Iron removal device for air chute
By designing a detachable iron removal device and using a permanent magnet roller and a driving device to automatically remove iron in the air chute, the transportation and installation problems caused by the cumbersome equipment design in the existing technology are solved, and automatic iron removal is realized and the scope of application is expanded. , improving the efficiency and safety of material transportation.
Patent Information
- Application Number
- CN202420806884.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-18
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2034-04-18
AI Technical Summary
The design of existing air chute iron removal devices and equipment is too cumbersome and difficult to transport and install separately, which limits its application scope and affects the efficiency and safety of material transportation.
An iron removal device including a transport bracket and a detachable installation is designed. It uses a permanent magnet roller and a driving device, combined with a scraper assembly and an iron storage tank to achieve automatic iron removal and collection. The simplified structure makes it easy to disassemble and collect. Installation, suitable for different models of air chute equipment.
It realizes the automatic and effective removal of iron substances during material transportation, simplifies the transportation and installation of iron removal devices, expands the scope of application, improves production efficiency and safety, and reduces production and use costs.
Smart Images

Figure CN221890113U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of air chute, and specifically relates to an iron removal device for air chute. Background Art
[0002] In the field of material transportation and processing, air chute is a common material transportation equipment, widely used in many industries, such as cement, electricity, ceramics, bricks and tiles, chemicals, food, glass, metallurgy, steel, etc. Its working principle mainly relies on the driving effect of airflow to transport materials from high to low, and by adjusting the speed and pressure of airflow, it can effectively control the material transportation speed and transportation volume.
[0003] However, in the process of material transportation, some iron impurities will inevitably be mixed in. If these iron impurities are not removed in time, it will not only affect the quality of the material, but also may cause damage to subsequent processing equipment and even cause safety accidents. Therefore, it is particularly important to develop an efficient iron removal device for air chutes.
[0004] Existing air chute iron removal devices are all designed together with the air chute, which makes the air chute equipment too complicated and difficult to transport, resulting in the air chute being only applicable in specific industries and being inconvenient to use. Utility Model Content
[0005] The main technical problem to be solved by the utility model is to provide an iron removal device for an air chute which has a simple overall structure, can be transported separately, is convenient to install and disassemble on various types of air chute equipment, automatically removes and collects iron, and improves the use effect.
[0006] In order to solve the above technical problems, the utility model provides the following technical solutions:
[0007] An iron removal device for an air chute comprises a transport bracket and an iron removal device, wherein the iron removal device is detachably mounted on the upper end surface of the transport bracket, the iron removal device comprises a mounting flange detachably mounted on the transport bracket, a protective cover is fixedly mounted on the mounting flange, permanent magnetic rollers are rotatably mounted on two opposite inner walls of the protective cover, a driving device for driving the permanent magnetic rollers to rotate is mounted on the outer side of the protective cover, a scraper assembly is top-connected to one side of the outer surface of the permanent magnetic roller, an observation port is arranged at an end surface position of the upper surface of the protective cover, and an air chute device detachably connected to the mounting flange is arranged below the mounting flange.
[0008] The following is a further optimization of the above technical solution by the utility model:
[0009] A support plate is arranged at the upper end of the bracket, and first threaded holes are respectively opened at the four corners of the support plate.
[0010] Further optimization: first through holes are opened on the mounting flange at positions corresponding to the four first threaded holes, and the same locking bolt is inserted into the first through hole and the first threaded hole.
[0011] Further optimization: the scraper assembly includes an inclined scraper connected to the outer surface of the permanent magnet roller, and one end of the inclined scraper connected to the permanent magnet roller is provided with a material connecting strip, and one end of the material connecting strip is in close contact with the outer surface of the permanent magnet roller.
[0012] Further optimization: the other end of the material connection strip is fixedly connected with an inclined plate, and the inclined plate is arranged at an angle.
