 41 unloading funnel, 42 unloading chute, 43 unloading conduit, 44 unloading guide pipe. DETAILED DESCRIPTION

[0027] The following is a further detailed description of the implementation of the present application in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application but cannot be used to limit the scope of the present application.

[0028] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0029] It should be noted that, in the coordinate system XYZ provided in this document, the positive direction of the X-axis represents the right, the reverse direction of the X-axis represents the left, the positive direction of the Y-axis represents the front, the reverse direction of the Y-axis represents the back, the positive direction of the Z-axis represents the top, and the reverse direction of the Z-axis represents the bottom; the meanings of the Z-axis, X-axis, and Y-axis are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0030] See also Figure 1-Figure 5The utility model provides a concrete pouring full-tube chute device, comprising a chute pipe fitting 1 and a connecting inclined pipe 2, wherein the chute pipe fitting 1 comprises a first guide pipe 11, a second guide pipe 12 and a standard conduit 13, and the two ends of the standard conduit 13 are respectively connected with the first guide pipe 11 and the second guide pipe 12; the first guide pipe 11 comprises a first buffer pipe 111 and a first connecting pipe 112, the first buffer pipe 111 is trumpet-shaped, the end of the first buffer pipe 111 with a small diameter is connected to the standard conduit 13, and the end of the first buffer pipe 111 with a large diameter is connected to the first connecting pipe 112; the first connecting pipe 112 is away from One end of the first buffer tube 111 is sealed or open, which has waterproof and dustproof effects when sealed, and is convenient for observing the internal working conditions of the chute pipe 1 when open. The end of the second guide tube 12 away from the standard conduit 13 is sealed; multiple chute pipes 1 are connected in sequence through the connecting inclined tube 2, and the connecting inclined tube 2 is connected between the first connecting tube 112 of the chute pipe 1 at the lower end and the second guide tube 12 of the chute pipe 1 at the upper end, and the angle between the axis of the connecting inclined tube 2 and the end of the axis of the first connecting tube 112 away from the first buffer tube 111 is an acute angle.

[0031] Specifically, the axes of the plurality of chute pipes 1 are arranged in parallel, or partially parallel and partially overlapped, which means that the axes of the plurality of chute pipes 1 connected in sequence through the connecting inclined pipe 2 are parallel, or partially parallel and partially overlapped, but the axes of two adjacent chute pipes 1 will not overlap. Alternatively, the axes of the plurality of chute pipes 1 are offset at an acute angle, depending on the actual situation.

[0032] The cross section of the connecting inclined tube 2 may be a trapezoidal structure, and the two ends of the connecting inclined tube 2 are respectively connected to the first connecting tube 112 of the chute pipe 1 at the lower end and the second guide tube 12 of the chute pipe 1 at the upper end.

[0033] In this embodiment, the entire chute device is formed by connecting a plurality of the chute pipe fittings 1 and the connecting inclined pipe 2. Specifically, the plurality of the chute pipe fittings 1 are sequentially connected from top to bottom through the connecting inclined pipe 2. In other words, adjacent chute pipe fittings 1 are connected through the connecting inclined pipe 2. One of the two adjacent chute pipe fittings 1 is located at the upper end of the connecting inclined pipe 2, and the other is located at the lower end of the connecting inclined pipe 2. That is, "the chute pipe fitting 1 located at the upper end and the chute pipe fitting 1 located at the lower end" in this embodiment refers to the position of two adjacent chute pipe fittings 1 relative to the connecting inclined pipe 2 therebetween. Specifically, each chute pipe member 1 includes a first guide pipe 11, a second guide pipe 12 and a standard guide pipe 13. Concrete flows from the connecting inclined pipe 2 into the first connecting pipe 112 of the first guide pipe 11. Since the angle between the axis of the connecting inclined pipe 2 and the end of the axis of the first connecting pipe 112 away from the first buffer pipe 111 is an acute angle, when the concrete enters the first connecting pipe 112, it first hits the inner wall of the first connecting pipe 112 to achieve a preliminary buffering effect, and then flows from the first connecting pipe 112 into the first buffer pipe 111. Since the first buffer pipe 111 is trumpet-shaped, when the concrete flows down the first buffer pipe 111, the first buffer pipe 111 has a further buffering effect on the concrete, which can offset the impact force of part of the concrete flowing out, reduce the flow rate of the concrete, and avoid concrete segregation. When the trough pipe fittings 1 are connected by the connecting inclined pipe 2, the axes of the plurality of chute pipe fittings 1 are arranged in parallel, or partially in parallel and partially overlapped, and the connecting inclined pipe 2 is connected between the first connecting pipe 112 of the chute pipe fitting 1 at the lower end and the second guide pipe 12 of the chute pipe fitting 1 at the upper end, that is, each chute pipe fitting 1 always keeps the first guide pipe 11 facing upward and the second guide pipe 12 facing downward, and all chute pipe fittings 1 can be arranged vertically, so as to facilitate the concrete to flow down from a high place under the action of gravity; the setting of the connecting inclined pipe 2 is conducive to the chute pipe fitting 1 to adapt to the changing environment of the mountain for disassembly and assembly, and can also change the conveying direction of concrete to adapt to the environment, avoiding the concrete segregation caused by the high flow rate and impact when the concrete is vertically conveyed from the top of the mountain to the bottom of the mountain, which is conducive to reducing the speed of concrete conveying to the pouring site and facilitating the workers to control the pouring of the chute. This structure avoids the arrangement of buffers on the inside, which is conducive to reducing the difficulty of production, thereby reducing the processing cost, and the length of the chute can be set according to the actual situation, the structure is simple and the construction cost is greatly reduced.

