Mine vertical shaft composite shaft wall structure
By adopting a composite shaft wall structure in the mine shaft wall, using Portland cement and reinforced concrete combined with a sandwich structure, the problem of uneven distribution of ground pressure stress in the shaft wall structure in a high-depth environment is solved, and the stability of the shaft wall is achieved. safety and construction safety.
Patent Information
- Application Number
- CN202420193227.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-26
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-26
AI Technical Summary
The ground pressure stress and the pressure caused by the fragmentation of the ore rock layer caused by the ground pressure stress and the fracture of the ore rock layer during the construction and use period of the existing mine shaft wall structure caused separation of the outer layer of concrete and the middle steel plate, resulting in poor mutual coordination of the shaft wall structure.
It adopts a composite shaft wall structure, including an outer Portland cement shaft wall, an inner reinforced concrete shaft wall and a sandwich structure. The sandwich consists of a bracket and a rubber stress plate. The bracket is an annular structure, and the rubber stress plate is close to the bracket. The sandwich The steel plate distributes the stress to the bracket and the inner well wall to ensure that the ground pressure is evenly distributed.
It effectively disperses the geopressure stress of the well wall, improves the coordination and stability of the well wall structure, ensures construction safety and progress, and at the same time improves the strength and elasticity of the well wall and reduces fault phenomena.
Smart Images

Figure CN221856713U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of mine shaft support, and in particular to a mine shaft composite shaft wall structure. Background Art
[0002] With the rapid development of the mining industry, my country's mine shafts have reached the level of deep mines, which are also accompanied by risks brought by high-depth environments. The shaft wall structure is subjected to ground pressure stress during construction and use, pressure caused by the fragmentation of mineral rock layers, and weathering of internal walls.
[0003] In the prior art, the shaft wall is usually cylindrical, and the shaft wall structure is provided with an inner and outer layer, with a steel bracket embedded in the middle. Mortise and tenon structures are provided at both ends of the steel plate bracket, and the steel plate brackets can be mortise-jointed with each other. After the bracket is fixed, reinforced concrete is poured into the inner and outer layers of the shaft wall respectively.
[0004] Since the poured reinforced concrete layer of the outer shaft wall is in direct contact with the mine, the solidification time and the effect after solidification are different from those of the inner layer, delamination will occur between the outer concrete and the middle steel plate. In addition, the influence of the vertical stress of the shaft leads to poor mutual coordination of the shaft wall structure. Therefore, a composite shaft wall structure is needed in which the outer shaft wall and the inner shaft wall can coordinate with each other and disperse the force. Utility Model Content
[0005] In view of the deficiencies in the prior art, the purpose of this application is to provide a composite shaft wall structure for a mine shaft, which is used to solve the problem of faults between the outer concrete layer and the middle support layer, resulting in poor coordinated and dispersed force effect of the composite shaft wall structure.
[0006] The above-mentioned purpose of the present application is achieved through the following technical solutions: a composite shaft wall structure for a mine shaft, the composite shaft wall structure includes an outer shaft wall, an intermediate inner layer and an inner shaft wall, the outer layer is basically adjacent to the ore rock layer, the inner layer includes a bracket and a sandwich steel plate, the sandwich steel plate divides the bracket into various space blocks, each space block is respectively provided with a rubber stress plate, and the rubber stress plate is tightly attached to the bracket.
[0007] The above technical solution is usually adopted. When a certain area of the outer wall of the shaft is subjected to excessive ground pressure from the mineral rock layer, the rubber stress plate on the bracket first disperses the stress to the sandwich steel plate, and then disperses the stress to the bracket along with the sandwich steel plate. The bracket then coordinates with the inner wall of each area, thereby dispersing the ground pressure on the entire composite wall to various parts of the structure.
[0008] Furthermore, the cross section of the bracket is a closed annular structure.
[0009] By adopting the above technical solution, when multiple areas are subjected to ground pressure at the same time, the stress will be dispersed to the entire shaft structure along with the bracket due to its annular shape.
[0010] Furthermore, the inner sandwich panel is composed of a plurality of sandwich blocks.
[0011] The above technical solution is usually adopted to disperse the ground pressure on the mineral rock layer during construction.
