Fabricated wallboard screw hole anti-seepage structure

By opening a structural cavity in the wall panel and filling it with a layer of sealant and concrete, and sealing the end of the pull screw, the problem of weak anti-seepage effect of the screw eye in the construction of prefabricated wall panels is solved, achieving better sealing effect and use performance.

CN221878406UActive Publication Date: 2024-10-22谌亮
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420379667.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2024-10-22
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

In the construction of prefabricated wall panels, the anti-seepage effect at the screw eye is relatively weak, which can easily lead to water seepage problems during use of prefabricated wall panels.

Method used

A structural cavity is opened on the wall panel, and after the end of the pull screw is cut, the sealant layer and concrete layer are filled to seal the structural cavity to ensure that the end of the pull screw is blocked in the structural cavity to enhance the sealing effect. Sealing caps and reinforcement mesh can be used to further reinforce the sealant and concrete layer to improve sealing stability.

Benefits of technology

It significantly improves the anti-seepage effect at the screw eye of the wall panel, extends the service life of the sealant layer, ensures the sealing effect of the gap between the pull screw and the wall panel, and enhances the performance of the wall panel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221878406U_ABST
    Figure CN221878406U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of assembly type wallboard construction technologies, in particular to an assembly type wallboard screw hole anti-seepage structure which comprises a wallboard and a plurality of opposite-pull screws penetrating through the wallboard, structural cavities are formed in the surfaces, corresponding to the ends of the opposite-pull screws, of the wallboard, the ends of the opposite-pull screws are located in the structural cavities, and the opposite-pull screws are arranged in the structural cavities. The structural cavity is filled with a sealant layer and a concrete layer. The anti-seepage effect of the screw hole of the wallboard can be improved, and then the using effect of the wallboard is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of fabricated wall panel construction technology, and in particular to an anti-seepage structure of a screw eye of a fabricated wall panel. Background Art

[0002] The construction method of prefabricated wall panels is now a common construction method in the construction field. It has the advantages of convenient construction, high efficiency, short construction period, and little impact from climate and environment.

[0003] When prefabricated wall panels are made in the factory, the formwork is first built so that the inside of the formwork forms a casting space of the required wall panel size. Then, a steel mesh is installed in the casting space, and concrete is poured at the same time to form a concrete prefabricated wall panel. Finally, the formwork can be removed. The formwork includes multiple side panels, multiple diagonal braces, and multiple tension screws. The multiple side panels are distributed in a ring shape, so that the inner area encloses the casting space. The tension screws are simultaneously inserted into the two opposite side panels, and the diagonal braces are installed on the outside of the side panels to support the side panels.

[0004] When the template is disassembled, the extended section of the tension screw rod is cut, leaving a screw eye at the installation position of the tension screw rod on the prefabricated wall panel. The cutting process also causes the tension screw rod to vibrate continuously, resulting in an increase in the gap between the tension screw rod and the prefabricated wall panel. As a result, when the prefabricated wall panel is installed on site and put into use, the anti-seepage effect at the screw eye is relatively weak, which is easy to affect the use of the prefabricated wall panel. Utility Model Content

[0005] In order to improve the anti-seepage effect at the screw eyes of the wall panels and thereby improve the use effect of the wall panels, the present application provides an anti-seepage structure for the screw eyes of an assembled wall panel.

[0006] The present application provides an assembled wall panel screw eye anti-seepage structure using the following technical solution:

[0007] An assembled wall panel screw eye anti-seepage structure comprises a wall panel and a plurality of tension screws penetrating the wall panel, a surface of the wall panel corresponding to the ends of the tension screws is provided with a structural cavity, the ends of the tension screws are located in the structural cavity, and the structural cavity is filled with a sealant layer and a concrete layer.

[0008] By adopting the above technical solution, during construction, a structural cavity is first chiseled out on the wall panel, and then the end of the tension screw is cut, and then a sealant layer and a concrete layer are constructed to seal the structural cavity, and the end of the tension screw is sealed in the structural cavity; the sealant layer and the concrete layer can seal the tension screw of the wall panel, thereby improving the anti-seepage effect at the screw eye of the wall panel and improving the use effect of the wall panel.

[0009] Optionally, the sealant layer is applied to the bottom wall of the structural cavity, the sealant layer covers the gap between the tension screw rod and the wall panel, and the concrete layer is laid on the outside of the sealant layer.

[0010] By adopting the above technical solution, the concrete layer has a better protective effect on the sealant layer, ensuring a long-term sealing effect of the sealant layer.

