Preheating device for coal gas of hot-blast stove
By arranging detection parts and indicators in the gas preheating device of the hot blast stove, the leakage point can be quickly discovered and repaired, which solves the problem of difficulty in repairing gas leakage in the existing technology and improves the reliability and processing efficiency of gas transportation.
Patent Information
- Application Number
- CN202420333561.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-22
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-02-22
AI Technical Summary
When gas leakage occurs in the existing hot blast stove gas preheating device, maintenance is difficult, which affects blast furnace production and energy utilization efficiency.
A heat exchange part including the first and second heat exchange channels is designed, equipped with a detection part. By passing gas mixed with an indicator at the leakage point, the pressure detection part is used to quickly find and repair the leakage point to ensure gas transportation. reliability.
It achieves rapid discovery and repair of leak points, improves the reliability and processing efficiency of gas transmission, reduces the impact on continuous operations, and maintains the reliability of repairs and the stability of subsequent operations.
Smart Images

Figure CN221877070U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of blast furnace metallurgical equipment, and in particular to a preheating device for hot blast furnace coal gas. Background Art
[0002] In blast furnace metallurgical operations, the internal combustion hot blast furnace is a heating device that increases the temperature of the air entering the furnace. The cold air from the blast furnace blower enters from the bottom of the hot blast furnace through the pipeline and cold air valve at a certain flow rate, temperature and pressure, and is heated from the bottom to the top by the high-temperature seven-hole bricks in the furnace. The temperature rises rapidly and becomes hot air, and then the hot air is sent to the blast furnace through the hot air valve, hot air pipeline and related facilities. In order to save energy and make full use of the waste heat of the hot blast furnace, a set of preheating devices is added to the hot blast furnace system. Through the principle of heat exchange, the waste heat of the hot blast furnace flue gas is used to preheat the coal gas used for heating the hot blast furnace.
[0003] However, if there is a gas leak in the preheating device, the risk factor of the on-site working environment will increase significantly. During the maintenance process, directly shutting down the preheating device will cause the blast furnace air temperature to drop, which will have a serious impact on the normal production of the blast furnace and cause energy waste in flue preheating. In addition, the specific location of the preheating device leakage is difficult to identify, which further leads to the problem of difficulty in handling maintenance. Utility Model Content
[0004] In view of the defects existing in the prior art, the present application provides a preheating device for hot blast furnace gas to solve the problem of difficult maintenance when gas leakage occurs in the preheating device in the prior art.
[0005] The above-mentioned purpose of the present application is mainly achieved through the following technical solutions:
[0006] A preheating device for hot blast furnace gas, the preheating device for hot blast furnace gas comprising:
[0007] A heat exchange component, wherein a first heat exchange channel and a second heat exchange channel are provided inside;
[0008] The first pipeline is provided with two groups and is respectively connected to both ends of the first heat exchange channel, and the end of the first pipeline away from the first heat exchange channel is used for introducing and exhausting flue gas;
[0009] The second pipeline is provided with two groups and is respectively connected to both ends of the second heat exchange channel, and the end of the second pipeline away from the first heat exchange channel is used for introducing and discharging the gas;
[0010] The detection component includes a first valve portion respectively arranged on two groups of the second pipelines, and a pressure detection portion arranged on one group of the second pipelines, and an air inlet end is arranged on the second pipeline between the first valve portion and the pressure detection portion, and the air inlet end is used to introduce gas mixed with an indicator.
[0011] In an optional embodiment, a first heat exchange plate group and a second heat exchange plate group are provided inside the heat exchange element, the first heat exchange plate group and the second heat exchange plate group are arranged in sequence along the flow direction of the flue gas, and the second heat exchange plate group and the first heat exchange plate group are arranged in sequence along the flow direction of the gas.
[0012] In an optional embodiment, the first heat exchange plate group and the second heat exchange plate group respectively include a plurality of heat exchange plates, the internal cavity of each heat exchange plate forms the first heat exchange channel, and adjacent heat exchange plates are arranged at intervals to form the second heat exchange channel.
[0013] In an optional embodiment, a connecting pipeline is provided between the heat exchange plates in the first heat exchange plate group and the heat exchange plates in the second heat exchange plate group.
[0014] In an optional embodiment, the air inlet end is arranged on the connecting pipeline.
[0015] In an optional embodiment, a working gap is provided between the first heat exchange plate group and the second heat exchange plate group.