[0012] Furthermore, a rectangular groove is provided at one end of the sandwich block, and a flange is provided at the other end.
[0013] By adopting the above technical solution, during construction, it is only necessary to insert the flange of the sandwich block into the rectangular groove of another sandwich block. When the construction is completed, the pressure of the ore rock layer will tightly fit the sandwich blocks together to form an inner sandwich.
[0014] Furthermore, the rubber stress-bearing plate is triangular in shape, with one vertex facing the outer well wall and the other two vertices connected to the sandwich steel plate.
[0015] By adopting the above technical solution, the ground pressure can be better dispersed on the sandwich steel plates on both sides.
[0016] Furthermore, the inner well wall filler is a well wall made of reinforced concrete.
[0017] By adopting the above scheme, after the reinforced concrete of the inner well wall solidifies, the well wall can disperse the stress of the outer layer.
[0018] Furthermore, the outer well wall filler is a well wall made of silicate cement.
[0019] By adopting the above solution, the poured silicate cement of the outer well wall has elasticity and viscosity, which can better disperse the ground pressure of the well wall.
[0020] Furthermore, the vertical shafts excavated downwards are progressive, the excavation diameter of the first-layer vertical shaft is larger than that of the second-layer vertical shaft, and the excavation diameter of the second-layer vertical shaft is larger than that of the third-layer vertical shaft.
[0021] By adopting the above technical solution, it is more convenient and safer to mine downwards in the vertical shaft again.
[0022] Furthermore, the inner layer of the inner well wall is provided with a steel template.
[0023] By adopting the above technical solution, supporting force can be provided for the inner layer of the well wall made of reinforced concrete.
[0024] In summary, the present application includes at least one of the following beneficial technical effects:
[0025] When the structure of the shaft wall is subjected to relatively large ground pressure from the mineral rock strata, the silicate cement of the outer shaft wall is elastic and will disperse the force to the surroundings. At the same time, as the bracket transmits part of the force to the reinforced concrete of the entire inner shaft wall, the various rubber load-bearing plates on the bracket will also disperse the force to the sandwich steel plates on both sides, thereby mutually adjusting the ground pressure of the mineral rock strata on the outer shaft wall.
[0026] The inner interlayer is composed of multiple interlayer blocks, one end of which is a rectangular groove and the other end is a flange. When mining the mine, just put the two inner interlayers together. After the construction is completed, the ground pressure of the ore rock layer will tightly fit the inner interlayers together, so that the structural interlayers of the well wall can be quickly connected, and the construction progress can be quickly completed.
[0027] The outer well wall is filled with silicate cement, and the inner well wall is filled with reinforced concrete. The two are poured at the same time during construction, which is conducive to speeding up the construction progress and can also control the strength of the filling materials of the inner and outer well walls. Silicate cement has elastic and viscous properties, while reinforced concrete has strong hardness.
[0028] The vertical shaft is constructed in a progressive manner downwards. When a certain stage of implementation is completed and the fillings of the outer and inner layers of the shaft wall structure are fixed, the second layer of the shaft is excavated at the bottom of the lowest point of the first vertical shaft excavation. When the fillings of the second layer of the shaft wall structure solidify, the third layer of the shaft is excavated, and so on. This can maintain the construction progress while improving construction safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the structure of the overall embodiment 1;
[0030] Figure 2 is a schematic diagram of the cross-sectional structure of the bracket in Example 1;
[0031] Figure 3 It is a schematic diagram of the structure of the sandwich blocks connected to each other;
[0032] Figure 4 It is a schematic diagram of the progressive structure of the shaft;
[0033] Figure numerals: 1, outer shaft wall; 101, inner shaft wall; 2, rubber stress plate; 3, inner interlayer; 30, interlayer block; 301, bracket; 302, interlayer steel plate; 4, ore rock layer; 5, first-layer vertical shaft; 501, second-layer vertical shaft; 502, third-layer vertical shaft; 6, rectangular groove; 601, flange; 7, steel formwork. DETAILED DESCRIPTION
[0034] The present application is further described in detail below in conjunction with the accompanying drawings.
