Piling equipment for photovoltaic construction
By integrating vacuum fans and spray water pipes into the piling equipment, dust problems and soil hardness problems during the piling process are solved, and work efficiency and safety are improved.
Patent Information
- Application Number
- CN202323631836.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2033-12-29
AI Technical Summary
The existing piling equipment produces a large amount of dust during the piling process, which affects the vision and health of the workers. In addition, manual water spraying is required when working with soil or rock layers with high hardness, which is inconvenient to operate.
A piling equipment for photovoltaic construction is designed, which includes a dust suction fan and suction port to absorb dust, a water storage tank and a spray water pipe to moisten the soil, reduce soil hardness and reduce dust flying.
It effectively prevents the impact of dust on workers, improves piling efficiency, reduces dust flying, avoids soil cracking, and simplifies piling operations.
Smart Images

Figure CN221856614U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of photovoltaics, in particular to a piling device for photovoltaic construction. Background Art
[0002] A pile driver consists of a pile hammer, a pile frame and ancillary equipment. The pile hammer is attached between two parallel vertical guide rods in front of the pile frame and is lifted by a lifting hook. The pile frame is a steel structure tower with a winch at the rear to lift the pile and pile hammer. There is a guide frame composed of two guide rods in front of the pile frame to control the direction of piling so that the pile can be accurately penetrated into the formation according to the designed direction. The basic technical parameters of a pile driver are the weight of the impact part, the impact kinetic energy and the impact frequency. Pile hammers can be divided into drop hammers, steam hammers, diesel hammers, hydraulic hammers, etc. according to the power source of the movement. Pile driving equipment is needed for piling installation during photovoltaic construction.
[0003] Existing piling equipment will generate a lot of dust during piling. This flying dust will not only block the workers' vision and affect their normal work, but also have an impact on the health of the surrounding workers and induce occupational diseases. At the same time, when encountering some soil or rock layers with higher hardness, workers need to manually spray water to reduce the soil hardness, which is very inconvenient. Utility Model Content
[0004] The technical problem to be solved by the utility model is to overcome the defects of the prior art and provide a piling device for photovoltaic construction.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions:
[0006] The utility model discloses a piling device for photovoltaic construction, comprising an equipment main body, the equipment main body comprising a piling assembly and a base, one end of the piling assembly is provided with a fixed support rod, one end of the fixed support rod is provided with a base, a driving motor, a piling rod and a drill bit are provided inside the piling assembly, a dust suction port is provided on the surface of one end of the fixed support rod, a water storage tank and a water pump are provided at the top of the base, an ash storage box is provided inside the base, and a spray water pipe is provided at one end of the base.
[0007] As a preferred technical solution of the present invention, a pile driving rod is provided at the bottom end of the driving motor, and a drill bit is provided at the bottom end of the pile driving rod.
[0008] As a preferred technical solution of the present invention, a dust suction fan is provided inside the base, the dust suction fan and the dust suction port are located correspondingly, and the dust suction fan is provided on the top side of the dust storage box.
[0009] As a preferred technical solution of the present invention, the ash storage box is a drawer-type structure, both ends of the ash storage box are provided with sliding grooves, and one end surface of the ash storage box is provided with a handle.
[0010] As an optimal technical solution of the present invention, a water pump is provided at one end of the storage water tank, and a connecting water pipe is provided at the bottom end of the water pump. The connecting water pipe is arranged inside the base, and the connecting water pipe is connected to the spray water pipe. The spray water pipe is "L"-shaped, and one end of the spray water pipe is connected to the base, and the other end of the spray water pipe is facing the drill bit position.
[0011] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0012] The utility model relates to a piling device for photovoltaic construction. A dust suction fan and a dust suction port are provided to absorb dust generated during the piling process into the interior to prevent it from affecting the workers. A water storage tank and a water spray pipe are also provided. When the piling work is in progress, the soil can be moistened, the soil hardness can be reduced, and the piling efficiency can be improved. At the same time, when the moistened soil is used for piling, the soil will not crack, and the flying dust generated during the piling process can also be reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0015] Figure 2 It is a partial structural sectional view of the utility model;
[0016] In the figure: 1. Equipment body; 2. Pile driving assembly; 201. Drive motor; 202. Pile driving rod; 203. Drill bit; 3. Base; 301. Dust suction fan; 302. Dust suction port; 303. Ash storage box; 3031. Handle; 304. Water storage tank; 305. Water pump; 306. Spray water pipe. DETAILED DESCRIPTION
[0017] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention and are not used to limit the present invention.
[0018] In the drawings, the same reference numerals all refer to the same components.
[0019] like Figure 1-2As shown, the utility model provides a piling device for photovoltaic construction, including a device body 1, the device body 1 includes a piling assembly 2 and a base 3, one end of the piling assembly 2 is provided with a fixed support rod, one end of the fixed support rod is provided with a base 3, the interior of the piling assembly 2 is provided with a driving motor 201, a piling rod 202 and a drill bit 203, one end surface of the fixed support rod is provided with a dust suction port 302, the top of the base 3 is provided with a storage water tank 304 and a water pump 305, the interior of the base 3 is provided with an ash storage box 303, and one end of the base 3 is provided with a spray water pipe 306.
