Building structure for building high-rise building with multi-story building

By installing heating components and a drainage system on the roof of the building, the problem of inconvenient drainage of snowmelt water was solved, effective snowmelt and drainage were achieved, and the balcony countertop was protected.

CN221856001UActive Publication Date: 2024-10-18SURVEYING & MAPPING INST OF LINYI MUNICIPAL BUREAU OF LAND & RESOURCES
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420187774.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-25
Publication Date
2024-10-18
Estimated Expiration
2034-01-25

AI Technical Summary

Technical Problem

After the existing multi-story buildings are built into high-rise buildings, it is difficult to drain the melted snow water after the snow is removed, causing the balcony countertops to be easily soaked.

Method used

Set up heating components on the roof of the building, including S-shaped water pipes, tee pipes, water pumps and water heaters. The heating components melt the snow and use drainage holes and drainage pipes to drain the melted snow water.

Benefits of technology

It effectively speeds up the snow melting process on the building rooftop and drains the melted snow water through the drainage system to prevent the balcony countertop from being soaked.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221856001U_ABST
    Figure CN221856001U_ABST
Patent Text Reader

Abstract

The utility model provides a building structure for building a high-rise building with a multi-storey building, which comprises a building rooftop, a surrounding platform integrally arranged on the periphery of the building rooftop, a guardrail integrally poured on the upper portion of the surrounding platform, a heating assembly installed inside the building rooftop, and a three-way pipe installed at one end of the S-shaped water pipe. A stainless steel end cover is installed at one end of the three-way pipe, a water pump is installed at the other end of the three-way pipe, and a water heater is installed at one end of the S-shaped water pipe. Due to the arrangement of the S-shaped water pipe, the three-way pipe, the water pump and the water heater, snow melting on the building rooftop can be accelerated, and snow melting water can be discharged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of multi-story buildings, and in particular relates to a building structure in which a multi-story building is built within a high-rise building. Background Art

[0002] Multi-story buildings and high-rise buildings are common existing building structures. The existing building structure suitable for multi-story buildings within high-rise buildings includes walls, which are symmetrically installed on the top of the roof. The outer walls of the walls are symmetrically provided with grooves, and the grooves have slides inside. This building structure shovels snow through a snow shovel, but the shoveled snow is not convenient to be transported away from the balcony, and the accumulated snow is easy to soak the balcony countertop. Utility Model Content

[0003] In order to solve the above technical problems, the utility model provides a building structure in which a multi-story building is built inside a high-rise building, which can accelerate snow melting and drain the water from the melted snow.

[0004] The utility model is realized by the following technical solutions:

[0005] A building structure in which a multi-story building is built within a high-rise building, comprising a building roof, an outer periphery of the building roof is integrally provided with a perimeter platform, an upper portion of the perimeter platform is integrally cast with a guardrail, and is characterized in that a heating component is installed inside the building roof, the heating component comprises an S-shaped water pipe, one end of the S-shaped water pipe is installed with a tee pipe, one end of the tee pipe is installed with a stainless steel end cap, the other end of the tee pipe is installed with a water pump, and one end of the S-shaped water pipe is installed with a water heater.

[0006] Preferably, a drainage hole is provided on one side of the enclosure.

[0007] Preferably, a drain pipe is installed at the drain hole.

[0008] Compared with the prior art, the beneficial effects of the utility model are:

[0009] 1. In the utility model, the arrangement of the S-shaped water pipe, the tee pipe, the water pump and the water heater is conducive to accelerating the melting of snow on the roof of the building and draining the melted snow water.

[0010] 2. In the present invention, the arrangement of the enclosure and guardrail is beneficial to protecting people on the roof of the building. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a structural schematic diagram of the utility model.

[0012] Figure 2 It is a structural schematic diagram of the heating component of the utility model.

