Garbage collecting device for engineering construction
By designing a garbage collection device with rotating, lifting and telescopic mechanisms, the problem of garbage accumulation gaps affecting transportation efficiency and loading boxes being inconvenient for unloading is solved, achieving efficient collection and stable transportation of garbage.
Patent Information
- Application Number
- CN202420011465.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-03
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-01-03
AI Technical Summary
During construction, when the garbage collection device collects large construction waste, it may cause accumulation gaps that affect transportation efficiency, and it cannot effectively adjust the tilt angle of the loading box for unloading, causing inconvenience.
A garbage collection device including a carrier component, a loading component, a support component and a box component is designed. It adopts rotation, lifting and telescopic mechanisms, and realizes the crushing of garbage and the height and tilt angle of the loading box through electro-hydraulic push rods and servo motors. Adjust to ensure efficient collection and discharge of garbage.
It effectively solves the problem of garbage accumulation gaps affecting transportation efficiency, and adjusts the tilt angle of the loading box to facilitate unloading, improving the efficiency and stability of garbage collection and transportation.
Smart Images

Figure CN221889980U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering construction, in particular to a garbage collection device used for engineering construction. Background Art
[0002] In the process of engineering construction, it is often necessary to collect the garbage generated by the construction. Therefore, a garbage collection device for engineering construction is needed.
[0003] In the process of realizing the utility model, the inventors found that the prior art had the following problems: 1. When the garbage collection device collects construction waste, some of the construction waste may be large, and large gaps may be formed when piled together, which may affect the efficiency of garbage collection and transportation; 2. When some garbage collection devices transport the garbage to the designated location for unloading, the tilt angle of the loading box cannot be adjusted, which may be inconvenient during unloading. Utility Model Content
[0004] The purpose of the utility model is to provide a garbage collection device for engineering construction, so as to solve the problem that when the garbage collection device collects large construction waste, the garbage may be piled up together to form large gaps, which may affect the efficiency of garbage collection and transportation and some garbage collection devices are not convenient for unloading. To achieve the above purpose, the utility model provides the following technical solutions: A garbage collection device for engineering construction, including a carrier assembly, a loading assembly, a supporting assembly and a box assembly are fixedly installed on the top of the carrier assembly, and a crushing assembly is fixedly installed on the inner wall of the box assembly.
[0005] The carrier assembly comprises a support frame, a support block and a first rotating seat are fixedly mounted on the top of the support frame, a first electro-hydraulic push rod is fixedly mounted on one side of the first rotating seat, and a second rotating seat is fixedly mounted on one side of the first electro-hydraulic push rod;
[0006] The loading assembly includes a fixed block fixedly installed on the top of the support frame, a first connecting rod is fixedly installed through the front end of the fixed block, a mounting block is movably installed on the outer wall of the first connecting rod, a loading box is fixedly installed on the top of the mounting block, a second electro-hydraulic push rod is fixedly installed on the front end of the loading box, and a baffle is fixedly installed on the top of the second electro-hydraulic push rod.
[0007] The support assembly includes a third electro-hydraulic push rod fixedly mounted on the top of the support frame, a fourth electro-hydraulic push rod fixedly mounted on the front end of the third electro-hydraulic push rod, a second connecting rod fixedly mounted on the front end of the fourth electro-hydraulic push rod, and an auxiliary wheel rotatably mounted on the outer wall of the second connecting rod.
[0008] The box assembly comprises a support leg fixedly mounted on the top of the support frame, a crushing box is fixedly mounted on the top of the support leg, a feed hopper is fixedly mounted on the top of the crushing box, and a guide plate is fixedly mounted on the inner wall of the crushing box.
[0009] The crushing assembly comprises a servo motor fixedly mounted on one side of the support frame, a third connecting rod is fixedly mounted at the axis of the servo motor, and a crushing roller is fixedly mounted on the outer wall of the third connecting rod.