[0034] Specifically, the distance between two adjacent chute pipes is in the range of 15m-20m; the acute angle is in the range of 45°-60°. This structure is conducive to reducing the speed of concrete during the sliding process, thereby reducing concrete segregation.

[0035] See also Figure 1 Preferably, the second guide pipe 12 includes a second buffer pipe 121 and a second connecting pipe 122, the second buffer pipe 121 is trumpet-shaped, the end of the second buffer pipe 121 with a smaller diameter is connected to the standard conduit 13, and the end of the second buffer pipe 121 with a larger diameter is connected to the second connecting pipe 122; the connecting inclined pipe 2 is connected between the first connecting pipe 112 of the chute pipe fitting 1 at the lower end and the second connecting pipe 122 of the chute pipe fitting 1 at the upper end.

[0036] In this embodiment, the second buffer tube 121 is trumpet-shaped, and the end of the second buffer tube 121 with a smaller diameter is connected to the standard conduit 13, and the end of the second buffer tube 121 with a larger diameter is connected to the second connecting tube 122. This structure can prevent the connection between the standard conduit 13 and the second guide tube 12 from being blocked due to the small diameter.

[0037] See also Figure 1 Preferably, the chute pipe fitting 1 also includes a sealing flange plate 16, and the lower end of the second connecting pipe 122 of the second guide pipe 12 is sealed by the sealing flange plate 16; the sealing flange plate 16 is fixed to the lower end of the second connecting pipe 122 by bolts; the connecting inclined pipe 2 is connected to the side wall of the second connecting pipe 122 of the chute pipe fitting 1 located at the upper end.

[0038] Specifically, the second connecting pipe 122 and the sealing flange plate 16 form a receiving cavity at the lower end of the second guide pipe 12. Concrete flows through the first guide pipe 11 into the receiving cavity inside the second guide pipe 12 to form a certain amount of accumulation. Then, the concrete falls along the second buffer pipe 121 to impact the concrete in the receiving cavity, thereby playing a secondary mixing role to avoid concrete segregation. When the amount of concrete in the receiving cavity reaches the connection point of the connecting inclined pipe 2, the concrete enters the next chute pipe 1 from the connecting inclined pipe 2. This structure is conducive to reducing the flow rate of concrete and further reducing the occurrence of concrete segregation.

[0039] In this embodiment, the provision of the sealing flange plate 16 is conducive to that after concrete accumulates at the bottom of the second connecting pipe 122 and blocks the pipe, the bolts can be directly removed and the flange sealing plate can be loosened. The concrete blocking the pipe can flow out directly from the second connecting pipe 122 due to its own weight, thus avoiding personnel from handling it on a steep slope.

[0040] See also Figure 1Preferably, the chute pipe fitting 1 further includes a connecting flange 14 , and the first buffer pipe 111 is connected to the standard conduit 13 via the connecting flange 14 ; the second buffer pipe 121 is connected to the standard conduit 13 via the connecting flange 14 .

[0041] Specifically, the first buffer tube 111 and the first connecting tube 112 are integrally formed or welded together, and the second buffer tube 121 and the second connecting tube 122 are integrally formed or welded together.

[0042] In this embodiment, when any one of the first guide tube 11, the standard tube 13, or the second guide tube 12 is damaged, it can be replaced or repaired by removing the connecting flange 14, which has a simple structure and is easy to operate; or, when any one of the first guide tube 11, the standard tube 13, or the second guide tube 12 is blocked inside, it can be unblocked by removing the connecting flange 14, which has a simple structure and is easy to operate.

