Novel dike
By setting up prefabricated vegetation troughs and micro-flow energy dissipation sills on the embankment slopes, the problem of insufficient stability and ecological loss of the embankment during flood erosion is solved, effective penetration and filtration of rainwater is achieved, and soil erosion is slowed down. , improving the firmness and ecological nature of the embankment.
Patent Information
- Application Number
- CN202420389417.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-29
- Publication Date
- 2024-10-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing embankments are easily damaged by floods, leading to soil erosion and river bed elevation. They also lack ecology and affect biota.
A new embankment design with an inclination towards the water side is adopted. Prefabricated vegetation troughs and micro-flow energy-dissipation ridges are arranged at intervals on the slope. Through the filtration of the vegetation trough and the micro-flow energy-dissipation ridges, the flow rate of rainwater is slowed down and the penetration of rainwater is achieved. and absorption, stabilizing the embankment structure, slowing down soil erosion, and improving the filtration effect through multi-layer filter layers and permeable hole systems.
It enhances the firmness and ecological properties of the embankment slopes, slows down soil erosion, improves the ecological environment of the river, and extends the service life of the embankment.
Smart Images

Figure CN221877971U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of levees, in particular to a new type of levee. Background Art
[0002] At present, embankment construction is divided into four types according to the common building materials: earth embankment, sand embankment, stone embankment and concrete embankment. Among them, earth embankments are built of clay and loam, and are mainly built along the banks of rivers in plain areas, coasts, around lakes, along drainage ditches and around reservoirs. Sand embankments are built of sand or gravel, and are mainly built along the banks of rivers in mountainous and hilly areas, around reservoirs and coasts. Stone embankments are built of blocks or strips of stone, and are mainly built on the coast, along the banks of rivers where soil is difficult to obtain, and along the banks of urban river sections. Concrete embankments are built of concrete or reinforced concrete, and are mainly used along the banks of urban river sections.
[0003] The above types of embankment construction are often used in river management. However, earth embankments and sand embankments are easily washed away and breached when encountering floods, and the scouring by river water will cause soil erosion, raise the riverbed, and make the river water muddy; stone embankments are slightly better than earth embankments, but because they are made of pure stone and lack vitality, they are easy to be broken and collapsed after long-term scouring; concrete embankments have strong structures and are not easy to collapse, but because they are gray and lifeless, they will destroy the river biological community and reduce the types of aquatic species. Utility Model Content
[0004] The utility model aims to provide a new type of embankment, which solves the technical problems of insufficient firmness of the existing embankment slope and serious soil and water loss.
[0005] In order to solve the above technical problems, the utility model adopts the following technical scheme: a new type of embankment, wherein the water-facing side of the embankment is inclined to set a slope, and its characteristic is that assembled vegetation troughs and micro-flow-diverting energy-dissipating nose sills are arranged on the slope from top to bottom at intervals; the assembled vegetation troughs are used to absorb and filter rainwater on the slope; the micro-flow-diverting energy-dissipating nose sills are used to slow down the flow rate of rainwater on the slope.
[0006] With the utility model of the embankment, rainfall passes through layers of assembled vegetation troughs and micro-flow-dissipating energy-dissipating nose sills. The assembled vegetation troughs are used to achieve rainwater infiltration, filtration and absorption; the micro-flow-dissipating energy-dissipating nose sills are used to slow down the flow rate of rainwater. After energy dissipation, filtration and infiltration, the rainfall alleviates the erosion of the embankment slope, stabilizes the embankment structure, strengthens the firmness of the embankment slope, and slows down the erosion of water and soil on the slope; plants are planted in the assembled vegetation troughs, and the vegetation absorbs nutrients to grow, which increases the ecological nature of the embankment.
[0007] When it rains, water flows from the top of the embankment to the foot of the embankment, slows down the flow rate through the micro-flow-diverting and energy-dissipating nose sill, and then is filtered by the vegetation in the layers of vegetation troughs. Part of it is absorbed by the soil, and the excess flows deep into the ground through the drainage holes at the bottom of the vegetation troughs, forming underground runoff and slowing down soil and water loss.