[0013] Further optimization: a mounting plate is vertically arranged on the inner wall of the protective cover near the inclined plate, and the middle position of the inclined plate is fixedly connected to the mounting plate.
[0014] Further optimization: a first slide groove is provided at the other end of the inclined plate.
[0015] Further optimization: A second slide groove is fixedly installed at a position on the lower end surface of the mounting flange corresponding to the first slide groove.
[0016] Further optimization: the same iron storage trough is detachably mounted on the first chute and the second chute, and hanging ears are symmetrically arranged at both ends of the iron storage trough, and the shapes of the hanging ears match the shapes of the first chute and the second chute.
[0017] The utility model adopts the above technical scheme, which is ingenious in conception and reasonable in structure. It can effectively and automatically remove and collect iron substances in the material during the material conveying process of the air chute equipment, and the iron removal device and the air chute equipment are convenient to disassemble and install, so that the iron removal device is simple and quick during transportation. In this way, the iron removal device can be applied to various fields, expand the scope of use, improve production efficiency, be safe and reliable, and be easy to operate. The overall structure is simple, convenient to manufacture and produce, can reduce production and use costs, and improve economic benefits.
[0018] When the iron removal device is installed and used with the air chute equipment, a second threaded hole with the same spacing as the first through hole on the mounting flange is opened at the position where the iron removal device is installed on the air chute equipment, and an avoidance groove matching the diameter of the permanent magnet roller is opened at the same time. Then, the air chute is installed at the avoidance groove position, and then the locking bolts are used to align and lock it to complete the installation. The iron removal device is universal and can be used with air chute equipment of different models, thereby increasing the scope of use and facilitating use.
[0019] After the iron removal device is used, it can be transported by simply removing it from the air chute equipment and installing it on the transport bracket. The whole process is easy to operate and easy to use.
[0020] The utility model is further described below in conjunction with the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a front view of the overall structure in the embodiment of the utility model;
[0022] Figure 2 It is a side view of the overall structure in the embodiment of the utility model;
[0023] Figure 3 It is a top view of the overall structure in the embodiment of the utility model;
[0024] Figure 4 It is a schematic diagram of the installation and use of the iron removal device in the embodiment of the utility model.
[0025] In the figure: 1-transport bracket; 11-support leg; 12-support plate; 120-first threaded hole; 2-iron removal device; 21-mounting flange; 210-first through hole; 22-locking bolt; 23-protective cover; 231-mounting plate; 24-permanent magnet roller; 240-magnetic area; 241-non-magnetic area; 3-scraper assembly; 31-inclined scraper; 310-material receiving strip; 311-inclined plate; 32-first slide; 33-second slide; 34-iron storage tank; 4-driving device; 41-central shaft; 42-bearing seat; 43-first sprocket; 44-chain; 45-reduction motor; 46-motor fixing seat; 47-second sprocket; 5-observation port; 6-air chute equipment; 61-material. DETAILED DESCRIPTION
[0026] like Figure 1-4 As shown: an iron removal device for an air chute, comprising a transport bracket 1 and an iron removal device 2, wherein the iron removal device 2 is detachably mounted on the upper end surface of the transport bracket 1, and the iron removal device 2 comprises a mounting flange 21 detachably mounted on the transport bracket 1, a protective cover 23 is fixedly mounted on the mounting flange 21, permanent magnetic rollers 24 are rotatably mounted on two opposite inner walls of the protective cover 23, a driving device 4 for driving the permanent magnetic roller 24 to rotate is mounted on the outer side of the protective cover 23, a scraper assembly 3 is top-connected to one side of the outer surface of the permanent magnetic roller 24, an observation port 5 is arranged at an end surface position of the upper surface of the protective cover 23, and an air chute device 6 detachably connected to the mounting flange 21 is arranged below the mounting flange 21.
[0027] like Figure 1-2 As shown, in this embodiment, the transport bracket 1 includes a plurality of support legs 11 arranged in an array on the ground.