[0016] In an optional embodiment, a first branch connected in parallel with the heat exchange element is provided between the two groups of the first pipelines, and a second branch connected in parallel with the heat exchange element is provided between the two groups of the second pipelines.
[0017] In an optional embodiment, a bypass valve is provided on the first branch and the second branch respectively.
[0018] In an optional embodiment, two groups of the first pipelines are respectively provided with interconnected vent pipes, and the vent pipes are respectively provided with a second valve portion.
[0019] In an optional embodiment, the indicator may be a fluorescent powder.
[0020] Compared with the prior art, the advantages of this application are:
[0021] The preheating device of the hot blast furnace coal gas in the present application includes a heat exchanger with a first heat exchange channel and a second heat exchange channel inside, the two ends of the first heat exchange channel are respectively connected with a first pipeline, and the end of the first pipeline away from the first heat exchange channel is used for introducing and discharging flue gas; the two ends of the second heat exchange channel are respectively connected with a second pipeline, and the end of the second pipeline away from the first heat exchange channel is used for introducing and discharging fuel gas, and a detection component is also provided, the detection component includes a first valve part respectively provided on the two groups of second pipelines, and a pressure detection part provided on one of the groups of second pipelines, and an air inlet end is provided on the second pipeline between the first valve part and the pressure detection part, the air inlet end is used for introducing gas mixed with an indicator, when the high-temperature flue gas flows in the first pipeline and the first heat exchange channel, the high-temperature flue gas increases the temperature of the heat exchanger, and when the fuel gas flows in the second pipeline, When flowing in the second heat exchange channel, the gas undergoes heat exchange to increase the temperature, thereby completing preheating. When a gas leak occurs in the preheating device, the first valve portion is closed so that the second heat exchange channel area between the two first valve portions is relatively closed. Then, by introducing a gas mixed with an indicator at the air inlet end and cooperating with the pressure detection portion, after reaching the target pressure, the gas mixed with the indicator will be discharged from the leakage point, which can be quickly observed by maintenance personnel through the indicator, and then the leakage point can be quickly repaired and sealed, thereby improving the reliability of gas transportation. The process has high processing efficiency and little impact on continuous operation. After the leakage point is repaired, gas can be introduced again, and the pressure detection portion detects that no leakage occurs after the pressure reaches the target value, thereby maintaining the reliability of the repair and improving the stability of subsequent operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0023] Figure 1 A partial schematic diagram of a preheating device provided in an embodiment of the present application;
[0024] Figure 2 Provide an embodiment of the present application Figure 1 A partial bottom view of the middle preheating device;
[0025] Figure 3 Provide an embodiment of the present application Figure 1 A partial bottom view of the middle preheating device;
[0026] In the figure: 100, heat exchange element; 101, first heat exchange plate group; 102, second heat exchange plate group; 103, heat exchange plate; 104, connecting pipeline; 105, working gap; 201, first pipeline; 202, second pipeline; 301, first valve part; 302, pressure detection part; 303, air inlet end; 401, first branch; 402, second branch; 403, bypass valve; 404, vent pipe; 405, second valve part; 406, third valve part. DETAILED DESCRIPTION
[0027] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention. The specific structural and functional details disclosed herein are only used to describe the exemplary embodiments of the present invention. However, the present invention can be embodied in many alternative forms, and it should not be understood that the present invention is limited to the embodiments described herein.
[0028] Figure 1 A partial schematic diagram of a preheating device provided in an embodiment of the present application, Figure 2 Provide an embodiment of the present application Figure 1 Partial bottom view of the preheating device. Figure 3 Provide an embodiment of the present application Figure 1 Partial bottom view of the middle preheating device.
[0029] like Figure 1 As shown, a preheating device for hot blast furnace gas, the preheating device for hot blast furnace gas comprises a heat exchanger 100, a first pipeline 201, a second pipeline 202 and a detection element, wherein:
[0030] A first heat exchange channel and a second heat exchange channel are provided inside the heat exchange element 100. The first heat exchange channel and the second heat exchange channel are independent of each other, and the first heat exchange channel and the second heat exchange channel can achieve heat transfer by utilizing the heat exchange principle. When the temperature in the first heat exchange channel is higher than the temperature in the second heat exchange channel, the heat in the first heat exchange channel will be transferred to the second heat exchange channel, thereby achieving the purpose of heat exchange.
