Bridge suspended formwork supporting device

By designing the bridge hanging formwork support device and using the combined structure of the steel formwork and suspender components, the time-consuming and labor-intensive problem of supporting the full-hall frame is solved, the rapid erection and disassembly of the bridge during the forming process is achieved, the impact on the traffic environment is reduced, and Reduced construction costs.

CN221855284UActive Publication Date: 2024-10-18CHINA RAILWAY 19TH BUREAU GRP FIFTH ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323469829.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2024-10-18
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

During the forming process of the existing bridge, the construction and dismantling of the full-tank support is time-consuming and laborious, and takes up a large space, affecting the surrounding traffic environment.

Method used

A bridge hanging formwork support device is designed, which includes a first steel formwork, a second steel formwork, a crossbeam component, a suspender component and a box beam. The suspender component is connected to the crossbeam component, and the box beam and support components are used to provide support, reducing the It reduces the occupation of floor space and simplifies the installation and disassembly process.

Benefits of technology

It realizes the rapid erection and disassembly of the bridge hanging formwork support device, reduces the impact on the surrounding traffic environment, and reduces the construction cost and construction complexity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855284U_ABST
    Figure CN221855284U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of bridge decks, and provides a bridge suspended formwork supporting device. The bridge suspended formwork supporting device comprises a first steel formwork, a second steel formwork, a cross beam assembly, a suspender assembly, a supporting assembly and a box girder, the box girder is provided with a top plate, the two sides of the top plate are connected with the first steel formwork and the second steel formwork respectively, and the supporting assembly is arranged between the top plate and the cross beam assembly. And suspender assemblies are arranged between the first steel template and the cross beam assembly and between the second steel template and the cross beam assembly. According to the bridge suspended formwork supporting device, the cross beam assembly is supported through the box girder and the supporting assembly, the two sides of the cross beam assembly are connected with the first steel formwork and the second steel formwork through the suspender assemblies so that the cross beam assembly can be balanced, and the first steel formwork plays a role in supporting the edge of the outer end of the bridge deck slab. The bridge suspended formwork supporting device is time-saving and labor-saving to disassemble and construct, does not occupy ground space, and does not influence surrounding traffic.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the technical field of bridge formwork, and in particular to a bridge hanging formwork supporting device. Background Art

[0002] In steel-concrete composite beam bridge decks, concrete members are usually used as the main supporting structure of the bridge deck, and steel is used to reinforce concrete to improve the bearing capacity and stability of the steel-concrete composite beam.

[0003] In the related art, scaffolding support is usually required during the bridge deck forming process, especially when the sidewalk at its edge is suspended in the air. In most projects, full-frame support is used. The erection and disassembly of full-frame support is time-consuming and labor-intensive, and the full-frame support occupies a large space, thus having a negative impact on the surrounding traffic environment. Utility Model Content

[0004] In order to solve the above technical problems or at least partially solve the above technical problems, the present disclosure provides a bridge hanging formwork supporting device.

[0005] The present invention provides a bridge hanging formwork support device, comprising a first steel formwork, a second steel formwork, a crossbeam assembly, a hanger assembly, a support assembly and a box girder, wherein the box girder has a top plate, and the two sides of the top plate are respectively connected to the first steel formwork and the second steel formwork, the support assembly is arranged between the top plate and the crossbeam assembly, and the hanger assembly is arranged between the first steel formwork, the second steel formwork and the crossbeam assembly.

[0006] Optionally, the crossbeam assembly is extended along the width direction of the bridge, and the first steel formwork, the top plate and the second steel formwork are connected in sequence along the width direction of the bridge from the side of the bridge to the middle of the bridge, wherein one end of the first steel formwork is connected to the top plate, and the other end of the first steel formwork is connected to the crossbeam assembly through a hanger assembly.

[0007] Optionally, the first steel template is tilted and the other end of the first steel template is closer to the beam assembly than the end thereof connected to the top plate.

[0008] Optionally, a middle portion of the second steel formwork is formed with a convex portion protruding toward the beam assembly along the thickness direction of the bridge.

[0009] Optionally, the hanger rod assembly includes a screw rod, two washers and two nuts, one end of the screw rod is inserted through the crossbeam assembly, the other end of the screw rod is inserted through one of the first steel formwork and the second steel formwork, and both ends of the screw rod pass through one of the washers and are locked with one of the nuts.

[0010] Optionally, two I-beams are provided between the first steel formwork, the second steel formwork and the gasket, and the other end of the screw rod is inserted into the gap between the two I-beams.