[0008] In order to solve the technical problem of limited filtering effect of the assembled vegetation trough, the utility model adopts the following technical solution: the slope is provided with foundation pits from top to bottom, and the assembled vegetation trough is provided in the foundation pit; the upper part of the assembled vegetation trough forms a planting area; the lower part of the assembled vegetation trough forms a filtering area; and the bottom of the assembled vegetation trough is provided with drainage holes. When it rains, the rainwater is filtered through the filtering area, the nutrients remain in the vegetation area, and the rainwater penetrates into the ground.
[0009] In order to solve the technical problem of how to realize the vegetation area and the filtration area, the utility model adopts the following technical solution: a plurality of cross beams are arranged from top to bottom in the assembled vegetation trough, and water permeable holes are arranged on the cross beams;
[0010] The topmost beam plate is used to separate the vegetation area and the filtration area;
[0011] The crossbeam plate located in the filter area is used to separate the filter area from top to bottom into a plurality of filter layers. By using a plurality of crossbeam plates with water-permeable holes, the vegetation area and the filter area are separated, and the filter layers in the filter area are separated. The production cost is low and the processing is convenient. The crossbeam plate adopts a concrete structure to improve the strength of the crossbeam plate. The crossbeam plate can also be equipped with a supporting tie beam to further ensure the strength. Two rows of water-permeable holes can be opened on the crossbeam plate to facilitate layer-by-layer filtration.
[0012] In order to solve the technical problem that the assembled vegetation trough is convex or concave on the slope, resulting in an uneven surface of the slope, the utility model adopts the following technical solution: a groove is set on the top of the assembled vegetation trough, and the groove is flush with the slope, and the assembled vegetation trough is a reinforced concrete structure. The assembled vegetation trough with a groove on the top is adopted to ensure that the groove of the assembled trough is flush with the slope, thereby ensuring the flatness of the slope. The assembled vegetation trough adopts a reinforced concrete structure to increase the service life of the assembled vegetation trough.
[0013] In order to solve the technical problem of inconvenient transportation of planting soil in the vegetation area, the utility model adopts the following technical solution: the slope soil is placed in the assembled vegetation groove above the uppermost cross beam plate, the thickness of the slope soil is 45-55cm, and the slope soil is used to plant vegetation. The soil around the slope is directly used in the vegetation area, and the soil excavated from the foundation pit can be directly converted and utilized.
[0014] In order to solve the technical problem that the filtering layer structure is single and the filtering effect is not ideal, the utility model adopts the following technical solution, the filtering area includes a first filtering layer, a second filtering layer, a third filtering layer, a fourth filtering layer, and a fifth filtering layer arranged from top to bottom;
[0015] The particle sizes of the filter materials placed in the first filter layer, the second filter layer, the third filter layer, the fourth filter layer, and the fifth filter layer gradually increase.
[0016] The utility model uses a crossbeam plate to divide the filter area into five filter layers from top to bottom. When it rains, rainwater is filtered through the five filter layers with gradually increasing filter material particle sizes, nutrients are retained in the vegetation area, and rainwater penetrates into the ground.
[0017] In order to solve the technical problem of how to realize the five-layer filter layer, the utility model adopts the following technical solution: the first filter layer is a fine sand layer, the thickness of the fine sand layer is 45-55cm, and the particle size of the fine sand layer is 0.2-0.5mm; the outer wall of the first filter layer is provided with a convex groove;
[0018] The second filter layer is a coarse sand layer, the thickness of the coarse sand layer is 45-55 cm, and the particle size of the coarse sand in the coarse sand layer is 1-12 mm;
[0019] The third filter layer is a gravel layer, the thickness of the gravel layer is 45-55 cm, and the gravel particle size of the gravel layer is 5-35 mm;
[0020] The fourth filter layer is a pebble layer, the thickness of the pebble layer is 45-55 cm, and the particle size of the pebble in the pebble layer is 20-65 mm;
[0021] The fifth filter layer is a rock layer, the thickness of the rock layer is 45-55 cm, and the particle size of the rocks in the rock layer is 30-90 mm.
[0022] The utility model designs the outer side wall of the first filter layer as a convex-shaped groove, which is convenient for clamping and carrying the assembled vegetation trough during transportation.
