Pile driver for constructional engineering

By designing the bracket component and clamping component, part of the weight of the pile driver is transferred to the ground and vibration is alleviated, which solves the weight burden problem caused by the hand-held operation of the existing pile driver, improves the comfort and convenience of use, and reduces the impact ring damage and usage costs.

CN221855513UActive Publication Date: 2024-10-18BOFENG ARCHITECTURAL DESIGN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420327900.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-22
Publication Date
2024-10-18
Estimated Expiration
2034-02-22

AI Technical Summary

Technical Problem

During use of the existing pile driver, due to the need for hand-operated operation, the entire weight of the pile driver is exerted on the user's body, affecting the user experience and comfort.

Method used

A pile driver including a bracket component, a sleeve component, a pile driving component, a connection component, a support component and a clamping component is designed. Part of the weight is transferred to the ground through the leg structure, and the sliding connection and return spring and damper are used to alleviate vibration. And the clamping components are used to clamp steel pipes of different specifications.

Benefits of technology

It improves the comfort and convenience of using the pile driver, alleviates the vibration and impact force of the user during operation, and reduces the damage of the impact ring and the cost of use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855513U_ABST
    Figure CN221855513U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of pile drivers, in particular to a pile driver for constructional engineering. The technical problem that in the using process of an existing pile driver, due to the fact that a user needs to hold the pile driver with hands for operation, the weight of the pile driver is likely to be exerted on the body of the user, and then the using comfort of the whole pile driver is affected is solved. According to the technical scheme, the pile driver for constructional engineering comprises a support assembly, a sleeve assembly, a pile driving assembly, a connecting assembly, a supporting assembly and a clamping assembly. Part of weight of the pile driver can be transmitted to the ground by arranging the supporting leg structure, so that the use comfort of the whole pile driver can be improved to a certain extent, and the problem that in the use process of an existing pile driver, a user needs to hold the pile driver by hand to operate, and the use comfort of the pile driver is affected is solved. And therefore, the weight of the pile driver is easily applied to the body of a user, and the use comfort of the whole pile driver is affected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of pile drivers, and more particularly to a pile driver for building construction. Background Technology

[0002] A pile driver consists of a pile hammer, a pile frame, and auxiliary equipment. The pile hammer is attached to two parallel vertical guide rods at the front of the pile frame and is lifted by a hoisting hook. The pile frame is a steel tower structure with a winch at the rear for lifting the pile and pile hammer. A guide frame composed of two guide rods at the front of the pile frame controls the driving direction, ensuring the pile penetrates the ground accurately according to the design orientation. The basic technical parameters of a pile driver are the weight of the impact component, impact kinetic energy, and impact frequency. Pile hammers can be classified according to their power source, such as drop hammers, steam hammers, diesel hammers, and hydraulic hammers. However, in construction projects, there are often steel pipes with small diameters that need to be piled. The installation environment of these small pipes often restricts the movement of excavators, necessitating the use of small pile drivers to drive the pipes into the ground. The use of small pile drivers often requires manual operation, which places the entire weight of the pile driver on the user's body, significantly impacting the overall user experience. Utility Model Content

[0003] In order to overcome the problem that existing pile drivers require users to hold the machine while operating it, which easily causes the weight of the pile driver to be applied to the user's body and thus affects the overall comfort of using the pile driver.

[0004] The technical solution of this utility model is as follows: a pile driver for construction engineering, comprising a support assembly, a sleeve assembly, a pile driving assembly, a connecting assembly, a support assembly, and a clamping assembly; a sleeve assembly is provided on the inner side of the support assembly; a pile driving assembly is provided on one side of the support assembly; a connecting assembly is provided at the lower end of the sleeve assembly; a support assembly is provided on the outer side of the connecting assembly; and a clamping assembly is fixedly connected to the lower end of the connecting assembly.

[0005] Preferably, the sleeve assembly is used to assist the movement of the piling assembly, the piling assembly is used to strike the clamping assembly, the connecting assembly is used to buffer the vibration during piling, the support assembly is used to provide auxiliary support for the piling machine, and the clamping assembly is used to connect the steel pipe.

[0006] Preferably, the support assembly includes a fixed bracket, a fixing plate, and a hand grip; the fixed bracket is equipped with the fixing plate; the fixing plate is equipped with the hand grip, which allows the entire pile driver to be held by hand.