[0013] In the figure:

[0014] 1. Building roof; 2. Enclosure; 3. Guardrail; 4. Drain pipe; 5. Heating component;

[0015] 51. S-shaped water pipe; 52. Tee pipe; 53. Water pump; 54. Water heater. DETAILED DESCRIPTION

[0016] The utility model is described in detail below in conjunction with the accompanying drawings. Figure 1 As shown, a building structure of a multi-story building within a high-rise building comprises a building roof 1, an outer periphery of the building roof 1 is integrated with a perimeter platform 2, a drainage hole is opened on one side of the perimeter platform 2, a drainage pipe 4 is installed at the drainage hole, a guardrail 3 is integrally cast on the upper part of the perimeter platform 2, and a heating component 5 is installed inside the building roof 1.

[0017] In this embodiment, combined with the Figure 2 As shown, the heating assembly 5 includes an S-shaped water pipe 51, one end of the S-shaped water pipe 51 is installed with a tee pipe 52, one end of the tee pipe 52 is installed with a stainless steel end cover, the other end of the tee pipe 52 is installed with a water pump 53, and one end of the S-shaped water pipe 51 is installed with a water heater 54. The hot water in the heater 54 circulates through the S-shaped water pipe 51, the tee pipe 52, the water pump 53 and the water heater 54 to heat the building roof 1 and melt snow. The melted snow water can be discharged into the building drainage pipe through the drain pipe 4.

[0018] In this embodiment, specifically, the water inlet end of the water pump 53 is connected to the water outlet end of the water heater 54 through a pipeline.

[0019] In this embodiment, specifically, the water outlet end of the water pump 53 is connected to the tee pipe 52 .

[0020] In this embodiment, specifically, the water inlet end of the water heater 54 is connected to the S-shaped water pipe 51 .

[0021] How it works

[0022] In the utility model, when there is snow on the building rooftop 1, the water heater 54 and the water pump 53 are connected to the external mains electricity, the water heater 54 heats the water inside the water heater 54, the water pump 53 transports the heated water to the S-shaped water pipe 51, the S-shaped water pipe 51 heats the table top of the building rooftop 1, and the enclosure 2 and the guardrail 3 protect the people on the building balcony 1.

[0023] Utilizing the technical solution described in the utility model, or those skilled in the art designing similar technical solutions inspired by the technical solution of the utility model to achieve the above-mentioned technical effects, all fall within the protection scope of the utility model.

Claims

1. A building structure of a multi-story building enclosed within a high-rise building, the building structure of the multi-story building enclosed within the high-rise building comprising a building rooftop (1), the periphery of the building rooftop (1) is integrally provided with a surrounding platform (2), the upper part of the surrounding platform (2) is integrally cast with a guardrail (3), characterized in that: A heating assembly (5) is installed inside the building rooftop (1), and the heating assembly (5) comprises an S-shaped water pipe (51), one end of the S-shaped water pipe (51) is installed with a tee pipe (52), one end of the tee pipe (52) is installed with a stainless steel end cap, the other end of the tee pipe (52) is installed with a water pump (53), and one end of the S-shaped water pipe (51) is installed with a water heater (54).

2. The architectural structure of a multi-story building within a high-rise building as claimed in claim 1, characterized in that: The water inlet end of the water pump (53) is connected to the water outlet end pipeline of the water heater (54).

3. The architectural structure of a multi-story building within a high-rise building as claimed in claim 1, characterized in that: The water outlet end of the water pump (53) is connected to the three-way pipe (52).

4. The architectural structure of a multi-story building within a high-rise building as claimed in claim 1, characterized in that: The water inlet end of the water heater (54) is connected to the S-shaped water pipe (51).

5. The architectural structure of a multi-story building within a high-rise building as claimed in claim 1, characterized in that: A drainage hole is provided on one side of the enclosure (2).

6. The building structure of a multi-story building within a high-rise building as claimed in claim 5, characterized in that: A drainage pipe (4) is installed at the drainage hole.