[0023] In order to solve the technical problem of water storage on the nose sill of the micro-flow-diverting energy dissipation, the utility model adopts the following technical solution: a drainage channel is arranged on the nose sill of the micro-flow-diverting energy dissipation, and the drainage channel is arranged parallel to the slope of the embankment. The drainage channel is used to guide the water stored on the nose sill of the micro-flow-diverting energy dissipation to the lower assembled vegetation trough, which not only solves the problem of water storage on the nose sill of the micro-flow-diverting energy dissipation, but also can irrigate the plants in the lower assembled vegetation trough.
[0024] In order to solve the technical problem of how to realize a micro-flow-diverting energy-dissipating nose sill, the utility model adopts the following technical solution, and the micro-flow-diverting energy-dissipating nose sill includes:
[0025] A first arc-shaped portion, wherein the vertical cross-section of the first arc-shaped portion is a triangle, the drainage channel is arranged on the first arc-shaped portion, and a filter is arranged on the water inlet of the drainage channel;
[0026] The second arc portion is arranged at the end of the first arc portion, and the second arc portion and the first arc portion are in a V-shaped structure. The water inlet of the drainage channel is elliptical, and a filter is arranged on the water inlet to prevent large foreign objects from blocking the drainage channel.
[0027] In order to solve the technical problem of the inconvenience of manually obtaining data, the utility model adopts the following technical solution: a first water level sensor and a rain gauge are arranged on the dike; a second water level sensor is arranged at the bottom of the assembled vegetation trough; and a flow velocity meter is arranged at the bottom of the slope;
[0028] The levee also includes a controller, which is connected to the first water level sensor, the rain gauge, the second water level sensor, and the flow velocity meter. The controller can monitor the water level, rainfall, and rainwater flow velocity of the levee and slope in real time, and use the real-time data to facilitate the subsequent timely measures. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a structural schematic diagram of the levee of the utility model;
[0030] Figure 2a It is a structural schematic diagram of the assembled vegetation trough and supporting filter assembly of the utility model dike;
[0031] Figure 2b It is a structural schematic diagram of the assembled vegetation trough and supporting filter assembly of the utility model dike;
[0032] Figure 2c It is a structural schematic diagram of the assembled vegetation trough and supporting filter assembly of the utility model dike;
[0033] Figure 3a It is a schematic diagram of the micro flow-diverting energy-dissipating nose sill structure of the levee of the utility model;
[0034] Figure 3b It is a structural schematic diagram of the water inlet of the water discharge channel of the micro diversion energy dissipation nose sill of the dike of the utility model;
[0035] Figure 4 It is a schematic diagram of the control system of the levee of the utility model;
[0036] In the figure: 100 new embankment; 101 slope; 102 foundation pit;
[0037] 200 assembled vegetation trough; 210 vegetation area; 220 filter area; 221 first filter layer; 2210 convex groove; 222 second filter layer; 223 third filter layer; 224 fourth filter layer; 225 fifth filter layer; 230 cross beam plate; 231 first cross beam plate; 2311 supporting tie beam; 2312 water permeable hole; 232 second cross beam plate; 233 third cross beam plate; 234 fourth cross beam plate; 235 fifth cross beam plate; 240 drainage hole; 250 groove;
[0038] 300 micro flow-dissipating energy-dissipating nose sill; 310 first arc-shaped portion; 320 second arc-shaped portion; 330 drainage channel; 331 water inlet; 332 filter element;
[0039] 400 vegetation;
[0040] 500 controller; 501 first water level sensor; 502 rainfall monitor; 503 second water level sensor; 504 flow velocity meter; 504 mobile control terminal; 506 remote control terminal; 507 on-site control terminal; 508 signal transmitter; 509 cloud control system. DETAILED DESCRIPTION
[0041] The present invention will be further described below in conjunction with the accompanying drawings.
[0042] like Figure 1 As shown, the new type of dike 100 has a slope 101 arranged on the water-facing side of the dike. Prefabricated vegetation troughs 200 and micro-flow diversion energy dissipation nose sills 300 are arranged at intervals from top to bottom on the slope 101.
[0043] In one embodiment, Figure 2a , 2b As shown in 2c, foundation pits 102 are arranged at intervals from top to bottom on the slope 101, and assembled vegetation troughs 200 are arranged in the foundation pits 102. A planting area 210 is formed at the upper part of the assembled vegetation trough 200. A filtering area 220 is formed at the lower part of the assembled vegetation trough 200. Drain holes 240 are arranged at the bottom of the assembled vegetation trough 220. Several layers of assembled vegetation troughs are constructed on the slope of the embankment, and vegetation is planted in the planting area of the assembled vegetation troughs.
