Multifunctional discharge hole arrangement structure

By designing a multi-functional discharge tunnel layout structure and utilizing components such as arc doors, poppet valves, and ecological discharge pipes, flexible regulation of different flow requirements is achieved, which solves the problem of rapid vibration of the flood discharge structure under high pressure and improves the service life of the discharge structure. and power station safety.

CN221878011UActive Publication Date: 2024-10-22POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420283926.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-06
Publication Date
2024-10-22
Estimated Expiration
2034-02-06

AI Technical Summary

Technical Problem

When the existing flood discharge structure opens the gate to release water under high pressure, it is easy to produce rapid vibration, which is difficult to calculate and affects the safety and service life of the power station.

Method used

Design a multi-functional discharge hole layout structure, including an arc door drain pipe, a poppet valve drain pipe and an ecological drain pipe. The discharge flow is divided into three levels through the working arc door, working poppet valve and working flow regulating valve. It is equipped with The energy-dissipating structure and accidental eccentric semi-ball valve enable flexible regulation of different flow requirements.

Benefits of technology

It effectively responds to different discharge flow requirements, avoids rapid oscillation caused by long-term discharge due to small opening of the arc gate, and improves the service life of the structure and the safety of the power station.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221878011U_ABST
    Figure CN221878011U_ABST
Patent Text Reader

Abstract

The utility model provides a multifunctional discharge hole arrangement structure, which is characterized in that an arc gate water discharge pipe is closely arranged at the downstream of a main hole of a diversion discharge hole connected with a lower reservoir, a working arc gate is arranged on a discharge path of the arc gate water discharge pipe, and the arc gate water discharge pipe is connected with an energy dissipater at the downstream side of the working arc gate; a cone valve blow-off pipe and an ecological blow-off pipe are arranged beside the radial gate blow-off pipe, a working cone valve and a working flow adjusting valve are arranged on the discharge path of the cone valve blow-off pipe and the discharge path of the ecological blow-off pipe respectively, and water outlets of the cone valve blow-off pipe and the ecological blow-off pipe are connected with energy dissipation structures. The drainage hole arrangement structure meets different drainage flow requirements, different drainage structures can be used, it can be guaranteed that the river flow is within a reasonable range, and the service life of each structure is prolonged. And therefore, the situation that the safety of the gate and a power station is affected due to the fact that torrent oscillation generated by long-term discharge work of the radial gate with small opening degree is harmful to the safety of the gate and the power station can be avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of power station discharge engineering, in particular to a multifunctional discharge hole arrangement structure. Background Art

[0002] When the water level reaches the flood discharge elevation, the spillway or the dam body discharge structure with a higher elevation can be activated. When the water level does not reach the flood discharge elevation, the flood discharge and emptying tunnel with a lower elevation needs to be used to discharge the flood. The working head of the flood discharge tunnel is high, and it is a pressurized tunnel with a high flow rate. The downstream needs to be equipped with a corresponding energy dissipation structure. In order to ensure the ecological flow of the downstream river, the flood discharge and emptying tunnel usually also has the function of discharging the ecological flow. When other flood discharge structures cannot meet the conditions, there is a flood discharge and emptying tunnel to discharge a certain flow and undertake the task of ensuring the ecological flow. However, the operation process of opening the gate to discharge the water flow under high pressure will cause the problem of torrent vibration due to the coupled vibration of the water flow and the structure. This type of problem is very complex and difficult to calculate using theory. Most of the research is to analyze vibration, stress and displacement through prototype observation of the power station. The flood discharge before the flood usually requires a large flow rate, and its design flow rate affects the setting of the tunnel and gate size, while the ecological flow requirement is usually not large. The long-term use of a large gate with a small opening to discharge the ecological flow cannot avoid the vibration problem, affecting the safety and service life of the power station. Utility Model Content

[0003] The purpose of the utility model is to provide a discharge hole arrangement structure that can effectively cope with a variety of different discharge flow requirements. To this end, the utility model adopts the following technical solutions:

[0004] A multifunctional discharge hole arrangement structure, wherein an arc gate discharge pipe is arranged immediately downstream of a main tunnel of a diversion discharge hole connected to a lower reservoir, the arc gate discharge pipe is provided with a working arc gate on its discharge path, and the arc gate discharge pipe is connected to an energy dissipator on the downstream side of the working arc gate; a cone valve discharge pipe and an ecological discharge pipe are arranged on the side of the arc gate discharge pipe, the cone valve discharge pipe and the ecological discharge pipe are provided with a working cone valve and a working flow regulating valve respectively on their discharge paths, and the water outlets of the cone valve discharge pipe and the ecological discharge pipe are both connected to an energy dissipation structure; the discharge flow of water flowing through the working arc gate, the working cone valve and the working flow regulating valve is divided into three levels from high to low, so as to form a separate fully open discharge state of the valve or gate corresponding to different discharge flow requirements.

