Pile foundation underpinning structure in tunnel

By using arc-shaped pallets and steel beam structures in the pile foundation underpinning device, combined with the dual fixation method of concrete pouring, the problem of poor fixation effects in the existing technology is solved, and more stable pile foundation support and pressure sharing are achieved. .

CN221879410UActive Publication Date: 2024-10-22NUCLEAR IND HUANAN CONSTR ENG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420378120.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2024-10-22
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

When the existing pile foundation underpinning device is in use, it only has a single structure to fix the lifting plate at the bottom of the pile foundation. The fixing effect is not good, and the relative area of ​​the lifting plate is small, resulting in the lifting plate bearing greater pressure. It cannot provide good support.

Method used

Adopt a structure including an arc-shaped upper clamping plate, an arc-shaped lower clamping plate, an arc-shaped bottom supporting plate and the original pile foundation. The No. 2 steel beam is preset through the arc-shaped lower clamping plate, and the arc-shaped bottom supporting plate is fixed with a No. 2 bolt. The plate is fixed under the No. 2 steel beam, and then the arc bottom supporting plate is connected to the No. 2 steel beam. The steel beam is welded and fixed, and then concrete is poured between the arc lower clamping plate and the arc bottom supporting plate to form the second concrete layer, which realizes double fixation of the arc bottom supporting plate, improves the fixing effect, and passes the larger The curved bottom plate shares the pressure.

Benefits of technology

Through double fixation and the support of the concrete layer, the fixation effect of the pile foundation underpinning is significantly improved, and the pressure can be shared more effectively to ensure the stable support of the pile foundation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221879410U_ABST
    Figure CN221879410U_ABST
Patent Text Reader

Abstract

The utility model discloses a tunnel inner pile foundation underpinning structure which comprises an arc-shaped upper clamping plate, an arc-shaped lower clamping plate, an arc-shaped bottom supporting plate and an original pile foundation, the arc-shaped lower clamping plate is arranged under the arc-shaped upper clamping plate, and the arc-shaped bottom supporting plate is arranged under the arc-shaped lower clamping plate. The bottom end of the original pile foundation penetrates through the arc-shaped upper clamping plate and the arc-shaped lower clamping plate and abuts against the arc-shaped bottom supporting plate, and a first steel beam is welded between the arc-shaped upper clamping plate and the arc-shaped lower clamping plate. The arc-shaped bottom supporting plate and the second steel beam are welded and fixed to achieve primary fixing of the arc-shaped bottom supporting plate, then the arc-shaped lower clamping plate, the second steel beam and the arc-shaped bottom supporting plate are connected into a whole through the second concrete layer, further fixing of the arc-shaped bottom supporting plate is completed, and double fixing of the arc-shaped bottom supporting plate is achieved. And meanwhile, the relative area of the arc-shaped bottom supporting plate is large, the pressure from an original pile foundation can be shared, and therefore the good supporting effect is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pile foundation underpinning, in particular to a pile foundation underpinning structure in a tunnel. Background Art

[0002] Pile underpinning is a general term for all foundation underpinning methods that use pile foundations. It is used for foundations such as soft clay, loose sand, saturated loess, collapsible loess, plain fill and miscellaneous fill. The content of pile underpinning is very extensive. In foreign countries, there are pre-test pile underpinning and driven pile underpinning. Commonly used pile underpinning methods in China include driven pile underpinning, anchor static pile underpinning, cast-in-place pile underpinning and root pile underpinning.

[0003] When some existing pile foundation replacement devices are in use, only a single structure is provided to fix the support plate at the bottom of the pile foundation. The fixing effect is poor, and the support plate has a relatively small area, resulting in a large pressure on the support plate, which cannot provide a good support effect.

