Bridge arch rib supporting and fixing integrated construction device

CN221855297UActive Publication Date: 2024-10-18CHONGQING CHUANCHUANDAYE STEEL STRUCTURE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420384139.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2024-10-18
Estimated Expiration
2034-02-28

Smart Images

  • Figure CN221855297U_ABST
    Figure CN221855297U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of construction devices, and discloses a bridge arch rib supporting and fixing integrated construction device which comprises a bottom plate, a construction opening is formed in the center of the bottom plate, moving wheels are installed at the four corners of the bottom of the bottom plate, and supporting legs are in threaded connection with the four corners of the bottom plate. Four vertical rods are symmetrically installed on the top face of the bottom plate, a machine frame is slidably installed on the outer sides of the four vertical rods, lug plates are connected to the bottoms of the four corners of the machine frame, synchronous jacks are connected between the bottom plate and the lug plates, and a two-shaft moving mechanism is installed on the top of the machine frame. An electric hoist is mounted at the output end of the two-axis moving mechanism; according to the structural design, the machine frame, the two-shaft moving mechanism and the electric hoist are integrally designed, only the bottom plate needs to be moved to a using area, a crane does not need to be used for assistance, and the demand quantity of the crane is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of construction devices, and in particular relates to an integrated construction device for supporting and fixing bridge arch ribs. Background Art

[0002] A bridge is a building built to cross natural or artificial obstacles. It is built on rivers, lakes and seas to allow vehicles and pedestrians to pass smoothly. The arch rib is the skeleton of the main arch ring of the arch bridge. During the process of arch wave installation, the arch rib bears its own weight, lateral connecting components, arch wave and corresponding construction loads. During the construction of the bridge, some bridges are usually installed with arch ribs.

[0003] Before the arch rib is installed, a support frame for supporting and fixing is needed to assist in the installation of the arch rib. The currently known installation method is to use a crane to hoist the corresponding support legs to a height and then connect them with screws or weld them together. However, because a support frame actually takes a long time to complete the installation, and during this stage, the crane needs to be on standby, which undoubtedly increases the demand for cranes. Moreover, when working at heights, the current working method uses scaffolding, which is relatively inconvenient and affects the passage of transportation equipment such as cranes or trucks. Utility Model Content

[0004] In view of the problems raised by the above background technology, the purpose of the utility model is to provide an integrated construction device for supporting and fixing bridge arch ribs.

[0005] In order to achieve the above technical purpose, the technical solution adopted by the utility model is as follows:

[0006] A bridge arch rib support and fixing integrated construction device comprises a bottom plate, a construction opening is provided at the center of the bottom plate, moving wheels are installed at the four corners of the bottom plate, supporting feet are threadedly connected at the four corners of the bottom plate, four vertical poles are symmetrically installed on the top surface of the bottom plate, a frame is slidably installed on the outer sides of the four vertical poles, ear plates are connected to the bottom positions of the four corners of the frame, a synchronous jack is connected between the bottom plate and the ear plates, a two-axis moving mechanism is installed on the top of the frame, and an electric hoist is installed at the output end of the two-axis moving mechanism;

[0007] The frame is equipped with a climbing ladder, and the frame is equipped with a workstation board on the side of the climbing ladder.

[0008] It is further defined that the frame is provided with matching holes, the vertical poles are evenly provided with a number of positioning holes, and the positioning holes are matched with positioning columns. With such a design, after being lifted to a certain height by the synchronous jack, the positioning columns can be used to cooperate with the positioning holes and matching holes for auxiliary support to reduce the pressure on the synchronous jack.

[0009] It is further defined that a stay is connected between the two-axis moving mechanism and the frame. Such a design supports the frame and ensures the load-bearing effect of the frame.

[0010] It is further defined that reinforcement ropes are installed on four sides of the top of the frame. Such a design uses the reinforcement ropes to provide a reinforced connection to prevent tipping.

[0011] It is further defined that the frame is installed with a safety hanging rod. With such a design, relevant staff can hang the rope buckle of the safety rope on the safety hanging rod to improve safety.

[0012] The beneficial effects of adopting the utility model are:

[0013] The structural design of the utility model is adopted, and the frame, two-axis moving mechanism and electric hoist are designed in an integrated manner. Therefore, when working, it is only necessary to move the bottom plate to the use area, and there is no need to use a crane for assistance, thereby reducing the demand for cranes;

[0014] The structural design of the utility model can improve the convenience and safety of operation and the work efficiency under the effect of the safety standing board. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The present invention can be further described by the non-limiting embodiments given in the accompanying drawings;

[0016] Figure 1 This is a schematic diagram of the structure of an embodiment of a bridge arch rib support and fixing integrated construction device of the utility model. Figure 1 ;

[0017] Figure 2 This is a schematic diagram of the structure of an embodiment of a bridge arch rib support and fixing integrated construction device of the utility model. Figure 2 ;

[0018] Figure 3 It is a cross-sectional structural schematic diagram of an embodiment of a bridge arch rib support and fixation integrated construction device of the utility model;

[0019] Figure 4 for Figure 2 The enlarged structural diagram at A in the middle;

[0020] The main component symbols are described as follows:

[0021] Base plate 1; construction opening 2; moving wheel 3; supporting foot 4; vertical pole 5; frame 6; ear plate 7; synchronous jack 8; two-axis moving mechanism 9; electric hoist 10; support bar 11; reinforcement rope 12;

