Monitoring type fence for building engineering construction
By designing sliding plates and limit rings in the monitoring enclosure for construction projects to facilitate maintenance, and setting up a sprinkler system and a monitoring system, the problems of aging water pipes and incomplete dust treatment are solved, and the service life and construction of the enclosure are improved. On-site security.
Patent Information
- Application Number
- CN202323419581.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-14
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-14
AI Technical Summary
The water pipes with monitoring enclosures used in existing construction projects are susceptible to aging due to exposure to the sun, the exposed pipelines are easily damaged, the sprinkler heads spray to the outside and affect pedestrian traffic, and the dust in the construction area is not completely handled.
An enclosure structure is designed that includes the first upright column, the second upright column and the third upright column. The main pipe is laid inside the first upright column, the branch pipe runs through the cross bar and the second and third upright column, and the sprinkler system and monitoring system are installed inside the first upright column. The top of the column, the sliding plate and the limit ring facilitate inspection, and the warning light improves nighttime safety.
It improves the service life and visual quality of the pipeline, prevents dust from overflowing, and enhances the safety performance and traffic safety of the construction site.
Smart Images

Figure CN221879093U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building engineering construction, and more specifically, particularly relates to a monitoring enclosure for building engineering construction. Background Art
[0002] During the construction of construction projects, it is necessary to set up fences to isolate them from the outside world. At present, the fences erected are generally simple connections between baffles and columns. Dust control in the construction area is often carried out by using fog cannons. However, due to the long-term construction or the limitation of the working surface, the fog cannon cannot carry out all-round dust reduction on site, and some overflow causes damage to the surrounding environment. In addition, the use of fog cannons for dust reduction will consume more machine shifts and manpower.
[0003] Publication No. CN218061827U provides a monitoring enclosure for construction engineering, including several columns and several enclosure plates, a support plate is horizontally arranged at the lower end of the column, an enclosure plate is arranged between every two columns, an upper plate is matched between the upper ends of the two columns, a water pipe is matched on the upper side of the upper plate, and several sprinkler heads are evenly arranged on the side of the water pipe, a support rod is vertically arranged on the side of a column, several limit blocks are fixedly arranged on the side of the column, and the limit blocks are all provided with limit slots matching the support rod and matched with fastening knobs, a fixed block corresponding to the lower end of the support rod is fixedly arranged on the side of the lower end of the column, and the fixed block is provided with a limit slot matching the support rod, and a monitoring camera is matched on the upper end of the support rod. It can realize all-round dust reduction in the construction site, saving time and effort.
[0004] However, the patent solution still has the following problems: first, the water pipes are installed on the upper part of the enclosure. In construction projects with a long construction period, the pipes will often become aged and fragile due to long-term exposure to the sun, making them more susceptible to wind damage or deliberate damage by unscrupulous persons; second, the pipelines are exposed on the upper part of the enclosure, which makes the visual quality of the enclosure poor; third, the sprinkler heads installed on the top of the enclosure will spray to the outside of the enclosure during the dust reduction process, affecting the normal passage of pedestrians and causing adverse effects on citizens. Utility Model Content
[0005] In order to overcome the above-mentioned shortcomings, the utility model aims to provide a monitoring type enclosure for construction engineering, which can solve the above problems.
[0006] A monitoring enclosure for construction engineering, comprising:
[0007] A plurality of baffles, wherein the top of each baffle is movably connected to a cross bar, and the bottom of each baffle is fixedly connected to a warning plate;
[0008] A column disposed between two of the enclosure boards, the column comprising a first column, a second column and a third column, the first column being disposed at both ends of a plurality of the enclosure boards, and the second column and the third column being staggered in equal amounts or in multiples between the two of the first columns;
[0009] A sprinkler system is arranged inside the cross bar and the columns, the sprinkler system comprises a main pipe and a branch pipe, the main pipe is arranged vertically inside the first column, the branch pipe sequentially and transversely penetrates the cross bar, the second column and the third column, the branch pipe is vertically fixedly connected to a connecting pipe, the connecting pipe is tilted and extends toward the inner side and the upper part of the enclosure, and the end of the connecting pipe can be detachably connected to a sprinkler head;
[0010] And a monitoring system is arranged on the top of the second column or the third column, and the monitoring system includes a solar panel, a battery and a camera; and a warning light is fixedly connected to the top of the second column or the third column.
