Welding-free prefabricated tie bolt
Through the design of welding-free prefabricated tie bolts and the hook screw and nut structure, the problem of welding or manual support is required to fix the steel frame and the beam side formwork has been solved, achieving a fast and safe concrete beam formwork process and improving the efficiency of the concrete beam formwork. Construction efficiency and safety.
Patent Information
- Application Number
- CN202323365477.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-11
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2033-12-11
AI Technical Summary
In the existing concrete formwork process, the fixation between the steel frame and the beam side formwork requires welding or manual support, which results in a complicated process and welding safety hazards, affecting efficiency and safety.
Welding-free prefabricated tie bolts are used, including the first hook-type screw, the second hook-type screw and the nut. By hooking the steel bar and turning the mold erection screw, the head contacts the steel bar to achieve horizontal fixation of the mould, which avoids Welding operations.
It realizes welding-free tie-fastening between the steel frame and the beam side formwork, quickly completes the concrete beam formwork process, improves efficiency and safety, and avoids fire hazards during fire operations.
Smart Images

Figure CN221856212U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of concrete formwork pouring, in particular to a welding-free prefabricated tie bolt Background Art
[0002] For example, Chinese utility model CN219946640U discloses a vertical mold for flat-bottom reinforced concrete slabs, which is composed of a bottom mold, a vertical mold placed on the bottom mold, a number of positioning clips, and a number of steel bar bars used to be placed between adjacent vertical plates. The bottom mold is composed of a number of channel steels welded longitudinally on the base, and the bottom template is welded on the channel steel. Positioning guide structures are arranged around the bottom mold. The vertical mold is composed of a number of vertical plates hanging on two lifting shafts, and a pad is arranged between adjacent vertical plates. A number of positioning clips are clamped on the vertical plates of the vertical mold. The steel bar bars are composed of a number of transverse steel bars welded on the vertical sections of a number of bent steel bars, and the width of the bent steel bars is adapted to the spacing between adjacent vertical plates. After the mold is erected, the vertical plates of the mold are clamped with clips. Before the clips are used, the vertical plates of the mold need to be kept upright by other means, such as welding or manual support. Utility Model Content
[0003] The technical problem to be solved by the utility model is to provide a welding-free prefabricated tie bolt, which can realize welding-free tie fixation between the tied steel bar skeleton and the beam side formwork, so as to quickly complete the concrete beam formwork process.
[0004] In order to solve the above problems, a welding-free prefabricated tie bolt is adopted, which comprises:
[0005] The first hook-type screw rod has a hook portion in the middle of which a steel bar can pass through;
[0006] A second hook-shaped screw rod is spaced apart from and arranged in the opposite direction to the first hook-shaped screw rod, so that a steel bar passing through the first hook-shaped screw rod can also pass through the second hook-shaped screw rod;
[0007] A nut, which is welded to an end of the first hook-shaped screw and the second hook-shaped screw away from the hook portion, and the nut is located between the first hook-shaped screw and the second hook-shaped screw;
[0008] The mold screw rod is adapted to the nut, and is threadedly passed through the nut between the first hook-shaped screw rod and the second hook-shaped screw rod. A top head is arranged at the end of the mold screw rod to abut against the steel bars passing through the first hook-shaped screw rod and the second hook-shaped screw rod.
[0009] With such a structure, after the first hook-shaped screw and the second hook-shaped screw hook the steel bar, the mold screw is rotated to make the top head abut the steel bar, so that the mold screw can be kept horizontal, so that the mold screw can pass horizontally through the mold to realize the upright mold, which is beneficial to improve the mold efficiency.
[0010] As a further improvement of the utility model, the steel bars are frame bars or waist bars in the beam steel bar skeleton.
[0011] As a further improvement of the present invention, the first hook-shaped screw rod and the second hook-shaped screw rod are made of No. 32 steel bars.
[0012] As a further improvement of the present invention, the length of the mold screw is 25 cm.
[0013] As a further improvement of the present invention, the first hook-shaped screw rod and the second hook-shaped screw rod are spaced 3 cm apart.
[0014] As a further improvement of the present invention, the diameter of the hook portion of the first hook-shaped screw and the second hook-shaped screw is 5 cm.
[0015] The utility model can realize welding-free tie-and-fix between the tied steel bar skeleton and the beam side formwork, so as to quickly complete the concrete beam formwork process. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of an embodiment.
[0017] Figure 2 It is a partial enlarged schematic diagram of the embodiment.
[0018] Figure numerals: 1. first hook-shaped screw; 2. second hook-shaped screw; 3. nut; 4. mold screw; 5. top head. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] In the description of the present utility model, it should be noted that the orientation or position relationship indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. is based on the orientation or position relationship shown in the drawings, and is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present utility model; the terms "first", "second", and "third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance; in addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a communication between the two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0021] Example 1
[0022] like Figure 1-Figure 2 As shown, a welding-free prefabricated tie bolt comprises:
[0023] A first hook-shaped screw rod 1, the middle of which hook portion can be passed through by a steel bar;
[0024] The second hook-shaped screw rod 2 is spaced apart from and arranged in the opposite direction to the first hook-shaped screw rod 1, so that the steel bar passing through the first hook-shaped screw rod 1 can also pass through the second hook-shaped screw rod 2;
[0025] A nut 3, which is welded to an end of the first hook-shaped screw 1 and the second hook-shaped screw 2 away from the hook portion, and the nut 3 is located between the first hook-shaped screw 1 and the second hook-shaped screw 2;
[0026] The mold screw 4 is adapted to the nut 3 and is threaded through the nut 3 between the first hook-shaped screw 1 and the second hook-shaped screw 2. A top head 5 is provided at the end thereof to abut against the steel bars passing through the first hook-shaped screw 1 and the second hook-shaped screw 2.
