Floor bearing plate supporting frame used in fabricated steel structure engineering
By designing the floor deck support frame for the prefabricated steel structure, using the combined structure of steel beams, reinforcing bars and supporting angle steel, we can reduce the welding steps and improve the installation accuracy, solve the welding safety hazards and structural stability problems, and achieve Greater installation security and structural stability.
Patent Information
- Application Number
- CN202323407378.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-14
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-14
AI Technical Summary
There are safety hazards in the welding of existing prefabricated floor decking during the installation process, and the high temperature of welding may damage non-metallic parts and affect the structural stability.
A floor deck support frame including steel beams, reinforcing bars and supporting angles is designed. The fixed connection of factory parts is completed through welding. Bolts are used to assemble on site to reduce welding steps. The support frame is installed through telescopic rods, push rods, piston cylinders and suction cups. Such structures improve the accuracy and safety of installation and reduce welding damage to non-metallic parts.
It improves the stability and installation safety of the prefabricated steel structure, reduces the risk of damage to non-metallic parts by welding, and improves the accuracy and smoothness of installation.
Smart Images

Figure CN221878975U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building materials, in particular to a floor deck support frame used in assembled steel structure engineering. Background Art
[0002] Prefabricated floor decking is an important building material and is widely used in various industrial and civil buildings.
[0003] Prefabricated floor decking is made of materials such as steel bars, I-shaped steel, galvanized steel, etc. It has the advantages of high mechanical strength, high durability, and fire resistance. Prefabricated floor decking is easy to install, has a fast construction speed, and low cost.
[0004] At the same time, because welding is a hot work, a fire watcher is needed to manage the hot work during welding, so the existing welding work has certain risks.
[0005] When installing prefabricated floor decking, the floor decking needs to be welded and fixed with angle steel. The level of welding may affect the stability of the structure. The welds also need to be polished. Welding will generate high temperature and may cause damage to other non-metallic parts.
[0006] To this end, the utility model provides a floor deck support frame used in assembled steel structure engineering. Utility Model Content
[0007] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.
[0008] The technical solution adopted by the utility model to solve its technical problems is: the floor deck support frame used in the assembled steel structure project described in the utility model comprises a steel beam; the side of the steel beam close to the top is fixedly connected with a first reinforcing rib; the side of the first reinforcing rib is bolted with a first supporting angle steel; the bottom of the first supporting angle steel is fixedly connected with a second reinforcing rib; the side of the second reinforcing rib is bolted with a second supporting angle steel; the other end of the second supporting angle steel is bolted with a third reinforcing rib; the third reinforcing rib is fixedly connected to the side of the steel beam; in this step, through the arrangement of the steel beam, the first reinforcing rib, the first supporting angle steel, the second reinforcing rib, the second supporting angle steel, and the third reinforcing rib, the welding work is placed before leaving the factory, and the structure can be assembled with bolts for use in on-site construction, which improves convenience, reduces damage to other non-metallic components caused by welding, and improves the stability of the structure.
[0009] Preferably, the side of the steel beam away from the third stiffener is fixedly connected with a fourth stiffener; the side of the fourth stiffener is hinged with a third supporting angle steel; the other end of the third supporting angle steel is hinged with a supporting plate; the middle of the third supporting angle steel is hinged with a first telescopic rod; the other end of the first telescopic rod is hinged to the side of the steel beam away from the third stiffener; in this step, through the arrangement of the fourth stiffener, the third supporting angle steel, the first telescopic rod and the support plate, the device is preliminarily adjusted to be consistent with the level of the installation surface before installation, thereby improving the accuracy of installation and improving the safety of the installation project.
[0010] Preferably, a push rod is provided in the middle of the support plate; multiple groups of push rods are provided in the middle of the support plate; a spring is sleeved on the outside of the push rod; one end of the spring is fixedly connected to the bottom of the push rod; the other end of the push rod is fixedly connected to the bottom of the support plate; a suction cup is fixedly connected to the top of the push rod; in this step, through the arrangement of the push rod, spring and suction cup, the mounting surface and the support plate are connected by suction with the suction cup, thereby improving the stability of the support plate and reducing the risk of the support plate falling off the mounting surface.