[0004] For example, a pile foundation supporting device for replacing pile foundation in a tunnel is disclosed with announcement number CN209243795U. In this patent, a hollow steel tray is pre-embedded into the pile foundation according to the designed position, and an I-beam is welded to the hollow steel tray. After the initial support is completed, an H-shaped steel arch frame is quickly erected to form a pile-supporting arch steel frame, and the hollow steel tray is welded to the pile-supporting arch steel frame. The upper part of the I-beam is welded to the upper part of the H-shaped steel frame to form a first-layer supporting structure. Arch steel bars are constructed to form a steel grating. The steel bars should be tied around the location of the piles. At the same time, the channel steel and the pile-supporting arch steel frame are pre-welded. After the steel grating is constructed, the pile-supporting arch concrete is poured. After the concrete strength reaches the designed strength, the pile foundation intruding into the tunnel is cut off, and the solid steel tray is welded to the channel steel pre-embedded in the arch to form a second-layer supporting structure.

[0005] However, one end of the connecting piece of the patent is welded and fixed to the pile supporting arch steel frame, and the other end extends outside the pile supporting arch and is welded and fixed to the solid steel pallet. The solid steel pallet is fixed only by the connecting piece, and the fixing effect is poor. In addition, the solid steel pallet has a relatively small area, resulting in a large pressure on the solid steel pallet, which cannot play a good supporting role.

[0006] Therefore, it is necessary to invent a tunnel pile foundation underpinning structure to solve the above problems. Utility Model Content

[0007] The purpose of the utility model is to provide a pile foundation replacement structure in a tunnel to solve the problem that some existing pile foundation replacement devices in the technology only have a single structure to fix the supporting plate at the bottom of the pile foundation when in use, the fixing effect is poor, and the supporting plate has a relatively small area, resulting in a large pressure on the supporting plate and failure to play a good supporting role.

[0008] In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pile foundation replacement structure in a tunnel, comprising an arc-shaped upper clamping plate, an arc-shaped lower clamping plate, an arc-shaped bottom supporting plate and an original pile foundation, wherein the arc-shaped lower clamping plate is arranged directly below the arc-shaped upper clamping plate, and the arc-shaped bottom supporting plate is arranged directly below the arc-shaped lower clamping plate, the bottom end of the original pile foundation passes through the arc-shaped upper clamping plate and the arc-shaped lower clamping plate and abuts against the arc-shaped bottom supporting plate, a No. 1 steel beam is welded between the arc-shaped upper clamping plate and the arc-shaped lower clamping plate, a No. 1 bolt is arranged above the arc-shaped lower clamping plate, a No. 2 steel beam is arranged between the arc-shaped lower clamping plate and the arc-shaped bottom supporting plate, the bottom end of the No. 1 bolt passes through the arc-shaped lower clamping plate and is threadedly connected to the top of the No. 2 steel beam, the top of the No. 2 steel beam is welded to the bottom of the arc-shaped lower clamping plate, a No. 2 bolt is arranged below the arc-shaped bottom supporting plate, the top end of the No. 2 bolt passes through the arc-shaped bottom supporting plate and is threadedly connected to the bottom of the No. 2 steel beam, and the bottom of the No. 2 steel beam is welded to the top of the arc-shaped bottom supporting plate.

[0009] Preferably, an upper annular groove and a lower annular groove are provided on the surface of one end of the original pile foundation close to the bottom, and the lower annular groove is arranged directly below the upper annular groove. The arrangement of the upper annular groove and the lower annular groove facilitates the initial clamping and limiting of the arc-shaped upper clamping plate and the arc-shaped lower clamping plate with the original pile foundation.

[0010] Preferably, the arc-shaped upper clamping plate is composed of an upper clamping plate No. 1 and an upper clamping plate No. 2, and the upper clamping plate No. 1 and the upper clamping plate No. 2 are respectively arranged on both sides of the original pile foundation, and the upper clamping plate and the arc-shaped lower clamping plate are equally divided into two clamping plates, which is convenient for clamping operation.

[0011] Preferably, the surfaces of the No. 1 upper clamping plate and the No. 2 upper clamping plate are both provided with a first arc-shaped notch, and the two first arc-shaped notches are both engaged with the upper ring groove.