[0011] Furthermore, the inner side wall of the first column is provided with an opening extending through from top to bottom, and the first sliding plate is slidably connected to the two side walls of the opening of the first column; the inside of the two side walls of the opening of the first column are fixedly connected to the first sliding rail, and the first sliding rail is slidably connected to the second sliding plate.
[0012] Furthermore, the heights of the first sliding plate and the second sliding plate are both set to 1 / 2 of the height of the first column, the first sliding plate is set on the upper part of the first column, and the second sliding plate is set on the lower part of the first column.
[0013] Furthermore, two first limiting rings and two second limiting rings are fixedly connected to the middle parts of the two outer side walls at the opening of the first column, and the two first limiting rings are arranged on the upper parts of the two second limiting rings; the two side walls of the first sliding plate close to the bottom are fixedly connected to the first telescopic rod, and the first telescopic rod is adapted to the first limiting ring and sleeved on the first limiting ring; the inner side wall of the second sliding plate close to the bottom is fixedly connected to two L-shaped first connecting rods, and the other end of the connecting rod is fixedly connected to the second telescopic rod, and the second telescopic rod is adapted to the second limiting ring.
[0014] Furthermore, an opening is provided on the upper portion of the inner wall of the second column, and the position of the second column opening is adapted to the branch pipe; a third sliding plate is slidably connected to both side walls of the second column opening, and second sliding rails are fixedly connected inside both side walls of the second column opening, and the second sliding rails are slidably connected to a fourth sliding plate.
[0015] Furthermore, the heights of the third sliding plate and the fourth sliding plate are both set to 1 / 2 of the height of the second column, the second sliding plate is set on the upper part of the second column, and the fourth sliding plate is set on the lower part of the second column.
[0016] Furthermore, two third limiting rings and two fourth limiting rings are fixedly connected to the middle parts of the two outer side walls at the opening of the second column, and the two third limiting rings are arranged on the upper parts of the two fourth limiting rings; the two side walls of the third sliding plate close to the bottom are fixedly connected to the third telescopic rod, and the third telescopic rod is adapted to and sleeved on the third limiting ring; the inner side wall of the fourth sliding plate close to the bottom is fixedly connected to two L-shaped second connecting rods, and the other end of the second connecting rod is fixedly connected to the fourth telescopic rod, and the fourth telescopic rod is adapted to the fourth limiting ring.
[0017] Furthermore, a groove is provided at the bottom of the cross bar, and the top of the enclosure plate is clamped in the groove; through holes for inserting the cross bar are provided on both side walls of the first column, the second column or the third column, and both ends of the cross bar are respectively inserted into the side walls of the second column and the first column or the third column.
[0018] When in use, first fix the first column to the bottom surface by anchor bolts, weld the enclosure plate, lay the branch pipe in the cross bar, bond the connecting pipe to the branch pipe through the side hole of the cross bar to connect the two, and the bottom of the cross bar is clamped on the top of the enclosure plate; then insert the cross bar into the side wall of the first column, connect the branch pipe with the main pipe through a three-way pipe fitting, insert the other end of the cross bar into the second column, connect the two branch pipes to be connected through a short joint and set the joint in the second column, finally weld the other side wall of the second column to clamp the upper part of the enclosure plate to the cross bar, and repeat the operation to install the third column or the second column according to the on-site pipeline joint situation. When the main pipe needs to be repaired, slide the second sliding plate upward and set the telescopic rod on the second limiting ring to check the lower half of the main pipe in the first column, or separate the first telescopic rod from the first limiting ring and slide it downward to the bottom of the first column to check the upper half of the main pipe; refer to the above operation to repair the branch pipe connection in the second column.
[0019] Beneficial Effects
[0020] Compared with the prior art, the beneficial effects of the utility model are:
[0021] ① Due to the provision of the first column, the main pipe can be laid inside the first column, and the cross bar can arrange the branch pipe therein, so that the visual quality of the enclosure with the sprinkler system is significantly improved, and the main pipe and the branch pipe can be prevented from aging and becoming fragile after being exposed to the sun, and at the same time, damage to the pipeline by outsiders can be avoided, thereby increasing the service life and reuse rate of the pipeline.