[0007] Preferably, the sleeve assembly includes a connecting rod, a sliding sleeve, a connecting ring, and an impact ring; the connecting rod is fixedly connected to the fixed bracket; a sliding sleeve is provided on the outer side of the connecting rod; a connecting ring is fixedly connected to the sliding sleeve; and an impact ring is installed at the lower end of the connecting ring, which can be quickly installed and removed from the impact ring by means of bolted connection between the connecting ring and the impact ring.

[0008] Preferably, the piling assembly includes a fixing sleeve, a hydraulic push rod, a connecting plate, a fixing rod, and a fixing ring; the upper end of the connecting ring is provided with a fixing ring; the upper end of the fixing ring is fixedly connected to a fixing rod; the upper end of the fixing rod is fixedly connected to a connecting plate; the lower end of the connecting plate is equipped with a hydraulic push rod; the outer side of the hydraulic push rod is equipped with a fixing sleeve, which can achieve the positioning and fixing of the hydraulic push rod.

[0009] Preferably, the connecting assembly includes a positioning ring, a damper, a return spring, and a mounting ring; the lower end of the connecting rod is provided with a mounting ring; the lower end of the mounting ring is provided with a damper; the outside of the damper is provided with a return spring; the lower end of the return spring is provided with a positioning ring, which can reduce the vibration generated by the pile driver through the cooperation of the damper and the return spring.

[0010] Preferably, the support assembly includes a fixing strip, a rotating frame, a positioning sleeve, a bracket strip, a grounding post, and a reinforcing plate; the lower end of the fixing bracket is provided with a fixing strip; the rotating frame is bolted to the fixing strip; the positioning sleeve is slidably connected to the rotating frame; the lower end of the positioning sleeve is fixedly connected to the bracket strip; the grounding post is installed on the bracket strip; and the upper end of the bracket strip is fixedly connected to the reinforcing plate, which can reinforce the relationship between the positioning sleeve and the bracket strip.

[0011] Preferably, the clamping assembly includes a combined column, a mounting plate, an electric push rod, a clamping plate, and a limiting groove; the combined column is provided on the inner side of the positioning ring; a limiting groove is provided on the lower end face of the combined column; a clamping plate is provided at the lower end of the limiting groove; an electric push rod is installed on the clamping plate; a mounting plate is installed on the outer side of the electric push rod, which can drive the clamping plate to move through the electric push rod, so as to enable the pile driver to clamp steel pipes of different specifications.

[0012] The beneficial effects of this utility model are:

[0013] 1. By setting up a support leg structure, part of the weight of the pile driver can be transferred to the ground, thereby improving the overall comfort of using the pile driver to a certain extent. This solves the problem that when using existing pile drivers, the user needs to hold the pile driver to operate it, which easily causes the weight of the pile driver to be applied to the user's body, thus affecting the overall comfort of using the pile driver.

[0014] 2. By setting up a rotating frame and a positioning sleeve with a sliding connection, the positioning sleeve and the support strip can be fixed to the ground by inserting a ground column during the use of the pile driver. At the same time, the reaction force brought by the steel pipe allows the rotating frame to slide inside the positioning sleeve as the steel pipe sinks, thereby providing auxiliary support for the pile driver to a certain extent and greatly improving the convenience of use for the user.

[0015] 3. By setting a return spring and a damper to work together, the impact force generated when the impact ring is pressed down can be relieved. At the same time, the vibration generated by the pile driver during the pile driving process can also be reduced to a certain extent. In addition, the bolted connection between the connecting ring and the impact ring allows for quick disassembly and assembly of the impact ring when it is damaged, thereby significantly reducing the operating cost of the pile driver. Attached Figure Description

[0016] Figure 1 The diagram shown is a first three-dimensional structural schematic of the pile driver of this utility model;

[0017] Figure 2 The diagram shown is a second three-dimensional structural schematic of the pile driver of this utility model;

[0018] Figure 3 The diagram shown is a three-dimensional structural schematic of the pile driver support component of this utility model.

[0019] Figure 4 The diagram shown is a three-dimensional structural schematic of the pile driver clamping component of this utility model.