[0005] Furthermore: a drainage channel pipe is provided on the branch of the arc gate drainage pipe, and the water inlets of the cone valve drainage pipe and the ecological drainage pipe are uniformly connected to the drainage channel pipe.

[0006] Furthermore: the cone valve drain pipe and the ecological drain pipe are connected to the same energy dissipation pool at the downstream side of the valves.

[0007] Furthermore: an emergency eccentric hemispherical valve is arranged on the drain channel pipe.

[0008] Furthermore: the inner diameters of the arc gate drain pipe, the cone valve drain pipe and the ecological drain pipe decrease in sequence.

[0009] Compared with the prior art, the utility model has the following beneficial effects:

[0010] The discharge hole arrangement structure of the utility model can meet different discharge flow requirements, and different discharge structures can be used to ensure that the river flow is within a reasonable range and increase the service life of each structure. It can also avoid the radial gate using a small opening for long-term discharge work, and the torrent oscillation generated will harm the gate and power station safety, affecting the gate and power station safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a structural schematic diagram of the utility model.

[0012] The markings in the attached figure are: 1-main tunnel of diversion and discharge tunnel; 2-arc gate discharge pipe; 3-working arc gate; 4-discharge channel pipe; 5-cone valve discharge pipe; 6-ecological discharge pipe; 7-accident eccentric hemispherical valve; 8-working cone valve; 9-working flow regulating valve; 10-energy dissipation pool; 11-energy dissipation worker. DETAILED DESCRIPTION

[0013] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.

[0014] like Figure 1 As shown, a multifunctional discharge hole arrangement structure is shown, the upstream of the diversion discharge hole main hole 1 is connected to the lower reservoir, and an arc gate discharge pipe 2 is immediately arranged downstream of the diversion discharge hole main hole 1, and the arc gate discharge pipe 2 is provided with a working arc gate 3 on its discharge path, and the working arc gate 3 is correspondingly arranged in the arc gate room, and the arc gate discharge pipe 2 is connected to the energy dissipator 11 on the downstream side of the working arc gate 3; a cone valve discharge pipe 5 and an ecological discharge pipe 6 are arranged on the side of the arc gate discharge pipe 2, and the cone valve discharge pipe 5 and the ecological discharge pipe 6 are arranged on the discharge path of the arc gate discharge pipe 2. A working cone valve 8 and a working flow regulating valve 9 are respectively arranged on the path, and the outlets of the cone valve discharge pipe 5 and the ecological discharge pipe 6 are connected with energy dissipation structures; the discharge flow of the water body flowing through the working arc gate 3, the working cone valve 8 and the working flow regulating valve 9 is divided into three levels from high to low, and three independent discharge channels are formed for the discharge water body through the arc gate discharge pipe 2, the cone valve discharge pipe 5 and the ecological discharge pipe 6 respectively, so as to form a separate fully open discharge state of the valve or gate corresponding to different discharge flow requirements.

[0015] The arc gate discharge pipe 2 is branched with a discharge channel pipe 4, and the cone valve discharge pipe 5 and the ecological discharge pipe 6 are branched and arranged on the discharge channel pipe 4, and the water inlets of the cone valve discharge pipe 5 and the ecological discharge pipe 6 are uniformly connected to the discharge channel pipe 4, so that the working cone valve 8 and the working flow regulating valve 9 can be arranged in the same valve chamber. At the same time, the cone valve discharge pipe 5 and the ecological discharge pipe 6 are connected to the same energy dissipation pool 10 on the downstream side of their valves.

[0016] Correspondingly, the inner diameter of the arc gate drain pipe 2 is larger than the inner diameter of the cone valve drain pipe 5 , and the inner diameter of the cone valve drain pipe 5 is larger than the inner diameter of the ecological drain pipe 6 .

[0017] Among them, an accident eccentric hemispherical valve 7 is provided on the drainage channel pipe 4, and the accident eccentric hemispherical valve 7 is arranged upstream of the cone valve drainage pipe 5 and the ecological drainage pipe 6. When the cone valve drainage pipe 5 and the ecological drainage pipe 6 and the valves thereon have an accident or need maintenance, the accident eccentric hemispherical valve 7 can be used to close and block the water flow.

[0018] In this embodiment, the calculation content of the control process is as follows:

[0019] 1. The working arc gate 3 is used for large flow discharge. At the maximum discharge flow Q1, the orifice size is fully opened according to the arc gate opening, and the orifice flow velocity v1 is 8m / s-15m / s.