[0022] ② Since the first sliding plate and the second sliding plate are provided on the side wall of the first column, it is convenient to inspect and repair the main pipe, and the first limiting ring, the second limiting ring, the first telescopic rod and the second telescopic rod can limit the sliding plate, which is easy to operate. The setting of the spray system can effectively prevent the dust from overflowing on site, and avoid the damage of the dust overflow to the external environment of the enclosure.
[0023] ③ Since the side wall of the second column is provided with the third sliding plate and the fourth sliding plate, it is convenient for the maintenance of the branch pipe. At the same time, the limiting components of the third sliding plate and the fourth sliding plate can facilitate the opening and closing of the side wall during maintenance, which saves time and effort in operation.
[0024] ④ The monitoring system can monitor the construction site in real time, improving the safety performance of the construction site; at the same time, the warning lights can alert pedestrians and vehicles passing by at night to avoid accidents. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0026] Figure 1 It is a schematic diagram of the overall structure of the monitoring enclosure for construction engineering in this embodiment.
[0027] Figure 2 yes Figure 1 Enlarged view of point A in the middle.
[0028] Figure 3 yes Figure 1 Enlarged view of point B in the middle.
[0029] Figure 4 yes Figure 1 Enlarged view of point C in the middle.
[0030] Figure 5 yes Figure 1 Enlarged view of point D in the middle.
[0031] Figure 6This is a cross-sectional view of the first sliding plate of the monitoring enclosure for construction engineering in this embodiment.
[0032] Figure 7 This is a cross-sectional view of the second sliding plate of the monitoring enclosure for construction engineering in this embodiment.
[0033] Figure 8 It is a cross-sectional view of the third sliding plate of the monitoring enclosure for construction engineering in this embodiment.
[0034] Fig. 9 It is a cross-sectional view of the fourth sliding plate of the monitoring enclosure for construction engineering in this embodiment.
[0035] Fig.10 It is a schematic diagram of the groove structure of the monitoring enclosure for construction engineering in this embodiment.
[0036] Fig.11 It is a schematic diagram of the fixed frame structure of the monitoring enclosure for construction engineering in this embodiment.
[0037] Fig.12 It is a schematic diagram of the partial structure of the sprinkler system of the monitoring enclosure used for construction engineering in this embodiment.
[0038] In the figure: 1. enclosure plate; 2. warning light; 3. cross bar; 4. warning plate; 5. groove; 6. first column; 7. second column; 8. third column; 9. fixing frame; 10. limiting protrusion; 11. main pipe; 12. branch pipe; 13. connecting pipe; 14. nozzle; 15. solar panel; 16. battery; 17. camera; 18. first sliding plate; 19. first slide rail; 20. second sliding plate; 21. first limiting ring; 22. second limiting ring; 23. first telescopic rod; 24. second telescopic rod; 25. third sliding plate; 26. second slide rail; 27. fourth sliding plate; 28. third limiting ring; 29. fourth limiting ring; 30. third telescopic rod; 31. fourth telescopic rod. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Specific embodiment:
[0041] A monitoring enclosure for construction engineering, such as Figure 1As shown, it includes a plurality of baffle plates 1, columns fixedly connected between two baffle plates 1, a spray system is arranged inside the baffle plates 1 and the columns, and a monitoring system or warning light 2 is arranged on the top of the columns.
[0042] Specifically, the enclosure plate 1 is a rectangular frame, the side walls and bottom walls of which are fixedly connected to the rectangular tube frame, and the middle part is fixedly connected to the horizontal support rod; the top of the enclosure plate 1 is movably connected to the cross bar 3, and the bottom is fixedly connected to the warning plate 4. The bottom of the cross bar 3 is provided with a groove 5, see Fig.10 The top of the enclosure plate 1 is clamped in the groove 5; the columns include a first column 6, a second column 7 and a third column 8, and the two side walls of the first column 6, the second column 7 or the third column 8 are provided with through holes for inserting the cross bar 3, and the through holes inside the first column 6, the second column 7 or the third column 8 are fixedly connected to the fixing frame 9 for supporting the cross bar 3, see Fig.11 The cross bar 3 is inserted into the first column 6, the second column 7 or the third column 8 and supported on the fixed frame 9. The fixed frame 9 is provided with a limiting protrusion 10 for limiting the cross bar 3. The two ends of the cross bar 3 are respectively inserted into the side walls of the second column 7 and the first column 6 or the third column 8. The cross bar 3 serves as a link between the enclosure plate 1 and the column, which enhances the overall performance of the structural connection.