[0010] Further preferably, the loading box forms a rotating mechanism with the support frame through the mounting block, the first connecting rod and the fixed block, and the loading box forms a lifting mechanism with the support frame through the second rotating seat, the first electro-hydraulic push rod and the first rotating seat.
[0011] Further preferably, a sliding groove is provided in the loading box, and the baffle forms a sliding mechanism with the loading box through the sliding groove, and the baffle and the second electro-hydraulic push rod form a lifting mechanism, and the second electro-hydraulic push rods are symmetrically distributed about the vertical center line of the baffle.
[0012] Further preferably, the third electro-hydraulic push rod and the fourth electro-hydraulic push rod form a telescopic mechanism, and the auxiliary wheel forms a lifting mechanism with the fourth electro-hydraulic push rod through the second connecting rod, and the support components are symmetrically distributed about the vertical center line of the support frame.
[0013] Further preferably, a plurality of crushing teeth are provided on the outer wall of the crushing roller, and the crushing roller and the servo motor form a rotating mechanism through a third connecting rod, and the crushing components are symmetrically distributed about the horizontal center line of the crushing box.
[0014] Further preferably, the guide plate is arranged as an inclined slope in the crushing box, and baffle plates are arranged at the front and rear ends of the guide plate.
[0015] Compared with the prior art, the utility model has the following beneficial effects:
[0016] In the utility model, construction waste is added into the crushing box from the feed hopper, and the servo motor is started. The outer wall of the crushing roller is provided with a plurality of crushing teeth, and the crushing roller and the servo motor form a rotating mechanism through the third connecting rod, and the crushing components are symmetrically distributed about the horizontal center line of the crushing box. The servo motor is started and the crushing roller is driven to rotate through the third connecting rod, so that the construction waste can be crushed, and the crushed waste is introduced into the loading box through the guide plate.
[0017] In the utility model, after the garbage is transported to the location, the second electro-hydraulic push rod is started, a sliding groove is provided in the loading box, and the baffle forms a sliding mechanism with the loading box through the sliding groove, and the baffle and the second electro-hydraulic push rod form a lifting mechanism, and at the same time, the second electro-hydraulic push rods are symmetrically distributed about the vertical center line of the baffle, and the second electro-hydraulic push rod is started, which can drive the baffle to move up, so as to facilitate unloading, and then the first electro-hydraulic push rod is started, and the loading box forms a rotating mechanism with the support frame through the mounting block, the first connecting rod and the fixed block, and the loading box forms a lifting mechanism with the support frame through the second rotating seat, the first electro-hydraulic push rod and the first rotating seat, and the first electro-hydraulic push rod is started, and the height of one side of the loading box can be adjusted, and the other side of the loading box can be rotated on the first connecting rod through the mounting block, so that the inclination angle of the loading box can be adjusted, so as to facilitate unloading. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the main structure of the utility model;
[0019] Figure 2 This is a schematic diagram of the structure of the carrier component of the utility model;
[0020] Figure 3 This is a schematic diagram of the structure of the loading assembly of the utility model;
[0021] Figure 4 This is a schematic diagram of the structure of the support assembly of the utility model;
[0022] Figure 5 This is a schematic diagram of the structure of the box assembly of the utility model;
[0023] Figure 6 This is a schematic diagram of the structure of the crushing component of the utility model.
[0024] In the figure: 1. carrier assembly; 101. support frame; 102. support block; 103. first rotating seat; 104. first electro-hydraulic push rod; 105. second rotating seat; 2. loading assembly; 201. fixing block; 202. first connecting rod; 203. mounting block; 204. loading box; 205. second electro-hydraulic push rod; 206. baffle; 3. supporting assembly; 301. third electro-hydraulic push rod; 302. fourth electro-hydraulic push rod; 303. second connecting rod; 304. auxiliary wheel; 4. box assembly; 401. support leg; 402. crushing box; 403. feed hopper; 404. guide plate; 5. crushing assembly; 501. servo motor; 502. third connecting rod; 503. crushing roller. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technical personnel in this field without creative work are within the scope of protection of the utility model.