[0012] Preferably, the arc-shaped lower clamping plate is composed of a No. 1 lower clamping plate and a No. 2 lower clamping plate, and the No. 1 lower clamping plate and the No. 2 lower clamping plate are respectively arranged on both sides of the original pile foundation.

[0013] Preferably, the surfaces of the No. 1 lower clamping plate and the No. 2 lower clamping plate are both provided with second arc-shaped notches, and the two second arc-shaped notches are both engaged with the lower ring groove.

[0014] Preferably, the No. 1 steel beam is made of I-beam, a No. 1 through groove is opened in the middle of the No. 1 steel beam, and the No. 2 steel beam is made of H-beam, a No. 2 through groove is opened in the middle of the No. 2 steel beam. The provision of the No. 1 through groove and the No. 2 through groove facilitates the collection and connection of concrete.

[0015] Preferably, a first concrete layer is cast between the arc-shaped upper card plate and the arc-shaped lower card plate, and a second concrete layer is cast between the arc-shaped lower card plate and the arc-shaped bottom support plate. The first concrete layer provides initial support to the original pile foundation, and the second concrete layer provides further support to the original pile foundation.

[0016] In the above technical solution, the technical effects and advantages provided by the utility model are:

[0017] By pre-placing No. 2 steel beam on the arc-shaped lower pallet, fixing the arc-shaped bottom support plate under the No. 2 steel beam with No. 2 bolts, and then welding the arc-shaped bottom support plate and the No. 2 steel beam to fix them, the arc-shaped bottom support plate can be initially fixed, and then concrete is poured between the arc-shaped lower pallet and the arc-shaped bottom support plate to form a No. 2 concrete layer, and the arc-shaped lower pallet, the No. 2 steel beam and the arc-shaped bottom support plate are connected into a whole through the No. 2 concrete layer, and after the No. 2 concrete layer is completely solidified, the arc-shaped bottom support plate is further fixed. Double fixing of the arc-shaped bottom support plate is beneficial to improve the fixing effect. At the same time, the arc-shaped bottom support plate has a relatively large area and can share the pressure from the original pile foundation, thereby playing a good supporting role. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0019] Figure 2 This is a schematic diagram of the structure of the utility model after pouring the first concrete layer;

[0020] Figure 3 This is a schematic diagram of the structure of the utility model after pouring the second concrete layer;

[0021] Figure 4 It is a structural schematic diagram of the arc-shaped upper clamping plate, the arc-shaped lower clamping plate and the original pile foundation of the utility model;

[0022] Figure 5 It is a schematic diagram of the structure of the No. 1 steel beam and the No. 2 steel beam of the utility model.

[0023] Description of reference numerals:

[0024] 1. Arc-shaped upper clamp; 2. Arc-shaped lower clamp; 3. Arc-shaped bottom support plate; 4. Original pile foundation; 5. No. 1 steel beam; 6. No. 1 bolt; 7. No. 2 steel beam; 8. No. 2 bolt; 9. Upper ring groove; 10. Lower ring groove; 11. No. 1 upper clamp; 12. No. 2 upper clamp; 13. First arc-shaped notch; 14. No. 1 lower clamp; 15. No. 2 lower clamp; 16. Second arc-shaped notch; 17. No. 1 through groove; 18. No. 2 through groove; 19. No. 1 concrete layer; 20. No. 2 concrete layer. DETAILED DESCRIPTION