[0022] Climbing ladder 61; workstation board 62; matching hole 63; positioning hole 64; safety hanging rod 65. DETAILED DESCRIPTION

[0023] In order to enable those skilled in the art to better understand the present invention, the technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0024] like Figure 1 to Figure 4 As shown, the utility model is a bridge arch rib support and fixing integrated construction device, comprising a bottom plate 1, a construction opening 2 is provided at the center of the bottom plate 1, moving wheels 3 are installed at the four corners of the bottom of the bottom plate 1, supporting feet 4 are threadedly connected at the four corners of the bottom plate 1, four vertical poles 5 are symmetrically installed on the top surface of the bottom plate 1, a frame 6 is slidably installed on the outer sides of the four vertical poles 5, ear plates 7 are connected to the bottom positions of the four corners of the frame 6, a synchronous jack 8 is connected between the bottom plate 1 and the ear plate 7, a two-axis moving mechanism 9 is installed on the top of the frame 6, and an electric hoist 10 is installed at the output end of the two-axis moving mechanism 9;

[0025] The frame 6 is installed with a climbing ladder 61 , and the frame 6 is installed with a workstation board 62 on the side of the climbing ladder 61 .

[0026] In this implementation case, when using a bridge arch rib support and fixing integrated construction device, the base plate 1 is conveniently moved to the use area by the moving wheels 3 and fixed in position by the supporting feet 4. The area of ​​the construction opening 2 is the installation area of ​​the supporting fixing frame;

[0027] When the relevant materials move to the side of the bottom plate 1, the two-axis moving mechanism 9 is controlled to cooperate with the electric hoist 10 to load, unload and lift, and then move to the square of the construction opening 2 for installation. The relevant staff use the climbing ladder 61 to move to the workstation board 62 at the corresponding position for construction. The width of the workstation board 62 allows the staff to work at ease.

[0028] When the height needs to be adjusted, the synchronous jack 8 is controlled to run, driving the frame 6. Under the limiting effect of the vertical rod 5, the frame 6 is lifted and lowered smoothly, and the height adjustment can adapt to the installation of support fixing frames with different height requirements.

[0029] Preferably, the frame 6 is provided with a matching hole 63, and the vertical rod 5 is evenly provided with a plurality of positioning holes 64, and the positioning holes 64 are matched with positioning columns. With such a design, after being lifted to a certain height by the synchronous jack 8, the positioning columns can be used to cooperate with the positioning holes and matching holes for auxiliary support to reduce the pressure on the synchronous jack 8. In fact, the structure of the auxiliary support can also be considered according to specific circumstances.

[0030] Preferably, a stay 11 is connected between the two-axis moving mechanism 9 and the frame 6. Such a design supports the frame 6 and ensures the load-bearing effect of the frame 6. In fact, the support structure can also be considered according to specific circumstances.

[0031] Preferably, reinforcement ropes 12 are installed on the four sides of the top of the frame 6. Such a design uses the reinforcement ropes 12 to reinforce the connection and prevent tipping. In fact, reinforcement measures can also be considered according to specific circumstances.

[0032] Preferably, the frame 6 is installed with a safety hanging rod 65. With such a design, relevant staff can hang the rope buckle of the safety rope on the safety hanging rod 65 to improve safety. In fact, the number and position of the safety hanging rod 65 can also be considered according to specific circumstances.

[0033] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the technology may modify or change the above embodiments without violating the spirit and scope of the present invention. Therefore, all equivalent modifications or changes made by those with ordinary knowledge in the relevant technical field without departing from the spirit and technical ideas disclosed in the present invention shall still be covered by the claims of the present invention.

Claims

1. A bridge arch rib support and fixing integrated construction device, comprising a bottom plate (1), characterized in that: A construction opening (2) is provided at the center of the base plate (1), movable wheels (3) are installed at the four corners of the bottom of the base plate (1), support feet (4) are threadedly connected to the four corners of the base plate (1), a total of four vertical poles (5) are symmetrically installed on the top surface of the base plate (1), and a frame (6) is slidably installed on the outer sides of the four vertical poles (5), and ear plates (7) are connected to the bottom of the four corners of the frame (6), and a synchronous jack (8) is connected between the base plate (1) and the ear plates (7), and a two-axis moving mechanism (9) is installed on the top of the frame (6), and an electric hoist (10) is installed at the output end of the two-axis moving mechanism (9); The frame (6) is installed with a climbing ladder (61), and the frame (6) is installed with a workstation board (62) on the side of the climbing ladder (61).

2. The bridge arch rib support and fixing integrated construction device according to claim 1, characterized in that: The frame (6) is provided with a matching hole (63), and the vertical rod (5) is evenly provided with a plurality of positioning holes (64), and the positioning holes (64) are matched with positioning columns.

3. The bridge arch rib support and fixing integrated construction device according to claim 2, characterized in that: A support bar (11) is connected between the two-axis moving mechanism (9) and the frame (6).

4. The bridge arch rib support and fixing integrated construction device according to claim 3 is characterized in that: Reinforcement ropes (12) are installed on four sides of the top of the frame (6).

5. The bridge arch rib support and fixing integrated construction device according to claim 4, characterized in that: The frame (6) is equipped with a safety hanging rod (65).