[0031] like Figure 1As shown, the first pipeline 201 is provided with two groups, and is respectively connected to the two ends of the first heat exchange channel. One group of first pipelines 201 is connected to the input end of the flue gas, and the other group of first pipelines 201 is connected to the output end of the flue gas. The end of the first pipeline 201 away from the first heat exchange channel is used for introducing and exhausting the flue gas. That is to say, the flue gas enters the first heat exchange channel from one group of first pipelines 201, and after passing through the first heat exchange channel, it is discharged from another group of first pipelines 201. In order to facilitate the control of the first pipelines 201, the third valve parts 406 are respectively arranged on the first pipelines 201, which can control the state of the flue gas introduction and exhaust, thereby improving the controllability of the operation.
[0032] like Figure 1 As shown, two groups of second pipelines 202 are provided and are respectively connected at both ends of the second heat exchange channel. One group of second pipelines 202 is connected to the input end of the gas, and one group of second pipelines 202 is connected to the output end of the gas. The end of the second pipeline 202 away from the first heat exchange channel is used for introducing and discharging the gas. That is to say, the gas enters the second heat exchange channel from one group of second pipelines 202, passes through the second heat exchange channel, and is discharged from the other group of second pipelines 202.
[0033] like Figure 1 As shown, the detection component includes a first valve portion 301 respectively arranged on two groups of the second pipelines 202, and a pressure detection portion 302 arranged on one group of the second pipelines 202, and an air inlet end 303 is arranged on the second pipeline 202 between the first valve portion 301 and the pressure detection portion 302, and the air inlet end 303 is used to introduce gas mixed with an indicator. The opening and closing operations of the first valve portion 301 complete the conduction and closing operations of the position where the second pipeline 202 is located. The pressure detection portion 302 detects the pressure state in the second pipeline 202 and reflects the pressure value. After the air inlet end 303 is directly connected to the gas supply end, compressed gas can be input into the second pipeline 202, and when the two first valve portions 301 are in the closed state, the gas introduced by the air inlet end 303 can enter the second pipeline 202 and the second heat exchange channel, and by continuously introducing gas, the pressure value of the area filled by the introduced gas is reflected by the pressure detection portion 302 in this state.
[0034] The working principle of the preheating device of the hot blast furnace coal gas in the present application is: the preheating device of the hot blast furnace coal gas includes a heat exchanger 100 with a first heat exchange channel and a second heat exchange channel inside, the two ends of the first heat exchange channel are respectively connected with a first pipeline 201, and the end of the first pipeline 201 away from the first heat exchange channel is used for introducing and discharging flue gas; the two ends of the second heat exchange channel are respectively connected with a second pipeline 202, and the end of the second pipeline 202 away from the first heat exchange channel is used for introducing and discharging fuel gas, and a detection component is also provided, the detection component includes a first valve part 301 respectively provided on the two groups of second pipelines 202, and a pressure detection part 302 provided on one group of the second pipelines 202, and an air inlet end 303 is provided on the second pipeline 202 located between the first valve part 301 and the pressure detection part 302, and the air inlet end 303 is used to introduce gas mixed with an indicator. When the high-temperature flue gas flows in the first pipeline 201 and the first heat exchange channel, the high-temperature flue gas flows in the first pipeline 201 and the first heat exchange channel. The flue gas increases the temperature of the heat exchanger 100. When the gas flows in the second pipeline 202 and the second heat exchange channel, the gas undergoes heat exchange to increase the temperature, thereby completing preheating. When a gas leak occurs in the preheating device, the first valve portion 301 is closed to make the second heat exchange channel area between the two first valve portions 301 relatively closed. Then, a gas mixed with an indicator is introduced at the air inlet end 303, and the pressure detection portion 302 is used to cooperate with the target pressure. After the gas mixed with the indicator is discharged from the leakage point, the indicator can be quickly observed by maintenance personnel, and the leakage point can be quickly repaired and blocked, thereby improving the reliability of gas transportation. The process has high processing efficiency and little impact on continuous operation. After the leakage point is repaired, the gas can be introduced again. The pressure detection portion 302 detects that no leakage occurs after the pressure reaches the target value, thereby maintaining the reliability of the repair and improving the stability of subsequent operations.
[0035] like Figure 1 As shown, in an optional embodiment, a first heat exchange plate group 101 and a second heat exchange plate group 102 are provided inside the heat exchange element 100, and the first heat exchange plate group 101 and the second heat exchange plate group 102 are arranged in sequence along the flue gas flow direction.
