Ballastless track double-sleeper paving construction device

By designing a ballastless track double sleeper paving construction device and utilizing rail racks and adjustment mechanisms to achieve pre-calibration and movement of the rails, the problem of low construction efficiency was solved and construction efficiency was significantly improved.

CN221895440UActive Publication Date: 2024-10-25CHINA RAILWAY 11TH BUREAU GRP CORP LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420322199.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-21
Publication Date
2024-10-25
Estimated Expiration
2034-02-21

AI Technical Summary

Technical Problem

In the construction of ballastless track, the existing technology has the problem of low construction efficiency. Especially when continuous construction is carried out on roads and bridges, the equipment is inconvenient to move and it is difficult to leave enough space, which seriously restricts the construction efficiency.

Method used

A ballastless track double-block sleeper paving construction device is designed, including a rail rack, an adjustment mechanism and a moving device. The pre-calibration and movement of the rails are realized through the support beam and electric hoist. The adjustment mechanism is used to adjust the level and level of the support beam. displacement, simplifying the track paving process.

Benefits of technology

By pre-calibrating the movement of rails and support beams, the efficiency of track paving construction is significantly improved, reducing reliance on large hoisting equipment and improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895440U_ABST
    Figure CN221895440U_ABST
Patent Text Reader

Abstract

The utility model relates to a ballastless track double-sleeper paving construction device. The ballastless track double-sleeper paving construction device comprises a track panel frame, an adjusting mechanism and a moving device. Wherein the track panel frame comprises two rails, a track panel, a track panel and a track panel, and the distance between the two rails is a standard track gauge; the multiple supporting beams are arranged on the portal in a lifting mode, the supporting beams and the rails are arranged in an orthogonal mode, two mounting grooves allowing the rails to penetrate are formed in each supporting beam, and fixing mechanisms used for fixing the rails are arranged at the positions, at the mounting grooves, of the supporting beams; supporting mechanisms are arranged at two ends of the supporting beam; the adjusting mechanism is used for adjusting horizontal displacement of the supporting beam; the moving device comprises a gantry, a plurality of rollers are mounted at the bottom of the gantry, and an electric hoist is arranged on the gantry. According to the rail laying device, by arranging the multiple supporting beams, sleepers can be installed on the rail in advance and calibrated, then the rail is moved to a to-be-constructed area with the help of the portal, the posture of the rail is calibrated only with the help of the supporting mechanism and the adjusting mechanism, and the rail laying construction efficiency can be greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of track construction equipment, and in particular to a double-block sleeper paving construction device for ballastless track. Background Art

[0002] Ballastless track refers to a track structure that uses concrete, asphalt mixture and other integral foundations to replace the granular gravel roadbed. It is also called ballastless track and is the most advanced track technology in the world today. Compared with ballasted track, ballastless track avoids ballast splashing, has good smoothness, good stability, long service life, good durability, less maintenance work, and the train can run at a speed of more than 350 kilometers. At present, the track-laying method is usually used in the construction of double-block ballastless track, in which the track-laying frame and formwork system are reinforced and fine-tuned by the rods by means of top or support.

[0003] When constructing the ballast plate, the ballast plate template is usually installed first, and then the track is installed and roughly and finely adjusted. During the fine-tuning process, it is necessary to use a total station or special equipment for track fine-tuning to calibrate. After the track is fine-tuned, concrete is quickly poured until it is finalized. When continuous construction is carried out on roads and bridges, diagonal braces are usually used to support the ballast plate template. As a result, after the track is fine-tuned, it is necessary to use a large gantry crane to hoist the corresponding equipment to the next section. Not only is there a defect of inconvenient movement, but there is also a problem in actual construction that it is difficult to leave enough space for the gantry crane to move. Therefore, the construction efficiency of ballastless track laying on roads and bridges is seriously restricted. Utility Model Content

[0004] In order to improve the problem of low efficiency in online paving construction of ballastless track, the present application provides a double-block sleeper paving construction device for ballastless track.

[0005] The present application provides a ballastless track double-block sleeper paving construction device adopts the following technical solution:

[0006] A ballastless track double-sleeper paving construction device, comprising:

[0007] Rail racks, adjustment mechanisms and moving devices;

[0008] Wherein, the rail rack comprises:

[0009] Railroad tracks, two of which are provided and the distance between them is of standard gauge;

[0010] A plurality of support beams are provided and are lifted and lowered on the gantry. The support beams are arranged orthogonally to the rails. Two mounting grooves are provided on the support beams for the rails to pass through. The support beams are provided with fixing mechanisms for fixing the rails at the mounting grooves. Support mechanisms are provided at both ends of the support beams.