[0044] In one embodiment, a groove 250 is provided at the top of the assembled vegetation trough 200, and the groove 250 is provided flush with the slope 101. Specifically, the assembled vegetation trough 200 is a reinforced concrete structure. The assembled vegetation trough with a groove at the top is used to ensure that the groove of the assembled trough is flush with the slope, thereby ensuring the flatness of the slope. The assembled vegetation trough 200 adopts a reinforced concrete structure to increase the service life of the assembled vegetation trough.
[0045] In one embodiment, a plurality of cross beams 230 are arranged from top to bottom in the assembled vegetation trough 200, and water permeable holes 2312 are arranged on the cross beams 230. The topmost cross beam is used to separate the vegetation area and the filtration area. The cross beam located in the filtration area is used to separate the filtration area from top to bottom into a plurality of filtration layers. Specifically, there are 5 cross beams 230, including a first cross beam 231, a second cross beam 232, a third cross beam 233, a fourth cross beam 234, and a fifth cross beam 235. The first, second, third, fourth, and fifth cross beams are all made of concrete structure to improve the strength of the cross beams. Support tie beams 2311 can also be used on the cross beams 230 to further ensure the strength of the cross beams. Two rows of water permeable holes 2312 can be provided on the cross beam 230, preferably designed on both sides of the support tie beam 2311 to facilitate layer-by-layer filtration.
[0046] The first cross beam 231 is located at the uppermost layer and is used to separate the vegetation area 210 and the filtration area 220. In one embodiment, the slope soil is placed in the assembled vegetation trough 200 above the first cross beam 231. The thickness of the slope soil is 45-55 cm, and the slope soil is used to plant vegetation 400. The vegetation 400 can be vegetation with a well-developed root system such as Bermuda grass roots. The soil around the slope is directly used in the vegetation area, and the soil excavated from the foundation pit can be directly converted and utilized.
[0047] The first cross beam plate 231, the second cross beam plate 232, the third cross beam plate 233, the fourth cross beam plate 234, and the fifth cross beam plate 235 divide the filter area 220 into a first filter layer 221, a second filter layer 222, a third filter layer 223, a fourth filter layer 224, and a fifth filter layer 225 arranged from top to bottom.
[0048] Specifically, filter materials are placed in the first filter layer 221, the second filter layer 222, the third filter layer 223, the fourth filter layer 224, and the fifth filter layer 225. In one embodiment, the particle size of the filter materials in the first filter layer 221, the second filter layer 222, the third filter layer 223, the fourth filter layer 224, and the fifth filter layer 225 gradually increases.
[0049] Specifically, the first filter layer 221 is a fine sand layer, the thickness of the fine sand layer is 45-55 cm, and the particle size of the fine sand layer is 0.2-0.5 mm. In one embodiment, a convex-shaped groove 2210 is provided on the outer wall of the first filter layer 221. The utility model designs the outer wall of the first filter layer as a convex-shaped groove, which is convenient for clamping and carrying the assembled vegetation trough during transportation.
[0050] Specifically, the second filter layer 222 is a coarse sand layer, the thickness of the coarse sand layer is 45-55 cm, and the particle size of the coarse sand in the coarse sand layer is 1-12 mm.
[0051] Specifically, the third filter layer 223 is a gravel layer, the thickness of the gravel layer is 45-55 cm, and the gravel particle size of the gravel layer is 5-35 mm.
[0052] Specifically, the fourth filter layer 224 is a pebble layer, the thickness of the pebble layer is 45-55 cm, and the particle size of the pebble in the pebble layer is 20-65 mm.
[0053] Specifically, the fifth filter layer 225 is a rock layer, the thickness of the rock layer is 45-55 cm, and the particle size of the rocks in the rock layer is 30-90 mm.
[0054] like Figure 3a , Figure 3b As shown, the micro flow-distracting energy-dissipating nose sill 300 includes a first arc-shaped portion 310 and a second arc-shaped portion 320. Specifically, the longitudinal cross-section of the first arc-shaped portion 320 is triangular. The second arc-shaped portion 320 is located at the end of the first arc-shaped portion 310, and the second arc-shaped portion 320 and the first arc-shaped portion 310 are in a V-shaped structure.