[0036] By arranging a first heat exchange plate group 101 and a second heat exchange plate group 102 inside the heat exchange element 100, and the first heat exchange plate group 101 and the second heat exchange plate group 102 are arranged in sequence along the flow direction of the flue gas, when the high-temperature flue gas is flowing, it will first contact with the first heat exchange plate group 101 and complete heat exchange, and correspondingly, the first heat exchange plate group 101 will reach a temperature state higher than that of the second heat exchange plate group 102. It should be noted that the first heat exchange channel is arranged in the first heat exchange plate group 101, and the flow direction of the gas is from the second heat exchange plate group 102 to the first heat exchange plate group 101, that is, and the second heat exchange plate group 102 and the first heat exchange plate group 101 are arranged in sequence along the flow direction of the gas, when the gas is flowing, it first passes through the second heat exchange plate group 102 with a lower temperature, and then passes through the first heat exchange plate group 101 with a higher temperature, thereby forming a gradual increase in temperature, so as to improve the heat exchange effect of the gas and improve the heat exchange efficiency.
[0037] like Figure 1 As shown, in an optional embodiment, the first heat exchange plate group 101 and the second heat exchange plate group 102 respectively include a plurality of heat exchange plates 103, the internal cavity of each heat exchange plate 103 forms the first heat exchange channel, and adjacent heat exchange plates 103 are arranged at intervals to form the second heat exchange channel.
[0038] The interior of each heat exchange plate 103 is respectively connected to the second pipeline 202 to form a second heat exchange channel, and the space between each heat exchange plate 103 is respectively connected to the first pipeline 201 to form a first heat exchange channel. The multiple heat exchange plates 103 can provide more contact area between the heat exchange channels, thereby improving the heat exchange efficiency.
[0039] like Figure 1 As shown, in an optional embodiment, a connecting pipe 104 is provided between the heat exchange plate 103 in the first heat exchange plate group 101 and the heat exchange plate 103 in the second heat exchange plate group 102 to maintain the independence and continuity of the first heat exchange channel.
[0040] like Figure 1 As shown, in an optional embodiment, the air inlet end 303 is arranged on the connecting pipeline 104. After the external gas enters the first heat exchange channel, the first heat exchange channel can be filled in a shorter time, and the target pressure can be reached in a shorter time, thereby improving the operating efficiency.
[0041] like Figure 1As shown, in an optional embodiment, a working gap 105 is provided between the first heat exchange plate group 101 and the second heat exchange plate group 102 to facilitate maintenance work by operators. At the same time, direct heat exchange is avoided between the first heat exchange plate group 101 and the second heat exchange plate group 102, and heat exchange is performed on the gas in the process of passing through the second heat exchange plate group 102 and the first heat exchange plate group 101 in sequence, thereby improving operation reliability.
[0042] like Figure 2 and Figure 3 As shown, in an optional embodiment, a first branch 401 connected in parallel with the heat exchange element 100 is provided between the two groups of the first pipelines 201, and a second branch 402 connected in parallel with the heat exchange element 100 is provided between the two groups of the second pipelines 202. The first branch 401 and the second branch 402 can be used to transport the gas and the flue gas through different passages, so that maintenance can be completed without stopping the machine, thereby improving the efficiency of the operation.
[0043] like Figure 2 and Figure 3 As shown, in an optional embodiment, a bypass valve 403 is provided on the first branch 401 and the second branch 402 respectively, and the direction of the gas and the flue gas can be more accurately controlled by opening and closing the bypass valve 403, and the control is accurate and flexible.
[0044] like Figure 1 As shown, in an optional embodiment, the two groups of the first pipelines 201 are respectively provided with interconnected vent pipes 404, and the vent pipes 404 are respectively provided with second valve parts 405. While the vent pipes 404 meet the purpose of venting, they are closed by operating the second valve part 405, so that when checking the leakage point, a relatively closed space can be provided, thereby improving the maintenance efficiency.
[0045] In an optional embodiment, the indicator may be fluorescent powder or other colored gases, so as to be more quickly discovered by operators.
[0046] It should be understood that the terms first, second, etc. are only used to distinguish descriptions and should not be understood as indicating or implying relative importance. Although the terms first, second, etc. may be used herein to describe various units, these units should not be limited by these terms. These terms are only used to distinguish one unit from another unit. For example, the first unit may be referred to as the second unit, and similarly, the second unit may be referred to as the first unit without departing from the scope of the exemplary embodiments of the present utility model.