[0011] The adjustment mechanism is used to adjust the horizontal displacement of the support beam;

[0012] The moving device comprises a gantry, a plurality of rollers are installed at the bottom of the gantry, and an electric hoist is arranged on the gantry.

[0013] Furthermore, the supporting mechanism comprises:

[0014] A support seat, fixedly connected to the end of the support beam;

[0015] A support stud is vertically penetrated on the support seat;

[0016] A support nut is threadedly connected to the support stud and is located on the lower end surface of the support seat.

[0017] Furthermore, the adjustment mechanism includes a base plate, a vertical plate fixed to the base plate, and an adjustment screw threaded through the vertical plate. The support stud is slidably arranged on the base plate, and the free end of the adjustment screw is rotatably installed with a stopper that abuts against the side of the support stud away from the rail.

[0018] Furthermore, the abutment piece is configured to be in an arc shape that matches the outer peripheral contour of the support stud.

[0019] Furthermore, the bottom plate is provided with a plurality of embedding holes for embedding the ground anchor nails.

[0020] Furthermore, the fixing mechanism includes two fixing plates respectively fixed to two opposite groove walls of the installation groove, and fishtail plates are installed on adjacent side walls of the two fixing plates.

[0021] Furthermore, a plurality of cross beams parallel to the support beams are movably arranged on the door frame, and a limiting plate for preventing the cross beams from slipping horizontally is installed on the door frame.

[0022] In summary, the beneficial technical effects of this application are:

[0023] By setting up multiple support beams, the sleepers can be installed in advance on the rails for construction and calibrated. Then, after the rails are moved to the construction area with the help of a gantry, only the rail posture needs to be calibrated. This is achieved by adjusting the horizontality of the support beams through the support mechanism and the horizontal displacement of the support beams through the adjustment mechanism, which can greatly improve the track laying construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the overall structure of the door frame of the embodiment of the present application when the rail is being transferred;

[0025] Figure 2 It is a schematic diagram of the overall structure of the adjustment mechanism of the embodiment of the present application when calibrating the rail rack;

[0026] Figure 3 It is a structural schematic diagram mainly used to show the adjustment mechanism of the embodiment of the present application.

[0027] Description of reference numerals:

[0028] 1. Door frame; 11. Roller; 12. Longitudinal beam; 13. Cross beam; 14. Limit block;

[0029] 2. Railroad tracks;

[0030] 31. bottom plate; 32. vertical plate; 33. adjusting screw; 34. stopper; 35. embedded hole;

[0031] 4. Support beam; 41. Mounting slot; 42. Fixing plate; 43. Fish plate;

[0032] 51. Support seat; 52. Support stud; 53. Support nut. DETAILED DESCRIPTION

[0033] The technical solution of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.

[0034] The present application embodiment discloses a ballastless track double-block sleeper paving construction device. Figure 1 and Figure 2 , a ballastless track double-sleeper paving construction device comprises a rail rack, an adjusting mechanism and a moving device;

[0035] Among them, the moving device includes a door frame 1, at the bottom of which a plurality of rollers 11 are installed; at least two door frames 1 are provided, and multiple door frames 1 can be provided according to different laying requirements. In this embodiment, two are taken as an example, and the two groups of door frames 1 are arranged in parallel, and a hanging piece for hanging an electric hoist is fixedly connected to the middle of the door frame 1; and a longitudinal beam 12 is fixedly connected to the bottom end of the two door frames 1, and the longitudinal beams 12 are provided in two and are arranged along the extension direction of the door frame 1. At least two cross beams 13 are also overlapped on the two longitudinal beams 12, and a limit block 14 is fixedly connected to the end of the longitudinal beam 12, and the distance between the limit block 14 and the adjacent door frame 1 is adapted to the width of the cross beam 13.

[0036] The rail rack includes:

[0037] Rails 2, provided with two rails and the distance between them is of standard gauge;

[0038] There are multiple support beams 4 which are lifted and lowered together on the two gantries 1. The support beams 4 are orthogonal to the rails 2. Two mounting grooves 41 are provided on the support beam 4 for the rails 2 to pass through. The spacing between the two mounting grooves 41 is adapted to the standard track gauge. The support beam 4 is provided with a fixing mechanism for fixing the rails 2 at the mounting grooves 41; support mechanisms are provided at both ends of the support beam 4.