[0011] Optionally, the tension screw is detachably mounted with a sealing cap, and the sealing glue layer is sealed between the bottom wall of the structural cavity and the sealing cap.

[0012] By adopting the above technical solution, the sealing cap can seal the sealant layer after the sealant layer is applied, thereby improving the stability of the sealant layer after application and ensuring the sealing effect of the gap between the tension screw and the wall panel; at the same time, it reduces the possibility of the sealant layer being directly interfered by the concrete layer, thereby improving the sealing effect.

[0013] Optionally, the sealing cap includes a connecting cap and a sealing portion which are integrally formed, the connecting cap is sleeved and fitted on the end of the tension screw, and the sealing rubber layer is sealed between the bottom wall of the structural cavity and the sealing portion.

[0014] By adopting the above technical solution, during installation, it is only necessary to sleeve the connecting cap and fit the end of the tension screw, so that the sealing part can seal the sealant layer, thereby improving the stability of the sealant layer after coating.

[0015] Optionally, the sealing portion is provided with a glue injection hole, which penetrates the sealing portion along the thickness direction of the sealing portion, so that the sealant can be injected into the gap between the bottom wall of the structural cavity and the sealing portion from the glue injection hole.

[0016] By adopting the above technical solution, during construction, the sealing cap can be first fixed on the end of the tension screw, and then the sealant can be injected into the gap between the bottom wall of the structural cavity and the sealing part from the injection hole, so that the sealant can fill the gap between the bottom wall of the structural cavity and the sealing part, so that the coating effect of the sealant is better and the sealing effect of the screw eye on the wall panel is increased.

[0017] Optionally, the sealing cap is installed with a reinforcing mesh, and the reinforcing mesh is buried in the concrete layer.

[0018] By adopting the above technical solution, the reinforcement mesh can reinforce the concrete layer, increase the stability of the concrete layer after construction, and ensure the sealing effect of the concrete layer on the structural cavity.

[0019] Optionally, the sealing cap and the end of the tension screw are both provided with filling channels, the filling channel on the sealing cap is connected with the filling channel on the tension screw, and the filling channel is used to fill part of the concrete in the concrete layer.

[0020] By adopting the above technical solution, after the concrete layer solidifies, the concrete layer located in the filling channel can further reinforce the installation of the sealing cap, improve the integrity between the sealing cap and the tension screw, and then improve the integrity between the concrete layer and the wall panel, reduce the possibility of the concrete layer falling off from the structural cavity due to vibration, and ensure the anti-seepage effect at the screw eye of the wall panel.

[0021] Optionally, a plurality of reinforcement grooves are provided on the inner wall of the structural cavity, and the concrete layer is partially filled into the reinforcement grooves.

[0022] By adopting the above technical solution, after the concrete layer solidifies, the provided reinforcement groove can increase the bite force between the concrete layer and the wall panel, reduce the possibility of the concrete layer falling off from the structural cavity due to vibration, and ensure the anti-seepage effect at the screw eye of the wall panel.

[0023] In summary, the present application includes at least one of the following beneficial technical effects:

[0024] 1. The sealant layer and the concrete layer can bury the ends of the tension screws in the structural cavity, thereby sealing the tension screws of the wallboard, improving the anti-seepage effect of the screw holes of the wallboard, and improving the use effect of the wallboard;

[0025] 2. The sealing cap can seal the sealant layer, improve the stability of the sealant layer after coating, and ensure the sealing effect of the gap between the tension screw and the wall panel; at the same time, it reduces the possibility of the sealant layer being directly interfered by the concrete layer, making the sealing effect better. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 is a schematic diagram of a partial cross-sectional structure of a wall panel in Example 1 of the present application;

[0027] Figure 2 is a schematic diagram of a partial cross-sectional structure of a wall panel in Example 2 of the present application;

[0028] Figure 3 is a schematic diagram of a partial cross-sectional structure of a wall panel in Example 3 of the present application;

[0029] Figure 4 It is a schematic diagram of the partial cross-sectional structure of the wall panel of Example 4 of the present application.

[0030] Explanation of the accompanying drawings: 1. Wall panel; 2. Tension screw; 3. Structural cavity; 31. Reinforcement groove; 4. Sealant layer; 5. Sealing cap; 51. Connecting cap; 52. Sealing part; 521. Glue injection hole; 6. Reinforcement mesh; 7. Filling channel; 8. Concrete layer. DETAILED DESCRIPTION

[0031] The following is combined with Figure 1-4 This application is described in further detail.

[0032] The embodiment of the present application discloses an anti-seepage structure for screw holes of assembled wall panels.