[0043] like Figure 1 As shown, the first columns 6 are arranged at both ends of a plurality of enclosure panels 1, and the second columns 7 and the third columns 8 are arranged between the two first columns 6 in equal amounts or in multiples. Fig.12 As shown, the sprinkler system includes a main pipe 11 and a branch pipe 12. The main pipe 11 is vertically arranged inside the first column 6. The branch pipe 12 runs horizontally through the crossbar 3, the second column 7 and the third column 8 in turn. The branch pipe 12 is vertically fixed to the connecting pipe 13. The connecting pipe 13 extends to the inside and the upper part of the enclosure. The end of the connecting pipe 13 can be detachably connected to the nozzle 14. The nozzle 14 preferably uses an atomizing nozzle. By setting the main pipe 11 and the branch pipe 12 inside the crossbar 3 and the column, the aging and fragility of the pipeline caused by exposure to the sun can be prevented, and the pipeline can be prevented from being damaged by wind or intentionally damaged by illegal personnel, and the overall visual quality of the enclosure can be improved. The monitoring system includes a solar panel 15, a battery 16 and a camera 17. The top of the second column 7 or the third column 8 is fixedly connected to a warning light 2. According to the on-site monitoring requirements, the monitoring system is fixedly connected to the top of the second column 7 or the third column 8 through a connecting bracket and bolts. The top of the remaining second column 7 or the third column 8 is provided with a warning light 2. The monitoring system can monitor the conditions inside the construction site and around the fence in real time. The warning lights 2 and the warning board 4 are provided to remind pedestrians and vehicles passing near the fence at night to avoid accidents.
[0044] Please also see Figure 1 , Figure 2 and Figure 3 The inner side wall of the first column 6 is provided with an opening extending through from top to bottom. Preferably, a C-shaped steel is used as the first column 6. The first sliding plate 18 is slidably connected to the two side walls of the opening of the first column 6; the first slide rail 19 is fixedly connected to the inside of the two side walls of the opening of the first column 6. Figure 6 The first slide rail 19 is slidably connected to the second slide plate 20, see Figure 7 The height of the first sliding plate 18 and the second sliding plate 20 are both set to 1 / 2 of the height of the first column 6. The first sliding plate 18 is set at the upper part of the first column 6, and the second sliding plate 20 is set at the lower part of the first column 6. The middle of the two outer side walls at the opening of the first column 6 are respectively fixedly connected to two first limiting rings 21 and two second limiting rings 22, and the two first limiting rings 21 are set at the upper part of the two second limiting rings 22; the two side walls of the first sliding plate 18 near the bottom are fixedly connected to the first telescopic rod 23, and the first telescopic rod 23 is adapted to the first limiting ring 21 and sleeved on the first limiting ring 21; the inner side wall of the second sliding plate 20 near the bottom is fixedly connected to two L-shaped first connecting rods, and the other end of the connecting rod is fixedly connected to the second telescopic rod 24, and the second telescopic rod 24 is adapted to the second limiting ring 22. By sliding the first sliding plate 18 and the second sliding plate 20 up and down, the first column 6 can be opened to facilitate the inspection of the internal main pipe 11.