[0028] The plurality of supporting legs 11 are arranged perpendicular to the ground at the same time.
[0029] Support plates 12 are vertically arranged on the upper end surfaces of the plurality of support legs 11 .
[0030] The support plate 12 has four corners respectively formed with first threaded holes 120 .
[0031] The mounting flange 21 is provided with first through holes 210 at positions corresponding to the four first threaded holes 120 .
[0032] A locking bolt 22 is inserted into the first through hole 210 . The locking bolt 22 passes through the corresponding first through hole 210 and is threadedly connected to the corresponding first threaded hole 120 .
[0033] With such a design, the mounting flange 21 can be detachably mounted on the supporting plate 12 .
[0034] The lower surface of the protective cover 23 is provided with an open opening, and the lower end surface of the protective cover 23 is fixedly mounted on the mounting flange 21 by bolts.
[0035] like Figure 4 As shown, the permanent magnet roller 24 is provided with a magnetic zone 240 and a non-magnetic zone 241. In the prior art, the principle of the permanent magnet roller 24 is based on the strong magnetic field generated by the permanent magnet material. This roller is composed of a group of strong permanent magnets arranged on the shaft. These permanent magnets form high-intensity magnetic lines of force in the axial direction through a special magnetic circuit structure, thereby forming a magnetic zone 240. The ferrous material adsorbed by the permanent magnet roller 24 in the magnetic zone 240 is transported to the non-magnetic zone 241 with the rotation of the permanent magnet roller 24, and then falls from the surface of the permanent magnet roller 24.
[0036] This technology is already well-known and widely used, and will not be described in detail here.
[0037] The driving device 4 includes a central shaft 41 rotatably mounted on two opposite inner walls of the protective cover 23 through bearings, and two ends of the central shaft 41 penetrate through the corresponding inner walls of the protective cover 23 and are fixedly mounted with seat bearings 42 .
[0038] The mounting ends of the seat bearings 42 are fixedly mounted at corresponding positions of the mounting flanges 21 .
[0039] The permanent magnet roller 24 is sleeved on the outer surface of the central rotating shaft 41 located inside the protective cover 23. In this design, the rotation of the central rotating shaft 41 drives the permanent magnet roller 24 to rotate at the same time.
[0040] A first sprocket 43 is fixedly mounted at one end of the central rotating shaft 41 , and one end of a chain 44 is connected to an outer surface of the first sprocket 43 .
[0041] A motor fixing seat 46 is fixedly mounted at one end of the upper end of the protective cover 23 away from the observation port 5 .
[0042] The motor fixing seat 46 is fixedly mounted with a reduction motor 45 .
[0043] A second sprocket 47 is fixedly mounted on the power output end of the reduction motor 45 , and the other end of the chain 44 is abutted against the outer surface of the second sprocket 47 .
[0044] With this design, when the reduction motor 45 is started, the power output end of the reduction motor 45 rotates to drive the second sprocket 47 to rotate, which is then transmitted to the first sprocket 43 through the chain 44 to rotate, and then drives the central shaft 41 to drive the permanent magnet drum 24 to rotate.
[0045] In this embodiment, the reduction motor 45 indirectly drives the permanent magnet roller 24 to rotate clockwise all the time.
[0046] In this embodiment, the transmission mode of the first sprocket 43, the second sprocket 47 and the chain 44 can be replaced by a transmission mode of a pulley and a belt.
[0047] The portion of the permanent magnetic roller 24 close to the lower end is located outside the opening of the protective cover 23 .
[0048] The scraper assembly 3 includes an inclined scraper 31 connected to the non-magnetic area 241 on the outer surface of the permanent magnet roller 24 .
[0049] A material receiving strip 310 is disposed at one end of the inclined scraper 31 that is in contact with the permanent magnet roller 24 , and one end of the material receiving strip 310 is in close contact with the outer surface of the non-magnetic region 241 of the permanent magnet roller 24 .