[0011] Optionally, the crossbeam assembly includes two I-beams, and one end of the screw rod is inserted into a gap between the two I-beams.

[0012] Optionally, the support assembly includes a steel pipe column, and both ends of the steel pipe column are respectively connected to the beam assembly and the top plate.

[0013] Optionally, the support assembly further includes an outer tube, and the outer tube is sleeved on the periphery of the steel pipe column.

[0014] Optionally, the box girder is an open box structure, the open edge of the box girder has two opposite top plates along the width direction of the bridge, the second steel formwork spans the opening of the box girder and the second steel formwork is located between the two top plates, and both ends of the second steel formwork are connected to one of the top plates;

[0015] A supporting assembly is provided between each of the top plates and the crossbeam assembly.

[0016] Compared with the prior art, the technical solution provided by the embodiments of the present disclosure has the following advantages:

[0017] The bridge formwork support device provided by the disclosed embodiment provides support for the crossbeam assembly by arranging a box beam and a support assembly. The crossbeam assembly uses the support assembly as a fulcrum and its two ends are connected to the first steel formwork and the second steel formwork respectively through the suspension rod assembly to achieve balance. The crossbeam assembly applies an upward pulling force to the first steel formwork through the suspension rod assembly, and the first steel formwork supports the sidewalk slab of the bridge deck. The disassembly and assembly of the bridge formwork support device saves time and effort, does not occupy ground space, and does not affect the normal working environment of surrounding traffic. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present disclosure and, together with the description, serve to explain the principles of the present disclosure.

[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0020] Figure 1 It is a structural schematic diagram of the bridge formwork support device according to an embodiment of the present disclosure;

[0021] Figure 2 for Figure 1 A partial enlarged view of point A in the middle.

[0022] Among them, 1. first steel formwork; 2. second steel formwork; 21. convex part; 3. crossbeam assembly; 4. suspension rod assembly; 5. support assembly; 6. box beam; 61. top plate; 7. I-beam;

[0023] 8. Bridge deck. DETAILED DESCRIPTION

[0024] In order to more clearly understand the above-mentioned objectives, features and advantages of the present disclosure, the scheme of the present disclosure will be further described below. It should be noted that the embodiments of the present disclosure and the features in the embodiments can be combined with each other without conflict.

[0025] In the following description, many specific details are set forth to facilitate a full understanding of the present disclosure, but the present disclosure may also be implemented in other ways different from those described herein; it is obvious that the embodiments in the specification are only part of the embodiments of the present disclosure, rather than all of the embodiments.

[0026] The slab structure of the bridge is cast into a bridge deck. In the related art, the sidewalk position at the edge of the bridge deck (usually referred to as the sidewalk slab of the bridge deck) is usually supported by a full-height frame during the bridge deck forming process. However, the erection and disassembly of the full-height frame is time-consuming and labor-intensive, and the full-height frame occupies a large space, which has a negative impact on the surrounding traffic environment during and after the erection process.

[0027] Based on this, the embodiment of the present disclosure provides a bridge formwork support device, which eliminates the use of scaffolding. The bridge formwork support device is described in detail below through a specific embodiment:

[0028] like Figure 1 and Figure 2 As shown, this embodiment provides a bridge hanging formwork support device, including a first steel formwork 1, a second steel formwork 2, a crossbeam assembly 3, a hanger assembly 4, a support assembly 5 and a box beam 6, wherein the box beam 6 has a top plate 61, and both sides of the top plate 61 are respectively connected to the first steel formwork 1 and the second steel formwork 2. The top plate 61 and the first steel formwork 1 and the second steel formwork 2 can be connected by overlapping or plugging. A support assembly 5 is provided between the top plate 61 and the crossbeam assembly 3, and the support assembly 5 extends in the vertical direction. A hanger assembly 4 is provided between the first steel formwork 1 and the second steel formwork 2 and the crossbeam assembly 3.