[0047] It should be understood that the term "and / or" in this article is merely a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent three situations: A exists alone, B exists alone, and A and B exist at the same time. The term " / and" in this article describes another relationship between associated objects, indicating that two relationships may exist. For example, A / and B can represent two situations: A exists alone, and A and B exist alone. In addition, the character " / " in this article generally indicates that the previous and next associated objects are in an "or" relationship.
[0048] It should be understood that in the description of the present invention, the terms "upper", "vertical", "inside", "outside", etc. indicate orientations or positional relationships that are customarily placed when the disclosed product is used, or are orientations or positional relationships that are customarily understood by those skilled in the art. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0049] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be a communication between the two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0050] The terms used herein are only used to describe specific embodiments and are not intended to limit the exemplary embodiments of the utility model. As used herein, the singular forms "one", "an", and "the" are intended to include plural forms unless the context clearly indicates the opposite meaning. It should also be understood that the terms "include", "comprise", "include", and / or "comprising" when used herein specify the existence of the claimed features, integers, steps, operations, units, and / or components, and do not exclude the existence or increase of one or more other features, quantities, steps, operations, units, components, and / or their combinations.
[0051] Specific details are provided in the following description to facilitate a complete understanding of the exemplary embodiments. However, it should be understood by those of ordinary skill in the art that the exemplary embodiments may be implemented without these specific details. In other embodiments, well-known processes, structures, and techniques may not be shown in unnecessary detail to avoid making the exemplary embodiments unclear.
[0052] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.
[0053] It should be noted that the information disclosed in the above background technology section is only used to enhance the understanding of the background of the present disclosure, and therefore may include information that does not constitute the prior art known to ordinary technicians in the field.
Claims
1. A preheating device for hot blast stove gas, characterized in that: The preheating device of the hot blast stove gas comprises: A heat exchange component, wherein a first heat exchange channel and a second heat exchange channel are provided inside; The first pipeline is provided with two groups and is respectively connected to both ends of the first heat exchange channel, and the end of the first pipeline away from the first heat exchange channel is used for introducing and exhausting flue gas; The second pipeline is provided with two groups and is respectively connected to both ends of the second heat exchange channel, and the end of the second pipeline away from the first heat exchange channel is used for introducing and discharging the gas; The detection component includes a first valve portion respectively arranged on two groups of the second pipelines, and a pressure detection portion arranged on one group of the second pipelines, and an air inlet end is arranged on the second pipeline between the first valve portion and the pressure detection portion, and the air inlet end is used to introduce gas mixed with an indicator.
2. The preheating device for hot blast stove gas as claimed in claim 1, characterized in that: A first heat exchange plate group and a second heat exchange plate group are provided inside the heat exchange element. The first heat exchange plate group and the second heat exchange plate group are arranged in sequence along the flow direction of the flue gas, and the second heat exchange plate group and the first heat exchange plate group are arranged in sequence along the flow direction of the fuel gas.
3. The preheating device for hot blast stove gas as claimed in claim 2, characterized in that: The first heat exchange plate group and the second heat exchange plate group respectively include a plurality of heat exchange plates, the inner cavity of each heat exchange plate forms the first heat exchange channel, and adjacent heat exchange plates are arranged at intervals to form the second heat exchange channel.
4. The preheating device for hot blast stove gas as claimed in claim 3, characterized in that: A connecting pipeline is provided between the heat exchange plates in the first heat exchange plate group and the heat exchange plates in the second heat exchange plate group.
5. The preheating device for hot blast stove gas as claimed in claim 4, characterized in that: The air inlet end is arranged on the connecting pipeline.
6. The preheating device for hot blast stove gas as claimed in claim 2, characterized in that: A working gap is provided between the first heat exchange plate group and the second heat exchange plate group.
7. The preheating device for hot blast stove gas as claimed in claim 1, characterized in that: A first branch connected in parallel with the heat exchange element is provided between the two groups of the first pipelines, and a second branch connected in parallel with the heat exchange element is provided between the two groups of the second pipelines.
8. The preheating device for hot blast stove gas as claimed in claim 7, characterized in that: The first branch and the second branch are respectively provided with a bypass valve.
9. The preheating device for hot blast stove gas as claimed in claim 1, characterized in that: The two groups of the first pipelines are respectively provided with communicating vent pipes, and the vent pipes are respectively provided with second valve parts.
10. The hot blast stove gas preheating device as claimed in claim 1, characterized in that: The indicator may be fluorescent powder.