[0055] In one embodiment, Figure 3a As shown, a drainage channel 330 is provided on the micro diversion energy dissipation nose sill 300. Specifically, the drainage channel 330 is designed on the first arc-shaped portion 310. Preferably, the drainage channel 330 is arranged parallel to the slope 101 of the embankment. The drainage channel is used to guide the water stored on the micro diversion energy dissipation nose sill to the lower assembled vegetation trough, which not only solves the problem of water storage on the micro diversion energy dissipation nose sill, but also can irrigate the plants in the lower assembled vegetation trough.
[0056] In one embodiment, in order to prevent large foreign objects from blocking the drainage channel, the water inlet 331 of the drainage channel 330 is designed to be elliptical in shape, and a filter 332 is provided on the water inlet 331 .
[0057] In one embodiment, in order to obtain rainfall data, a rainfall monitor 502 is erected on the top of the levee 100. In order to obtain river water level data, a first water level sensor 501 is installed inside the levee 100. In order to obtain water level data inside the levee, a second water level sensor 503 is installed at the bottom of the assembled vegetation trough 200. In order to obtain water flow velocity data, a current velocity meter 504 is installed at the bottom of the slope 102.
[0058] In one embodiment, Figure 4As shown, the dike 100 further includes a controller 500, which may be a CPU central processing unit. The controller 500 is respectively connected to the first water level sensor 501, the flow velocity meter 504, the second water level sensor 503, and the rainfall monitor 502. Specifically, the controller 500 is connected to a signal transmitter 508, which is respectively connected to the first water level sensor 501, the rainfall detector 502, the second water level sensor 503, and the flow velocity meter 504.
[0059] The controller 500 is connected to the cloud control system 509 and the field control terminal 507 respectively. The cloud control system 509 is connected to the mobile terminal 504 and the remote control terminal 506 respectively. The four sets of data, namely, river water level data, water flow velocity data, dike water level data, and rainfall data, are transmitted to the controller 500 through the signal transmitter 508, and the data are automatically stored and drawn into a graph.
[0060] The utility model ecological landscape embankment includes an assembled vegetation trough, a micro-flow diversion energy dissipation nose sill, a flow velocity meter, and a water level sensor. The upper and lower sides of the assembled vegetation trough are respectively provided with micro-flow diversion energy dissipation nose sills, the assembled vegetation trough is directly grounded, and the flow velocity meter and the water level sensor are transmitted to the controller through a signal transmitter, and the controller uniformly controls the situation of the entire embankment.
[0061] The prefabricated vegetation trough includes several layers. The foundation pit is excavated along the slope of the embankment and poured layer by layer. The prefabricated vegetation trough is a rectangular deep trough with a bevel. Five crossbeams are set from top to bottom in each prefabricated vegetation trough to form five filter layers. Drainage holes are set at the bottom of the prefabricated vegetation trough, which are directly connected to the ground. The entire prefabricated vegetation trough is poured with concrete. There is a micro-flow-dissipating nose sill at the top and bottom of the prefabricated vegetation trough. The micro-flow-dissipating nose sill is arc-shaped at the front end and has a curved arc at the rear end.
[0062] Working process of the dike:
[0063] When it rains, water flows from the top of the embankment to the foot of the embankment, slows down the flow rate through the micro-flow-dissipating nose sill, and then is filtered by the vegetation in the layers of vegetation troughs. A part of it is absorbed by the soil, and the excess part goes deep into the ground through the drainage holes at the bottom of the vegetation trough, forming underground runoff, which slows down soil and water loss. When it rains, rainwater is filtered through the first, second, third, fourth, and fifth filter layers with five different particle sizes. Nutrients are retained in the vegetation area, and rainwater infiltrates into the ground. At the same time, rainwater flows down from the top of the embankment, is filtered and infiltrated by the vegetation in the layers of vegetation troughs, and flows into the river.
[0064] The rain gauge erected on the top of the levee obtains rainfall data; the first water level sensor installed inside the levee obtains river water level data; the second water level sensor installed in the slope obtains water level data inside the levee, and a flow velocity meter is installed at the end of the slope to obtain water flow velocity data; the four instruments monitor 24 hours a day, and four sets of data are transmitted to the controller through the signal transmitter. The controller obtains the data after processing, and finally outputs it for storage and drawing.