[0029] The bridge formwork support device provided in this embodiment, when in use, the first steel formwork 1, the top plate 61 of the box beam 6 and the second steel formwork 2 provide support for the bridge deck 8, and the box beam 6 is directly or indirectly connected to the ground, for example, the box beam 6 is arranged on a support, and the bottom end of the support is connected to the ground. A support assembly 5 is arranged between the top plate 61 of the box beam 6 and the cross beam assembly 3, and the box beam 6 supports the cross beam assembly 3 through the support assembly 5. The first steel formwork 1 and the second steel formwork 2 are respectively connected to the cross beam assembly 3 through the suspension rod assembly 4, and the cross beam assembly 3 is connected to the first steel formwork 1 and the second steel formwork 2 through the suspension rod assembly 4 with the support assembly 5 as the fulcrum. The cross beam assembly 3 is connected to the first steel formwork 1 and the second steel formwork 2 at both ends to achieve balance. The cross beam assembly 3 applies an upward pulling force to the first steel formwork 1 through the suspension rod assembly 4, and the first steel formwork 1 supports the sidewalk slab of the bridge deck 8. The bridge formwork support device provided in this embodiment is time-saving and labor-saving to disassemble and assemble, does not occupy ground space, and does not affect the normal working environment of surrounding traffic.

[0030] In some embodiments, the crossbeam assembly 3 is extended along the width direction of the bridge. The width direction of the bridge is the width direction of the bridge deck 8. During the forming process of the bridge deck 8, the sidewalk position at its edge (usually referred to as the sidewalk slab of the bridge deck 8) usually needs external parts to support it to prevent it from not being fully formed and forming sufficient strength. Along the width direction of the bridge from the side of the bridge to the middle of the bridge, the first steel formwork 1, the top plate 61 and the second steel formwork 2 are connected in sequence, wherein one end of the first steel formwork 1 is connected to the top plate 61, and the other end of the first steel formwork 1 is connected to the crossbeam assembly 3 through the hanger assembly 4. Of course, the side of the other side of the bridge deck 8 also needs to be supported by the bridge hanger support device. The situation on both sides of the bridge deck 8 is the same. For the convenience of description, only the side of one side of the bridge deck 8 is introduced.

[0031] In some embodiments, the first steel formwork 1 is tilted and the other end of the first steel formwork 1 is closer to the cross beam assembly 3 than the end connected to the top plate 61. On the one hand, the formed sidewalk slab is thinner at the edge and thicker in the middle, which saves concrete raw materials and reduces construction costs while meeting the use strength. On the other hand, the sidewalk slab formed in this way makes the entire bridge deck 8 more beautiful.

[0032] In some embodiments, the middle portion of the second steel template 2 is formed with a convex portion 21 protruding toward the cross beam assembly 3 along the thickness direction of the bridge. Figure 2 As shown, a concave portion is formed at the bottom of the bridge deck 8 corresponding to the convex portion 21, thereby saving the concrete raw materials used in building the bridge deck 8 and reducing the cost.

[0033] In some embodiments, the suspension rod assembly 4 includes a screw, two washers and two nuts. One end of the screw is inserted through the crossbeam assembly 3, and the other end of the screw is inserted through one of the first steel formwork 1 and the second steel formwork 2. Both ends of the screw pass through a washer and are locked with a nut. In order to facilitate construction and save costs, the screw is usually made of threaded steel bars, specifically, the screw is 20mm threaded steel; the washers are steel plates with structural strength. The screw can also be provided with an outer tube body made of, for example, PVC material, to facilitate the reuse of the screw and reduce construction costs.

[0034] In some embodiments, a longitudinal beam assembly is further provided between the first steel formwork 1 and the second steel formwork 2 and the gasket, and the longitudinal beam assembly may include two I-beams 7, the two I-beams 7 extend along the length direction of the bridge deck 8, and the other end of the screw rod is inserted into the gap between the two I-beams 7. The crossbeam assembly 3 includes two I-shaped steel pieces, the two I-shaped steel pieces extend along the width direction of the bridge deck 8, and one end of the screw rod is inserted into the gap between the two I-beams 7. The connection strength between the hanger assembly 4 and the first steel formwork 1, the second steel formwork 2 and the crossbeam assembly 3 is strengthened and the installation structure is simplified. In specific implementation, the two I-beams 7 and the two I-shaped steel pieces can be double-pieced I14 I-beams 7.

[0035] In some embodiments, the support assembly 5 includes a steel pipe column, and the two ends of the steel pipe column are respectively connected to the cross beam assembly 3 and the top plate 61. In specific implementation, the steel pipe column can be a 180mm*6mm steel pipe. The steel pipe column meets the requirements of supporting the cross beam assembly 3 and is convenient for construction and transportation during dismantling.

[0036] In some embodiments, the support assembly 5 further includes an outer tube, which is sleeved on the periphery of the steel pipe column. The outer tube can be a tube body made of PVC material. After the bridge deck 8 is formed, the outer tube is connected to the bridge deck 8, and the steel pipe column can be dismantled and reused to reduce construction costs.