[0011] Preferably, a push rod is hinged on the side of the steel beam away from the third reinforcement rib; a piston is hinged on the other end of the push rod; a piston cylinder is arranged on the outside of the piston; the side of the piston cylinder is hinged on the side of the third supporting angle steel; an oil filling pipe is fixedly connected to the bottom of the piston cylinder; the other end of the oil filling pipe is arranged at the connection between the fourth reinforcement rib and the third supporting angle steel; in this step, through the arrangement of the push rod, the piston cylinder, the oil filling pipe and the piston, the connection between the fourth reinforcement rib and the third supporting angle steel is lubricated when the third supporting angle steel is rotated, thereby improving the smoothness of the rotation of the third supporting angle steel and reducing the possibility of jamming.
[0012] Preferably, a second telescopic rod is hinged at the middle of the third supporting angle steel; the other end of the second telescopic rod is hinged to the bottom of the supporting plate; in this step, the installation accuracy is improved and the error generated during installation is reduced through the provision of the second telescopic rod.
[0013] Preferably, a first pad is fixedly connected to the top of the support plate; the first pad is made of rubber; in this step, the first pad is provided to reduce the impact of external vibration on the device and reduce the damage of vibration to the fastening effect of the fastener.
[0014] Preferably, a second pad is provided on the top of the steel beam; multiple groups of the second pad are provided on the top of the steel beam and are evenly distributed at the four corners of the top of the steel beam; in this step, the damage of vibration to the fastening effect of the fastener is reduced through the provision of the second pad, and the influence of vibration on the service life of the device is reduced.
[0015] Preferably, a spirit level is provided on the side of the support plate; the spirit level is provided in the middle of the side of the support plate; in this step, the installation accuracy is improved and the error caused by the installation is reduced by providing the spirit level.
[0016] The beneficial effects of the utility model are as follows:
[0017] 1. The floor deck support frame used in the assembled steel structure project described in the utility model has the steel beam, the first reinforcing rib, the first supporting angle steel, the second reinforcing rib, the second supporting angle steel and the third reinforcing rib arranged, so that the welding work is put before leaving the factory, and the structure can be assembled with bolts on site for use, which improves convenience, reduces damage to other non-metallic parts caused by welding, and improves the stability of the structure.
[0018] 2. The floor deck support frame used in the assembled steel structure project described in the utility model, through the arrangement of the fourth reinforcing rib, the third supporting angle steel, the first telescopic rod and the support plate, is initially adjusted to be level with the installation surface before installation, thereby improving the accuracy of installation and the safety of the installation project. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The utility model will be further described below in conjunction with the accompanying drawings.
[0020] Figure 1 This is a schematic diagram of the structure of the steel beam and angle steel in the first embodiment of the present invention;
[0021] Figure 2 is a three-dimensional diagram of the support member in the second embodiment;
[0022] Figure 3 This is a schematic diagram of the structure of the third supporting angle steel and the supporting plate in the second embodiment;
[0023] Figure 4 is a schematic diagram of the structure of the cooperation between the ejector rod and the support plate in the fourth embodiment;
[0024] Figure 5 is a structural schematic diagram of the connection between the piston cylinder and the third supporting angle steel in the third embodiment;
[0025] Figure 6 is a schematic diagram of the structure of the connection between the piston cylinder and the oil injection pipe in the third embodiment;
[0026] Figure 7 is a schematic diagram of the structure of the level in the sixth embodiment;
[0027] Figure 8 It is a structural schematic diagram of a second pad provided on the top of the steel beam in the fifth embodiment.