[0020] The usage of this utility model is as follows:
[0021] 1. When using the device body 1, first, the device body 1 is transported to the designated location, the driving motor 201 drives the pile driving rod 202 to rotate, and the drill bit 203 is used to break through the soil to perform the pile driving operation. During the pile driving process, the water pump 305 extracts water from the storage tank 304 and transports it to the spray water pipe 306 through the connecting water pipe. The water is sprayed through the spray water pipe 306, which has the effect of pre-moistening the soil, reducing the soil hardness and improving the pile driving efficiency. At the same time, when the moistened soil is used for pile driving, the soil will not crack and the dust flying during the pile driving process will be reduced.
[0022] 2. Dust will inevitably fly during the piling process. By starting the dust suction fan 301, the adsorption fan absorbs the dust into the interior through the dust suction port 302 and stores it in the dust storage box 303 to prevent the flying dust from causing health effects on the surrounding workers or blocking their sight, thereby affecting normal work. After a certain amount of dust is stored in the dust storage box 303, the worker can drag the dust storage box 303 out of the base 3 through the handle 3031, so as to centrally process the dust stored inside.
[0023] Furthermore, a pile driving rod 202 is provided at the bottom end of the driving motor 201, and a drill bit 203 is provided at the bottom end of the pile driving rod 202. The driving motor 201 drives the pile driving rod 202 to rotate. By braking the pile driving rod 202 upward or downward, pile driving can be carried out, and the drill bit 203 is used to quickly break through the soil.
[0024] Furthermore, a dust suction fan 301 is provided inside the base 3. The positions of the dust suction fan 301 and the dust suction port 302 correspond to each other. The dust suction fan 301 is provided on the top side of the dust storage box 303. When piling work is carried out, dust will be generated due to the soil in the picture. The flying dust will have an impact on the health of the surrounding workers and will block the line of sight, affecting normal work. By starting the dust suction fan 301, the dust suction fan 301 will suck the flying dust into the interior from the dust suction port 302 and store it inside the dust storage box 303.
[0025] Furthermore, the ash storage box 303 is a drawer-type structure, and sliding grooves are provided at both ends of the ash storage box 303. A handle 3031 is provided on the surface of one end of the ash storage box 303. After a certain amount of dust is stored inside the ash storage box 303, the staff can drag the ash storage box 303 out from the inside of the base 3 through the handle 3031, so as to centrally process the dust stored inside. The setting of the handle 3031 is used to facilitate the staff to stretch the ash storage box 303.
[0026] Furthermore, a water pump 305 is provided at one end of the storage water tank 304, and a connecting water pipe is provided at the bottom end of the water pump 305. The connecting water pipe is arranged inside the base 3, and the connecting water pipe is connected to the spray water pipe 306. The spray water pipe 306 is "L"-shaped, and one end of the spray water pipe 306 is connected to the base 3, and the other end of the spray water pipe 306 is facing the position of the drill bit 203. During the piling process, the water pump 305 can be started, and the water pump 305 will extract the water stored in the storage water tank 304 from the inside and transport it to the spray water pipe 306 through the connecting water pipe. The water flow is released to the position of the drill bit 203 through the spray water pipe 306, thereby moistening the soil that is about to be broken through. The moistened soil is more convenient to break through and will not cause dust to fly.
[0027] The utility model is a piling device for photovoltaic construction. By arranging a dust suction fan 301 and a dust suction port 302, dust generated during the piling process is adsorbed into the interior to prevent it from affecting the workers. At the same time, a storage water tank 304 and a spray water pipe 306 are provided. When the piling work is carried out, the soil can be moistened, the soil hardness can be reduced, and the piling efficiency can be improved. At the same time, when the moistened soil is used for piling, the soil will not crack, and the flying dust generated during the piling process can also be reduced.
[0028] Finally, it should be noted that the above description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art will be able to modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein with equivalents. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the scope of protection of the present invention.
Claims
1. A piling device for photovoltaic construction, characterized in that: The invention comprises an equipment body (1), wherein the equipment body (1) comprises a piling assembly (2) and a base (3), wherein a fixed support rod is arranged at one end of the piling assembly (2), and the base (3) is arranged at one end of the fixed support rod, wherein a driving motor (201), a piling rod (202) and a drill bit (203) are arranged inside the piling assembly (2), a dust suction port (302) is arranged on the surface of one end of the fixed support rod, a water storage tank (304) and a water pump (305) are arranged at the top of the base (3), an ash storage box (303) is arranged inside the base (3), and a spray water pipe (306) is arranged at one end of the base (3).
2. A piling device for photovoltaic construction according to claim 1, characterized in that: A pile driving rod (202) is provided at the bottom end of the driving motor (201), and a drill bit (203) is provided at the bottom end of the pile driving rod (202).
3. A piling device for photovoltaic construction according to claim 1, characterized in that: A dust suction fan (301) is arranged inside the base (3); the dust suction fan (301) and the dust suction port (302) are located in corresponding positions; the dust suction fan (301) is arranged on the top side of the dust storage box (303).
4. A piling device for photovoltaic construction according to claim 3, characterized in that: The ash storage box (303) is a drawer-type structure, with sliding grooves being provided at both ends of the ash storage box (303), and a handle (3031) being provided on the surface of one end of the ash storage box (303).
5. A piling device for photovoltaic construction according to claim 1, characterized in that: A water pump (305) is provided at one end of the water storage tank (304), and a connecting water pipe is provided at the bottom end of the water pump (305). The connecting water pipe is arranged inside the base (3), and is connected to a spray water pipe (306). The spray water pipe (306) is in an "L" shape, and one end of the spray water pipe (306) is connected to the base (3), and the other end of the spray water pipe (306) is directly opposite to the position of the drill bit (203).