[0026] See also Figures 1 to 6 The utility model provides a technical solution: a garbage collection device for engineering construction, including a carrier component 1, a loading component 2, a supporting component 3 and a box component 4 are fixedly installed on the top of the carrier component 1, and a crushing component 5 is fixedly installed on the inner wall of the box component 4.
[0027] The carrier assembly 1 includes a support frame 101, a support block 102 and a first rotating seat 103 are fixedly installed on the top of the support frame 101, a first electro-hydraulic push rod 104 is fixedly installed on one side of the first rotating seat 103, and a second rotating seat 105 is fixedly installed on one side of the first electro-hydraulic push rod 104;
[0028] The loading assembly 2 includes a fixed block 201 fixedly installed on the top of the support frame 101, a first connecting rod 202 is fixedly installed through the front end of the fixed block 201, a mounting block 203 is movably installed on the outer wall of the first connecting rod 202, a loading box 204 is fixedly installed on the top of the mounting block 203, a second electro-hydraulic push rod 205 is fixedly installed on the front end of the loading box 204, and a baffle 206 is fixedly installed on the top of the second electro-hydraulic push rod 205.
[0029] The support assembly 3 includes a third electro-hydraulic push rod 301 fixedly mounted on the top of the support frame 101, a fourth electro-hydraulic push rod 302 fixedly mounted on the front end of the third electro-hydraulic push rod 301, a second connecting rod 303 fixedly mounted on the front end of the fourth electro-hydraulic push rod 302, and an auxiliary wheel 304 rotatably mounted on the outer wall of the second connecting rod 303.
[0030] The box assembly 4 includes a support leg 401 fixedly mounted on the top of the support frame 101 , a crushing box 402 fixedly mounted on the top of the support leg 401 , a feed hopper 403 fixedly mounted on the top of the crushing box 402 , and a guide plate 404 fixedly mounted on the inner wall of the crushing box 402 .
[0031] The crushing assembly 5 includes a servo motor 501 fixedly mounted on one side of the support frame 101 , a third connecting rod 502 is fixedly mounted at the axis of the servo motor 501 , and a crushing roller 503 is fixedly mounted on the outer wall of the third connecting rod 502 .
[0032] In this embodiment, Figure 1 , Figure 2 and Figure 3As shown, the loading box 204 forms a rotating mechanism with the support frame 101 through the mounting block 203, the first connecting rod 202 and the fixed block 201, and the loading box 204 forms a lifting mechanism with the support frame 101 through the second rotating seat 105, the first electro-hydraulic push rod 104 and the first rotating seat 103; when the first electro-hydraulic push rod 104 is started, the height of one side of the loading box 204 can be adjusted, and the other side of the loading box 204 can be rotated on the first connecting rod 202 through the mounting block 203, so that the inclination angle of the loading box 204 can be adjusted to facilitate unloading.
[0033] In this embodiment, Figure 1 and Figure 3 As shown, a sliding groove is provided in the loading box 204, and the baffle 206 forms a sliding mechanism with the loading box 204 through the sliding groove, and the baffle 206 and the second electro-hydraulic push rod 205 form a lifting mechanism, and the second electro-hydraulic push rods 205 are symmetrically distributed about the vertical center line of the baffle 206; when the second electro-hydraulic push rod 205 is started, it can drive the baffle 206 to move up and down. When unloading, the baffle 206 can be automatically opened to facilitate unloading.
[0034] In this embodiment, Figure 1 and Figure 4 As shown, the third electro-hydraulic push rod 301 and the fourth electro-hydraulic push rod 302 form a telescopic mechanism, and the auxiliary wheel 304 forms a lifting mechanism with the fourth electro-hydraulic push rod 302 through the second connecting rod 303, and the support components 3 are symmetrically distributed about the vertical center line of the support frame 101; when the third electro-hydraulic push rod 301 is started, it can drive the fourth electro-hydraulic push rod 302, the second connecting rod 303 and the auxiliary wheel 304 to extend and retract, and when the fourth electro-hydraulic push rod 302 is started, it can drive the second connecting rod 303 and the auxiliary wheel 304 to move up and down. When the auxiliary wheel 304 expands outward and contacts the ground, the stability of the garbage collection device during movement and unloading can be improved.