[0028] In the figure: 1. steel beam; 11. first reinforcing rib; 12. first supporting angle steel; 13. second reinforcing rib; 14. second supporting angle steel; 15. third reinforcing rib; 2. fourth reinforcing rib; 21. third supporting angle steel; 22. first telescopic rod; 23. supporting plate; 3. push rod; 31. spring; 32. suction cup; 4. push rod; 41. piston cylinder; 42. oil filling pipe; 43. piston; 5. second telescopic rod; 6. first cushion block; 7. second cushion block; 8. spirit level. DETAILED DESCRIPTION
[0029] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0030] Embodiment 1
[0031] like Figure 1 As shown, a floor deck support frame for assembled steel structure engineering described in an embodiment of the utility model comprises a steel beam 1; a first reinforcing rib 11 is fixedly connected to the side of the steel beam 1 near the top; a first supporting angle steel 12 is bolted to the side of the first reinforcing rib 11; a second reinforcing rib 13 is fixedly connected to the bottom of the first supporting angle steel 12; a second reinforcing rib 13 is bolted to the side of the second supporting angle steel 14; a third reinforcing rib 15 is bolted to the other end of the second supporting angle steel 14; the third reinforcing rib 15 is fixedly connected to the side of the steel beam 1; during operation, the steel beam 1, the first reinforcing rib 11, the first supporting angle steel 12, the second reinforcing rib 13, the second supporting angle steel 14, and the third reinforcing rib 15 are connected through The first supporting angle steel 12 is fixed by welding or bolting, the painting of the first supporting angle steel 12 and the welding of other parts can be completed before leaving the factory. During on-site construction, the parts can be assembled with bolts. The first reinforcing ribs 11, the second reinforcing ribs 13, and the third reinforcing ribs 15 play a role in stabilizing the structure, and the second supporting angle steel 14 supports the first supporting angle steel 12. In this step, the welding work is placed before leaving the factory through the arrangement of the steel beam 1, the first reinforcing ribs 11, the first supporting angle steel 12, the second reinforcing ribs 13, the second supporting angle steel 14, and the third reinforcing ribs 15. The structure can be assembled with bolts for use during on-site construction, which improves convenience, reduces damage to other non-metallic parts caused by welding, and improves the stability of the structure.
[0032] Embodiment 2
[0033] like Figures 2 to 3As shown, the side of the steel beam 1 away from the third reinforcing rib 15 is fixedly connected with the fourth reinforcing rib 2; the side of the fourth reinforcing rib 2 is hinged with a third supporting angle steel 21; the other end of the third supporting angle steel 21 is hinged with a supporting plate 23; the middle of the third supporting angle steel 21 is hinged with a first telescopic rod 22; the other end of the first telescopic rod 22 is hinged to the side of the steel beam 1 away from the third reinforcing rib 15; during operation, before installation, the third supporting angle steel 21 is rotated to drive the first telescopic rod 22 to stretch and bring the supporting plate 23 into contact with the installation surface, thereby improving the accuracy of installation, and the fourth reinforcing rib 2 plays a fixing role; in this step, through the arrangement of the fourth reinforcing rib 2, the third supporting angle steel 21, the first telescopic rod 22, and the supporting plate 23, the device is preliminarily adjusted to be level with the installation surface before installation, thereby improving the accuracy of installation and improving the safety of the installation project.
[0034] like Figures 2 to 3 As shown, a push rod 3 is provided in the middle of the support plate 23; multiple groups of push rods 3 are provided in the middle of the support plate 23; a spring 31 is sleeved on the outside of the push rod 3; one end of the spring 31 is fixedly connected to the bottom of the push rod 3; the other end of the push rod 3 is fixedly connected to the bottom of the support plate 23; a suction cup 32 is fixedly connected to the top of the push rod 3; during work, the support plate 23 is adjusted and installed, the suction cup 32 supports the installation surface and adsorbs it, the push rod 3 moves downward to stretch the spring 31, and when the support plate 23 moves downward, the suction cup 32 moves away from the installation surface, and the spring 31 drives the push rod 3 to reset; in this step, through the setting of the push rod 3, the spring 31, and the suction cup 32, the installation surface and the support plate 23 are connected by adsorption of the suction cup 32, thereby improving the stability of the support plate 23 and reducing the risk of the support plate 23 falling off the installation surface.