[0043] See also Figure 1 Preferably, the chute pipe 1 further includes a lifting ring 15 , and the two lifting rings 15 are respectively used to be installed on the ends of the first guide pipe 11 and the second guide pipe 12 .

[0044] Specifically, the two lifting rings 15 are used to be installed on the sealing top end of the first connecting pipe 112 of the first guide pipe 11 and the lower end of the sealing flange plate 16 of the second guide pipe 12 respectively.

[0045] In this embodiment, the provision of the lifting ring 15 facilitates the butt connection construction of two adjacent chute pipe fittings 1 .

[0046] See also Figure 2-Figure 3 Preferably, the concrete pouring full-tube chute device also includes a feeding component 3, the feeding component 3 includes a first feeding funnel 31 and a feeding chute 32, the feeding chute 32 is connected to the lower end of the first feeding funnel 31, and the feeding chute 32 is inclined.

[0047] Specifically, the first feeding funnel 31 is arranged at the feeding position of concrete.

[0048] In this embodiment, the concrete supply first passes through the first supply hopper 31 and flows down along the supply chute 32 to be transported through the chute pipe 1 .

[0049] See also Figure 2Preferably, the feed chute 32 is connected to the chute pipe 1 at the uppermost end through the connecting inclined pipe 2, and the feed chute 32 and the connecting inclined pipe 2 have the same inclination angle.

[0050] In this embodiment, when the feed chute 32 is used to be connected to the connecting inclined pipe 2 and the inclination angles of the feed chute 32 and the connecting inclined pipe 2 are consistent, the concrete flowing down the feed chute 32 then flows into the chute pipe 1 along the connecting inclined pipe 2, and flows downstream through multiple chute pipes 1, thereby realizing the transportation of concrete at a high altitude with an inclined flow.

[0051] See also Figure 3 In other embodiments, the feed assembly 3 further includes a second feed hopper 33, a feed conduit 34 and a feed guide pipe 35, the upper end of the second feed hopper 33 is used to receive the lower part of the feed chute 32, the lower end of the second feed hopper 33 is connected to the feed conduit 34, the lower end of the feed conduit 34 is connected to the feed guide pipe 35, the feed guide pipe 35 is connected to the first connecting pipe 112 of the chute pipe member 1 at the uppermost end through the connecting inclined pipe 2; this structure enables the concrete to first pass through the second feed hopper 33, the feed conduit 34 and the feed guide pipe 35 after passing through the feed chute 32, realize preliminary buffering, and then flow from the connecting inclined pipe 2 into the chute pipe member 1, pass through multiple chute pipe members 1 and flow downstream, so as to realize the transportation of concrete at a high place. This structure adds a buffer before the chute pipe member 1, which is conducive to further reducing the flow rate of concrete, thereby preventing the problem of concrete segregation.

[0052] See also Figure 4-Figure 5 Preferably, the concrete pouring full tube chute device also includes a material discharge component 4, the material discharge component 4 includes a material discharge funnel 41 and a material discharge chute 42, and the lower end of the material discharge funnel 41 is connected to the material discharge chute 42.

[0053] See also Figure 4 Specifically, the upper end of the discharge funnel 41 can be used to receive the lower part of the connecting inclined tube 2 of the second guide tube 12, that is, the concrete overflowing from the connecting inclined tube 2 of the second guide tube 12 falls into the discharge funnel 41 and flows out from the discharge chute 42 to the casting site.

[0054] In this embodiment, the discharge hopper 41 and the discharge chute 42 are used to receive the concrete in the chute pipe 1 to the pouring site.

[0055] See also Figure 5In other embodiments, the material discharge component 4 further includes a material discharge conduit 43 and a material discharge guide pipe 44, the material discharge guide pipe 44 is connected to the second connecting pipe 122 of the chute pipe fitting 1 at the lower end through the connecting inclined pipe 2, the lower end of the material discharge guide pipe 44 is connected to the material discharge conduit 43, and the upper end of the material discharge funnel 41 is used to receive the lower part of the material discharge conduit 43; this structure enables the concrete to flow from the connecting inclined pipe 2 on one side of the second connecting pipe 122 into the material discharge guide pipe 44 after passing through the chute pipe fitting 1, and flow into the material discharge funnel 41 through the material discharge conduit 43, and flow out to the casting site through the material discharge chute 42; this structure adds another buffer after the chute pipe fitting 1, which is beneficial to further reduce the flow rate of concrete, thereby preventing the problem of concrete segregation.

[0056] Although the utility model is disclosed as above, the protection scope of the utility model is not limited thereto. Those skilled in the art may make various changes and modifications without departing from the spirit and scope of the utility model, and these changes and modifications will fall within the protection scope of the utility model.