[0039] And the adjustment mechanism is used to adjust the horizontal displacement of the support beam 4.

[0040] After such arrangement, when paving the track, firstly, the two rails 2 are passed through the two installation grooves 41 on the multiple support beams 4 and fixed by the fixing mechanism, and then the two sections of rails 2 are lifted a certain distance by the two electric hoists on the two door frames 1, and the sleepers are respectively installed on the two rails 2 and calibrated. After the calibration is completed, the rails 2 and the support beams 4 are continued to be lifted until they pass over the longitudinal beams 12, and then the cross beams 13 are overlapped on the two longitudinal beams 12, and the ends of the cross beams 13 are embedded in the gaps between the limit blocks 14 and the door frames 1 to prevent the cross beams 13 from slipping, and then the rails 2 at both ends are lifted and placed on the cross beams 13 for support.

[0041] Then move the gantry 1 directly to the area to be paved, remove the crossbeam 13, lower the rail 2 to the set height, and then calibrate the horizontality of the support beam 4 through the support mechanism and adjust the horizontal displacement of the support beam through the adjustment mechanism. After the calibration is completed, concrete can be poured in the steel cage in the area to be paved to carry out track laying construction; after the construction is completed, release the connection between the rail 2 and the sleeper, and hoist the rail 2 and the support beam 4 to the next construction point through the gantry 1. Since the sleepers on the rail 2 have been calibrated in advance, it is only necessary to calibrate the posture of the rail 2 after moving it to the area to be constructed, which is achieved by adjusting the horizontality of the support beam 4 through the support mechanism and the horizontal displacement of the support beam 4 through the adjustment mechanism, which can greatly improve the efficiency of track laying construction.

[0042] Specifically, refer to Figure 2 and Figure 3 , the supporting institutions include:

[0043] The support seat 51 is fixedly connected to the end of the support beam 4. Specifically, the support seat 51 is welded and fixed at both ends of the support beam 4.

[0044] The support stud 52 is vertically penetrated on the support seat 51;

[0045] The support nut 53 is threadedly connected to the support stud 52 and is located on the lower end surface of the support seat 51 .

[0046] After such arrangement, the construction personnel can conveniently adjust the horizontality of the support beam 4 by adjusting the position of the support nut 53 located at the lower part of the support stud 52 .

[0047] In addition, the adjustment mechanism includes a base plate 31, a vertical plate 32 fixed to the base plate 31, and an adjustment screw 33 with a horizontal thread penetrating the vertical plate 32. The vertical plate 32 is specifically configured to have a "C"-shaped cross section. The support stud 52 is slidably disposed on the base plate 31. The free end of the adjustment screw 33 is rotatably mounted with a retaining plate 34 that abuts against the side of the support stud 52 away from the rail 2. The retaining plate 34 is configured to be an arc shape that matches the outer peripheral contour of the support stud 52, and a plurality of embedding holes 35 for the engagement of ground anchors are provided on the base plate 31.

[0048] After such arrangement, when the attitude of the sleeper needs to be calibrated after the track frame is installed in place, an adjustment mechanism is set at the position corresponding to the support stud 52 on the track frame, and a ground anchor is driven into the embedding hole 35 of the base plate 31. The horizontal displacement of the support beam 4 is calibrated by rotating the two adjusting screws 33 at both ends of the support beam 4. Specifically, when the adjusting screw 33 is rotated on the vertical plate 32, the adjusting screw 33 drives the arc-shaped abutment plate 34 to press against the support stud 52, thereby pushing the support screw and the support beam 4 to move laterally to calibrate the horizontal displacement of the sleeper on the rail 2.

[0049] In addition, refer to Figure 1 and Figure 3 The fixing mechanism includes two fixing plates 42 respectively fixed on two opposite groove walls of the installation groove 41, and fish plates 43 are installed on the adjacent side walls of the two fixing plates 42; specifically, holes for bolts to pass through are provided at the corresponding positions of the fixing plates 42, the fish plates 43 and the rails 2. In this way, after the rails 2 are installed in the installation groove 41 on the support beam 4, the bolts are sequentially passed through the rails 2 and the two sets of fixing plates 42 and the two sets of fish plates 43, and then locked with nuts. With the good fit between the fish plates 43 and the side walls of the rails 2, the position of the rails 2 in the installation groove 41 can be accurately fixed, thereby ensuring the straightness of the rails 2 installed on multiple support beams 4 as much as possible.