[0025] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0026] The utility model provides Figure 1-5The pile foundation replacement structure in the tunnel shown in the figure comprises an arc-shaped upper card plate 1, an arc-shaped lower card plate 2, an arc-shaped bottom supporting plate 3 and an original pile foundation 4, the arc-shaped lower card plate 2 is arranged directly below the arc-shaped upper card plate 1, the arc-shaped bottom supporting plate 3 is arranged directly below the arc-shaped lower card plate 2, the bottom end of the original pile foundation 4 passes through the arc-shaped upper card plate 1 and the arc-shaped lower card plate 2 and abuts against the arc-shaped bottom supporting plate 3, a No. 1 steel beam 5 is welded between the arc-shaped upper card plate 1 and the arc-shaped lower card plate 2, and a steel beam 5 is welded between the arc-shaped upper card plate 1 and the arc-shaped lower card plate 2. A No. 1 bolt 6 is provided, and a No. 2 steel beam 7 is provided between the arc-shaped lower clamping plate 2 and the arc-shaped bottom supporting plate 3. The bottom end of the No. 1 bolt 6 penetrates the arc-shaped lower clamping plate 2 and is threadedly connected to the top of the No. 2 steel beam 7. The top of the No. 2 steel beam 7 is welded to the bottom of the arc-shaped lower clamping plate 2. A No. 2 bolt 8 is provided below the arc-shaped bottom supporting plate 3. The top end of the No. 2 bolt 8 penetrates the arc-shaped bottom supporting plate 3 and is threadedly connected to the bottom of the No. 2 steel beam 7. The bottom of the No. 2 steel beam 7 is welded to the top of the arc-shaped bottom supporting plate 3.

[0027] By adopting the above technical solution, the No. 2 steel beam 7 is fixed to the bottom of the arc-shaped lower card plate 2 by the No. 1 bolt 6, and then the No. 2 steel beam 7 and the arc-shaped lower card plate 2 are welded and fixed, then the No. 1 steel beam 5 is welded to the top of the arc-shaped lower card plate 2, and then the No. 1 steel beam 5 and the arc-shaped upper card plate 1 are welded and fixed, and then concrete is poured between the arc-shaped upper card plate 1 and the arc-shaped lower card plate 2 to form a No. 1 concrete layer 19, and the arc-shaped upper card plate 1, the arc-shaped lower card plate 2, the No. 1 steel beam 5 and the original pile foundation 4 are connected into a whole through the No. 1 concrete layer 19, and after the No. 1 concrete layer 19 is completely solidified, the bottom end of the original pile foundation 4 is cut off , place the arc bottom support plate 3 just below the arc lower card plate 2, at this time, the arc bottom support plate 3 is abutted against the cutoff part, and then the arc bottom support plate 3 is fixed to the bottom of the No. 2 steel beam 7 by the No. 2 bolt 8, and then the No. 2 steel beam 7 and the arc bottom support plate 3 are welded and fixed to achieve the preliminary fixation of the arc bottom support plate 3, and finally concrete is poured between the arc lower card plate 2 and the arc bottom support plate 3 to form a No. 2 concrete layer 20, and the arc lower card plate 2, the No. 2 steel beam 7 and the arc bottom support plate 3 are connected into a whole through the No. 2 concrete layer 20, and after the No. 2 concrete layer 20 is completely solidified, the arc bottom support plate 3 is further fixed.

[0028] In one aspect of the present embodiment, an upper annular groove 9 and a lower annular groove 10 are formed on the surface of one end of the original pile foundation 4 near the bottom, and the lower annular groove 10 is arranged directly below the upper annular groove 9. The arc-shaped upper clamping plate 1 is composed of a No. 1 upper clamping plate 11 and a No. 2 upper clamping plate 12. The No. 1 upper clamping plate 11 and the No. 2 upper clamping plate 12 are respectively arranged on both sides of the original pile foundation 4. The surfaces of the No. 1 upper clamping plate 11 and the No. 2 upper clamping plate 12 are both provided with a first arc-shaped notch 13, and the two first arc-shaped notches 13 are both clamped with the upper annular groove 9. The arc-shaped lower clamping plate 2 is composed of a No. 1 lower clamping plate 14 and a No. 2 lower clamping plate 15. The clamping plate 14 and the second lower clamping plate 15 are respectively arranged on both sides of the original pile foundation 4. The surfaces of the No. 1 lower clamping plate 14 and the No. 2 lower clamping plate 15 are both provided with a second arc-shaped notch 16, and the two second arc-shaped notches 16 are both clamped with the lower annular groove 10. The No. 1 steel beam 5 is made of I-beam, and a No. 1 through groove 17 is opened in the middle of the No. 1 steel beam 5. The No. 2 steel beam 7 is made of H-shaped steel, and a No. 2 through groove 18 is opened in the middle of the No. 2 steel beam 7. A No. 1 concrete layer 19 is cast between the arc-shaped upper clamping plate 1 and the arc-shaped lower clamping plate 2, and a No. 2 concrete layer 20 is cast between the arc-shaped lower clamping plate 2 and the arc-shaped bottom support plate 3.