[0035] In this embodiment, Figure 1 and Figure 6 As shown, the outer wall of the crushing roller 503 is provided with a plurality of crushing teeth, and the crushing roller 503 forms a rotating mechanism through the third connecting rod 502 and the servo motor 501, and the crushing components 5 are symmetrically distributed about the horizontal center line of the crushing box 402; when the servo motor 501 is started, the crushing roller 503 is driven to rotate through the third connecting rod 502, so that the construction waste can be crushed.
[0036] In this embodiment, Figure 1 and Figure 5 As shown, the guide plate 404 is set as an inclined slope in the crushing box 402, and baffles are provided at the front and rear ends of the guide plate 404; the guide plate 404 facilitates the introduction of crushed garbage into the loading box 204.
[0037] The use method and advantages of the utility model: When the garbage collection device used for engineering construction is used, the working process is as follows:
[0038] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown, when first used, construction waste is added from the feed hopper 403 into the crushing box 402, and the servo motor 501 is started at the same time. The outer wall of the crushing roller 503 is provided with a plurality of crushing teeth, and the crushing roller 503 and the servo motor 501 form a rotating mechanism through the third connecting rod 502, and the crushing components 5 are symmetrically distributed about the horizontal center line of the crushing box 402. The servo motor 501 is started, and the crushing roller 503 is driven to rotate through the third connecting rod 502 to crush the construction waste under construction. The crushed waste is introduced into the loading box 204 through the guide plate 404. When the loading box 204 is full of construction waste, the crushed waste is crushed. After the garbage is collected, the garbage collection device can be dragged by the hook of the garbage collection device and the wheels at the bottom. When the transportation location is relatively open, the third electro-hydraulic push rod 301 and the fourth electro-hydraulic push rod 302 are started, and the third electro-hydraulic push rod 301 and the fourth electro-hydraulic push rod 302 form a telescopic mechanism, and the auxiliary wheel 304 forms a lifting mechanism with the fourth electro-hydraulic push rod 302 through the second connecting rod 303, and the support components 3 are symmetrically distributed about the vertical center line of the support frame 101. The start of the third electro-hydraulic push rod 301 can drive the fourth electro-hydraulic push rod 302, the second connecting rod 303 and the auxiliary wheel 304 to extend and retract. 02 start can drive the second connecting rod 303 and the auxiliary wheel 304 to move up and down. When the auxiliary wheel 304 expands outward and contacts the ground, the stability of the garbage collection device during movement and unloading can be improved. After the garbage is transported to the location, the second electro-hydraulic push rod 205 is started. A sliding groove is provided in the loading box 204, and the baffle 206 forms a sliding mechanism with the loading box 204 through the sliding groove, and the baffle 206 and the second electro-hydraulic push rod 205 form a lifting mechanism. At the same time, the second electro-hydraulic push rods 205 are symmetrically distributed about the vertical center line of the baffle 206. When the second electro-hydraulic push rod 205 is started, it can To drive the baffle 206 to move upward to facilitate unloading, then start the first electro-hydraulic push rod 104, the loading box 204 forms a rotating mechanism with the support frame 101 through the mounting block 203, the first connecting rod 202 and the fixed block 201, and the loading box 204 forms a lifting mechanism with the support frame 101 through the second rotating seat 105, the first electro-hydraulic push rod 104 and the first rotating seat 103. When the first electro-hydraulic push rod 104 is started, the height of one side of the loading box 204 can be adjusted, and the other side of the loading box 204 can be rotated on the first connecting rod 202 through the mounting block 203 to adjust the inclination angle of the loading box 204 for easy unloading.