[0035] Embodiment 3
[0036] like Figures 5 and 6 As shown, the side of the steel beam 1 away from the third reinforcement rib 15 is hinged with a push rod 4; the other end of the push rod 4 is hinged with a piston 43; a piston cylinder 41 is arranged outside the piston 43; the side of the piston cylinder 41 is hinged to the side of the third supporting angle steel 21; the bottom of the piston cylinder 41 is fixedly connected with an oil filling pipe 42; the other end of the oil filling pipe 42 is arranged at the connection between the fourth reinforcement rib 2 and the third supporting angle steel 21; during operation, lubricating oil is added to the rodless cavity. When the third supporting angle steel 21 rotates toward the steel beam 1, the push rod 4 drives the piston 43 to compress the rodless cavity, squeezes out the lubricating oil, and continues to lubricate the connection between the fourth reinforcement rib 2 and the third supporting angle steel 21 through the oil filling pipe 42; in this step, through the arrangement of the push rod 4, the piston cylinder 41, the oil filling pipe 42, and the piston 43, when the third supporting angle steel 21 is rotated, the connection between the fourth reinforcement rib 2 and the third supporting angle steel 21 is lubricated, thereby improving the smoothness of the rotation of the third supporting angle steel 21 and reducing the possibility of jamming.
[0037] Embodiment 4
[0038] like Figure 4 As shown, a second telescopic rod 5 is hinged to the middle of the third supporting angle steel 21; the other end of the second telescopic rod 5 is hinged to the bottom of the support plate 23; during operation, when adjusting the level of the support plate 23, the second telescopic rod 5 is adjusted to keep the support plate 23 consistent with the installation surface level; in this step, the second telescopic rod 5 is set to improve the accuracy of installation and reduce the error generated during installation.
[0039] like Figure 4 As shown, a first pad 6 is fixedly connected to the top of the support plate 23; the first pad 6 is made of rubber; during operation, the first pad 6 is arranged between the mounting surface and the support plate 23 to reduce the transmission of vibration between the mounting surface and the device; in this step, the influence of external vibration on the device is reduced through the arrangement of the first pad 6, and the damage of vibration to the fastening effect of the fastener is reduced.
[0040] Embodiment 5
[0041] like Figure 8 As shown, a second pad 7 is arranged on the top of the steel beam 1; multiple groups of the second pads 7 are arranged on the top of the steel beam 1 and are evenly distributed at the four corners of the top of the steel beam 1; during operation, a second pad 7 is arranged on the top of the steel beam 1 to reduce the transmission of vibration between the mounting surface and the steel beam 1; in this step, through the arrangement of the second pad 7, the damage of vibration to the fastening effect of the fastener is reduced, and the influence of vibration on the service life of the device is reduced.
[0042] Embodiment 6
[0043] like Figure 7 As shown, a level 8 is provided on the side of the support plate 23; the level 8 is provided in the middle of the side of the support plate 23; during operation, the level 8 is used to check the levelness of the support plate 23, and adjustments are made if it is not level; in this step, the accuracy of installation is improved and the errors caused by installation are reduced through the setting of the level 8.
[0044] During operation, the steel beam 1, the first reinforcing rib 11, the first supporting angle steel 12, the second reinforcing rib 13, the second supporting angle steel 14, and the third reinforcing rib 15 are fixed by welding or bolting. The painting of the first supporting angle steel 12 and the welding of other parts can be completed before leaving the factory. During on-site construction, the parts can be assembled with bolts. The first reinforcing rib 11, the second reinforcing rib 13, and the third reinforcing rib 15 play a role in stabilizing the structure. The second supporting angle steel 14 supports the first supporting angle steel 12. Before installation, the third supporting angle steel 21 is rotated to drive the first telescopic rod 22 to stretch and bring the supporting plate 23 into contact with the installation surface to improve the accuracy of installation. The fourth reinforcing rib 2 plays a fixing role. After adjusting the supporting plate 23, install it, and use the suction cup 32 is pressed against the mounting surface and adsorbed, and the push rod 3 moves downward to stretch the spring 31. When the support plate 23 moves downward, the suction cup 32 moves away from the mounting surface, and the spring 31 drives the push rod 3 to reset; lubricating oil is added to the rodless cavity. When the third supporting angle steel 21 rotates toward the steel beam 1, the push rod 4 drives the piston 43 to compress the rodless cavity, squeezes out the lubricating oil, and continues to lubricate the connection between the fourth reinforcing rib 2 and the third supporting angle steel 21 through the oil filling pipe 42; when adjusting the level of the support plate 23, the support plate 23 is kept consistent with the level of the mounting surface through the adjustment of the second telescopic rod 5; a first cushion block 6 is set between the mounting surface and the support plate 23 to reduce the transmission of vibration between the mounting surface and the device; a second cushion block 7 is set on the top of the steel beam 1 to reduce the transmission of vibration between the mounting surface and the steel beam 1.