[0033] Embodiment 1:

[0034] Reference Figure 1 The assembled wall panel screw eye anti-seepage structure comprises a wall panel 1 and a plurality of tension screws 2 penetrating the wall panel 1. A structural cavity 3 is provided on the surface of the wall panel 1 corresponding to the end of the tension screw 2, and the end of the tension screw 2 is cut so that the overall length of the tension screw 2 is less than the thickness of the wall panel 1, so that the end of the tension screw 2 is located in the structural cavity 3.

[0035] Reference Figure 1 At this time, the structural cavity 3 is filled with a sealant layer 4 and a concrete layer 8. The sealant layer 4 is applied to the bottom wall of the structural cavity 3, and the sealant layer 4 covers the gap between the tension screw 2 and the wallboard 1. The end of the tension screw 2 can also be detachably installed with a sealing cap 5. A gap is set between the sealing cap 5 and the bottom wall of the structural cavity 3, and the sealant layer 4 is sealed between the bottom wall of the structural cavity 3 and the sealing cap 5. The concrete layer 8 covers the outside of the sealing cap 5, so that the concrete layer 8 blocks the remaining space in the structural cavity 3. During actual construction, the concrete mortar can be manually applied to the structural cavity 3 to form the concrete layer 8, or the structural cavity 3 can be filled by wet spraying of concrete mortar.

[0036] During construction, the structural cavity 3 is firstly excavated on the wall panel 1, and then the end of the tension screw 2 is cut. Next, the sealant layer 4, the sealing cap 5 and the concrete layer 8 are sequentially constructed to seal the structural cavity 3, and the end of the tension screw 2 is sealed in the structural cavity 3. The sealant layer 4 and the concrete layer 8 can seal the tension screw 2 of the wall panel 1, improve the anti-seepage effect of the screw eye of the wall panel 1, and improve the use effect of the wall panel 1.

[0037] Moreover, the sealing cap 5 can seal the sealant layer 4 after the sealant layer 4 is applied, thereby improving the stability of the sealant layer 4 after application and ensuring the sealing effect of the gap between the tension screw 2 and the wallboard 1. At the same time, the possibility of the sealant layer 4 being directly interfered by the concrete layer 8 is reduced, so that the sealing effect is better.

[0038] Reference Figure 1 The sealing cap 5 includes a connecting cap 51 and a sealing portion 52, and the connecting cap 51 and the sealing portion 52 are integrally formed. The connecting cap 51 is sleeved and matched with the end of the tension screw 2, so that the connecting cap 51 and the tension screw 2 have an interference fit. The sealing portion 52 is an annular structure, and the sealing portion 52 is located at one end of the connecting cap 51 facing the bottom wall of the structural cavity 3. A gap is set between the sealing portion 52 and the bottom wall of the structural cavity 3, so that the sealant layer 4 is located in the gap.

[0039] When installing the sealing cap 5 , it is only necessary to sleeve the connecting cap 51 onto the end of the tensioning screw 2 , so that the sealing portion 52 can seal the sealant layer 4 , thereby improving the stability of the sealant layer 4 after coating.

[0040] During actual construction, the connection cap 51 may be welded and fixed to the end of the tension screw rod 2 . Of course, the connection cap 51 may also be threadedly connected to the end of the tension screw rod 2 .

[0041] Reference Figure 1 In addition, the sealing cap 5 is also equipped with a reinforcing mesh 6, specifically, the reinforcing mesh 6 is welded and fixed on the connecting cap 51. After the sealing cap 5 is sleeved and fixed on the end of the tension screw 2, the sealing cap 5 can support the reinforcing mesh 6 inside the structural cavity 3. After the concrete layer 8 is poured, the reinforcing mesh 6 is buried in the concrete layer 8. The reinforcing mesh 6 can reinforce the concrete layer 8, increase the stability of the concrete layer 8 after construction, and ensure the sealing effect of the concrete layer 8 on the structural cavity 3.

[0042] The implementation principle of Example 1 is as follows: the end of the tension screw 2 is sealed in the structural cavity 3. The sealant layer 4 and the concrete layer 8 can seal the tension screw 2 of the wallboard 1, improve the anti-seepage effect of the screw eye of the wallboard 1, and improve the use effect of the wallboard 1.

[0043] Embodiment 2:

[0044] Reference Figure 2 The difference between this embodiment and embodiment 1 is that a plurality of reinforcement grooves 31 are opened on the inner wall of the structure cavity 3, so that when the concrete layer 8 is filled in the structure cavity 3, part of the concrete mortar can be filled into the reinforcement grooves 31.