[0020] The calculation formula of the flood discharge orifice flow velocity v is as follows:

[0021]

[0022] Where, H is the water head at the inlet of the flood discharge tunnel (m); φ is the velocity coefficient; g is the acceleration of gravity (9.81m / s 2 );v1——flow velocity at the inlet section (m / s);h1——water depth at the inlet section (m).

[0023] The orifice size is usually the initial selection of the cross-sectional area of ​​the arc gate discharge pipe. Therefore, 60% of the tunnel area S = arc gate hole area (height H×width B) = Q1 / v1.

[0024] 2. The diameter D of the cone valve discharge pipe 5 is determined according to the flow rate Q2 of the flood flow rate once a year to 5 years, and the flow velocity v2 in the pipe is determined according to 5m / s-8m / s. However, the maximum discharge is not more than 20m 3 / s is controlled, and the water passing through the working cone valve 8 enters the energy dissipation pool 10 for re-efficiency and then flows out of the energy dissipation pool 10 and flows into the downstream ditch or river.

[0025] 3. The discharge flow of the ecological discharge pipe 6 is determined according to the flow that meets the requirements of ecological water replenishment, which is usually the flow rate Q3 in a normal water year or the required discharge flow that can be discharged within 24 hours in the rainy season. The flow velocity v3 in the pipe is determined according to 3m / s-5m / s. The water body 9 that passes through the working flow regulating valve is dissipated through the energy dissipation pool 10 and then flows into the downstream ditch or river.

[0026] Based on the above content, the flow rate calculation formula flowing through the working cone valve 8 and the working flow regulating valve 9 is as follows:

[0027]

[0028] In the formula, c q ——Flow coefficient; A0——Valve port flow area (m 2 );△p——pressure difference before and after the valve port (Pa); ρ——liquid density (kg / m 3 ).

[0029] Accordingly, the calculation formula for the size of the stilling pool 10 is as follows:

[0030] S=h c "-h t (3)

[0031] L k =L d +0.8L j (4)

[0032] Where, S is the depth of the stilling pool (m); h is c "——Water depth after the jump (m); h t ——Downstream water depth (m); L k ——Pool length (m); L d ——water tongue length (m); L j ——Length of hydraulic jump (m).

[0033] Based on the above content, this implementation case provides a discharge hole arrangement structure with specific values:

[0034] The main tunnel 1 of the diversion and discharge tunnel is 20.3m long and 6m in diameter, and the arc gate discharge pipe 2 is 8.7m long and has the same diameter as the main tunnel 1 of the diversion and discharge tunnel. The area of ​​the arc gate opening is 18m 2 (4m wide × 4.5m high). The discharge channel pipe 4 is 14.8m long and 3m in diameter. The cone valve discharge pipe 5 has the same diameter as the discharge channel pipe 4 and is 4.2m long. The ecological discharge pipe 6 is 7.2m long and 1.1m in diameter. The working cone valve 8 has a diameter of 2.6m, the working flow regulating valve 9 has a diameter of 0.8m, and the accident eccentric hemispherical valve 7 has a diameter of 2.6m. The energy dissipation pool 10 is 7m×9.5m in size.

[0035] Combined with the size of the above-mentioned discharge hole arrangement structure and the calculation method of the control process, when the discharge hole arrangement structure is used for discharge control, the specific discharge control method and whether it can meet the corresponding requirements are as follows:

[0036] (1) When there is no early flood discharge task:

[0037] The working arc gate 3 is closed, the working cone valve 8 is closed, the working flow regulating valve 9 and the accident eccentric semi-ball valve 7 are working, and the water is discharged through the water discharge channel pipe 4 and the ecological water discharge pipe 6;

[0038] The ecological flow discharge requirement of the power station is not less than 0.05m 3 , the working flow regulating valve 9 is fully opened, and the flow rate is calculated by combining the above formula (2):

[0039]

[0040] At this time, the water in the working flow regulating valve 9 dissipates energy through the energy dissipation pool 10 and then flows downstream. The water depth of the energy dissipation pool 10 under the maximum discharge flow is calculated based on the size of the energy dissipation pool 10 and the above formulas (3) and (4):

[0041] S=h c "-h t =0.109-0.1=0.009m;

[0042] L k =L d +0.8L j =2.195+0.8×0.191=2.348<9.5m, then the size of the energy dissipation pool 10 meets the requirements.