[0039] The above shows and describes the basic principle, main features and advantages of the utility model. Technical staff in this industry should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model will have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.
Claims
1. A garbage collection device for engineering construction, comprising a carrier assembly (1), characterized in that: A loading assembly (2), a supporting assembly (3) and a box assembly (4) are fixedly mounted on the top of the carrier assembly (1), and a crushing assembly (5) is fixedly mounted on the inner wall of the box assembly (4); The carrier assembly (1) comprises a support frame (101), a support block (102) and a first rotating seat (103) are fixedly mounted on the top of the support frame (101), a first electro-hydraulic push rod (104) is fixedly mounted on one side of the first rotating seat (103), and a second rotating seat (105) is fixedly mounted on one side of the first electro-hydraulic push rod (104); The loading assembly (2) comprises a fixing block (201) fixedly mounted on the top of the support frame (101); a first connecting rod (202) is fixedly mounted through the front end of the fixing block (201); a mounting block (203) is movably mounted on the outer wall of the first connecting rod (202); a loading box (204) is fixedly mounted on the top of the mounting block (203); a second electro-hydraulic push rod (205) is fixedly mounted on the front end of the loading box (204); and a baffle (206) is fixedly mounted on the top of the second electro-hydraulic push rod (205); The support assembly (3) comprises a third electro-hydraulic push rod (301) fixedly mounted on the top of the support frame (101); a fourth electro-hydraulic push rod (302) is fixedly mounted on the front end of the third electro-hydraulic push rod (301); a second connecting rod (303) is fixedly mounted on the front end of the fourth electro-hydraulic push rod (302); and an auxiliary wheel (304) is rotatably mounted on the outer wall of the second connecting rod (303); The box assembly (4) comprises a support leg (401) fixedly mounted on the top of the support frame (101), a crushing box (402) fixedly mounted on the top of the support leg (401), a feed hopper (403) fixedly mounted on the top of the crushing box (402), and a guide plate (404) fixedly mounted on the inner wall of the crushing box (402); The crushing assembly (5) comprises a servo motor (501) fixedly mounted on one side of the support frame (101), a third connecting rod (502) fixedly mounted at the axis of the servo motor (501), and a crushing roller (503) fixedly mounted on the outer wall of the third connecting rod (502).
2. A garbage collection device for engineering construction according to claim 1, characterized in that: The loading box (204) forms a rotating mechanism with the support frame (101) through the mounting block (203), the first connecting rod (202) and the fixing block (201), and the loading box (204) forms a lifting mechanism with the support frame (101) through the second rotating seat (105), the first electro-hydraulic push rod (104) and the first rotating seat (103).
3. A garbage collection device for engineering construction according to claim 1, characterized in that: The loading box (204) is provided with a sliding groove, and the baffle (206) forms a sliding mechanism with the loading box (204) through the sliding groove, and the baffle (206) and the second electro-hydraulic push rod (205) form a lifting mechanism, and the second electro-hydraulic push rod (205) is symmetrically distributed about the vertical center line of the baffle (206).
4. A garbage collection device for engineering construction according to claim 1, characterized in that: The third electro-hydraulic push rod (301) and the fourth electro-hydraulic push rod (302) form a telescopic mechanism, and the auxiliary wheel (304) forms a lifting mechanism with the fourth electro-hydraulic push rod (302) through the second connecting rod (303), and the support components (3) are symmetrically distributed about the vertical center line of the support frame (101).
5. The garbage collection device for engineering construction according to claim 1, characterized in that: The outer wall of the crushing roller (503) is provided with a plurality of crushing teeth, and the crushing roller (503) forms a rotating mechanism with a servo motor (501) via a third connecting rod (502), and the crushing components (5) are symmetrically distributed about the horizontal center line of the crushing box (402).
6. A garbage collection device for engineering construction according to claim 1, characterized in that: The guide plate (404) is arranged as an inclined surface in the crushing box (402), and baffle plates are arranged at the front and rear ends of the guide plate (404).