[0045] The implementation principle of Example 2 is: after the concrete layer 8 solidifies, the set reinforcement groove 31 can increase the bite force between the concrete layer 8 and the wall panel 1, reduce the possibility of the concrete layer 8 falling off from the structural cavity 3 due to vibration, and ensure the anti-seepage effect at the screw eye of the wall panel 1.

[0046] Embodiment 3:

[0047] Reference Figure 3 The difference between this embodiment and the embodiment 2 is that the end of the sealing cap 5 and the end of the tension screw 2 are both provided with a filling channel 7, and the filling channel 7 on the sealing cap 5 is connected with the filling channel 7 on the tension screw 2. When the concrete layer 8 is filled in the structural cavity 3, part of the concrete mortar can be filled into the filling channel 7.

[0048] The implementation principle of Example 3 is: after the concrete layer 8 solidifies, the concrete layer 8 located in the filling channel 7 can further reinforce the installation of the sealing cap 5, improve the integrity between the sealing cap 5 and the tension screw 2, and then improve the integrity between the concrete layer 8 and the wall panel 1, reduce the possibility of the concrete layer 8 falling off from the structural cavity 3 due to vibration, and ensure the anti-seepage effect at the screw eye of the wall panel 1.

[0049] Embodiment 4:

[0050] Reference Figure 4 The difference between this embodiment and the above embodiment is that the sealing portion 52 is provided with a glue injection hole 521, and the glue injection hole 521 penetrates the sealing portion 52 along the thickness direction of the sealing portion 52, and the glue injection hole 521 connects the gap between the bottom wall of the structural cavity 3 and the sealing portion 52.

[0051] The implementation principle of Example 4 is as follows: during construction, the sealing cap 5 can be first fixed on the end of the tension screw 2, and then the sealant is injected from the injection hole 521 into the gap between the bottom wall of the structure cavity 3 and the sealing portion 52, thereby achieving the application of the sealant through another construction method. The sealant can fill the gap between the bottom wall of the structure cavity 3 and the sealing portion 52, so that the application effect of the sealant layer 4 is better, and the sealing effect of the screw eye on the wallboard 1 is increased.

[0052] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An assembled wall panel screw eye anti-seepage structure, comprising a wall panel (1) and a plurality of tension screws (2) penetrating the wall panel (1), characterized in that: A structural cavity (3) is provided on the surface of the wall panel (1) corresponding to the end of the tensioning screw (2); the end of the tensioning screw (2) is located in the structural cavity (3); and the structural cavity (3) is filled with a sealing glue layer (4) and a concrete layer (8); The sealant layer (4) is applied to the bottom wall of the structural cavity (3), the sealant layer (4) covers the gap between the tension screw (2) and the wallboard (1), and the concrete layer (8) is laid on the outside of the sealant layer (4); The tension screw rod (2) is detachably mounted with a sealing cap (5), and the sealing rubber layer (4) is sealed between the bottom wall of the structural cavity (3) and the sealing cap (5); The sealing cap (5) and the end of the tension screw (2) are both provided with a filling channel (7), the filling channel (7) on the sealing cap (5) is connected to the filling channel (7) on the tension screw (2), and the filling channel (7) is used to fill part of the concrete in the concrete layer (8).

2. The screw eye anti-seepage structure of the assembled wall panel according to claim 1, characterized in that: The sealing cap (5) comprises a connecting cap (51) and a sealing portion (52) which are integrally formed, the connecting cap (51) being sleeved and fitted on the end of the tensioning screw (2), and the sealing rubber layer (4) being sealed between the bottom wall of the structural cavity (3) and the sealing portion (52).

3. The screw hole anti-seepage structure of the assembled wall panel according to claim 2 is characterized by: The sealing portion (52) is provided with a glue injection hole (521), and the glue injection hole (521) penetrates the sealing portion (52) along the thickness direction of the sealing portion (52), so that the sealant can be injected from the glue injection hole (521) into the gap between the bottom wall of the structural cavity (3) and the sealing portion (52).

4. The screw hole anti-seepage structure of the assembled wall panel according to claim 1, characterized in that: The sealing cap (5) is installed with a reinforcing mesh (6), and the reinforcing mesh (6) is buried in the concrete layer (8).

5. The screw hole anti-seepage structure of the assembled wall panel according to claim 1, characterized in that: The inner wall of the structural cavity (3) is provided with a plurality of reinforcement grooves (31), and the concrete layer (8) is partially filled into the reinforcement grooves (31).