[0045] Please also see Figure 1 , Figure 4 and Figure 5 The branch pipe 12 running through the second column 7 is connected with a short joint. The second column 7 is made of a rectangular tube with the same length and width welded with a C-shaped steel. The upper part of the inner wall of the second column 7 is provided with an opening, i.e., a C-shaped steel section. The position of the opening of the second column 7 is adapted to the branch pipe 12. The two side walls of the opening of the second column 7 are slidably connected to the third sliding plate 25. The two side walls of the opening of the second column 7 are fixedly connected to the second slide rail 26. Figure 8 The second slide rail 26 is slidably connected to the fourth slide plate 27, see Fig. 9The height of the third sliding plate 25 and the fourth sliding plate 27 are both set to 1 / 2 of the height of the second column 7. The third sliding plate 25 is set at the upper part of the second column 7, and the fourth sliding plate 27 is set at the lower part of the second column 7. The middle of the two outer side walls at the opening of the second column 7 are respectively fixedly connected to two third limiting rings 28 and two fourth limiting rings 29, and the two third limiting rings 28 are set at the upper part of the two fourth limiting rings 29; the two side walls of the third sliding plate 25 near the bottom are fixedly connected to the third telescopic rod 30, and the third telescopic rod 30 is adapted to the third limiting ring 28 and sleeved on the third limiting ring 28; the inner side wall of the fourth sliding plate 27 near the bottom is fixedly connected to two L-shaped second connecting rods, and the other end of the second connecting rod is fixedly connected to the fourth telescopic rod 31, and the fourth telescopic rod 31 is adapted to the fourth limiting ring 29. By sliding the third sliding plate 25 and the fourth sliding plate 27 up and down, the second column 7 can be opened to facilitate the inspection of the internal branch pipe 12. The third column 8 is made of a rectangular tube and is used to connect the baffle plate 1 and the cross bar 3. A branch pipe 12 without a joint runs through the third column 8.
[0046] When in use, first fix the first column 6 to the bottom surface with anchor bolts, weld the baffle plate 1, lay the branch pipe 12 in the cross bar 3, and bond the connecting pipe 13 to the branch pipe 12 through the side hole of the cross bar 3 to connect the two, and the bottom of the cross bar 3 is clamped on the top of the baffle plate; then insert the cross bar 3 into the side wall of the first column 6, connect the branch pipe 12 and the main pipe 11 through a three-way pipe fitting, and insert the other end of the cross bar 3 into the second column 7, connect the two branch pipes 12 to be connected through a short joint and set the joint in the second column 7, finally, weld the baffle plate 1 on the other side wall of the second column 7 and clamp the cross bar 3 on the upper part of the baffle plate, and repeat the operation to install the third column 8 or the second column 7 according to the on-site pipeline joint conditions. When the main pipe 11 needs to be inspected, the second sliding plate 20 is slid upward and the telescopic rod is sleeved on the second limiting ring 22 to check the lower half of the main pipe 11 in the first column 6, or the first telescopic rod 23 is detached from the first limiting ring 21 and slid downward to the bottom of the first column 6 to check the upper half of the main pipe 11; referring to the above operation, the connection of the branch pipe 12 in the second column 7 can be inspected.
[0047] In the monitoring enclosure for construction of the construction project in this embodiment, due to the provision of the first column 6, the main pipe 11 can be laid inside the first column 6, and the cross bar 3 can be provided with the branch pipe 12 inside, so that the visual quality of the enclosure with the spray system is significantly improved, and the main pipe 11 and the branch pipe 12 can be prevented from aging and becoming fragile after being exposed to the sun, and at the same time, damage to the pipes by outsiders can be avoided, thereby improving the service life and reuse rate of the pipes. Since the side wall of the first column 6 is provided with the first sliding plate 18 and the second sliding plate 20, it is convenient to inspect and repair the main pipe 11, and the first limiting ring 21, the second limiting ring 22, the first telescopic rod 23 and the second telescopic rod 24 can limit the sliding plate, which is easy to operate. The provision of the spray system can effectively prevent the dust from overflowing on site, and avoid the damage of the dust overflow to the external environment of the enclosure. Since the side wall of the second column 7 is provided with the third sliding plate 25 and the fourth sliding plate 27, it is convenient to inspect the branch pipe 12. At the same time, the limiting components of the third sliding plate 25 and the fourth sliding plate 27 can facilitate the opening and closing of the side wall during inspection, which saves time and effort. The monitoring system can monitor the construction site in real time, improving the safety performance of the construction site; at the same time, the warning light 2 can remind pedestrians and vehicles passing at night to avoid accidents.