[0050] The other end of the material receiving strip 310 is fixedly connected to an inclined plate 311 , and the inclined plate 311 is arranged at an inclination with respect to the horizontal plane. In this way, the material receiving strip 310 receives the ferrous material from the outer surface of the permanent magnetic roller 24 and drops it to the lower area under the action of the inclined plate 311 .
[0051] A mounting plate 231 is vertically arranged on the inner wall of the protective cover 23 near the inclined plate 311 , and the middle position of the inclined plate 311 is fixedly connected to the mounting plate 231 .
[0052] The other end of the inclined plate 311 is provided with a first sliding groove 32 .
[0053] A second slide groove 33 is fixedly mounted on the lower end surface of the mounting flange 21 at a position corresponding to the first slide groove 32 .
[0054] The same iron storage trough 34 is detachably mounted on the first chute 32 and the second chute 33, and hanging ears are symmetrically arranged at both ends of the iron storage trough 34, and the shape of the hanging ears matches the shape of the first chute 32 and the second chute 33. This design facilitates the easy disassembly and assembly of the iron storage trough 34 and flexible operation.
[0055] In this embodiment, the air chute device 6 is a commonly used wind conveying device, which can use air to make the material to be conveyed flow downward along the chute in a fluidized state. Its specific working principle is well known and widely used in the prior art and will not be repeated here.
[0056] When in use, the mounting flange 21 of the iron removal device 2 is first detachably mounted on the support plate 12 of the transport bracket 1 through the locking bolts 22. Because the lower end portion of the permanent magnetic roller 24 of the iron removal device 2 is located outside the open mouth of the protective cover 23, when the iron removal device 2 is transported to the place of application, if the permanent magnetic roller 24 is directly placed on the transport vehicle, it is easy to cause the permanent magnetic roller 24 to be damaged, affecting the application effect. Therefore, the iron removal device 2 needs to be installed on the transport bracket 1, and then the transport bracket 1 and the permanent magnetic roller 24 installed together are placed on the transport vehicle and transported to the place where they are needed. This design facilitates the transportation of the iron removal device 2.
[0057] When the iron removal device 2 is transported to the place of use, at the same time, the air chute device 6 has been placed at the application position, and corresponding second threaded holes are opened on the upper end surface of the air chute device 6 according to the spacing of the four first through holes 210 on the mounting flange 21, and an avoidance groove is opened between the upper four second threaded holes of the air chute device 6, and the size of the avoidance groove matches the diameter of the permanent magnet roller 24.
[0058] Then the iron removal device 2 is removed from the transport bracket 1 and installed at the avoidance groove position on the air chute equipment 6. The locking bolt 22 passes through the first through hole 210 and is threadedly connected to the corresponding second threaded hole and locked, so that the permanent magnet roller 24 rotates clockwise inside the air chute equipment 6.
[0059] like Figure 4As shown, the material 61 in the air chute device 6 is transported by the conveyor belt. At this time, the reduction motor 45 is started, and the power output end of the reduction motor 45 rotates clockwise to drive the central shaft 41 to drive the permanent magnet roller 24 to rotate clockwise through the transmission action of the second sprocket 47, the chain 44 and the first sprocket 43. When the magnetic area 240 of the permanent magnet roller 24 is transferred to the material 61 in the air chute device 6, the magnetic area 240 will absorb the iron substances doped in the material 61, and the material 6 1 is not affected and continues to be transported forward. The magnetic zone 240 absorbs the ferrous material and rotates clockwise. When it reaches the position of the non-magnetic zone 241, the material receiving strip 310 scrapes off the ferrous material. At the same time, the ferrous material is easily scraped off by the material receiving strip 310 without the influence of magnetic force. The scraped ferrous material falls into the iron storage tank 34 through the inclined plate 311. The permanent magnet roller 24 continues to rotate clockwise to the magnetic zone 240 to absorb the ferrous material in the material 61, and this cycle is repeated.