[0027] With such a structure, after the first hook-shaped screw 1 and the second hook-shaped screw 2 hook the steel bar, the formwork screw 4 is rotated to make the top head 5 abut against the steel bar, so that the formwork screw 4 can be kept horizontal, so that the formwork screw 4 can pass through the formwork horizontally to facilitate the connection between the steel bar skeleton and the formwork, which is beneficial to improving the formwork efficiency.
[0028] In this embodiment, the steel bars are frame bars or waist bars in the beam steel bar skeleton.
[0029] In this embodiment, the first hook-shaped screw rod 1 and the second hook-shaped screw rod 2 are made of No. 32 steel bars.
[0030] In this embodiment, the length of the mold screw 4 is 25 cm.
[0031] In this embodiment, the first hook-shaped screw 1 and the second hook-shaped screw 2 are spaced 3 cm apart.
[0032] In this embodiment, the hook diameters of the first hook-shaped screw 1 and the second hook-shaped screw 2 are 5 cm.
[0033] The utility model can realize welding-free tie-and-fix between the tied steel bar skeleton and the beam side formwork, so as to quickly complete the concrete beam formwork process.
[0034] Example 2
[0035] The present embodiment is a welding-free prefabricated tie bolt, which acts between the steel bar and the concrete beam formwork. When in use, the device is buckled and placed on the frame bars and waist bars of the beam steel skeleton, and a welding-free tie fixation is achieved between the tied steel skeleton and the beam side formwork, so as to quickly complete the concrete beam formwork process. A No. 32 hook-type screw is used to fix the tool and the steel bar, and a welded connection nut is used in the middle to connect with the 25cm screw. A gasket is welded to the end of the screw, which can quickly complete the rapid formwork process on the steel beam. The present embodiment has the effect of improving the efficiency of the concrete beam formwork support process.
[0036] This embodiment has been comprehensively upgraded and innovated in terms of materials, size, and usage effects to ensure that its design meets the needs of on-site construction, so as to achieve the effects of optimizing the process, improving quality, and reducing construction costs. This embodiment adopts the following technical solutions:
[0037] In this embodiment, a 32-gauge hook-shaped screw rod is set up in both directions as a tension bolt connected to the steel bar, and the formwork screw rod is welded with a nut between the tension bolt rods. By twisting and adjusting the screw rod size, it can adapt to beams of various sizes, quickly assist in the installation and fixation of the tied beam reinforcement and beam formwork, and complete the concrete beam formwork process. Ensure that its position is correct and the joints are tight.
[0038] This embodiment can realize independent operation and can be directly stored and carried after use, which solves the problems that traditional devices cannot operate independently, accessories are easy to lose, and the cost is high, and improves the standardization of civilized construction on site.
[0039] The length of the formwork screw in this embodiment is 25 cm, and a nut is set at the connection point with the tension bolt, so that the screw can be twisted to quickly adjust the size, which is suitable for various beam sizes. The diameter of the two-way tension bolt is 5 cm, which meets the size of most steel bars on construction sites.
[0040] The steel wire is made of Q235B steel material, and its structure is more stable and firm and not easy to damage.
[0041] The utility model has the following beneficial effects:
[0042] Compared with the traditional tie screw, this device can realize on-site hot work without hot work, and solve the fire hazard of hot work in the environment of on-site mold opening and accumulation of combustibles.
[0043] This device can effectively optimize the construction process, save time and effort, and effectively speed up the construction progress.
[0044] This device is firmly tied, especially in the formwork fixing operation of large-sized beams, columns and walls, which can effectively ensure the construction quality and safety during the pouring operation.
[0045] This device can play a leading role in demonstrating practical technological innovation and can guide enterprises to actively carry out high-quality technology creation work.
[0046] The above contents are further detailed descriptions of the present invention in combination with specific preferred implementations, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For technicians in the technical field to which the present invention belongs, several equivalent substitutions or obvious variations can be made without departing from the concept of the present invention, and the performance or use is the same, which should be regarded as belonging to the protection scope of the present invention.
Claims
1. A welding-free prefabricated tie bolt, Features include: A first hook-shaped screw rod (1), the middle of which hook portion can be passed through by a steel bar; A second hook-shaped screw rod (2) is spaced apart from and arranged in the opposite direction to the first hook-shaped screw rod (1), so that a steel bar passing through the first hook-shaped screw rod (1) can also pass through the second hook-shaped screw rod (2); A nut (3) is welded to the first hook-shaped screw (1) and the second hook-shaped screw (2) at one end away from the hook portion, and the nut (3) is located between the first hook-shaped screw (1) and the second hook-shaped screw (2); The mold screw (4) is adapted to the nut (3), and is threadedly passed through the nut (3) between the first hook-shaped screw (1) and the second hook-shaped screw (2). A head (5) is provided at the end thereof to abut against the steel bars passing through the first hook-shaped screw (1) and the second hook-shaped screw (2).
2. According to claim 1, the welding-free prefabricated tie bolt, Features The steel bars are frame bars or waist bars in the beam steel bar skeleton.
3. According to claim 1, the welding-free prefabricated tie bolt, Features The first hook-shaped screw rod (1) and the second hook-shaped screw rod (2) are made of No. 32 steel bars.
4. According to claim 1, the welding-free prefabricated tie bolt, Features The length of the mold screw (4) is 25 cm.
5. According to claim 1, the welding-free prefabricated tie bolt, Features The first hook-shaped screw (1) and the second hook-shaped screw (2) are spaced 3 cm apart.
6. According to claim 1, the welding-free prefabricated tie bolt, Features The hook diameters of the first hook-shaped screw (1) and the second hook-shaped screw (2) are 5 cm.