[0048] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0049] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A monitoring enclosure for construction engineering, characterized in that: include: A plurality of enclosure plates (1), wherein the top of each enclosure plate (1) is movably connected to a cross bar (3), and the bottom of each enclosure plate (1) is fixedly connected to a warning plate (4); A column arranged between two of the enclosure plates (1), the column comprising a first column (6), a second column (7) and a third column (8), the first column (6) being arranged at both ends of a plurality of the enclosure plates (1), the second column (7) and the third column (8) being arranged between two of the first columns (6) in equal or multiple staggered arrangements; A spray system is arranged inside the cross bar (3) and the columns, the spray system comprising a main pipe (11) and a branch pipe (12), the main pipe (11) is arranged vertically inside the first column (6), the branch pipe (12) sequentially and transversely penetrates the cross bar (3), the second column (7) and the third column (8), the branch pipe (12) is vertically fixedly connected to a connecting pipe (13), the connecting pipe (13) is tilted and extends toward the inner side and the upper part of the enclosure, and the end of the connecting pipe (13) is detachably connected to a spray head (14); and a monitoring system arranged on the top of the second column (7) or the third column (8), the monitoring system comprising a solar panel (15), a storage battery (16) and a camera (17); a warning light (2) is fixedly connected to the top of the second column (7) or the third column (8).
2. The monitoring enclosure for construction engineering according to claim 1 is characterized in that: The inner side wall of the first column (6) is provided with an opening which passes through from top to bottom, and the two side walls of the opening of the first column (6) are slidably connected to a first sliding plate (18); the inside of the two side walls of the opening of the first column (6) are both fixedly connected to a first sliding rail (19), and the first sliding rail (19) is slidably connected to a second sliding plate (20).
3. The monitoring enclosure for construction engineering according to claim 2 is characterized in that: The heights of the first sliding plate (18) and the second sliding plate (20) are both set to 1 / 2 of the height of the first column (6); the first sliding plate (18) is set on the upper part of the first column (6), and the second sliding plate (20) is set on the lower part of the first column (6).
4. The monitoring enclosure for construction engineering according to claim 3 is characterized in that: Two first limiting rings (21) and two second limiting rings (22) are fixedly connected to the middle of the two outer side walls at the opening of the first column (6), and the two first limiting rings (21) are arranged on the upper parts of the two second limiting rings (22); the two side walls of the first sliding plate (18) close to the bottom are fixedly connected to the first telescopic rod (23), and the first telescopic rod (23) is adapted to the first limiting ring (21) and is sleeved on the first limiting ring (21); the inner side wall of the second sliding plate (20) close to the bottom is fixedly connected to two L-shaped first connecting rods, and the other end of the connecting rod is fixedly connected to the second telescopic rod (24), and the second telescopic rod (24) is adapted to the second limiting ring (22).
5. The monitoring enclosure for construction engineering according to claim 1 is characterized in that: An opening is provided at the upper portion of the inner wall of the second column (7), and the position of the opening of the second column (7) is adapted to the branch pipe (12); a third sliding plate (25) is slidably connected to the two side walls of the opening of the second column (7), and a second sliding rail (26) is fixedly connected inside the two side walls of the opening of the second column (7), and the second sliding rail (26) is slidably connected to a fourth sliding plate (27).
6. The monitoring enclosure for construction engineering according to claim 5 is characterized by: The heights of the third sliding plate (25) and the fourth sliding plate (27) are both set to 1 / 2 of the height of the second column (7); the second sliding plate (20) is set on the upper part of the second column (7), and the fourth sliding plate (27) is set on the lower part of the second column (7).
7. The monitoring enclosure for construction engineering according to claim 6 is characterized in that: Two third limiting rings (28) and two fourth limiting rings (29) are fixedly connected to the middle of the two outer side walls at the opening of the second column (7), and the two third limiting rings (28) are arranged on the upper parts of the two fourth limiting rings (29); the two side walls of the third sliding plate (25) close to the bottom are fixedly connected to the third telescopic rod (30), and the third telescopic rod (30) is adapted to the third limiting ring (28) and sleeved on the third limiting ring (28); the inner side wall of the fourth sliding plate (27) close to the bottom is fixedly connected to two L-shaped second connecting rods, and the other end of the second connecting rod is fixedly connected to the fourth telescopic rod (31), and the fourth telescopic rod (31) is adapted to the fourth limiting ring (29).
8. The monitoring enclosure for construction engineering according to claim 7 is characterized in that: A groove (5) is provided at the bottom of the cross bar (3), and the top of the enclosure plate (1) is snap-fitted into the groove (5); through holes for inserting the cross bar (3) are provided on the two side walls of the first column (6), the second column (7) or the third column (8), and the two ends of the cross bar (3) are respectively inserted into the side walls of the second column (7) and the first column (6) or the third column (8).