[0060] After the iron removal device 2 has been working for a period of time, the iron material collection situation in the iron storage tank 34 inside the protective cover 23 is observed through the observation port 5. When the iron material in the iron storage tank 34 is full, the iron storage tank 34 is pulled out along the first chute 32 and the second chute 33 to clean up the iron material, and then the iron storage tank 34 is installed on the first chute 32 and the second chute 33 to continue collecting iron material.
[0061] After the use of the iron removal device 2 is completed, the locking bolt 22 is loosened, the iron removal device 2 is removed and reinstalled on the transport bracket 1. In this way, the iron removal device 2 and the air chute equipment 6 are transported separately and can be applied to various places where they are needed, avoiding limiting the scope of use of the equipment due to the equipment being too large to be transported.
[0062] Furthermore, the iron removal device 2 can be matched with various types of air chute equipment 6 to increase the scope of application.
[0063] For ordinary technicians in this field, according to the teachings of the present invention, without departing from the principles and spirit of the present invention, changes, modifications, substitutions and variations made to the implementation methods are still within the protection scope of the present invention.
Claims
1. An iron removal device for an air chute, comprising a transport support (1) and an iron removal device (2), characterized in that: The iron removal device (2) is detachably mounted on the upper end surface of the transport bracket (1), and comprises a mounting flange (21) detachably mounted on the transport bracket (1), a protective cover (23) being fixedly mounted on the mounting flange (21), permanent magnetic rollers (24) being rotatably mounted on two opposite inner walls of the protective cover (23), a driving device (4) for driving the permanent magnetic rollers (24) to rotate being mounted on the outer side of the protective cover (23), a scraper assembly (3) being top-connected to one side of the outer surface of the permanent magnetic roller (24), an observation port (5) being arranged at an end surface position of the upper surface of the protective cover (23), and an air chute device (6) being detachably connected to the mounting flange (21) being arranged below the mounting flange (21).
2. The iron removal device for an air chute according to claim 1, characterized in that: A support plate (12) is provided at the upper end of the bracket (1), and first threaded holes (120) are respectively provided at the four corners of the support plate (12).
3. The iron removal device for an air chute according to claim 2, characterized in that: First through holes (210) are provided at positions on the mounting flange (21) corresponding to the four first threaded holes, and the same locking bolt (22) is inserted into the first through hole (210) and the first threaded hole (120).
4. The iron removal device for an air chute according to claim 3, characterized in that: The scraper assembly (3) comprises an inclined scraper (31) connected to the position of the non-magnetic area (241) on the outer surface of the permanent magnetic roller (24), and one end of the inclined scraper (31) connected to the permanent magnetic roller (24) is provided with a material receiving strip (310), and one end of the material receiving strip (310) is in close contact with the outer surface of the non-magnetic area (241).
5. The iron removal device for an air chute according to claim 4, characterized in that: The other end of the material receiving strip (310) is fixedly connected to an inclined plate (311), and the inclined plate (311) is arranged in an inclined manner.
6. The iron removal device for an air chute according to claim 5, characterized in that: A mounting plate (231) is vertically arranged on the inner wall of the protective cover (23) near the inclined plate (311), and the middle position of the inclined plate (311) is fixedly connected to the mounting plate (231).
7. The iron removal device for an air chute according to claim 6, characterized in that: The other end of the inclined plate (311) is provided with a first sliding groove (32).
8. The iron removal device for an air chute according to claim 7, characterized in that: A second slide groove (33) is fixedly mounted on the lower end surface of the mounting flange (21) at a position corresponding to the first slide groove (32).
9. The iron removal device for an air chute according to claim 8, characterized in that: The first chute (32) and the second chute (33) are detachably provided with the same iron storage trough (34), and hanging ears are symmetrically arranged at both ends of the iron storage trough (34), and the shapes of the hanging ears match the shapes of the first chute (32) and the second chute (33).