[0050] The implementation principle of a ballastless track double-block sleeper paving construction device in the embodiment of the present application is:

[0051] When paving the track, first fix the two rails 2 and multiple support beams 4, then lift the two sections of rails 2 by the electric hoist on the gantry 1 for a certain distance, install sleepers on the two rails 2 respectively and calibrate them, then move the gantry 1 directly to the area to be paved, lower the rails 2 to the set height, and then calibrate the horizontality of the support beams 4 through the supporting mechanism. After the calibration is completed, concrete can be poured in the steel cage to carry out track laying construction.

[0052] Since the sleepers on the rails 2 have been calibrated in advance, it is only necessary to calibrate the posture of the rails 2 after moving to the area to be constructed. This is achieved by adjusting the horizontality of the support beam 4 through the support mechanism and the horizontal displacement of the support beam 4 through the adjustment mechanism, which can greatly improve the efficiency of track laying construction.

[0053] Unless otherwise defined, the technical terms or scientific terms used in this application should be understood by people with ordinary skills in the field to which this application belongs. The words "first", "second", "third" and similar words used in the specification and claims of this application do not indicate any order, quantity or importance, but are only used to distinguish different components. "One" or "one" and similar words do not indicate a quantitative limit, but indicate that there is at least one. "Include" or "comprise" and similar words mean that the elements or objects appearing before "include" or "comprise" include the elements or objects listed after "include" or "comprise" and their equivalents, and do not exclude other elements or objects. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0054] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A double-block sleeper paving construction device for ballastless track, It is characterized in that It includes a rail rack, an adjustment mechanism and a moving device; The moving device comprises a gantry (1) with a plurality of rollers (11) mounted on the bottom thereof, and an electric hoist is arranged on the gantry (1); Wherein, the rail rack comprises: There are two rails (2) with a distance between them being of standard gauge; A plurality of support beams (4) are provided and are arranged on the door frame (1) in a lifting manner. The support beams (4) are arranged orthogonally to the rails (2). Two mounting grooves (41) are provided on the support beams (4) for the rails (2) to pass through. The support beams (4) are provided with fixing mechanisms for fixing the rails (2) at the mounting grooves (41); support mechanisms are provided at both ends of the support beams (4); The adjustment mechanism is used to adjust the horizontal displacement of the support beam (4).

2. A ballastless track double-block sleeper paving construction device according to claim 1, It is characterized in that The supporting mechanism comprises: A support seat (51) fixedly connected to the end of the support beam (4); A support stud (52) vertically penetrates the support seat (51); A support nut (53) is threadedly connected to the support stud (52) and is located on the lower end surface of the support seat (51).

3. A ballastless track double-block sleeper paving construction device according to claim 2, It is characterized in that The adjustment mechanism comprises a bottom plate (31), a vertical plate (32) fixed to the bottom plate (31), and an adjustment screw (33) threadedly penetrating the vertical plate (32); the support stud (52) is slidably arranged on the bottom plate (31); and a stopper (34) is rotatably mounted on the free end of the adjustment screw (33) and is abutted against a side of the support stud (52) facing away from the rail (2).

4. A ballastless track double-block sleeper paving construction device according to claim 3, It is characterized in that The stopper (34) is configured to be in an arc shape that matches the outer peripheral contour of the support stud (52).

5. A ballastless track double-block sleeper paving construction device according to claim 3, It is characterized in that The bottom plate (31) is provided with a plurality of embedding holes (35) for embedding ground anchor nails.

6. A ballastless track double-sleeper paving construction device according to any one of claims 1 to 5, It is characterized in that The fixing mechanism comprises two fixing plates (42) respectively fixed to two opposite groove walls of the installation groove (41), and fishtail plates (43) are installed on adjacent side walls of the two fixing plates (42).

7. A ballastless track double-sleeper paving construction device according to claim 1, It is characterized in that A plurality of cross beams (13) parallel to the support beams (4) are movably arranged on the door frame (1), and a limit block (14) for preventing the cross beams (13) from slipping horizontally is installed on the door frame (1).