[0029] By adopting the above technical scheme, the setting of the upper annular groove 9 and the lower annular groove 10 facilitates the initial clamping and limiting of the arc-shaped upper clamping plate 1 and the arc-shaped lower clamping plate 2 with the original pile foundation 4. The arc-shaped upper clamping plate 1 and the arc-shaped lower clamping plate 2 are equally divided into two clamping plates, which is convenient for the clamping operation. The No. 1 steel beam 5 is used to connect the arc-shaped upper clamping plate 1 and the arc-shaped lower clamping plate 2, and the No. 2 steel beam 7 is used to connect the arc-shaped lower clamping plate 2 and the arc-shaped bottom support plate 3. The setting of the No. 1 through groove 17 and the No. 2 through groove 18 facilitates the collection and connection of concrete together, and the No. 1 concrete layer 19 plays a preliminary supporting role for the original pile foundation 4, and the No. 2 concrete layer 20 plays a further supporting role for the original pile foundation 4.

[0030] Working principle of this utility model:

[0031] Refer to the instruction manual Figure 1-5When using the utility model, firstly, a certain size of construction space is dug out around the original pile foundation 4, and preliminary support is done, then an upper annular groove 9 and a lower annular groove 10 are opened on the surface of the original pile foundation 4, and then the No. 1 lower card plate 14 and the No. 2 lower card plate 15 are moved closer to the original pile foundation 4 from both sides, and the second arc-shaped notch 16 on the surface of the No. 1 lower card plate 14 and the No. 2 lower card plate 15 is clamped with the lower annular groove 10, and then the No. 2 steel beam 7 is fixed to the bottom of the arc-shaped lower card plate 2 by the No. 1 bolt 6, and then the No. 2 lower card plate 15 is clamped with the No. 2 steel beam 7. The top of the No.1 steel beam 7 is welded and fixed to the bottom of the arc-shaped lower card plate 2, and then the No.1 steel beam 5 is welded to the top of the arc-shaped lower card plate 2, and then the No.1 upper card plate 11 and the No.2 upper card plate 12 are moved closer to the original pile foundation 4 from both sides, and the first arc-shaped notch 13 on the surface of the No.1 upper card plate 11 and the No.2 upper card plate 12 is clamped with the upper annular groove 9, and then the top of the No.1 steel beam 5 is welded and fixed to the bottom of the arc-shaped upper card plate 1, and then concrete is poured between the arc-shaped upper card plate 1 and the arc-shaped lower card plate 2, so as to form the No.1 steel beam 5. Concrete layer 19, the arc-shaped upper card plate 1, the arc-shaped lower card plate 2, the first steel beam 5 and the original pile foundation 4 are connected into a whole through the first concrete layer 19. After the first concrete layer 19 is completely solidified, the bottom end of the original pile foundation 4 is cut off first, and the cut-off part is processed accordingly, and the arc-shaped bottom support plate 3 is placed directly below the arc-shaped lower card plate 2. At this time, the arc-shaped bottom support plate 3 is abutted against the cut-off part, and the second steel beam 7 is located between the arc-shaped lower card plate 2 and the arc-shaped bottom support plate 3, and then the second screw is first used to fix the arc-shaped lower card plate 2. The bolts 8 fix the arc-shaped bottom support plate 3 to the bottom of the No. 2 steel beam 7, and then the bottom of the No. 2 steel beam 7 is welded and fixed to the top of the arc-shaped bottom support plate 3 to achieve preliminary fixation of the arc-shaped bottom support plate 3, and finally concrete is poured between the arc-shaped lower clamping plate 2 and the arc-shaped bottom support plate 3 to form a No. 2 concrete layer 20, and the arc-shaped lower clamping plate 2, the No. 2 steel beam 7 and the arc-shaped bottom support plate 3 are connected into a whole through the No. 2 concrete layer 20, and after the No. 2 concrete layer 20 is completely solidified, the arc-shaped bottom support plate 3 is further fixed.