[0020] Explanation of reference numerals in the attached drawings: 1. Bracket assembly; 2. Sleeve assembly; 3. Piling assembly; 4. Connecting assembly; 5. Support assembly; 6. Clamping assembly; 101. Fixed bracket; 102. Fixing plate; 103. Hand grip; 201. Connecting rod; 202. Sliding sleeve; 203. Connecting ring; 204. Impact ring; 301. Fixing sleeve; 302. Hydraulic push rod; 303. Connecting plate; 304. Fixing rod; 305. Fixing ring; 401. Positioning ring; 402. Damper; 403. Return spring; 404. Mounting ring; 501. Fixing strip; 502. Rotating frame; 503. Positioning sliding sleeve; 504. Bracket strip; 505. Grounding post; 506. Reinforcing plate; 601. Combined post; 602. Mounting plate; 603. Electric push rod; 604. Clamping plate; 605. Limiting groove. Detailed Implementation

[0021] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0022] Please see Figure 1-2 This utility model provides an embodiment: a pile driver for construction engineering, including a support assembly 1, a sleeve assembly 2, a pile driving assembly 3, a connecting assembly 4, a support assembly 5, and a clamping assembly 6; the sleeve assembly 2 is provided inside the support assembly 1; the pile driving assembly 3 is provided on one side of the support assembly 1; the connecting assembly 4 is provided at the lower end of the sleeve assembly 2; the support assembly 5 is provided on the outer side of the connecting assembly 4; the clamping assembly 6 is fixedly connected to the lower end of the connecting assembly 4; the support assembly 1 includes a fixed bracket 101, a fixing plate 102, and a hand grip 103; the fixing plate 102 is installed on the fixed bracket 101; the fixing plate 102... The piling assembly 203 is equipped with a hand grip 103, which allows the piling machine to be held. The piling assembly 3 includes a fixed sleeve 301, a hydraulic push rod 302, a connecting plate 303, a fixed rod 304, and a fixed ring 305. The upper end of the connecting ring 203 is provided with a fixed ring 305. The upper end of the fixed ring 305 is fixedly connected to the fixed rod 304. The upper end of the fixed rod 304 is fixedly connected to the connecting plate 303. The lower end of the connecting plate 303 is equipped with a hydraulic push rod 302. The fixed sleeve 301 is installed on the outside of the hydraulic push rod 302, which can be used to position and fix the hydraulic push rod 302.

[0023] Please see Figure 3-4In this embodiment, the sleeve assembly 2 includes a connecting rod 201, a sliding sleeve 202, a connecting ring 203, and an impact ring 204; the connecting rod 201 is fixedly connected to the fixed bracket 101; the sliding sleeve 202 is provided on the outer side of the connecting rod 201; the connecting ring 203 is fixedly connected to the sliding sleeve 202; the impact ring 204 is installed at the lower end of the connecting ring 203, and the connecting ring 203 and the impact ring 204 can be quickly disassembled and assembled by bolting. The connecting assembly 4 includes a positioning ring 401 and a damper 40. 2. A return spring 403 and a mounting ring 404; a mounting ring 404 is provided at the lower end of the connecting rod 201; a damper 402 is installed at the lower end of the mounting ring 404; a return spring 403 is provided on the outer side of the damper 402; a positioning ring 401 is provided at the lower end of the return spring 403, which can cooperate with the damper 402 and the return spring 403 to alleviate the vibration generated by the pile driver. The support assembly 5 includes a fixing strip 501, a rotating frame 502, a positioning sliding sleeve 503, a support strip 504, and a ground insertion post 50. 5 and reinforcing plate 506; a fixing strip 501 is provided at the lower end of the fixed bracket 101; a rotating frame 502 is bolted to the fixing strip 501; a positioning sleeve 503 is slidably connected to the rotating frame 502; a bracket strip 504 is fixedly connected to the lower end of the positioning sleeve 503; a grounding post 505 is installed on the bracket strip 504; a reinforcing plate 506 is fixedly connected to the upper end of the bracket strip 504, which can reinforce the positioning sleeve 503 and the bracket strip 504. The clamping assembly 6 includes a combination column. The piling machine comprises: 601, mounting plate 602, electric push rod 603, clamping plate 604, and limiting groove 605; a combined column 601 is provided on the inner side of the positioning ring 401; a limiting groove 605 is provided on the lower end face of the combined column 601; a clamping plate 604 is provided at the lower end of the limiting groove 605; an electric push rod 603 is installed on the clamping plate 604; a mounting plate 602 is installed on the outer side of the electric push rod 603, which can drive the clamping plate 604 to move through the electric push rod 603, so as to enable the piling machine to clamp steel pipes of different specifications.

[0024] During operation, the clamping plates 604 are moved by the electric push rod 603 so that multiple clamping plates 604 can clamp the piling steel pipe. After the clamping is confirmed, the entire piling machine is inserted into the ground by the ground-inserting column 505. The connecting plate 303 is moved down by the hydraulic push rod 302, and the fixing ring 305 is moved down synchronously by the fixing rod 304 so that the sliding sleeve 202 moves down, so that the impact ring 204 hits the mounting ring 404, so that the steel pipe fixed at the lower end of the combined column 601 can be knocked to achieve the piling process of the steel pipe.