[0035] Example 1, reference Figure 1 A composite shaft wall structure for a mine shaft comprises an outer shaft wall 1, an inner interlayer 3 in the middle and an inner shaft wall 101, wherein the outer shaft wall is adjacent to a mineral rock layer 4, the inner interlayer 3 comprises a bracket 301 and an interlayer steel plate 302, the interlayer steel plate 302 disperses the bracket 301 into various space blocks, each space block is provided with a rubber stress plate 2, and the rubber stress plate 2 is completely attached to the bracket 301 of the block, referring to Figure 2 The cross section of the bracket 301 is an annular structure. The outer well wall 1 is a well wall made of silicate cement, which has elasticity and viscosity. The inner well wall 101 is a well wall made of reinforced concrete, which has strong hardness. A steel template 7 is provided on the inner side of the inner well wall 101 to support the well wall made of reinforced concrete. When a certain block of the outer well wall 101 is subjected to a large stress of the mineral rock layer 4, the silicate cement of the outer well wall 1 will first disperse the force received to the sandwich steel plate 302 of the inner sandwich 3 through the rubber stress plate 2. Since the bracket 301 connected to the sandwich steel plate 302 is an annular structure, the stress is dispersed to other blocks, and then transferred to the reinforced concrete of the inner well wall 101. The reinforced concrete of the inner well wall 101 is then supported by the steel template 7. At this time, the stress of the mineral rock layer 4 is evenly dispersed to each block through the composite well wall structure, thereby completing the coordinated force.
[0036] In order to quickly make the inner interlayer 3 more compact during construction, in this embodiment, referring to Figure 3 The inner interlayer 3 is composed of a plurality of interlayer blocks 30, a rectangular groove 6 is provided at one end of the interlayer block 30, and a flange 601 is provided at the other end. During construction, the two interlayer blocks 30 are brought close to each other, and the flange 601 is embedded in the rectangular groove 6. This splicing structure allows the pressure of the ore rock layer 4 to be pressed on the inner interlayer 3 after the construction is completed, and at the same time, the two interlayer blocks 30 are brought close to each other, thereby making the connection tighter.
[0037] In order to make the solidification time of the filling materials of the outer well wall 1 and the inner well wall 101 consistent, in this embodiment, the silicate cement poured into the outer well wall 1 and the reinforced concrete poured into the inner well wall 101 are carried out simultaneously, which not only speeds up the construction process but also keeps the solidification time of the filling materials of the outer well wall 1 and the inner well wall 101 consistent.
[0038] In order to ensure the safety and quality of the construction progress, in this embodiment, the shaft is progressive, referring to Figure 4(The number of vertical shafts depends on the specific situation, and the figure is a schematic diagram of the scheme) After the excavation of the first layer of vertical shaft 5 is completed, after the filling materials of the outer layer of shaft wall 1 and the inner layer of shaft wall 101 in the shaft wall structure are solidified, the excavation of the second layer of vertical shaft 501 is carried out at the bottom of the first layer of vertical shaft 5. The shaft wall structure of the second layer of vertical shaft 501 is smaller than the shaft wall structure of the first layer of vertical shaft 5, so the second layer of vertical shaft 501 needs sufficient mining space. At the same time, when the shaft wall structure of the second layer of vertical shaft 501 is fixed, the excavation of the third layer of vertical shaft 502 is carried out at the bottom of the second layer of vertical shaft 501, and so on. This excavation method ensures that if an emergency occurs during the construction process, it can be quickly transferred to the upper layer of vertical shaft, thereby ensuring the safety of construction personnel.