Claims

1. A pile foundation underpinning structure in a tunnel, comprising an arc-shaped upper clamping plate (1), an arc-shaped lower clamping plate (2), an arc-shaped bottom supporting plate (3) and an original pile foundation (4), Features: The arc-shaped lower clamping plate (2) is arranged directly below the arc-shaped upper clamping plate (1), and the arc-shaped bottom supporting plate (3) is arranged directly below the arc-shaped lower clamping plate (2). The bottom end of the original pile foundation (4) passes through the arc-shaped upper clamping plate (1) and the arc-shaped lower clamping plate (2) and abuts against the arc-shaped bottom supporting plate (3). A No. 1 steel beam (5) is welded between the arc-shaped upper clamping plate (1) and the arc-shaped lower clamping plate (2). A No. 1 bolt (6) is arranged above the arc-shaped lower clamping plate (2). A No. 2 steel beam (7) is arranged between the arc-shaped lower clamping plate (2) and the arc-shaped lower clamping plate (2). The bottom end of the No. 1 bolt (6) passes through the arc-shaped lower clamping plate (2) and is threadedly connected to the top of the No. 2 steel beam (7). The top of the No. 2 steel beam (7) is welded to the bottom of the arc-shaped lower clamping plate (2). A No. 2 bolt (8) is arranged below the arc-shaped bottom supporting plate (3). The top end of the No. 2 bolt (8) passes through the arc-shaped bottom supporting plate (3) and is threadedly connected to the bottom of the No. 2 steel beam (7). The bottom of the No. 2 steel beam (7) is welded to the top of the arc-shaped bottom supporting plate (3).

2. A tunnel pile foundation underpinning structure according to claim 1, Features: An upper annular groove (9) and a lower annular groove (10) are provided on the surface of one end of the original pile foundation (4) close to the bottom, and the lower annular groove (10) is arranged directly below the upper annular groove (9).

3. The tunnel pile foundation underpinning structure according to claim 2, Features: The arc-shaped upper clamping plate (1) is composed of a No. 1 upper clamping plate (11) and a No. 2 upper clamping plate (12), and the No. 1 upper clamping plate (11) and the No. 2 upper clamping plate (12) are respectively arranged on both sides of the original pile foundation (4).

4. The tunnel pile foundation underpinning structure according to claim 3, Features: The surfaces of the first upper clamping plate (11) and the second upper clamping plate (12) are both provided with a first arc-shaped notch (13), and the two first arc-shaped notches (13) are both clamped with the upper annular groove (9).

5. The tunnel pile foundation underpinning structure according to claim 2, Features: The arc-shaped lower clamping plate (2) is composed of a No. 1 lower clamping plate (14) and a No. 2 lower clamping plate (15), and the No. 1 lower clamping plate (14) and the No. 2 lower clamping plate (15) are respectively arranged on both sides of the original pile foundation (4).

6. The pile foundation underpinning structure in a tunnel according to claim 5, Features: The surfaces of the first lower clamping plate (14) and the second lower clamping plate (15) are both provided with second arc-shaped notches (16), and the two second arc-shaped notches (16) are both engaged with the lower annular groove (10).

7. The tunnel pile foundation underpinning structure according to claim 1, Features: The first steel beam (5) is made of I-beam, and a first through groove (17) is provided in the middle of the first steel beam (5); the second steel beam (7) is made of H-beam, and a second through groove (18) is provided in the middle of the second steel beam (7).

8. The tunnel pile foundation underpinning structure according to claim 1, Features: A first concrete layer (19) is poured between the arc-shaped upper clamping plate (1) and the arc-shaped lower clamping plate (2), and a second concrete layer (20) is poured between the arc-shaped lower clamping plate (2) and the arc-shaped bottom supporting plate (3).