[0043] (2) When encountering a minor flood or a flood warning:

[0044] According to the storage capacity that needs to be released in advance, the time to open the working cone valve 8 to release the flow is obtained. Open the working cone valve 8, the accident eccentric hemispherical valve 7, close the working arc gate 3 and the working flow regulating valve 9, and the water body is released through the water discharge channel pipe 4 and the cone valve water discharge pipe 5;

[0045] The water level is required to be lowered by 6m and the discharge capacity is 1.1806 million m 3 , the working cone valve 8 is fully opened, the accident eccentric hemispherical valve 7 is opened, and the discharge flow is shown in the table:

[0046] Table 1 Working cone valve leakage flow and duration

[0047] Elevation(m) 325 326 327 328 331 <![CDATA[Storage capacity (10,000 m 3 )]]> 696.29 721.03 748.75 792.46 814.35 <![CDATA[Discharge (m 3 / s)]]> 15.96 16.13 16.85 17.66 19.83 Time (hours) 0.30 0.31 0.49 0.45 0.60

[0048] At this time, the water in the working cone valve 8 dissipates energy through the energy dissipation pool 10 and then flows downstream. The water depth of the energy dissipation pool 10 under the maximum discharge flow is calculated based on the size of the energy dissipation pool 10 and the above formulas (3) and (4):

[0049] S=h c "-h t =1.937-0.5=1.437m;

[0050] L k =L d +0.8L j =7.207+0.8×2.401=9.128m<9.5m, then the size of the energy dissipation pool 10 meets the requirements.

[0051] (3) When a major flood occurs and it is necessary to release water in advance:

[0052] Floods under the design standard rarely occur. Before the continuous heavy rainfall, it is also necessary to release the flow. The release requirement of the working cone valve 8 can no longer be met, so the working arc valve 3 is opened to release the flow. The release requires the water level to drop by 20m, and the release capacity is 4.0601 million m 3 . According to the storage capacity that needs to be released in advance, the time to open the working arc gate 3 to release the flow is obtained. Open the working arc gate 3, close the working cone valve 8 and the working flow regulating valve 9. The working arc gate 3 is fully opened, and the discharge flow and time are as follows:

[0053] Table 2 Working arc gate discharge flow and duration

[0054] Elevation(m) 311 313 318 323 331 <![CDATA[Storage capacity (10,000 m 3 )]]> 408.34 416.95 451.33 615.16 814.35 <![CDATA[Discharge (m 3 / s)]]> 141.59 143.12 149.08 152.77 162.35 Time (hours) 1.09 1.18 1.35 1.36 1.21

[0055] On the basis of the above content, in order to monitor the safety of each structure, corresponding stress sensors for detecting water pressure can be buried in the gates, valves and pipelines. During the operation of this implementation case, only small stress fluctuations and vibrations were monitored, which has a significant effect on maintaining the safe operation of the power station.

[0056] The above embodiment is only a preferred technical solution of the present invention. Those skilled in the art should understand that the technical solutions or parameters in the embodiments can be modified or replaced without departing from the principle and essence of the present invention, and all should be included in the protection scope of the present invention.

Claims

1. A multifunctional discharge hole arrangement structure, characterized in that: An arc gate drain pipe (2) is arranged immediately downstream of the main tunnel (1) of the diversion discharge tunnel, a working arc gate (3) is arranged on the discharge path of the arc gate drain pipe (2), and the arc gate drain pipe (2) is connected to an energy dissipator (11) on the downstream side of the working arc gate (3); A cone valve drain pipe (5) and an ecological drain pipe (6) are arranged beside the arc gate drain pipe (2); the cone valve drain pipe (5) and the ecological drain pipe (6) are provided with a working cone valve (8) and a working flow regulating valve (9) on their discharge paths; the water outlets of the cone valve drain pipe (5) and the ecological drain pipe (6) are both connected to an energy dissipation structure; the discharge flow of the water body flowing through the working arc gate (3) and the working cone valve (8) and the working flow regulating valve (9) is divided into three levels from high to low.

2. A multifunctional discharge hole arrangement structure according to claim 1, characterized in that: The arc gate drain pipe (2) is provided with a drain channel pipe (4) on its upper branch, and the water inlets of the cone valve drain pipe (5) and the ecological drain pipe (6) are uniformly connected to the drain channel pipe (4).

3. A multifunctional discharge hole arrangement structure according to claim 2, characterized in that: The cone valve drain pipe (5) and the ecological drain pipe (6) are connected to the same energy dissipation pool (10) at the downstream side of their valves.

4. A multifunctional discharge hole arrangement structure according to claim 2, characterized in that: The drain channel pipe (4) is provided with an emergency eccentric hemispherical valve (7).

5. The multifunctional discharge hole arrangement structure according to claim 1, characterized in that: The inner diameters of the arc gate drain pipe (2), the cone valve drain pipe (5) and the ecological drain pipe (6) decrease in sequence.

Citation Information

Cited By

  • Hydropower station ecological flow discharge system and discharge method

    CN120174794A