[0039] In the specific implementation process, the mineral rock layer 4 is excavated during the construction. After the outer periphery of the first layer of the vertical shaft 5 is excavated, the sandwich block 30 is placed in the excavated position. Since one end of the sandwich block 30 is provided with a rectangular groove 6 and the other end is provided with a flange 601, it is only necessary to insert the flange 601 of the sandwich block 30 into the rectangular groove 6 of another sandwich block 30. When the construction is completed, the pressure of the mineral rock layer 4 will tightly fit the sandwich blocks 30 together to form an inner sandwich 3. The inner sandwich 3 is provided with a bracket 301 and a sandwich steel plate 302. The sandwich steel plate 302 divides the bracket 301 into various space blocks. The space blocks are provided with rubber stress plates. 2. The rubber stress plate 2 is tightly fitted on the bracket 301. Portland cement will be poured between the bracket 301 and the mineral rock layer 4 to form an outer well wall 1. The well wall made of Portland cement has the characteristics of viscosity and elasticity. Reinforced concrete will be poured between the bracket 301 and the steel template 7 to form an inner well wall 101. The well wall made of reinforced concrete has strong hardness. The inner well wall 101 made of reinforced concrete is supported by the steel template 7. The outer Portland cement well wall is close to the mineral rock layer 4. The composite well wall structure is composed of the outer well wall 1 made of Portland cement, the inner interlayer 3 composed of the interlayer block 30 and the inner well wall 101 made of reinforced concrete.
[0040] During the working period of the shaft, when the pressure of the mineral rock layer in a certain block squeezes the shaft, the silicate cement of the outer shaft wall 1 of the shaft wall structure has elasticity, so the stress is dispersed to the sandwich steel plate 302 and the bracket 301 of the inner interlayer 3 in the block. Since the structure of the bracket 301 is annular, the stress is first dispersed to the sandwich steel plate 302, and then dispersed to the entire shaft wall structure through the bracket 301. The inner shaft wall 101 made of reinforced concrete has strong hardness, and the steel simulation 7 supports the inner shaft wall 101, thereby ensuring that the entire composite shaft wall structure can coordinate the forces with each other.
[0041] The vertical shaft as a whole is a progressive structure. After the first-layer vertical shaft 5 is built, wait for the silicate cement of the outer wall and the reinforced concrete of the inner wall 101 to solidify, then the second-layer vertical shaft 501 is excavated and the wall is built at the bottom of the first-layer vertical shaft 5, and so on to build the third-layer vertical shaft 502. By adopting this structure, when an emergency occurs during the excavation of the vertical shaft structure, it can be directly transferred to the vertical shaft structure that has been built on the upper layer, thereby ensuring the safety of construction workers during the construction and service periods.
[0042] The embodiments of this specific implementation method are all preferred embodiments of the present application, and are not intended to limit the protection scope of the application. Therefore, all equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A composite shaft wall structure for a mine shaft, characterized in that: The composite shaft wall structure comprises an outer shaft wall (1), an intermediate inner interlayer (3) and an inner shaft wall (101), wherein the outer shaft wall is close to the ore rock layer (4), the inner interlayer (3) comprises a support (301) and an interlayer steel plate (302), the interlayer steel plate (302) divides the support (301) into various space blocks, each space block is provided with a rubber stress plate (2), and the rubber stress plate (2) is attached to the support (301).
2. A mine shaft composite shaft wall structure according to claim 1, characterized in that: The cross section of the support (301) is a closed annular structure.
3. A mine shaft composite shaft wall structure according to claim 1, characterized in that: The inner interlayer (3) is composed of a plurality of interlayer blocks (30).
4. A mine shaft composite shaft wall structure according to claim 3, characterized in that: The sandwich block (30) is provided with a rectangular groove (6) at one end and a flange (601) at the other end.
5. The composite shaft wall structure of a mine shaft according to claim 1, characterized in that: The rubber stress-bearing plate (2) is in the shape of a triangle, with one vertex facing the outer well wall (1) and the other two vertices connected to the sandwich steel plate (302).
6. A mine shaft composite shaft wall structure according to claim 1, characterized in that: The inner well wall (101) is made of reinforced concrete.
7. A mine shaft composite shaft wall structure according to claim 1, characterized in that: The outer well wall (1) is made of silicate cement.
8. A mine shaft composite shaft wall structure according to claim 1, characterized in that: The composite shaft wall structure is a progressive structure, comprising a first-layer vertical shaft (5), a second-layer vertical shaft (501) and a third-layer vertical shaft (502), wherein the excavation diameter of the first-layer vertical shaft (5) is larger than that of the second-layer vertical shaft (501), and the excavation diameter of the second-layer vertical shaft (501) is larger than that of the third-layer vertical shaft (502).
9. A mine shaft composite shaft wall structure according to claim 1, characterized in that: The inner layer of the inner well wall (101) is provided with a steel template (7).