[0037] In some embodiments, the box girder 6 is an open box structure, the open edge of the box girder 6 has two opposite top plates 61 along the width direction of the bridge, the second steel template 2 spans the opening of the box girder 6 and the second steel template 2 is located between the two top plates 61, both ends of the second steel template 2 are connected to a top plate 61, and a support assembly 5 is provided between each top plate 61 and the cross beam assembly 3. The box girder 6 is connected to the cross beam assembly 3 through multiple top plates 61 and multiple support assemblies 5, so that the force on one side of the cross beam assembly 3 is evenly distributed. The second steel template 2 spans the opening of the box girder 6 and the second steel template 2 is located between the two top plates 61. In order to facilitate the reuse of the two steel templates, the width of the second steel template 2 is generally 1m-1.5m, which is convenient for manual disassembly and removal from the box girder 6.

[0038] In specific implementation, the side of the first steel formwork 1 and the second steel formwork 2 in contact with the bridge deck 8 can be set as a plane, so that the bridge deck 8 is smooth and beautiful after molding. The side of the first steel formwork 1 and the second steel formwork 2 facing away from the bridge deck 8 is provided with horizontal and vertical cross reinforcement ribs to increase the support strength of the first steel formwork 1 and the second steel formwork 2.

[0039] It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0040] The above description is only a specific embodiment of the present disclosure, so that those skilled in the art can understand or implement the present disclosure. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present disclosure. Therefore, the present disclosure will not be limited to the embodiments described herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A bridge hanging formwork support device, characterized in that: The invention comprises a first steel formwork (1), a second steel formwork (2), a crossbeam assembly (3), a suspension rod assembly (4), a support assembly (5) and a box beam (6); the box beam (6) has a top plate (61); two sides of the top plate (61) are respectively connected to the first steel formwork (1) and the second steel formwork (2); the support assembly (5) is arranged between the top plate (61) and the crossbeam assembly (3); and the suspension rod assembly (4) is arranged between the first steel formwork (1) and the second steel formwork (2) and the crossbeam assembly (3).

2. The bridge formwork support device according to claim 1, characterized in that: The crossbeam assembly (3) is extended along the width direction of the bridge, and the first steel formwork (1), the top plate (61) and the second steel formwork (2) are connected in sequence along the width direction of the bridge from the side of the bridge to the middle of the bridge, wherein one end of the first steel formwork (1) is connected to the top plate (61), and the other end of the first steel formwork (1) is connected to the crossbeam assembly (3) via a hanger assembly (4).

3. The bridge formwork support device according to claim 2, characterized in that: The first steel template (1) is arranged obliquely, and the other end of the first steel template (1) is closer to the crossbeam assembly (3) than the end thereof connected to the top plate (61).

4. The bridge formwork support device according to claim 2, characterized in that: The middle portion of the second steel formwork (2) is raised along the thickness direction of the bridge toward the crossbeam assembly (3) to form a convex portion (21).

5. The bridge formwork support device according to claim 2, characterized in that: The suspension rod assembly (4) comprises a screw rod, two washers and two nuts. One end of the screw rod is inserted into the crossbeam assembly (3), and the other end of the screw rod is inserted into one of the first steel formwork (1) and the second steel formwork (2). Both ends of the screw rod pass through one of the washers and are locked with one of the nuts.

6. The bridge formwork support device according to claim 5, characterized in that: A longitudinal beam assembly is also provided between the first steel formwork (1), the second steel formwork (2) and the gasket, and the longitudinal beam assembly comprises two I-beams (7), and the other end of the screw rod is inserted into the gap between the two I-beams (7).

7. The bridge formwork support device according to claim 5, characterized in that: The crossbeam assembly (3) comprises two I-beams, and one end of the screw rod is inserted into the gap between the two I-beams.

8. The bridge formwork support device according to claim 1, characterized in that: The support assembly (5) comprises a steel pipe column, and two ends of the steel pipe column are respectively connected to the crossbeam assembly (3) and the top plate (61).

9. The bridge formwork support device according to claim 8, characterized in that: The support assembly (5) further comprises an outer tube, wherein the outer tube is sleeved on the periphery of the steel pipe column.

10. The bridge formwork support device according to claim 9, characterized in that: The box girder (6) is an open box structure, the open edge of the box girder (6) has two opposite top plates (61) along the width direction of the bridge, the second steel formwork (2) spans the opening of the box girder (6) and the second steel formwork (2) is located between the two top plates (61), and both ends of the second steel formwork (2) are connected to one of the top plates (61); A support assembly (5) is provided between each of the top plates (61) and the crossbeam assembly (3).