[0065] The above-mentioned implementation mode is only for illustrating the technical features and concepts of the utility model, and its purpose is to enable technicians familiar with this technology in the field to understand the content of the utility model and implement it. It cannot be used to limit the protection scope of the utility model. All equivalent changes or modifications made according to the spirit and implementation mode of the utility model should be included in the protection scope of the utility model.
Claims
1. New type of embankment, the water-facing side of the embankment is inclined to set the slope, Its characteristics are: Assembled vegetation troughs and micro-flow diversion energy dissipation nose sills are arranged on the slope from top to bottom at intervals; the assembled vegetation troughs are used to absorb and filter rainwater on the slope; the micro-flow diversion energy dissipation nose sills are used to slow down the flow rate of rainwater on the slope.
2. The new embankment according to claim 1, Its characteristics are: Foundation pits are arranged at intervals from top to bottom on the slope, and the assembled vegetation troughs are arranged in the foundation pits; a planting area is formed at the upper part of the assembled vegetation trough; a filtering area is formed at the lower part of the assembled vegetation trough; and drainage holes are arranged at the bottom of the assembled vegetation trough.
3. The new embankment according to claim 2, Its characteristics are: A plurality of cross beams are arranged from top to bottom in the assembled vegetation trough, and water permeable holes are arranged on the cross beams; The topmost beam plate is used to separate the vegetation area and the filtration area; The crossbeam plate located in the filter area is used to separate the filter area into a plurality of filter layers from top to bottom.
4. The new embankment according to claim 2, Its characteristics are: A groove is arranged on the top of the assembled vegetation trough, and the groove is arranged flush with the side slope. The assembled vegetation trough is a reinforced concrete structure.
5. The new embankment according to claim 3, Its characteristics are: Slope soil is placed in the assembled vegetation trough above the uppermost cross beam plate. The thickness of the slope soil is 45-55 cm. The slope soil is used to plant vegetation.
6. The new embankment according to claim 3, Its characteristics are: The filter area includes a first filter layer, a second filter layer, a third filter layer, a fourth filter layer, and a fifth filter layer arranged from top to bottom; The particle sizes of the filter materials placed in the first filter layer, the second filter layer, the third filter layer, the fourth filter layer, and the fifth filter layer gradually increase.
7. The new embankment according to claim 6, Its characteristics are: The first filter layer is a fine sand layer, the thickness of the fine sand layer is 45-55 cm, and the particle size of the fine sand layer is 0.2-0.5 mm; a convex groove is provided on the outer wall of the first filter layer; The second filter layer is a coarse sand layer, the thickness of the coarse sand layer is 45-55 cm, and the particle size of the coarse sand in the coarse sand layer is 1-12 mm; The third filter layer is a gravel layer, the thickness of the gravel layer is 45-55 cm, and the gravel particle size of the gravel layer is 5-35 mm; The fourth filter layer is a pebble layer, the thickness of the pebble layer is 45-55 cm, and the particle size of the pebble in the pebble layer is 20-65 mm; The fifth filter layer is a rock layer, the thickness of the rock layer is 45-55 cm, and the particle size of the rocks in the rock layer is 30-90 mm.
8. The new embankment according to claim 1, Its characteristics are: A drainage channel is arranged on the nose sill of the micro-flow-dissipating energy dissipation device, and the drainage channel is arranged parallel to the side slope of the embankment.
9. The new embankment according to claim 8, Its characteristics are: The micro flow-dissipating energy-dissipating nose sill comprises: A first arc-shaped portion, wherein the vertical cross-section of the first arc-shaped portion is a triangle, the drainage channel is arranged on the first arc-shaped portion, and a filter is arranged on the water inlet of the drainage channel; The second arc-shaped portion is arranged at the end of the first arc-shaped portion, and the second arc-shaped portion and the first arc-shaped portion are in a V-shaped structure.
10. The new embankment according to claim 1, Its characteristics are: A first water level sensor and a rainfall detector are arranged on the dike; a second water level sensor is arranged at the bottom of the assembled vegetation trough; and a flow velocity meter is arranged at the bottom of the slope; The levee also includes a controller, which is respectively connected to the first water level sensor, the rain gauge, the second water level sensor, and the flow velocity meter.