[0025] Through the above steps, the outrigger structure is designed to transfer part of the weight of the pile driver to the ground, thereby improving the overall comfort of the pile driver. This addresses the problem that existing pile drivers require users to hold the machine while operating it, which can cause the weight of the pile driver to be applied to the user's body, affecting the overall comfort of the pile driver. Additionally, the sleeve assembly 2 facilitates the movement of the pile driving assembly 3, and the pile driving assembly 3 enables the striking of the clamping assembly 6. The connecting assembly 4 buffers vibrations during pile driving, the support assembly 5 provides auxiliary support for the pile driver, and finally, the clamping assembly 6 connects the steel pipe.

[0026] The embodiments of the present invention have been described in detail above with reference to the accompanying drawings. However, the present invention is not limited to the above embodiments. Within the scope of knowledge possessed by those skilled in the art, various changes can be made without departing from the spirit of the present invention.

Claims

1. A pile driver for construction engineering, comprising a bracket assembly (1); characterized in that: The invention also comprises a sleeve assembly (2), a pile driving assembly (3), a connection assembly (4), a support assembly (5) and a clamping assembly (6); the sleeve assembly (2) is arranged on the inner side of the support assembly (1); the pile driving assembly (3) is arranged on one side of the support assembly (1); the connection assembly (4) is arranged at the lower end of the sleeve assembly (2); the support assembly (5) is arranged on the outer side of the connection assembly (4); and the clamping assembly (6) is fixedly connected to the lower end of the connection assembly (4).

2. A pile driver for construction engineering according to claim 1, characterized in that: The support assembly (1) comprises a fixed support (101), a fixed plate (102) and a hand-held grip (103); the fixed support (101) is mounted with the fixed plate (102); and the hand-held grip (103) is mounted with the fixed plate (102).

3. A pile driver for construction engineering according to claim 2, characterized in that: The sleeve assembly (2) comprises a connecting rod (201), a sliding sleeve (202), a connecting ring (203) and an impact ring (204); the connecting rod (201) is fixedly connected to the fixed bracket (101); the sliding sleeve (202) is arranged on the outer side of the connecting rod (201); the connecting ring (203) is fixedly connected to the sliding sleeve (202); and the impact ring (204) is installed at the lower end of the connecting ring (203).

4. A pile driver for construction engineering according to claim 3, characterized in that: The piling assembly (3) comprises a fixing sleeve (301), a hydraulic push rod (302), a connecting plate (303), a fixing rod (304) and a fixing ring (305); the upper end of the connecting ring (203) is provided with a fixing ring (305); the upper end of the fixing ring (305) is fixedly connected to the fixing rod (304); the upper end of the fixing rod (304) is fixedly connected to the connecting plate (303); the lower end of the connecting plate (303) is installed with a hydraulic push rod (302); and the outer side of the hydraulic push rod (302) is installed with a fixing sleeve (301).

5. A pile driver for construction engineering according to claim 3, characterized in that: The connection assembly (4) comprises a positioning ring (401), a damper (402), a return spring (403) and a mounting ring (404); the lower end of the connection rod (201) is provided with a mounting ring (404); the lower end of the mounting ring (404) is provided with a damper (402); the outer side of the damper (402) is provided with a return spring (403); the lower end of the return spring (403) is provided with a positioning ring (401).

6. A pile driver for construction engineering according to claim 2, characterized in that: The support assembly (5) comprises a fixing bar (501), a rotating frame (502), a positioning sleeve (503), a bracket bar (504), a ground-inserted column (505) and a reinforcing plate (506); a fixing bar (501) is arranged at the lower end of the fixing bracket (101); the rotating frame (502) is connected to the fixing bar (501) by bolts; the rotating frame (502) is slidably connected to the positioning sleeve (503); the bracket bar (504) is fixedly connected to the lower end of the positioning sleeve (503); the ground-inserted column (505) is installed on the bracket bar (504); and the reinforcing plate (506) is fixedly connected to the upper end of the bracket bar (504).

7. A pile driver for construction engineering according to claim 5, characterized in that: The clamping assembly (6) comprises a combined column (601), a mounting plate (602), an electric push rod (603), a clamping plate (604) and a limiting groove (605); the combined column (601) is arranged on the inner side of the positioning ring (401); the limiting groove (605) is provided on the lower end surface of the combined column (601); the clamping plate (604) is arranged at the lower end of the limiting groove (605); the electric push rod (603) is mounted on the clamping plate (604); and the mounting plate (602) is mounted on the outer side of the electric push rod (603).