Claims

1. A concrete pouring full pipe chute device, It is characterized in that The invention comprises a chute pipe (1) and a connecting inclined pipe (2), wherein the chute pipe (1) comprises a first guide pipe (11), a second guide pipe (12) and a standard guide pipe (13), and the first guide pipe (11) and the second guide pipe (12) are connected to two ends of the standard guide pipe (13) respectively; The first guide tube (11) comprises a first buffer tube (111) and a first connecting tube (112); the first buffer tube (111) is trumpet-shaped; an end of the first buffer tube (111) with a smaller diameter is connected to the standard guide tube (13); and an end of the first buffer tube (111) with a larger diameter is connected to the first connecting tube (112); The plurality of chute pipe members (1) are connected in sequence through the connecting inclined pipe (2), the connecting inclined pipe (2) being connected between the first connecting pipe (112) of the chute pipe member (1) at the lower end and the second guide pipe (12) of the chute pipe member (1) at the upper end, and the angle between the axis of the connecting inclined pipe (2) and the axis of the first connecting pipe (112) is an acute angle.

2. The full-tube chute device for pouring concrete according to claim 1, It is characterized in that The second guide tube (12) comprises a second buffer tube (121) and a second connecting tube (122); the second buffer tube (121) is trumpet-shaped; the end of the second buffer tube (121) with a smaller diameter is connected to the standard guide tube (13), and the end of the second buffer tube (121) with a larger diameter is connected to the second connecting tube (122); the connecting inclined tube (2) is connected between the first connecting tube (112) of the chute pipe member (1) at the lower end and the second connecting tube (122) of the chute pipe member (1) at the upper end.

3. The full-tube chute device for pouring concrete according to claim 2, It is characterized in that The chute pipe fitting (1) also includes a sealing flange plate (16), and the lower end of the second connecting pipe (122) of the second guide pipe (12) is sealed by the sealing flange plate (16); the connecting inclined pipe (2) is connected to the side wall of the second connecting pipe (122) of the chute pipe fitting (1) located at the upper end.

4. The full-tube chute device for pouring concrete according to claim 2, It is characterized in that The chute pipe member (1) further comprises a connecting flange (14), wherein the first buffer pipe (111) is connected to the standard conduit (13) via the connecting flange (14); and the second buffer pipe (121) is connected to the standard conduit (13) via the connecting flange (14).

5. The full-tube chute device for pouring concrete according to claim 1, It is characterized in that The chute pipe member (1) further comprises a lifting ring (15), wherein the two lifting rings (15) are respectively used to be installed on the ends of the first guide pipe (11) and the second guide pipe (12).

6. The full-tube chute device for pouring concrete according to claim 1, It is characterized in that The invention also comprises a feeding assembly (3), wherein the feeding assembly (3) comprises a first feeding hopper (31) and a feeding chute (32), wherein the feeding chute (32) is connected to the lower end of the first feeding hopper (31), and the feeding chute (32) is arranged at an angle.

7. The full-tube chute device for pouring concrete according to claim 6, It is characterized in that The feed chute (32) is connected to the chute pipe member (1) located at the uppermost end via the connecting inclined pipe (2), and the feed chute (32) and the connecting inclined pipe (2) have the same inclination angle.

8. The full-tube chute device for pouring concrete according to claim 6, It is characterized in that The feeding assembly (3) further comprises a second feeding hopper (33), a feeding conduit (34) and a feeding guide pipe (35); the upper end of the second feeding hopper (33) is used to receive the lower part of the feeding chute (32); the lower end of the second feeding hopper (33) is connected to the feeding conduit (34); the lower end of the feeding conduit (34) is connected to the feeding guide pipe (35); the feeding guide pipe (35) is connected to the first connecting pipe (112) of the chute pipe member (1) at the uppermost end via the connecting inclined pipe (2).

9. The full-tube chute device for pouring concrete according to claim 2, It is characterized in that It also includes a material discharge assembly (4), wherein the material discharge assembly (4) includes a material discharge hopper (41) and a material discharge chute (42), and the lower end of the material discharge hopper (41) is connected to the material discharge chute (42).

10. The full-tube chute device for pouring concrete according to claim 9, It is characterized in that The material discharge assembly (4) further comprises a material discharge conduit (43) and a material discharge guide pipe (44); the material discharge guide pipe (44) is connected to the second connecting pipe (122) of the chute pipe member (1) at the lower end via the connecting inclined pipe (2); the lower end of the material discharge guide pipe (44) is connected to the material discharge conduit (43); and the upper end of the material discharge funnel (41) is used to receive the lower part of the material discharge conduit (43).