[0045] The above shows and describes the basic principles, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principles of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A floor deck support frame used in assembled steel structure engineering, characterized by: The invention comprises a steel beam (1); a first reinforcing rib (11) is fixedly connected to the side surface of the steel beam (1) near the top; a first supporting angle steel (12) is bolted to the side surface of the first reinforcing rib (11); a second reinforcing rib (13) is fixedly connected to the bottom of the first supporting angle steel (12); a second supporting angle steel (14) is bolted to the side surface of the second reinforcing rib (13); a third reinforcing rib (15) is bolted to the other end of the second supporting angle steel (14); and the third reinforcing rib (15) is fixedly connected to the side surface of the steel beam (1).
2. A floor deck support frame for use in an assembled steel structure project according to claim 1, characterized in that: The side of the steel beam (1) away from the third reinforcing rib (15) is fixedly connected to a fourth reinforcing rib (2); the side of the fourth reinforcing rib (2) is hinged to a third supporting angle steel (21); the other end of the third supporting angle steel (21) is hinged to a supporting plate (23); the middle of the third supporting angle steel (21) is hinged to a first telescopic rod (22); the other end of the first telescopic rod (22) is hinged to the side of the steel beam (1) away from the third reinforcing rib (15).
3. A floor deck support frame for use in an assembled steel structure project according to claim 2, characterized in that: A push rod (3) is arranged in the middle of the support plate (23); a plurality of push rods (3) are arranged in the middle of the support plate (23); a spring (31) is sleeved on the outside of the push rod (3); one end of the spring (31) is fixedly connected to the bottom of the push rod (3); the other end of the push rod (3) is fixedly connected to the bottom of the support plate (23); and a suction cup (32) is fixedly connected to the top of the push rod (3).
4. The floor deck support frame used in the assembled steel structure engineering according to claim 1, characterized in that: A push rod (4) is hingedly connected to the side of the steel beam (1) away from the third reinforcing rib (15); a piston (43) is hingedly connected to the other end of the push rod (4); a piston cylinder (41) is arranged outside the piston (43); the side of the piston cylinder (41) is hingedly connected to the side of the third supporting angle steel (21); an oil injection pipe (42) is fixedly connected to the bottom of the piston cylinder (41); the other end of the oil injection pipe (42) is arranged at the connection between the fourth reinforcing rib (2) and the third supporting angle steel (21).
5. The floor deck support frame used in the assembled steel structure engineering according to claim 2, characterized in that: A second telescopic rod (5) is hingedly connected to the middle of the third supporting angle steel (21); and the other end of the second telescopic rod (5) is hingedly connected to the bottom of the supporting plate (23).
6. A floor deck support frame for use in an assembled steel structure project according to claim 2, characterized in that: A first cushion block (6) is fixedly connected to the top of the support plate (23); the first cushion block (6) is made of rubber.
7. The floor deck support frame used in the assembled steel structure engineering according to claim 1, characterized in that: A second cushion block (7) is arranged on the top of the steel beam (1); a plurality of groups of the second cushion blocks (7) are arranged on the top of the steel beam (1) and are evenly distributed at the four corners of the top of the steel beam (1).
8. The floor deck support frame used in the assembled steel structure engineering according to claim 2, characterized in that: A level meter (8) is arranged on the side of the support plate (23); the level meter (8) is arranged in the middle of the side of the support plate (23).